<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><title>Construction Metrics</title><link>https://constructionmetrics.com/</link><description>Your guide to data engineering and measuring performance in the construction industry.</description><language>en-us</language><atom:link href="https://constructionmetrics.com/index.xml" rel="self" type="application/rss+xml"/><lastBuildDate>Sat, 14 Nov 2026 10:33:32 -0500</lastBuildDate><item><title>How to compute lost labor hours with a measured mile, worked through a 12-week conduit example</title><link>https://constructionmetrics.com/2026/11/14/measured-mile-lost-labor-productivity/</link><pubDate>Sat, 14 Nov 2026 10:33:32 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/14/measured-mile-lost-labor-productivity/</guid><category>Data</category><description>A measured mile compares a crew's unimpacted and impacted unit rates on the same job. This example turns 12 weeks of conduit data into 960 lost hours.</description><content:encoded>&lt;p&gt;A design change arrives in week five of a conduit run, and the electrical foreman&amp;rsquo;s crew slows down for the next two months. The project manager knows the change cost hours. The owner will want to know how many, and how they were counted.&lt;/p&gt;
&lt;p&gt;One method for answering that is the measured mile. It compares the crew&amp;rsquo;s productivity on the same job during a period the disruption did not touch with its productivity during the period it did. The difference, multiplied by the quantity installed in the impacted period, gives the lost labor hours.&lt;/p&gt;
&lt;h2 id="what-the-method-compares"&gt;What the method compares&lt;/h2&gt;
&lt;p&gt;AACE International&amp;rsquo;s Recommended Practice 25R-03, the cost engineering society&amp;rsquo;s guide to estimating lost labor productivity in claims, defines productivity as output divided by input, such as linear feet of conduit per labor hour. It also defines a productivity factor, the actual rate divided by the baseline or planned rate.&lt;/p&gt;
&lt;p&gt;AACE says there is no uniform agreement on how to calculate lost productivity, and also reports general agreement that a comparison to unimpacted work on the same project is preferred when enough data exists. AACE bases its practice on U.S. and Canadian case law and recommends legal advice before anyone prepares a lost productivity claim.&lt;/p&gt;
&lt;p&gt;A paper written for AGC&amp;rsquo;s 2021 Surety Bonding and Construction Risk Management Conference describes the measured mile the same way. The authors, from The Vertex Companies, Watt, Tieder, Hoffar &amp;amp; Fitzgerald and Liberty Mutual Surety, say the method compares actual performance with actual performance, so it does not depend on whether the estimate was right.&lt;/p&gt;
&lt;p&gt;They name two conditions:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;A valid unimpacted period on the same scope of work. If the work was disrupted from its first day, there is no measured mile.&lt;/li&gt;
&lt;li&gt;Quantities and hours recorded at the time the work happened, for both periods.&lt;/li&gt;
&lt;/ol&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The figures below are an example with round numbers. An electrical contractor estimated 50,000 linear feet (LF) of conduit at 0.110 labor hours per LF. In weeks one through four the crew installed 18,000 LF in 1,800 hours. That is 0.100 hours per LF, slightly better than the estimate, and it becomes the measured mile.&lt;/p&gt;
&lt;p&gt;The owner issued a redesign at the end of week four. In weeks five through twelve the crew installed 32,000 LF in 4,160 hours, or 0.130 hours per LF.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Hours per foot rose after the week 4 redesign and stayed above the measured mile&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Labor hours per linear foot of conduit, example crew, weeks 1 to 12&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;Hours per foot rose after the week 4 redesign and stayed above the measured mile&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 12 points from 1 to 12. Series: Hours per LF, Measured mile rate, Estimate. Values range from 0.10 to 0.15.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="234.0" y2="234.0"/&gt;&lt;line x1="72" x2="616" y1="162.0" y2="162.0"/&gt;&lt;line x1="72" x2="616" y1="90.0" y2="90.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;0.08&lt;/text&gt;&lt;text x="64" y="237.5" text-anchor="end"&gt;0.10&lt;/text&gt;&lt;text x="64" y="165.5" text-anchor="end"&gt;0.12&lt;/text&gt;&lt;text x="64" y="93.5" text-anchor="end"&gt;0.14&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;0.16&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;1&lt;/text&gt;&lt;text x="170.9" y="324" text-anchor="middle"&gt;3&lt;/text&gt;&lt;text x="269.8" y="324" text-anchor="middle"&gt;5&lt;/text&gt;&lt;text x="368.7" y="324" text-anchor="middle"&gt;7&lt;/text&gt;&lt;text x="467.6" y="324" text-anchor="middle"&gt;9&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;12&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-emph"&gt;
&lt;path class="line" d="M72.0,216.0 L121.5,241.2 L170.9,234.0 L220.4,241.2 L269.8,90.0 L319.3,54.0 L368.7,90.0 L418.2,126.0 L467.6,144.0 L517.1,162.0 L566.5,169.2 L616.0,147.6"/&gt;
&lt;circle class="end" cx="616.0" cy="147.6" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="216.0" r="9"&gt;&lt;title&gt;1: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="121.5" cy="241.2" r="9"&gt;&lt;title&gt;2: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="170.9" cy="234.0" r="9"&gt;&lt;title&gt;3: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="220.4" cy="241.2" r="9"&gt;&lt;title&gt;4: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="269.8" cy="90.0" r="9"&gt;&lt;title&gt;5: 0.14&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="319.3" cy="54.0" r="9"&gt;&lt;title&gt;6: 0.15&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="368.7" cy="90.0" r="9"&gt;&lt;title&gt;7: 0.14&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="418.2" cy="126.0" r="9"&gt;&lt;title&gt;8: 0.13&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="467.6" cy="144.0" r="9"&gt;&lt;title&gt;9: 0.13&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="517.1" cy="162.0" r="9"&gt;&lt;title&gt;10: 0.12&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="566.5" cy="169.2" r="9"&gt;&lt;title&gt;11: 0.12&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="147.6" r="9"&gt;&lt;title&gt;12: 0.12&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="151.6"&gt;0.12&lt;/text&gt;
&lt;text class="label label-name" x="624.0" y="164.6"&gt;Hours per LF&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-ctx"&gt;
&lt;path class="line" d="M72.0,234.0 L121.5,234.0 L170.9,234.0 L220.4,234.0 L269.8,234.0 L319.3,234.0 L368.7,234.0 L418.2,234.0 L467.6,234.0 L517.1,234.0 L566.5,234.0 L616.0,234.0"/&gt;
&lt;circle class="end" cx="616.0" cy="234.0" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="234.0" r="9"&gt;&lt;title&gt;1: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="121.5" cy="234.0" r="9"&gt;&lt;title&gt;2: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="170.9" cy="234.0" r="9"&gt;&lt;title&gt;3: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="220.4" cy="234.0" r="9"&gt;&lt;title&gt;4: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="269.8" cy="234.0" r="9"&gt;&lt;title&gt;5: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="319.3" cy="234.0" r="9"&gt;&lt;title&gt;6: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="368.7" cy="234.0" r="9"&gt;&lt;title&gt;7: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="418.2" cy="234.0" r="9"&gt;&lt;title&gt;8: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="467.6" cy="234.0" r="9"&gt;&lt;title&gt;9: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="517.1" cy="234.0" r="9"&gt;&lt;title&gt;10: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="566.5" cy="234.0" r="9"&gt;&lt;title&gt;11: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="234.0" r="9"&gt;&lt;title&gt;12: 0.10&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label label-ctx" x="624.0" y="238.0"&gt;Measured mile rate&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-ctx"&gt;
&lt;path class="line" d="M72.0,198.0 L121.5,198.0 L170.9,198.0 L220.4,198.0 L269.8,198.0 L319.3,198.0 L368.7,198.0 L418.2,198.0 L467.6,198.0 L517.1,198.0 L566.5,198.0 L616.0,198.0"/&gt;
