<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><title>Construction Starts | Construction Metrics</title><link>https://constructionmetrics.com/tag/construction-starts/</link><description>Construction Starts on Construction Metrics</description><language>en-us</language><atom:link href="https://constructionmetrics.com/tag/construction-starts/index.xml" rel="self" type="application/rss+xml"/><lastBuildDate>Fri, 20 Nov 2026 10:34:01 -0500</lastBuildDate><item><title>Construction starts rose 22.8% in October to a $1.63 trillion rate as manufacturing starts added $320 billion</title><link>https://constructionmetrics.com/2026/11/20/dodge-construction-starts-october-manufacturing/</link><pubDate>Fri, 20 Nov 2026 10:34:01 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/20/dodge-construction-starts-october-manufacturing/</guid><category>Data</category><description>Dodge says total construction starts rose 22.8% in October to a $1.63 trillion annual rate, led by a $16.8 billion Tesla chip plant in Texas.</description><content:encoded>&lt;p&gt;Total construction starts rose 22.8% in October 2026 to a seasonally adjusted annual rate (SAAR) of $1.63 trillion, Dodge Construction Network reported in a release dated November 20. A SAAR takes one month&amp;rsquo;s dollar value of projects breaking ground, removes the usual seasonal swing, and states it as a yearly pace. The gain is measured from September&amp;rsquo;s $1.33 trillion. Dodge does not publish a year-over-year change for a single month, but its 12-month total through October was $1.451 trillion, up 13.0% from the 12 months through October 2025. October&amp;rsquo;s figure is preliminary. It is the third-highest rate of the 13 months shown below, behind July and May, and it sits about 18% above the 12-month average of roughly $1.39 trillion.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;October starts were the third-highest month in 13&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Total construction starts, billions of dollars, seasonally adjusted annual rate&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;October starts were the third-highest month in 13&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Bar chart with 13 points from October 2025 to October 2026. Series: total. Values range from 0 to 1,788.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="234.0" y2="234.0"/&gt;&lt;line x1="72" x2="616" y1="162.0" y2="162.0"/&gt;&lt;line x1="72" x2="616" y1="90.0" y2="90.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;0&lt;/text&gt;&lt;text x="64" y="237.5" text-anchor="end"&gt;500&lt;/text&gt;&lt;text x="64" y="165.5" text-anchor="end"&gt;1,000&lt;/text&gt;&lt;text x="64" y="93.5" text-anchor="end"&gt;1,500&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;2,000&lt;/text&gt;&lt;text x="92.9" y="324" text-anchor="start"&gt;2025-10&lt;/text&gt;&lt;text x="218.5" y="324" text-anchor="middle"&gt;2026-01&lt;/text&gt;&lt;text x="344.0" y="324" text-anchor="middle"&gt;2026-04&lt;/text&gt;&lt;text x="469.5" y="324" text-anchor="middle"&gt;2026-07&lt;/text&gt;&lt;text x="595.1" y="324" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="72" x2="616" y1="106.5" y2="106.5"/&gt;
&lt;text x="76" y="102.5"&gt;12-period average 1,385&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;rect x="77.2" y="85.8" width="31.4" height="220.2"&gt;&lt;title&gt;October 2025: 1,529&lt;/title&gt;&lt;/rect&gt;&lt;rect x="119.1" y="131.0" width="31.4" height="175.0"&gt;&lt;title&gt;November 2025: 1,215&lt;/title&gt;&lt;/rect&gt;&lt;rect x="160.9" y="127.2" width="31.4" height="178.8"&gt;&lt;title&gt;December 2025: 1,242&lt;/title&gt;&lt;/rect&gt;&lt;rect x="202.8" y="126.7" width="31.4" height="179.3"&gt;&lt;title&gt;January 2026: 1,245&lt;/title&gt;&lt;/rect&gt;&lt;rect x="244.6" y="150.3" width="31.4" height="155.7"&gt;&lt;title&gt;February 2026: 1,081&lt;/title&gt;&lt;/rect&gt;&lt;rect x="286.5" y="130.3" width="31.4" height="175.7"&gt;&lt;title&gt;March 2026: 1,220&lt;/title&gt;&lt;/rect&gt;&lt;rect