&lt;circle class="end" cx="616.0" cy="198.0" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="198.0" r="9"&gt;&lt;title&gt;1: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="121.5" cy="198.0" r="9"&gt;&lt;title&gt;2: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="170.9" cy="198.0" r="9"&gt;&lt;title&gt;3: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="220.4" cy="198.0" r="9"&gt;&lt;title&gt;4: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="269.8" cy="198.0" r="9"&gt;&lt;title&gt;5: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="319.3" cy="198.0" r="9"&gt;&lt;title&gt;6: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="368.7" cy="198.0" r="9"&gt;&lt;title&gt;7: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="418.2" cy="198.0" r="9"&gt;&lt;title&gt;8: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="467.6" cy="198.0" r="9"&gt;&lt;title&gt;9: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="517.1" cy="198.0" r="9"&gt;&lt;title&gt;10: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="566.5" cy="198.0" r="9"&gt;&lt;title&gt;11: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="198.0" r="9"&gt;&lt;title&gt;12: 0.11&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label label-ctx" x="624.0" y="202.0"&gt;Estimate&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;Hours per foot rose after the week 4 redesign and stayed above the measured mile&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 12 points from 1 to 12. Series: Hours per LF, Measured mile rate, Estimate. Values range from 0.10 to 0.15.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="168.5" y2="168.5"/&gt;&lt;line x1="50" x2="276" y1="117.0" y2="117.0"/&gt;&lt;line x1="50" x2="276" y1="65.5" y2="65.5"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;0.08&lt;/text&gt;&lt;text x="42" y="172.0" text-anchor="end"&gt;0.1&lt;/text&gt;&lt;text x="42" y="120.5" text-anchor="end"&gt;0.12&lt;/text&gt;&lt;text x="42" y="69.0" text-anchor="end"&gt;0.14&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;0.16&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;1&lt;/text&gt;&lt;text x="173.3" y="237" text-anchor="middle"&gt;7&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;12&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-emph"&gt;
&lt;path class="line" d="M50.0,155.6 L70.5,173.7 L91.1,168.5 L111.6,173.7 L132.2,65.5 L152.7,39.8 L173.3,65.5 L193.8,91.2 L214.4,104.1 L234.9,117.0 L255.5,122.2 L276.0,106.7"/&gt;
&lt;circle class="end" cx="276.0" cy="106.7" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="155.6" r="9"&gt;&lt;title&gt;1: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="70.5" cy="173.7" r="9"&gt;&lt;title&gt;2: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="91.1" cy="168.5" r="9"&gt;&lt;title&gt;3: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="111.6" cy="173.7" r="9"&gt;&lt;title&gt;4: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="132.2" cy="65.5" r="9"&gt;&lt;title&gt;5: 0.14&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="152.7" cy="39.8" r="9"&gt;&lt;title&gt;6: 0.15&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="173.3" cy="65.5" r="9"&gt;&lt;title&gt;7: 0.14&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="193.8" cy="91.2" r="9"&gt;&lt;title&gt;8: 0.13&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="214.4" cy="104.1" r="9"&gt;&lt;title&gt;9: 0.13&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="234.9" cy="117.0" r="9"&gt;&lt;title&gt;10: 0.12&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="255.5" cy="122.2" r="9"&gt;&lt;title&gt;11: 0.12&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="106.7" r="9"&gt;&lt;title&gt;12: 0.12&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="110.7"&gt;0.12&lt;/text&gt;
&lt;text class="label label-name" x="284.0" y="123.7"&gt;Hours per LF&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-ctx"&gt;
&lt;path class="line" d="M50.0,168.5 L70.5,168.5 L91.1,168.5 L111.6,168.5 L132.2,168.5 L152.7,168.5 L173.3,168.5 L193.8,168.5 L214.4,168.5 L234.9,168.5 L255.5,168.5 L276.0,168.5"/&gt;
&lt;circle class="end" cx="276.0" cy="168.5" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="168.5" r="9"&gt;&lt;title&gt;1: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="70.5" cy="168.5" r="9"&gt;&lt;title&gt;2: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="91.1" cy="168.5" r="9"&gt;&lt;title&gt;3: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="111.6" cy="168.5" r="9"&gt;&lt;title&gt;4: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="132.2" cy="168.5" r="9"&gt;&lt;title&gt;5: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="152.7" cy="168.5" r="9"&gt;&lt;title&gt;6: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="173.3" cy="168.5" r="9"&gt;&lt;title&gt;7: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="193.8" cy="168.5" r="9"&gt;&lt;title&gt;8: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="214.4" cy="168.5" r="9"&gt;&lt;title&gt;9: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="234.9" cy="168.5" r="9"&gt;&lt;title&gt;10: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="255.5" cy="168.5" r="9"&gt;&lt;title&gt;11: 0.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="168.5" r="9"&gt;&lt;title&gt;12: 0.10&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label label-ctx" x="284.0" y="172.5"&gt;Measured mile rate&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-ctx"&gt;
&lt;path class="line" d="M50.0,142.8 L70.5,142.8 L91.1,142.8 L111.6,142.8 L132.2,142.8 L152.7,142.8 L173.3,142.8 L193.8,142.8 L214.4,142.8 L234.9,142.8 L255.5,142.8 L276.0,142.8"/&gt;
&lt;circle class="end" cx="276.0" cy="142.8" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="142.8" r="9"&gt;&lt;title&gt;1: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="70.5" cy="142.8" r="9"&gt;&lt;title&gt;2: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="91.1" cy="142.8" r="9"&gt;&lt;title&gt;3: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="111.6" cy="142.8" r="9"&gt;&lt;title&gt;4: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="132.2" cy="142.8" r="9"&gt;&lt;title&gt;5: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="152.7" cy="142.8" r="9"&gt;&lt;title&gt;6: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="173.3" cy="142.8" r="9"&gt;&lt;title&gt;7: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="193.8" cy="142.8" r="9"&gt;&lt;title&gt;8: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="214.4" cy="142.8" r="9"&gt;&lt;title&gt;9: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="234.9" cy="142.8" r="9"&gt;&lt;title&gt;10: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="255.5" cy="142.8" r="9"&gt;&lt;title&gt;11: 0.11&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="142.8" r="9"&gt;&lt;title&gt;12: 0.11&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label label-ctx" x="284.0" y="146.8"&gt;Estimate&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;Example figures. Lower is better. The measured mile is the weeks 1 to 4 average.&lt;/span&gt; &lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The calculation has four steps:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Measured mile rate: 1,800 hours divided by 18,000 LF, or 0.100 hours per LF.&lt;/li&gt;
&lt;li&gt;Hours the impacted quantity should have taken at that rate: 32,000 LF times 0.100, or 3,200 hours.&lt;/li&gt;
&lt;li&gt;Lost hours: 4,160 actual hours minus 3,200, or 960 hours.&lt;/li&gt;
&lt;li&gt;Cost: at an example loaded labor rate of $90 an hour, 960 hours come to $86,400 before markup.&lt;/li&gt;