x="328.3" y="114.9" width="31.4" height="191.1"&gt;&lt;title&gt;April 2026: 1,327&lt;/title&gt;&lt;/rect&gt;&lt;rect x="370.2" y="50.0" width="31.4" height="256.0"&gt;&lt;title&gt;May 2026: 1,778&lt;/title&gt;&lt;/rect&gt;&lt;rect x="412.0" y="101.5" width="31.4" height="204.5"&gt;&lt;title&gt;June 2026: 1,420&lt;/title&gt;&lt;/rect&gt;&lt;rect x="453.8" y="48.5" width="31.4" height="257.5"&gt;&lt;title&gt;July 2026: 1,788&lt;/title&gt;&lt;/rect&gt;&lt;rect x="495.7" y="112.6" width="31.4" height="193.4"&gt;&lt;title&gt;August 2026: 1,343&lt;/title&gt;&lt;/rect&gt;&lt;rect x="537.5" y="114.5" width="31.4" height="191.5"&gt;&lt;title&gt;September 2026: 1,330&lt;/title&gt;&lt;/rect&gt;&lt;rect x="579.4" y="70.8" width="31.4" height="235.2"&gt;&lt;title&gt;October 2026: 1,633&lt;/title&gt;&lt;/rect&gt;
&lt;text class="label" x="595.1" y="65.8" text-anchor="middle"&gt;1,633&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="595.1" x2="595.1" y1="63.8" y2="50.8"/&gt;
&lt;circle cx="595.1" cy="70.8" r="3.5"/&gt;&lt;text x="595.1" y="46.8" text-anchor="end"&gt;October 2026, 1,633&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;October starts were the third-highest month in 13&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Bar chart with 13 points from October 2025 to October 2026. Series: total. Values range from 0 to 1,788.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="117.0" y2="117.0"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;0&lt;/text&gt;&lt;text x="42" y="120.5" text-anchor="end"&gt;1,000&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;2,000&lt;/text&gt;&lt;text x="58.7" y="237" text-anchor="start"&gt;2025-10&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2026-04&lt;/text&gt;&lt;text x="267.3" y="237" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="50" x2="276" y1="77.3" y2="77.3"/&gt;
&lt;text x="54" y="73.3"&gt;12-period average 1,385&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;rect x="52.2" y="62.5" width="13.0" height="157.5"&gt;&lt;title&gt;October 2025: 1,529&lt;/title&gt;&lt;/rect&gt;&lt;rect x="69.6" y="94.9" width="13.0" height="125.1"&gt;&lt;title&gt;November 2025: 1,215&lt;/title&gt;&lt;/rect&gt;&lt;rect x="86.9" y="92.1" width="13.0" height="127.9"&gt;&lt;title&gt;December 2025: 1,242&lt;/title&gt;&lt;/rect&gt;&lt;rect x="104.3" y="91.8" width="13.0" height="128.2"&gt;&lt;title&gt;January 2026: 1,245&lt;/title&gt;&lt;/rect&gt;&lt;rect x="121.7" y="108.7" width="13.0" height="111.3"&gt;&lt;title&gt;February 2026: 1,081&lt;/title&gt;&lt;/rect&gt;&lt;rect x="139.1" y="94.3" width="13.0" height="125.7"&gt;&lt;title&gt;March 2026: 1,220&lt;/title&gt;&lt;/rect&gt;&lt;rect x="156.5" y="83.3" width="13.0" height="136.7"&gt;&lt;title&gt;April 2026: 1,327&lt;/title&gt;&lt;/rect&gt;&lt;rect x="173.9" y="36.9" width="13.0" height="183.1"&gt;&lt;title&gt;May 2026: 1,778&lt;/title&gt;&lt;/rect&gt;&lt;rect x="191.2" y="73.7" width="13.0" height="146.3"&gt;&lt;title&gt;June 2026: 1,420&lt;/title&gt;&lt;/rect&gt;&lt;rect x="208.6" y="35.8" width="13.0" height="184.2"&gt;&lt;title&gt;July 2026: 1,788&lt;/title&gt;&lt;/rect&gt;&lt;rect x="226.0" y="81.7" width="13.0" height="138.3"&gt;&lt;title&gt;August 2026: 1,343&lt;/title&gt;&lt;/rect&gt;&lt;rect x="243.4" y="83.0" width="13.0" height="137.0"&gt;&lt;title&gt;September 2026: 1,330&lt;/title&gt;&lt;/rect&gt;&lt;rect x="260.8" y="51.8" width="13.0" height="168.2"&gt;&lt;title&gt;October 2026: 1,633&lt;/title&gt;&lt;/rect&gt;
&lt;text class="label" x="267.3" y="46.8" text-anchor="middle"&gt;1,633&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="267.3" x2="267.3" y1="58.8" y2="70.8"/&gt;
&lt;circle cx="267.3" cy="51.8" r="3.5"/&gt;&lt;text x="267.3" y="81.8" text-anchor="end"&gt;&lt;tspan x="267.3"&gt;October 2026&lt;/tspan&gt;&lt;tspan x="267.3" dy="12"&gt;1,633&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;October 2025 through August 2026 are the sums of segment rates as first reported in each month&amp;#39;s Dodge release. September 2026 is as revised in the October release. October 2026 is preliminary.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://www.construction.com/construction-starts-jump-22-8-in-october/" rel="noopener"&gt;construction.com&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Dodge construction starts by segment, October 2025 through October 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Total starts ($B SAAR)&lt;/th&gt;&lt;th class="num"&gt;Monthly change reported by Dodge (%)&lt;/th&gt;&lt;th class="num"&gt;Nonresidential building ($B SAAR)&lt;/th&gt;&lt;th class="num"&gt;Residential building ($B SAAR)&lt;/th&gt;&lt;th class="num"&gt;Nonbuilding ($B SAAR)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Oct 2025&lt;/td&gt;&lt;td class="num"&gt;$1,529&lt;/td&gt;&lt;td class="num"&gt;21.1%&lt;/td&gt;&lt;td class="num"&gt;$561&lt;/td&gt;&lt;td class="num"&gt;$323&lt;/td&gt;&lt;td class="num"&gt;$645&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nov 2025&lt;/td&gt;&lt;td class="num"&gt;$1,215&lt;/td&gt;&lt;td class="num"&gt;-20.5%&lt;/td&gt;&lt;td class="num"&gt;$485&lt;/td&gt;&lt;td class="num"&gt;$368&lt;/td&gt;&lt;td class="num"&gt;$362&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec 2025&lt;/td&gt;&lt;td class="num"&gt;$1,242&lt;/td&gt;&lt;td class="num"&gt;2.6%&lt;/td&gt;&lt;td class="num"&gt;$450&lt;/td&gt;&lt;td class="num"&gt;$370&lt;/td&gt;&lt;td class="num"&gt;$422&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jan 2026&lt;/td&gt;&lt;td class="num"&gt;$1,245&lt;/td&gt;&lt;td class="num"&gt;0.7%&lt;/td&gt;&lt;td class="num"&gt;$378&lt;/td&gt;&lt;td class="num"&gt;$345&lt;/td&gt;&lt;td class="num"&gt;$522&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb 2026&lt;/td&gt;&lt;td class="num"&gt;$1,081&lt;/td&gt;&lt;td class="num"&gt;-13.2%&lt;/td&gt;&lt;td class="num"&gt;$442&lt;/td&gt;&lt;td class="num"&gt;$374&lt;/td&gt;&lt;td class="num"&gt;$265&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mar 2026&lt;/td&gt;&lt;td class="num"&gt;$1,220&lt;/td&gt;&lt;td class="num"&gt;12.8%&lt;/td&gt;&lt;td class="num"&gt;$466&lt;/td&gt;&lt;td class="num"&gt;$385&lt;/td&gt;&lt;td class="num"&gt;$369&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Apr 2026&lt;/td&gt;&lt;td class="num"&gt;$1,327&lt;/td&gt;&lt;td class="num"&gt;9.0%&lt;/td&gt;&lt;td class="num"&gt;$550&lt;/td&gt;&lt;td class="num"&gt;$383&lt;/td&gt;&lt;td class="num"&gt;$394&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;$1,778&lt;/td&gt;&lt;td class="num"&gt;34.1%&lt;/td&gt;&lt;td class="num"&gt;$647&lt;/td&gt;&lt;td class="num"&gt;$373&lt;/td&gt;&lt;td class="num"&gt;$758&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jun 2026&lt;/td&gt;&lt;td class="num"&gt;$1,420&lt;/td&gt;&lt;td class="num"&gt;-19.9%&lt;/td&gt;&lt;td class="num"&gt;$584&lt;/td&gt;&lt;td class="num"&gt;$363&lt;/td&gt;&lt;td class="num"&gt;$473&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jul 2026&lt;/td&gt;&lt;td class="num"&gt;$1,788&lt;/td&gt;&lt;td class="num"&gt;25.6%&lt;/td&gt;&lt;td class="num"&gt;$917&lt;/td&gt;&lt;td class="num"&gt;$386&lt;/td&gt;&lt;td class="num"&gt;$485&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aug 2026&lt;/td&gt;&lt;td class="num"&gt;$1,343&lt;/td&gt;&lt;td class="num"&gt;-24.8%&lt;/td&gt;&lt;td class="num"&gt;$624&lt;/td&gt;&lt;td class="num"&gt;$364&lt;/td&gt;&lt;td class="num"&gt;$355&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Sep 2026&lt;/td&gt;&lt;td class="num"&gt;$1,330&lt;/td&gt;&lt;td class="num"&gt;-1.5%&lt;/td&gt;&lt;td class="num"&gt;$586&lt;/td&gt;&lt;td class="num"&gt;$367&lt;/td&gt;&lt;td class="num"&gt;$378&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oct 2026&lt;/td&gt;&lt;td class="num"&gt;$1,633&lt;/td&gt;&lt;td class="num"&gt;22.8%&lt;/td&gt;&lt;td class="num"&gt;$865&lt;/td&gt;&lt;td class="num"&gt;$341&lt;/td&gt;&lt;td class="num"&gt;$427&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.construction.com/construction-starts-jump-22-8-in-october/" rel="noopener"&gt;construction.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The monthly-change column is the figure Dodge printed in each release, measured against the prior month as revised at that time. Dividing one row by the row above will not always reproduce it, because the rows hold first-reported values.&lt;/p&gt;