&lt;/ol&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Example weekly quantities and hours for a conduit crew (illustrative figures)&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th class="num"&gt;Week&lt;/th&gt;&lt;th&gt;Period&lt;/th&gt;&lt;th class="num"&gt;LF installed&lt;/th&gt;&lt;th class="num"&gt;Labor hours&lt;/th&gt;&lt;th class="num"&gt;Hours per LF&lt;/th&gt;&lt;th class="num"&gt;Hours at measured mile rate&lt;/th&gt;&lt;th class="num"&gt;Lost hours&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td class="num"&gt;1&lt;/td&gt;&lt;td&gt;Unimpacted&lt;/td&gt;&lt;td class="num"&gt;4,000&lt;/td&gt;&lt;td class="num"&gt;420&lt;/td&gt;&lt;td class="num"&gt;0.105&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td&gt;Unimpacted&lt;/td&gt;&lt;td class="num"&gt;5,000&lt;/td&gt;&lt;td class="num"&gt;490&lt;/td&gt;&lt;td class="num"&gt;0.098&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td&gt;Unimpacted&lt;/td&gt;&lt;td class="num"&gt;5,000&lt;/td&gt;&lt;td class="num"&gt;500&lt;/td&gt;&lt;td class="num"&gt;0.100&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;4&lt;/td&gt;&lt;td&gt;Unimpacted&lt;/td&gt;&lt;td class="num"&gt;4,000&lt;/td&gt;&lt;td class="num"&gt;390&lt;/td&gt;&lt;td class="num"&gt;0.098&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td&gt;Impacted&lt;/td&gt;&lt;td class="num"&gt;3,500&lt;/td&gt;&lt;td class="num"&gt;490&lt;/td&gt;&lt;td class="num"&gt;0.140&lt;/td&gt;&lt;td class="num"&gt;350&lt;/td&gt;&lt;td class="num"&gt;140&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;6&lt;/td&gt;&lt;td&gt;Impacted&lt;/td&gt;&lt;td class="num"&gt;3,500&lt;/td&gt;&lt;td class="num"&gt;525&lt;/td&gt;&lt;td class="num"&gt;0.150&lt;/td&gt;&lt;td class="num"&gt;350&lt;/td&gt;&lt;td class="num"&gt;175&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;7&lt;/td&gt;&lt;td&gt;Impacted&lt;/td&gt;&lt;td class="num"&gt;4,000&lt;/td&gt;&lt;td class="num"&gt;560&lt;/td&gt;&lt;td class="num"&gt;0.140&lt;/td&gt;&lt;td class="num"&gt;400&lt;/td&gt;&lt;td class="num"&gt;160&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;8&lt;/td&gt;&lt;td&gt;Impacted&lt;/td&gt;&lt;td class="num"&gt;4,000&lt;/td&gt;&lt;td class="num"&gt;520&lt;/td&gt;&lt;td class="num"&gt;0.130&lt;/td&gt;&lt;td class="num"&gt;400&lt;/td&gt;&lt;td class="num"&gt;120&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;9&lt;/td&gt;&lt;td&gt;Impacted&lt;/td&gt;&lt;td class="num"&gt;4,000&lt;/td&gt;&lt;td class="num"&gt;500&lt;/td&gt;&lt;td class="num"&gt;0.125&lt;/td&gt;&lt;td class="num"&gt;400&lt;/td&gt;&lt;td class="num"&gt;100&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;10&lt;/td&gt;&lt;td&gt;Impacted&lt;/td&gt;&lt;td class="num"&gt;4,500&lt;/td&gt;&lt;td class="num"&gt;540&lt;/td&gt;&lt;td class="num"&gt;0.120&lt;/td&gt;&lt;td class="num"&gt;450&lt;/td&gt;&lt;td class="num"&gt;90&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;11&lt;/td&gt;&lt;td&gt;Impacted&lt;/td&gt;&lt;td class="num"&gt;4,500&lt;/td&gt;&lt;td class="num"&gt;531&lt;/td&gt;&lt;td class="num"&gt;0.118&lt;/td&gt;&lt;td class="num"&gt;450&lt;/td&gt;&lt;td class="num"&gt;81&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;12&lt;/td&gt;&lt;td&gt;Impacted&lt;/td&gt;&lt;td class="num"&gt;4,000&lt;/td&gt;&lt;td class="num"&gt;494&lt;/td&gt;&lt;td class="num"&gt;0.124&lt;/td&gt;&lt;td class="num"&gt;400&lt;/td&gt;&lt;td class="num"&gt;94&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;The productivity factor for the impacted period is 0.100 divided by 0.130, or 0.77. In AACE&amp;rsquo;s terms, the crew worked at 77% of its own unimpacted productivity.&lt;/p&gt;
&lt;h2 id="how-it-compares-with-other-methods"&gt;How it compares with other methods&lt;/h2&gt;
&lt;p&gt;The same job data gives three different answers depending on the baseline. The measured mile uses the crew&amp;rsquo;s own unimpacted rate. Comparing the impacted weeks to the estimate uses the bid rate. The total cost method takes all hours on the activity and subtracts the estimate.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Example lost hours under three baselines, same conduit data (illustrative figures, $90 loaded hourly rate)&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Method&lt;/th&gt;&lt;th class="num"&gt;Baseline rate (hours per LF)&lt;/th&gt;&lt;th class="num"&gt;Work compared (LF)&lt;/th&gt;&lt;th class="num"&gt;Hours allowed&lt;/th&gt;&lt;th class="num"&gt;Actual hours&lt;/th&gt;&lt;th class="num"&gt;Lost hours&lt;/th&gt;&lt;th class="num"&gt;Cost at $90 per hour&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Measured mile&lt;/td&gt;&lt;td class="num"&gt;0.100&lt;/td&gt;&lt;td class="num"&gt;32,000&lt;/td&gt;&lt;td class="num"&gt;3,200&lt;/td&gt;&lt;td class="num"&gt;4,160&lt;/td&gt;&lt;td class="num"&gt;960&lt;/td&gt;&lt;td class="num"&gt;$86,400&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Impacted weeks against the estimate&lt;/td&gt;&lt;td class="num"&gt;0.110&lt;/td&gt;&lt;td class="num"&gt;32,000&lt;/td&gt;&lt;td class="num"&gt;3,520&lt;/td&gt;&lt;td class="num"&gt;4,160&lt;/td&gt;&lt;td class="num"&gt;640&lt;/td&gt;&lt;td class="num"&gt;$57,600&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total cost (whole activity against the estimate)&lt;/td&gt;&lt;td class="num"&gt;0.110&lt;/td&gt;&lt;td class="num"&gt;50,000&lt;/td&gt;&lt;td class="num"&gt;5,500&lt;/td&gt;&lt;td class="num"&gt;5,960&lt;/td&gt;&lt;td class="num"&gt;460&lt;/td&gt;&lt;td class="num"&gt;$41,400&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;The measured mile gives the largest figure here because the crew beat its estimate before the redesign. FindLaw&amp;rsquo;s review of a federal board decision makes the same point, that the method lets an efficient contractor use its own productivity rate, which can be better than the bid. The total cost figure is smallest because it also absorbs the 180 hours the crew saved in weeks one through four.&lt;/p&gt;
&lt;p&gt;The AGC paper calls the total cost method the least favored approach and says earned value analysis, a comparison of hours earned against the estimate, requires showing that the estimate was realistic.&lt;/p&gt;
&lt;h2 id="what-a-board-accepted"&gt;What a board accepted&lt;/h2&gt;
&lt;p&gt;In &lt;em&gt;Clark Concrete Contractors, Inc. v. General Services Administration&lt;/em&gt;, GSBCA No. 14340, the General Services Administration Board of Contract Appeals accepted a measured mile on a cast-in-place concrete FBI field office in Washington. FindLaw&amp;rsquo;s summary of the decision reports that blast-resistance redesigns after the 1995 Oklahoma City bombing disrupted Clark&amp;rsquo;s concrete work.&lt;/p&gt;
&lt;p&gt;Clark split the work into unimpacted, highly impacted and less impacted periods. For forming floor slabs, the reported rates were 0.048 labor hours per square foot unimpacted, 0.113 highly impacted and 0.065 less impacted. For stripping slabs they were 0.059, 0.147 and 0.108. Clark then ran the same steps as the conduit example for each period, pricing lost hours at its average labor rate.&lt;/p&gt;
&lt;p&gt;As quoted in FindLaw&amp;rsquo;s summary, the board set the test this way: &amp;ldquo;We will accept a comparison if it is between kinds of work which are reasonably alike, such that the approximations it involves will be meaningful.&amp;rdquo; It rejected Clark&amp;rsquo;s attempts to improve the baseline by 10% for slabs and by 50% for stripping, because the record did not support either adjustment.&lt;/p&gt;
&lt;p&gt;FindLaw reports a labor inefficiency award of $1,082,490 after overhead and G&amp;amp;A markups. The board&amp;rsquo;s decision could not be opened during this run, so these figures come from FindLaw&amp;rsquo;s summary.&lt;/p&gt;
&lt;h2 id="how-courts-and-boards-have-treated-it"&gt;How courts and boards have treated it&lt;/h2&gt;
&lt;p&gt;The AGC paper reprints a tally from &lt;em&gt;Construction Schedule Delays&lt;/em&gt; by Dale and D&amp;rsquo;Onofrio (Thomson Reuters, 2018) covering 138 U.S. court and board cases. The measured mile was accepted in 16 of the 30 cases that referenced it.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Outcomes of lost productivity methods in 138 U.S. court and board cases&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Method&lt;/th&gt;&lt;th class="num"&gt;Cases referencing&lt;/th&gt;&lt;th class="num"&gt;Accepted&lt;/th&gt;&lt;th class="num"&gt;Not accepted&lt;/th&gt;&lt;th class="num"&gt;Acceptance rate&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Measured mile&lt;/td&gt;&lt;td class="num"&gt;30&lt;/td&gt;&lt;td class="num"&gt;16&lt;/td&gt;&lt;td class="num"&gt;14&lt;/td&gt;&lt;td class="num"&gt;53%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Earned value&lt;/td&gt;&lt;td class="num"&gt;7&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;&lt;td class="num"&gt;43%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Comparison to similar projects&lt;/td&gt;&lt;td class="num"&gt;1&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;1&lt;/td&gt;&lt;td class="num"&gt;0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Modified total cost&lt;/td&gt;&lt;td class="num"&gt;23&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;&lt;td class="num"&gt;17&lt;/td&gt;&lt;td class="num"&gt;26%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total cost&lt;/td&gt;&lt;td class="num"&gt;24&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;19&lt;/td&gt;&lt;td class="num"&gt;21%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Productivity factors&lt;/td&gt;&lt;td class="num"&gt;36&lt;/td&gt;&lt;td class="num"&gt;9&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;25%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Visual observation or judgment&lt;/td&gt;&lt;td class="num"&gt;17&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;12&lt;/td&gt;&lt;td class="num"&gt;29%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;All methods&lt;/td&gt;&lt;td class="num"&gt;138&lt;/td&gt;&lt;td class="num"&gt;44&lt;/td&gt;&lt;td class="num"&gt;94&lt;/td&gt;&lt;td class="num"&gt;32%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.agc.org/sites/default/files/users/user22628/CLE%20Paper_%20Productivity%20Claims%20.pdf" rel="noopener"&gt;agc.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;In &lt;em&gt;Turner Construction Co.&lt;/em&gt; (2017), a Smithsonian museum renovation, the AGC paper reports that two of three subcontractors using a measured mile proved their costs. A subcontractor that used an industry inefficiency factor lost because it did not produce the publication behind its 34% figure or expert testimony supporting it.&lt;/p&gt;