&lt;h2 id="what-moved"&gt;What moved&lt;/h2&gt;
&lt;p&gt;Nonresidential building starts carried the month. They rose 47.7% to an $865 billion rate, while residential building fell 6.9% to $341 billion and nonbuilding work (highways, utilities, public works) rose 12.9% to $427 billion.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Starts by segment, September and October 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Segment&lt;/th&gt;&lt;th class="num"&gt;September 2026 revised ($B SAAR)&lt;/th&gt;&lt;th class="num"&gt;October 2026 ($B SAAR)&lt;/th&gt;&lt;th class="num"&gt;Monthly change (%)&lt;/th&gt;&lt;th class="num"&gt;Year to date through October (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;$586&lt;/td&gt;&lt;td class="num"&gt;$865&lt;/td&gt;&lt;td class="num"&gt;47.7%&lt;/td&gt;&lt;td class="num"&gt;30.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Residential building&lt;/td&gt;&lt;td class="num"&gt;$367&lt;/td&gt;&lt;td class="num"&gt;$341&lt;/td&gt;&lt;td class="num"&gt;-6.9%&lt;/td&gt;&lt;td class="num"&gt;-1.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nonbuilding&lt;/td&gt;&lt;td class="num"&gt;$378&lt;/td&gt;&lt;td class="num"&gt;$427&lt;/td&gt;&lt;td class="num"&gt;12.9%&lt;/td&gt;&lt;td class="num"&gt;10.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total construction&lt;/td&gt;&lt;td class="num"&gt;$1,330&lt;/td&gt;&lt;td class="num"&gt;$1,633&lt;/td&gt;&lt;td class="num"&gt;22.8%&lt;/td&gt;&lt;td class="num"&gt;14.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.construction.com/wp-content/uploads/2026/11/Starts-Oct12-Recent.png" rel="noopener"&gt;construction.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Inside nonresidential, the change came almost entirely from manufacturing. Dodge says manufacturing starts increased $320 billion into October, a rise of 1,364% after a weak August and September. The total rose $303 billion, from $1,330 billion to $1,633 billion. So manufacturing added more than the whole increase, and everything else combined was lower than in September. Eric Gaus, Dodge&amp;rsquo;s chief economist, put a number on that: &amp;ldquo;Excluding manufacturing, total construction starts fell 1.1 percent.&amp;rdquo;&lt;/p&gt;
&lt;p&gt;One project accounts for much of it. The $16.8 billion Tesla Terafab Semiconductor Fabrication Plant Phase 1 in Anderson, Texas, was the largest start of the month. If Dodge annualizes the usual way, multiplying a seasonally adjusted month by 12, a single $16.8 billion start adds about $200 billion to the annual rate before any seasonal factor. That is a reading of the arithmetic, and Dodge&amp;rsquo;s release does not break the rate out by project.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Largest projects to break ground in October 2026, as listed by Dodge&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Project&lt;/th&gt;&lt;th&gt;Location&lt;/th&gt;&lt;th&gt;Segment&lt;/th&gt;&lt;th class="num"&gt;Value ($ millions)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Tesla Terafab Semiconductor Fabrication Plant Phase 1&lt;/td&gt;&lt;td&gt;Anderson, Texas&lt;/td&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;$16,800&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mattameade Data Center Campus-Amazon Bldgs 2-7&lt;/td&gt;&lt;td&gt;Woodford, Virginia&lt;/td&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;$4,900&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;CF Industries Ammonia Blue Point Complex (Blue Point No. 1)&lt;/td&gt;&lt;td&gt;Modeste, Louisiana&lt;/td&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;$3,700&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;AL/DOT I-10 Mobile River Bridge Replacement Project 1&lt;/td&gt;&lt;td&gt;Mobile, Alabama&lt;/td&gt;&lt;td&gt;Nonbuilding&lt;/td&gt;&lt;td