&lt;h2 id="records-to-keep-from-day-one"&gt;Records to keep from day one&lt;/h2&gt;
&lt;p&gt;The AGC authors say most contractors do not have project controls in place to track productivity, and that this view often changes after a damaging productivity impact. The measured mile needs the same daily inputs as &lt;a href="https://constructionmetrics.com/2026/10/06/measure-labor-productivity-daily-logs-timecards/"&gt;labor productivity tracking&lt;/a&gt;: quantity by cost code from the daily log and hours by the same cost code from timecards.&lt;/p&gt;
&lt;p&gt;The paper adds these practices:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Record daily quantities for each activity against the manpower on it, broken down by area.&lt;/li&gt;
&lt;li&gt;When a crew splits its day across two tasks, code the hours to each task separately.&lt;/li&gt;
&lt;li&gt;Build the measured mile early, while work is usually unimpacted, on activities that continue through the job.&lt;/li&gt;
&lt;li&gt;Document each change to the planned work, such as stacking of trades, out-of-sequence work and access problems, with photographs and video.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;A labor claim often sits beside other cost categories. Extended field overhead and &lt;a href="https://constructionmetrics.com/2026/10/28/eichleay-formula-unabsorbed-home-office-overhead/"&gt;unabsorbed home office overhead&lt;/a&gt; come from delay, and &lt;a href="https://constructionmetrics.com/2026/10/19/compute-overtime-premium-extended-workweek/"&gt;overtime premium&lt;/a&gt; comes from acceleration. Code the &lt;a href="https://constructionmetrics.com/2026/10/04/measure-change-order-rate-by-cause/"&gt;change orders by cause&lt;/a&gt; so each disruption can be tied to the period it affected.&lt;/p&gt;
&lt;p&gt;To start, pick one repetitive self-performed activity on a current job, such as conduit or formwork. Compute its weekly hours per unit for the first four weeks and save that rate with the dates. If a disruption comes later, that saved rate is the starting point for a measured mile.&lt;/p&gt;</content:encoded></item><item><title>Attentive.ai's Beam AI extends instant AI takeoffs to seven trades and adds landscaping with Takeoff Monkey</title><link>https://constructionmetrics.com/2026/11/14/beam-ai-instant-takeoffs-seven-trades/</link><pubDate>Sat, 14 Nov 2026 06:34:07 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/14/beam-ai-instant-takeoffs-seven-trades/</guid><category>AI</category><description>Beam AI's self-serve AI takeoffs now cover concrete-rebar, electrical, landscaping and paving as well as HVAC, plumbing and steel.</description><content:encoded>&lt;p&gt;Attentive.ai, a San Jose company that sells AI takeoff and estimating software under the Beam AI name, announced on November 12, 2026 that its self-serve takeoff workflow now covers seven trades. Concrete-rebar, electrical, landscaping and paving join HVAC, plumbing and steel. The same release says Attentive.ai bought Takeoff Monkey, a landscaping takeoff business, and added in-app estimates for more trades. The change affects the estimator who measures quantities off bid drawings and then prices them.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;Beam AI runs two workflows. In Do It Yourself (DIY), the estimator uploads the plans and gets an AI takeoff back right away, then reviews the quantities in the software. In Done For You (DFY), Attentive.ai&amp;rsquo;s own team runs the takeoff and checks it before delivery, which the company says takes 24 to 72 hours and covers more than 15 trades.&lt;/p&gt;
&lt;p&gt;The DFY steps on Attentive.ai&amp;rsquo;s site follow the order of the work. The estimator uploads PDF plans, specs, legends and supporting documents, confirms which quantities are needed and adds project instructions. The AI extracts the quantities, a QA reviewer checks them, and the contractor receives an estimate built to its own pricing. The pricing page says the output comes as an Excel estimate.&lt;/p&gt;
&lt;p&gt;Before the release, the four new trades were available through DFY, which the pricing page lists for all trades. Now an electrical or concrete-rebar estimator can run the first pass alone. The review is the estimator&amp;rsquo;s job in DIY, since no QA team sits between the AI and the bid.&lt;/p&gt;
&lt;p&gt;In-app estimates let the estimator go from takeoff to estimate inside Beam AI, according to the release. It does not list which trades gained estimates.&lt;/p&gt;
&lt;p&gt;Takeoff Monkey measured landscaping jobs by hand for its customers. Its founder and CEO, Tommy Lather, said in the release that the work took hours per job and that &amp;ldquo;Attentive.ai&amp;rsquo;s model does that in minutes.&amp;rdquo; The release gives no deal terms. Attentive.ai already sells DFY takeoffs from aerial images for landscaping, snow, paving and striping work.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence so far is Attentive.ai&amp;rsquo;s announcement, its product and pricing pages, and testimonials from named customers on its website. These claims come from Attentive.ai:&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;What Attentive.ai and its customers report for Beam AI&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Claim&lt;/th&gt;&lt;th&gt;Figure&lt;/th&gt;&lt;th&gt;Who reported it&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Contractors using Beam AI in the US and Canada&lt;/td&gt;&lt;td&gt;More than 1,300&lt;/td&gt;&lt;td&gt;Attentive.ai press release&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jobs priced on the platform&lt;/td&gt;&lt;td&gt;More than 500,000&lt;/td&gt;&lt;td&gt;Attentive.ai press release&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Value of construction bids priced on the platform&lt;/td&gt;&lt;td&gt;$500 billion&lt;/td&gt;&lt;td&gt;Attentive.ai press release&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Done For You turnaround&lt;/td&gt;&lt;td&gt;24 to 72 hours&lt;/td&gt;&lt;td&gt;Attentive.ai press release and pricing page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Done For You accuracy&lt;/td&gt;&lt;td&gt;99%&amp;#43;&lt;/td&gt;&lt;td&gt;Attentive.ai pricing page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Time saved per project&lt;/td&gt;&lt;td&gt;Over 15 hours&lt;/td&gt;&lt;td&gt;Strack Inc. vice president of preconstruction, on Attentive.ai&amp;#39;s website&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Time saved per week&lt;/td&gt;&lt;td&gt;16 hours&lt;/td&gt;&lt;td&gt;Axion Specialty Contracting account executive, on Attentive.ai&amp;#39;s website&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Time saved per week&lt;/td&gt;&lt;td&gt;2 days of work&lt;/td&gt;&lt;td&gt;Senior estimator at a steel stair company, on Attentive.ai&amp;#39;s website&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://finance.yahoo.com/technology/ai/articles/attentive-ai-makes-first-acquisition-170000856.html" rel="noopener"&gt;finance.yahoo.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The $500 billion is the value of the bids contractors priced on the platform. The release does not say how much of that work they won. The 99% accuracy figure is attached to the DFY service, which includes human review. Accuracy for the four trades just added to DIY, and the method behind the 99% figure, are not yet public.&lt;/p&gt;