class="num"&gt;$3,200&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Person County Energy Complex at Roxboro&lt;/td&gt;&lt;td&gt;Semora, North Carolina&lt;/td&gt;&lt;td&gt;Nonbuilding&lt;/td&gt;&lt;td class="num"&gt;$2,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;New Ohio River Tunnel&lt;/td&gt;&lt;td&gt;Pittsburgh, Pennsylvania&lt;/td&gt;&lt;td&gt;Nonbuilding&lt;/td&gt;&lt;td class="num"&gt;$1,100&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;The Stockman Steamboat&lt;/td&gt;&lt;td&gt;Steamboat Springs, Colorado&lt;/td&gt;&lt;td&gt;Residential building&lt;/td&gt;&lt;td class="num"&gt;$444&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;101 Greenwich Street Residential Conversion&lt;/td&gt;&lt;td&gt;New York, New York&lt;/td&gt;&lt;td&gt;Residential building&lt;/td&gt;&lt;td class="num"&gt;$220&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Tower at Erieview Apartments/W Hotel/Office/Restaurant&lt;/td&gt;&lt;td&gt;Cleveland, Ohio&lt;/td&gt;&lt;td&gt;Residential building&lt;/td&gt;&lt;td class="num"&gt;$218&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.construction.com/construction-starts-jump-22-8-in-october/" rel="noopener"&gt;construction.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The rest of the building market was mixed. Commercial starts rose 89.2%, and among the commercial sectors Dodge lists, warehouses were the only other gainer at 7.3%. Offices fell 7.3%, their fourth straight monthly decline. Institutional starts fell 6.5%, with education down 4.9% and miscellaneous institutional down 35.5%, while healthcare rose 50.1%.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Change by sector, October 2026 and the latest 12 months&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Sector&lt;/th&gt;&lt;th&gt;Segment&lt;/th&gt;&lt;th class="num"&gt;October change from September (%)&lt;/th&gt;&lt;th class="num"&gt;12 months ending October vs prior 12 months (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Manufacturing&lt;/td&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;1364.0%&lt;/td&gt;&lt;td class="num"&gt;52.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Commercial&lt;/td&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;89.2%&lt;/td&gt;&lt;td class="num"&gt;47.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Healthcare&lt;/td&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;50.1%&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Warehouses&lt;/td&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;7.3%&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Education&lt;/td&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;-4.9%&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Institutional&lt;/td&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;-6.5%&lt;/td&gt;&lt;td class="num"&gt;-0.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Offices&lt;/td&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;-7.3%&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Miscellaneous institutional&lt;/td&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;-35.5%&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Highway and bridge&lt;/td&gt;&lt;td&gt;Nonbuilding&lt;/td&gt;&lt;td class="num"&gt;42.1%&lt;/td&gt;&lt;td class="num"&gt;7.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Environmental public works&lt;/td&gt;&lt;td&gt;Nonbuilding&lt;/td&gt;&lt;td class="num"&gt;38.2%&lt;/td&gt;&lt;td class="num"&gt;-5.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Miscellaneous nonbuilding&lt;/td&gt;&lt;td&gt;Nonbuilding&lt;/td&gt;&lt;td class="num"&gt;19.4%&lt;/td&gt;&lt;td class="num"&gt;-8.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Utilities&lt;/td&gt;&lt;td&gt;Nonbuilding&lt;/td&gt;&lt;td class="num"&gt;-29.6%&lt;/td&gt;&lt;td class="num"&gt;39.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Single family&lt;/td&gt;&lt;td&gt;Residential building&lt;/td&gt;&lt;td class="num"&gt;-1.0%&lt;/td&gt;&lt;td class="num"&gt;-7.