&lt;p&gt;The customer figures are self-reported time savings from specialty contractors, and each one covers a single firm. The vice president of preconstruction at Strack Inc. puts the savings at more than 15 hours per project, and an account executive at Axion Specialty Contracting puts it at 16 hours a week.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track takeoff hours per bid, by trade. Start the clock when the estimator opens the drawing set and stop it when the quantities are ready to price. Count the AI run and the review as one number, since the review time decides whether the tool saves hours.&lt;/p&gt;
&lt;p&gt;Capture the baseline before the pilot:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Pick five recent bids in one trade, such as electrical or concrete-rebar, with similar sheet counts.&lt;/li&gt;
&lt;li&gt;Record the takeoff hours for each from timesheets or the estimator&amp;rsquo;s own log.&lt;/li&gt;
&lt;li&gt;For two of those bids, keep the final manual quantities for a handful of line items, such as linear feet of conduit or tons of rebar.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;During the pilot, run the same two drawing sets through DIY and compare the AI quantities line by line with the manual ones. Log the percent difference on each line and the hours the estimator spent correcting it. A trade where corrections eat most of the saved time is a poor fit for the self-serve path.&lt;/p&gt;
&lt;p&gt;A first step on one job is to pull the takeoff file from your last electrical bid and write down how many hours it took and how many sheets it covered.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;The release says DIY now covers the seven trades. Beam AI sells annual licenses. The pricing page lists DIY from $8,000 a year per trade and DFY for construction plans from $25,000 a year, set by trade and volume. As of November 14, that page still listed DIY for HVAC, plumbing and steel, so the price for the four added trades goes through a demo request. Enterprise plans are priced by quote.&lt;/p&gt;
&lt;p&gt;Related reading: &lt;a href="https://constructionmetrics.com/2026/10/01/quotr-ai-takeoff-seed-round/"&gt;Quotr raises $4 million for AI takeoff software that it says cut 20-hour takeoffs to 1 to 2 hours&lt;/a&gt; and &lt;a href="https://constructionmetrics.com/2026/10/08/togal-takeoff-benchmark-best-ai-model-34/"&gt;Togal.AI&amp;rsquo;s takeoff benchmark scores the best general AI model at 34.0 out of 100 on 33 drawing tasks&lt;/a&gt;.&lt;/p&gt;</content:encoded></item><item><title>Construction input prices held flat in October as diesel fell 4.6% and steel rose 2.7%</title><link>https://constructionmetrics.com/2026/11/13/construction-input-prices-october-diesel-steel/</link><pubDate>Fri, 13 Nov 2026 10:33:12 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/13/construction-input-prices-october-diesel-steel/</guid><category>Data</category><description>BLS producer prices for goods bought by construction were flat in October 2026 and stand 11.5% above a year earlier, with steel up and diesel down.</description><content:encoded>&lt;p&gt;The Bureau of Labor Statistics reported on November 13 that its producer price index for goods bought as inputs by construction industries was 365.137 in October 2026, up 0.04% from September and effectively flat. A producer price index, or PPI, measures the prices domestic producers receive for what they sell, and this one covers the goods that contractors and other construction industries buy. The index is 11.5% above October 2025. It is not seasonally adjusted, and October is preliminary. September was revised down to a 2.1% monthly gain from the 2.2% first reported. October is still the highest reading of the last 25 months, 5.4% above the 12-month average of 346.6.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Construction input prices leveled off in October at a 25-month high&lt;/p&gt;&lt;p class="chart-subtitle"&gt;BLS PPI, net inputs to construction industries, goods, index June 1986 = 100, not seasonally adjusted, October 2024 to October 2026&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;Construction input prices leveled off in October at a 25-month high&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 25 points from October 2024 to October 2026. Series: value. Values range from 318 to 365.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="234.0" y2="234.0"/&gt;&lt;line x1="72" x2="616" y1="162.0" y2="162.0"/&gt;&lt;line x1="72" x2="616" y1="90.0" y2="90.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;300&lt;/text&gt;&lt;text x="64" y="237.5" text-anchor="end"&gt;320&lt;/text&gt;&lt;text x="64" y="165.5" text-anchor="end"&gt;340&lt;/text&gt;&lt;text x="64" y="93.5" text-anchor="end"&gt;360&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;380&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2024-10&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;2025-03&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;2025-08&lt;/text&gt;&lt;text x="412.0" y="324" text-anchor="middle"&gt;2026-01&lt;/text&gt;&lt;text x="525.3" y="324" text-anchor="middle"&gt;2026-06&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="72" x2="616" y1="138.4" y2="138.4"/&gt;
&lt;text x="76" y="134.4"&gt;12-period average 346.56&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,236.9 L94.7,239.5 L117.3,241.4 L140.0,226.3 L162.7,219.7 L185.3,214.9 L208.0,216.9 L230.7,213.0 L253.3,209.7 L276.0,205.8 L298.7,204.1 L321.3,203.4 L344.0,206.8 L366.7,201.0 L389.3,208.2 L412.0,198.8 L434.7,182.6 L457.3,154.8 L480.0,135.2 L502.7,106.0 L525.3,118.8 L548.0,112.9 L570.7,98.8 L593.3,72.0 L616.0,71.5 L616.0,306.0 L72.0,306.0 Z"/&gt;
&lt;path class="line" d="M72.0,236.9 L94.7,239.5 L117.3,241.4 L140.0,226.3 L162.7,219.7 L185.3,214.9 L208.0,216.9 L230.7,213.0 L253.3,209.7 L276.0,205.8 L298.7,204.1 L321.3,203.4 L344.0,206.8 L366.7,201.0 L389.3,208.2 L412.0,198.8 L434.7,182.6 L457.3,154.8 L480.0,135.2 L502.7,106.0 L525.3,118.8 L548.0,112.9 L570.7,98.8 L593.3,72.0 L616.0,71.5"/&gt;
&lt;circle class="end" cx="616.0" cy="71.5" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="236.9" r="9"&gt;&lt;title&gt;October 2024: 319.20&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="239.5" r="9"&gt;&lt;title&gt;November 2024: 318.48&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="241.4" r="9"&gt;&lt;title&gt;December 2024: 317.95&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="226.3" r="9"&gt;&lt;title&gt;January 2025: 322.14&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="219.7" r="9"&gt;&lt;title&gt;February 2025: 323.96&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="214.9" r="9"&gt;&lt;title&gt;March 2025: 325.31&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="216.9" r="9"&gt;&lt;title&gt;April 2025: 324.75&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="213.0" r="9"&gt;&lt;title&gt;May 2025: 325.83&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="209.7" r="9"&gt;&lt;title&gt;June 2025: 326.74&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="205.8" r="9"&gt;&lt;title&gt;July 2025: 327.83&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="204.1" r="9"&gt;&lt;title&gt;August 2025: 328.30&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="203.4" r="9"&gt;&lt;title&gt;September 2025: 328.50&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="206.8" r="9"&gt;&lt;title&gt;October 2025: 327.56&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="201.0" r="9"&gt;&lt;title&gt;November 2025: 329.17&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="208.2" r="9"&gt;&lt;title&gt;December 2025: 327.17&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="198.8" r="9"&gt;&lt;title&gt;January 2026: 329.78&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="182.6" r="9"&gt;&lt;title&gt;February 2026: 334.28&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="154.8" r="9"&gt;&lt;title&gt;March 2026: 341.99&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="135.2" r="9"&gt;&lt;title&gt;April 2026: 347.44&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="106.0" r="9"&gt;&lt;title&gt;May 2026: 355.56&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="118.8" r="9"&gt;&lt;title&gt;June 2026: 351.99&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="112.9" r="9"&gt;&lt;title&gt;July 2026: 353.63&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="98.8" r="9"&gt;&lt;title&gt;August 2026: 357.54&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="72.0" r="9"&gt;&lt;title&gt;September 2026: 365.00&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="71.5" r="9"&gt;&lt;title&gt;October 2026: 365.14&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="75.5"&gt;365.14&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="64.5" y2="51.5"/&gt;
&lt;circle cx="616.0" cy="71.5" r="3.5"/&gt;&lt;text x="616.0" y="47.5" text-anchor="end"&gt;October 2026, 365.14&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;Construction input prices leveled off in October at a 25-month high&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 25 points from October 2024 to October 2026. Series: value. Values range from 318 to 365.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="168.5" y2="168.5"/&gt;&lt;line x1="50" x2="276" y1="117.0" y2="117.0"/&gt;&lt;line x1="50" x2="276" y1="65.5" y2="65.5"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;300&lt;/text&gt;&lt;text x="42" y="172.0" text-anchor="end"&gt;320&lt;/text&gt;&lt;text x="42" y="120.5" text-anchor="end"&gt;340&lt;/text&gt;&lt;text x="42" y="69.0" text-anchor="end"&gt;360&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;380&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2024-10&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2025-10&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="50" x2="276" y1="100.1" y2="100.1"/&gt;
&lt;text x="54" y="96.1"&gt;12-period average 346.56&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,170.6 L59.4,172.4 L68.8,173.8 L78.2,163.0 L87.7,158.3 L97.1,154.8 L106.5,156.3 L115.9,153.5 L125.3,151.1 L134.8,148.3 L144.2,147.1 L153.6,146.6 L163.0,149.0 L172.4,144.9 L181.8,150.1 L191.2,143.3 L200.7,131.7 L210.1,111.9 L219.5,97.8 L228.9,76.9 L238.3,86.1 L247.8,81.9 L257.2,71.8 L266.6,52.6 L276.0,52.3 L276.0,220.0 L50.0,220.0 Z"/&gt;
&lt;path class="line" d="M50.0,170.6 L59.4,172.4 L68.8,173.8 L78.2,163.0 L87.7,158.3 L97.1,154.8 L106.5,156.3 L115.9,153.5 L125.3,151.1 L134.8,148.3 L144.2,147.1 L153.6,146.6 L163.0,149.0 L172.4,144.9 L181.8,150.1 L191.2,143.3 L200.7,131.7 L210.1,111.9 L219.5,97.8 L228.9,76.9 L238.3,86.1 L247.8,81.9 L257.2,71.8 L266.6,52.6 L276.0,52.3"/&gt;
&lt;circle class="end" cx="276.0" cy="52.3" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="170.6" r="9"&gt;&lt;title&gt;October 2024: 319.20&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="172.4" r="9"&gt;&lt;title&gt;November 2024: 318.48&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="173.8" r="9"&gt;&lt;title&gt;December 2024: 317.95&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="163.0" r="9"&gt;&lt;title&gt;January 2025: 322.14&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="158.3" r="9"&gt;&lt;title&gt;February 2025: 323.96&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="154.8" r="9"&gt;&lt;title&gt;March 2025: 325.31&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="156.3" r="9"&gt;&lt;title&gt;April 2025: 324.75&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="153.5" r="9"&gt;&lt;title&gt;May 2025: 325.83&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="151.1" r="9"&gt;&lt;title&gt;June 2025: 326.74&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="148.3" r="9"&gt;&lt;title&gt;July 2025: 327.83&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="147.1" r="9"&gt;&lt;title&gt;August 2025: 328.30&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="146.6" r="9"&gt;&lt;title&gt;September 2025: 328.50&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="149.0" r="9"&gt;&lt;title&gt;October 2025: 327.56&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="144.9" r="9"&gt;&lt;title&gt;November 2025: 329.17&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="150.1" r="9"&gt;&lt;title&gt;December 2025: 327.17&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="143.3" r="9"&gt;&lt;title&gt;January 2026: 329.78&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="131.7" r="9"&gt;&lt;title&gt;February 2026: 334.28&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="111.9" r="9"&gt;&lt;title&gt;March 2026: 341.99&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="97.8" r="9"&gt;&lt;title&gt;April 2026: 347.44&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="76.9" r="9"&gt;&lt;title&gt;May 2026: 355.56&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="86.1" r="9"&gt;&lt;title&gt;June 2026: 351.99&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="81.9" r="9"&gt;&lt;title&gt;July 2026: 353.63&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="71.8" r="9"&gt;&lt;title&gt;August 2026: 357.54&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="52.6" r="9"&gt;&lt;title&gt;September 2026: 365.00&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="52.3" r="9"&gt;&lt;title&gt;October 2026: 365.14&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="56.3"&gt;365&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="59.3" y2="71.3"/&gt;
&lt;circle cx="276.0" cy="52.3" r="3.5"/&gt;&lt;text x="276.0" y="82.3" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;October 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;365.14&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;October 2026 is preliminary. BLS revised June through September with this release.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/WPUIP2300001" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Goods inputs to construction industries, last 13 months&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Index (June 1986 = 100)&lt;/th&gt;&lt;th class="num"&gt;Change from prior month&lt;/th&gt;&lt;th class="num"&gt;Change from a year earlier&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;October 2025&lt;/td&gt;&lt;td class="num"&gt;327.6&lt;/td&gt;&lt;td class="num"&gt;-0.3%&lt;/td&gt;&lt;td class="num"&gt;2.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;November 2025&lt;/td&gt;&lt;td class="num"&gt;329.2&lt;/td&gt;&lt;td class="num"&gt;0.5%&lt;/td&gt;&lt;td class="num"&gt;3.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;December 2025&lt;/td&gt;&lt;td class="num"&gt;327.2&lt;/td&gt;&lt;td class="num"&gt;-0.6%&lt;/td&gt;&lt;td class="num"&gt;2.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;January 2026&lt;/td&gt;&lt;td class="num"&gt;329.8&lt;/td&gt;&lt;td class="num"&gt;0.8%&lt;/td&gt;&lt;td class="num"&gt;2.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;February 2026&lt;/td&gt;&lt;td class="num"&gt;334.3&lt;/td&gt;&lt;td class="num"&gt;1.4%&lt;/td&gt;&lt;td class="num"&gt;3.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;March 2026&lt;/td&gt;&lt;td class="num"&gt;342.0&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;5.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;April 2026&lt;/td&gt;&lt;td class="num"&gt;347.4&lt;/td&gt;&lt;td class="num"&gt;1.6%&lt;/td&gt;&lt;td class="num"&gt;7.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;355.6&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;9.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;June 2026&lt;/td&gt;&lt;td class="num"&gt;352.0&lt;/td&gt;&lt;td class="num"&gt;-1.0%&lt;/td&gt;&lt;td class="num"&gt;7.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;July 2026&lt;/td&gt;&lt;td class="num"&gt;353.6&lt;/td&gt;&lt;td class="num"&gt;0.5%&lt;/td&gt;&lt;td class="num"&gt;7.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;August 2026&lt;/td&gt;&lt;td class="num"&gt;357.5&lt;/td&gt;&lt;td class="num"&gt;1.1%&lt;/td&gt;&lt;td class="num"&gt;8.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;September 2026&lt;/td&gt;&lt;td class="num"&gt;365.0&lt;/td&gt;&lt;td class="num"&gt;2.1%&lt;/td&gt;&lt;td class="num"&gt;11.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;October 2026&lt;/td&gt;&lt;td class="num"&gt;365.1&lt;/td&gt;&lt;td class="num"&gt;0.0%&lt;/td&gt;&lt;td class="num"&gt;11.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/WPUIP2300001" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The index has risen 10.7% since January 2026. Seven of the eight monthly changes from February through September were increases, and June&amp;rsquo;s 1.0% decline was the only break before October.&lt;/p&gt;
&lt;h2 id="what-moved"&gt;What moved&lt;/h2&gt;