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Multifamily&lt;/td&gt;&lt;td&gt;Residential building&lt;/td&gt;&lt;td class="num"&gt;-14.8%&lt;/td&gt;&lt;td class="num"&gt;7.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.construction.com/construction-starts-jump-22-8-in-october/" rel="noopener"&gt;construction.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Highway and bridge starts rose 42.1%, led by the $3.2 billion I-10 Mobile River Bridge Replacement in Alabama, and environmental public works rose 38.2%. Utility starts fell 29.6% for the month but remain 39.3% higher over the latest 12 months than the 12 before.&lt;/p&gt;
&lt;p&gt;Residential dollars fell on multifamily, which dropped 14.8%, while single family slipped 1.0%. (Census reported a rise in October housing starts, which &lt;a href="https://constructionmetrics.com/2026/11/18/housing-starts-october-permits-25-month-low/"&gt;our post on that release&lt;/a&gt; covers. Census counts units and Dodge counts dollars, so a month of cheaper units or fewer large towers can push them apart.)&lt;/p&gt;
&lt;p&gt;Regionally, the South Central rose 68.2%, the Midwest 51.1% and the South Atlantic 22.0%. The Northeast fell 12.0% and the West 24.6%.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Change in total starts by region, October 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Region&lt;/th&gt;&lt;th class="num"&gt;October change from September (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;South Central&lt;/td&gt;&lt;td class="num"&gt;68.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Midwest&lt;/td&gt;&lt;td class="num"&gt;51.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;South Atlantic&lt;/td&gt;&lt;td class="num"&gt;22.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Northeast&lt;/td&gt;&lt;td class="num"&gt;-12.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;West&lt;/td&gt;&lt;td class="num"&gt;-24.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.construction.com/construction-starts-jump-22-8-in-october/" rel="noopener"&gt;construction.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="how-to-use-this-number"&gt;How to use this number&lt;/h2&gt;
&lt;p&gt;A start is a project breaking ground, so its value turns into put-in-place work over the months and years that follow. Two ways to use October&amp;rsquo;s release:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Use the 12-month totals, which Dodge does not seasonally adjust, as your comparison for annual planning. Nonresidential building was up 25.8% over the latest 12 months and nonbuilding was up 11.1%, while residential was down 1.7%. Set those beside the year-over-year change in your own awarded contract value by the same split. A firm that does not build fabs or data centers should weigh the ex-manufacturing figure heavily, since one chip plant carries much of October&amp;rsquo;s headline.&lt;/li&gt;
&lt;li&gt;Check the sector row that matches your backlog. A specialty contractor in education, offices or multifamily saw declines in October. A heavy civil firm saw highway, bridge and public works starts rise.&lt;/li&gt;
&lt;/ol&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;12-month moving totals of construction starts, not seasonally adjusted&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Segment&lt;/th&gt;&lt;th class="num"&gt;12 months ending Oct 2025 ($B)&lt;/th&gt;&lt;th class="num"&gt;12 months ending Oct 2026 ($B)&lt;/th&gt;&lt;th class="num"&gt;Change (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;$499&lt;/td&gt;&lt;td class="num"&gt;$628&lt;/td&gt;&lt;td class="num"&gt;25.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Residential building&lt;/td&gt;&lt;td class="num"&gt;$380&lt;/td&gt;&lt;td class="num"&gt;$374&lt;/td&gt;&lt;td class="num"&gt;-1.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nonbuilding&lt;/td&gt;&lt;td class="num"&gt;$405&lt;/td&gt;&lt;td class="num"&gt;$449&lt;/td&gt;&lt;td class="num"&gt;11.