&lt;p&gt;The flat total is two large moves that offset. BLS&amp;rsquo;s index of energy bought by nonresidential construction fell 3.1% in October after a 14% jump in September, and it is still 74.7% above a year ago. Strip out food and energy and the nonresidential goods index rose 0.7%, its largest monthly gain since January. Over 12 months that core index is up 6.3%.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;BLS input price indexes for construction, October 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Index&lt;/th&gt;&lt;th class="num"&gt;September 2026&lt;/th&gt;&lt;th class="num"&gt;October 2026&lt;/th&gt;&lt;th class="num"&gt;Change from prior month&lt;/th&gt;&lt;th class="num"&gt;Change from a year earlier&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Goods inputs to all construction&lt;/td&gt;&lt;td class="num"&gt;365.0&lt;/td&gt;&lt;td class="num"&gt;365.1&lt;/td&gt;&lt;td class="num"&gt;0.0%&lt;/td&gt;&lt;td class="num"&gt;11.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Goods inputs to residential construction&lt;/td&gt;&lt;td class="num"&gt;355.0&lt;/td&gt;&lt;td class="num"&gt;355.0&lt;/td&gt;&lt;td class="num"&gt;0.0%&lt;/td&gt;&lt;td class="num"&gt;9.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Goods inputs to nonresidential construction&lt;/td&gt;&lt;td class="num"&gt;184.7&lt;/td&gt;&lt;td class="num"&gt;185.0&lt;/td&gt;&lt;td class="num"&gt;0.2%&lt;/td&gt;&lt;td class="num"&gt;11.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nonresidential: energy&lt;/td&gt;&lt;td class="num"&gt;210.0&lt;/td&gt;&lt;td class="num"&gt;203.4&lt;/td&gt;&lt;td class="num"&gt;-3.1%&lt;/td&gt;&lt;td class="num"&gt;74.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nonresidential: goods less foods and energy&lt;/td&gt;&lt;td class="num"&gt;169.2&lt;/td&gt;&lt;td class="num"&gt;170.4&lt;/td&gt;&lt;td class="num"&gt;0.7%&lt;/td&gt;&lt;td class="num"&gt;6.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nonresidential: services&lt;/td&gt;&lt;td class="num"&gt;177.7&lt;/td&gt;&lt;td class="num"&gt;181.3&lt;/td&gt;&lt;td class="num"&gt;2.1%&lt;/td&gt;&lt;td class="num"&gt;18.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/graph/fredgraph.csv?id=WPUIP2300001,WPUIP2311001,WPUIP2312001,WPUIP23120012,WPUIP23120013,WPUIP2312002&amp;amp;cosd=2024-10-01,2024-10-01,2024-10-01,2024-10-01,2024-10-01,2024-10-01" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Goods inputs to residential construction were unchanged at 355.005, which leaves them 9.8% above October 2025. The nonresidential goods index rose 0.2% for the month and 11.5% for the year. Services bought by nonresidential builders rose 2.1% in October and are 18.3% above a year ago.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Selected material and fuel price indexes, October 2026, not seasonally adjusted&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Material&lt;/th&gt;&lt;th&gt;BLS series&lt;/th&gt;&lt;th class="num"&gt;October 2026 index&lt;/th&gt;&lt;th class="num"&gt;Change from prior month&lt;/th&gt;&lt;th class="num"&gt;Change from a year earlier&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;No. 2 diesel fuel&lt;/td&gt;&lt;td&gt;WPU057303&lt;/td&gt;&lt;td class="num"&gt;643.2&lt;/td&gt;&lt;td class="num"&gt;-4.6%&lt;/td&gt;&lt;td class="num"&gt;115.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Steel mill products&lt;/td&gt;&lt;td&gt;WPU1017&lt;/td&gt;&lt;td class="num"&gt;399.6&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;32.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Structural, architectural and pre-engineered metal products&lt;/td&gt;&lt;td&gt;WPU1074&lt;/td&gt;&lt;td class="num"&gt;401.8&lt;/td&gt;&lt;td class="num"&gt;1.7%&lt;/td&gt;&lt;td class="num"&gt;8.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Lumber&lt;/td&gt;&lt;td&gt;WPU081&lt;/td&gt;&lt;td class="num"&gt;275.6&lt;/td&gt;&lt;td class="num"&gt;-2.5%&lt;/td&gt;&lt;td class="num"&gt;6.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ready-mix concrete&lt;/td&gt;&lt;td&gt;WPU1333&lt;/td&gt;&lt;td class="num"&gt;394.8&lt;/td&gt;&lt;td class="num"&gt;-0.1%&lt;/td&gt;&lt;td class="num"&gt;2.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/graph/fredgraph.csv?id=WPU057303,WPU1017,WPU1074,WPU081,WPU1333,WPU801&amp;amp;cosd=2024-10-01,2024-10-01,2024-10-01,2024-10-01,2024-10-01,2024-10-01" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Diesel led the decline. The unadjusted diesel index fell 4.6% from September, and BLS&amp;rsquo;s seasonally adjusted figure in the release is a 7.9% drop. Diesel still costs more than twice what it did a year ago, up 115.2%. Steel went the other way. Steel mill products rose 2.7% in October and are 32.9% above a year earlier, and structural, architectural and pre-engineered metal products rose 1.7%. BLS named fabricated structural metal products among the indexes that pushed processed goods prices higher. Lumber fell 2.5%, its third straight monthly decline, and ready-mix concrete slipped 0.1%.&lt;/p&gt;
&lt;p&gt;The broader release moved the same way. BLS said final demand prices rose 0.3% in October on a seasonally adjusted basis, after 1.4% in September, and that final demand energy edged down 0.1%. For processed goods sold to businesses, the 12-month increase reached 14.6%, which BLS called the largest since July 2022.&lt;/p&gt;
&lt;p&gt;So the price of finished buildings caught up a little. BLS&amp;rsquo;s index for new nonresidential building construction, which tracks what builders receive for the work, rose 1.8% in October to 189.731 and is 5.5% above a year earlier. This index tends to move at the start of a quarter. It rose 2.3% in July, changed by less than 0.1% in August and September, and then took the October step. Since October 2024, goods inputs to nonresidential construction are up 14.9% and new nonresidential building prices are up 8.4%.&lt;/p&gt;
&lt;h2 id="how-to-use-this-number"&gt;How to use this number&lt;/h2&gt;
&lt;p&gt;Escalation on open jobs is the first use. The aggregate index was flat, but the pieces moved in opposite directions, so a clause tied to the total would have paid nothing this month while a steel package saw 2.7% and a fuel-heavy sitework job saw a 4.6% decline. Tie each clause to the index that matches what you are buying. The site&amp;rsquo;s post on &lt;a href="https://constructionmetrics.com/2026/10/14/steel-escalation-clause-bls-producer-price-index/"&gt;tying an escalation clause to a BLS index&lt;/a&gt; walks through the wording and the arithmetic.&lt;/p&gt;
&lt;p&gt;The second use is a check on fixed-price margin. Take the jobs on your work-in-progress schedule that still have steel to buy out:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Find the month each estimate was priced.&lt;/li&gt;
&lt;li&gt;Look up the steel mill products index for that month and for October 2026.&lt;/li&gt;
&lt;li&gt;Compare the percentage change with the change in your own quoted steel prices over the same months.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;A job priced in January 2026 carries a 26.7% move in the steel mill index through October. If your supplier quotes track that index and the contract has no escalation clause, the cost-to-complete update on that job is where the change will show up first.&lt;/p&gt;
&lt;h2 id="revisions-and-caveats"&gt;Revisions and caveats&lt;/h2&gt;
&lt;p&gt;October&amp;rsquo;s figures are preliminary. BLS revises PPI data for up to four months after first publication to pick up late reports and corrections, and this release revised June through September. The goods index for September moved from 365.374 in the October 15 vintage to 364.996, which trims September&amp;rsquo;s monthly gain from 2.2% to 2.1% and its 12-month gain from 11.2% to 11.1%. August moved up slightly, from 357.508 to 357.544.&lt;/p&gt;
&lt;p&gt;BLS collects these prices for the Tuesday of the week containing the 13th of the month, so October&amp;rsquo;s index describes prices around October 13. A price change after that date will appear in November&amp;rsquo;s figures, which BLS is scheduled to publish on December 15, 2026. BLS files the new nonresidential building index under &amp;ldquo;Construction (Partial)&amp;rdquo; in its series title, so read it as a guide to direction more than to the price of any one bid.&lt;/p&gt;</content:encoded></item><item><title>Gleeds grew its OpenSpace-based reality-capture service from 16 pilot users to 1,900 and reports £2 million in client savings for 2025</title><link>https://constructionmetrics.com/2026/11/13/gleeds-openspace-reality-capture-1900-users/</link><pubDate>Fri, 13 Nov 2026 06:34:18 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/13/gleeds-openspace-reality-capture-1900-users/</guid><category>AI</category><description>Gleeds' Visualise service, built on OpenSpace, pins 360-degree site photos to floor plans and now has 1,900 users on about 340 projects.</description><content:encoded>&lt;p&gt;Gleeds, an international property and construction consultancy, announced on November 10, 2026, that it will expand Visualise, its reality-capture service, after using it on about 340 projects in ten countries. Visualise runs on OpenSpace, software that places 360-degree photos from a site walk onto the project&amp;rsquo;s floor plans. Gleeds says the service has grown from a 16-person pilot in 2022 to more than 1,900 users and helped its clients save around £2 million in 2025. The work it changes is the site record behind progress reports, change orders, claims and defect closeout.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;On most jobs, the record of what an area looked like on a given date lives in a superintendent&amp;rsquo;s phone, a stack of daily reports and the memory of whoever walked the floor. When a ceiling closes over ductwork that later leaks, or a trade says its work was in place before a change was issued, a project engineer has to rebuild that record by hand.&lt;/p&gt;