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total construction&lt;/td&gt;&lt;td class="num"&gt;$1,284&lt;/td&gt;&lt;td class="num"&gt;$1,451&lt;/td&gt;&lt;td class="num"&gt;13.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.construction.com/wp-content/uploads/2026/11/Starts-Oct26-12mo.png" rel="noopener"&gt;construction.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;So the planning count and the starts count went opposite ways in October. The &lt;a href="https://constructionmetrics.com/2026/11/07/dodge-momentum-index-october-commercial-planning/"&gt;Dodge Momentum Index&lt;/a&gt;, which tracks nonresidential building projects entering planning, fell 9.0% to 260.4 in October, according to Dodge&amp;rsquo;s November 6 release. Dodge says that index leads nonresidential building spending by a full year to 18 months, so it describes work that would break ground well after the projects counted in October&amp;rsquo;s starts.&lt;/p&gt;
&lt;h2 id="revisions-and-caveats"&gt;Revisions and caveats&lt;/h2&gt;
&lt;p&gt;October&amp;rsquo;s numbers are preliminary, and Dodge revises the prior month in each release. September moved up slightly:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Nonresidential building went from $583 billion as first reported to $586 billion.&lt;/li&gt;
&lt;li&gt;Residential went from $366 billion to $367 billion, and nonbuilding from $377 billion to $378 billion.&lt;/li&gt;
&lt;li&gt;The total was stated as $1.33 trillion in both releases, and the October table shows it as $1,330 billion.&lt;/li&gt;
&lt;/ol&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;September 2026 starts as first reported and as revised in the October release&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Segment&lt;/th&gt;&lt;th class="num"&gt;September 2026 first reported ($B SAAR)&lt;/th&gt;&lt;th class="num"&gt;September 2026 revised ($B SAAR)&lt;/th&gt;&lt;th class="num"&gt;Revision ($B)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Nonresidential building&lt;/td&gt;&lt;td class="num"&gt;$583&lt;/td&gt;&lt;td class="num"&gt;$586&lt;/td&gt;&lt;td class="num"&gt;$3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Residential building&lt;/td&gt;&lt;td class="num"&gt;$366&lt;/td&gt;&lt;td class="num"&gt;$367&lt;/td&gt;&lt;td class="num"&gt;$1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nonbuilding&lt;/td&gt;&lt;td class="num"&gt;$377&lt;/td&gt;&lt;td class="num"&gt;$378&lt;/td&gt;&lt;td class="num"&gt;$1&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.construction.com/wp-content/uploads/2026/11/Starts-Oct12-Recent.png" rel="noopener"&gt;construction.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The series swings because a project&amp;rsquo;s full value lands in the month it starts. Over the 13 months above, Dodge&amp;rsquo;s reported monthly change ran from a 24.8% drop in August to a 34.1% gain in May. Dodge&amp;rsquo;s own release headlines tied July&amp;rsquo;s 25.6% gain to 25 projects of $1 billion or more, and described August&amp;rsquo;s drop as starts normalizing after July&amp;rsquo;s megaproject surge. The Dodge Index, which expresses total starts with 2000 set to 100, was 345 in October against 281 in September.&lt;/p&gt;
&lt;p&gt;The chart and the table use first-reported values for October 2025 through August 2026 and revised values only for September. October 2025&amp;rsquo;s first-reported segments sum to $1,529 billion, and October 2026&amp;rsquo;s $1,633 billion is 6.8% above that. That comparison mixes two vintages of Dodge&amp;rsquo;s data, which is why the 13.0% gain in the 12-month totals is the better measure of the year.&lt;/p&gt;
&lt;p&gt;Dodge&amp;rsquo;s starts record the value of projects when they break ground. Census construction spending records the value of work put in place each month, so the two series can move apart for long stretches. The &lt;a href="https://constructionmetrics.com/2026/11/02/construction-spending-september-residential-improvements/"&gt;September construction spending post&lt;/a&gt; covers that series.&lt;/p&gt;</content:encoded></item></channel></rss>