&lt;p&gt;Visualise follows the order of a site walk:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;A team member walks the site with a 360-degree camera mounted on a hard hat. Gleeds says the camera captures images automatically as the person walks.&lt;/li&gt;
&lt;li&gt;OpenSpace&amp;rsquo;s software works out the camera&amp;rsquo;s path. IN Site, a UK construction trade publication, explains that it uses image-based simultaneous localization and mapping, or SLAM, which estimates where the camera is by tracking how features shift from one frame to the next. The images are then pinned to their locations on the floor plan.&lt;/li&gt;
&lt;li&gt;The result is a walkable, dated record of each area. A user can open the same room on different walk dates. Gleeds&amp;rsquo; service page says its teams use split views and BIM Compare, which sets the photo beside the model, to find defects and verify work.&lt;/li&gt;
&lt;li&gt;During the walk, or later from a desk, users add Field Notes. A Field Note is a photo or a point in the 360-degree image with a description, markup, assignee and due date. OpenSpace says Field Notes sync both ways with Procore Observations and Punch List items and with Autodesk Issues, and export to PDF reports.&lt;/li&gt;
&lt;/ol&gt;
&lt;aside class="note"&gt;OpenSpace calls the placement step Spatial AI. In plain terms, the software works out where each photo was taken and places it on the drawing by itself. IN Site notes that reliable results still depend on suitable project information, such as the floor plans, and on the walk covering every area.&lt;/aside&gt;
&lt;p&gt;At Gleeds, the users are consultants working for owners, such as project managers and cost managers. On a US general contractor&amp;rsquo;s job, the camera would go to a project engineer or assistant superintendent. The PM, the superintendent and whoever prices change orders would read the record.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Gleeds&amp;rsquo; announcement, OpenSpace&amp;rsquo;s press release of the same day, and Gleeds&amp;rsquo; service page. Every figure comes from those two companies. IN Site describes the savings figure as a company-reported outcome.&lt;/p&gt;
&lt;p&gt;These claims come from Gleeds and OpenSpace:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Visualise began in 2022 as a 16-person pilot and now has more than 1,900 platform users in ten countries.&lt;/li&gt;
&lt;li&gt;It has been used on approximately 340 projects, from office fit-outs and listed building refurbishments to Peru&amp;rsquo;s Bicentennial Schools Programme, which spans several sites.&lt;/li&gt;
&lt;li&gt;Teams have logged more than 50,000 site observations, issues and actions in Field Notes against live project records.&lt;/li&gt;
&lt;li&gt;Clients saved around £2 million in 2025.&lt;/li&gt;
&lt;li&gt;Teams report improvements of up to 75% in progress reporting, change management, claims assessment and defects resolution. Gleeds&amp;rsquo; service page compares this with traditional manual methods.&lt;/li&gt;
&lt;li&gt;Users logged nearly 10,000 hours of remote site viewing, according to OpenSpace.&lt;/li&gt;
&lt;/ol&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Visualise deployment figures reported by Gleeds and OpenSpace, November 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Measure&lt;/th&gt;&lt;th class="num"&gt;Value&lt;/th&gt;&lt;th&gt;Unit&lt;/th&gt;&lt;th&gt;Period&lt;/th&gt;&lt;th&gt;Qualifier&lt;/th&gt;&lt;th&gt;Reported by&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Users in the original pilot&lt;/td&gt;&lt;td class="num"&gt;16&lt;/td&gt;&lt;td&gt;people&lt;/td&gt;&lt;td&gt;2022&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;Gleeds and OpenSpace&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Platform users&lt;/td&gt;&lt;td class="num"&gt;1900&lt;/td&gt;&lt;td&gt;people&lt;/td&gt;&lt;td&gt;2022 to November 2026&lt;/td&gt;&lt;td&gt;more than&lt;/td&gt;&lt;td&gt;Gleeds and OpenSpace&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Projects&lt;/td&gt;&lt;td class="num"&gt;340&lt;/td&gt;&lt;td&gt;projects&lt;/td&gt;&lt;td&gt;2022 to November 2026&lt;/td&gt;&lt;td&gt;approximately&lt;/td&gt;&lt;td&gt;Gleeds and OpenSpace&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Countries&lt;/td&gt;&lt;td class="num"&gt;10&lt;/td&gt;&lt;td&gt;countries&lt;/td&gt;&lt;td&gt;2022 to November 2026&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td&gt;Gleeds and OpenSpace&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Site observations issues and actions logged in Field Notes&lt;/td&gt;&lt;td class="num"&gt;50000&lt;/td&gt;&lt;td&gt;entries&lt;/td&gt;&lt;td&gt;2022 to November 2026&lt;/td&gt;&lt;td&gt;more than&lt;/td&gt;&lt;td&gt;Gleeds and OpenSpace&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Hours of remote site viewing&lt;/td&gt;&lt;td class="num"&gt;10000&lt;/td&gt;&lt;td&gt;hours&lt;/td&gt;&lt;td&gt;2022 to November 2026&lt;/td&gt;&lt;td&gt;nearly&lt;/td&gt;&lt;td&gt;OpenSpace&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Client savings&lt;/td&gt;&lt;td class="num"&gt;2000000&lt;/td&gt;&lt;td&gt;GBP&lt;/td&gt;&lt;td&gt;calendar year 2025&lt;/td&gt;&lt;td&gt;around&lt;/td&gt;&lt;td&gt;Gleeds and OpenSpace&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Efficiency improvement in selected activities&lt;/td&gt;&lt;td class="num"&gt;75&lt;/td&gt;&lt;td&gt;percent&lt;/td&gt;&lt;td&gt;not stated&lt;/td&gt;&lt;td&gt;up to&lt;/td&gt;&lt;td&gt;Gleeds and OpenSpace&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.openspace.ai/press-releases/openspaces-visual-intelligence-platform-helps-gleeds-deliver-millions-in-client-savings/" rel="noopener"&gt;openspace.ai&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Dividing the totals by the project count shows the scale on an average job. The table below is a Construction Metrics calculation from the reported figures. It averages four years of work across projects of very different sizes, so treat each number as a rough order of magnitude.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Reported totals divided by approximately 340 projects, Construction Metrics calculation&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Measure&lt;/th&gt;&lt;th class="num"&gt;Reported total&lt;/th&gt;&lt;th class="num"&gt;Projects&lt;/th&gt;&lt;th class="num"&gt;Per project&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Platform users&lt;/td&gt;&lt;td class="num"&gt;1900&lt;/td&gt;&lt;td class="num"&gt;340&lt;/td&gt;&lt;td class="num"&gt;5.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Field Notes entries&lt;/td&gt;&lt;td class="num"&gt;50000&lt;/td&gt;&lt;td class="num"&gt;340&lt;/td&gt;&lt;td class="num"&gt;147&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Hours of remote site viewing&lt;/td&gt;&lt;td class="num"&gt;10000&lt;/td&gt;&lt;td class="num"&gt;340&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;A breakdown of the £2 million by project or by activity, and the baseline behind the 75% figure, are not yet public. Bricks &amp;amp; Bytes, a construction technology newsletter, wrote that splitting the savings into fewer site visits, faster decisions, less rework and fewer disputes would make the business case clearer. It also pointed out that Gleeds delivers the technology inside its consulting service, with a defined purpose and a growing user base.&lt;/p&gt;
&lt;p&gt;Sheldon Atkinson, head of Visualise at Gleeds, said in the announcement: &amp;ldquo;That means decisions can be made with greater confidence, issues can be resolved faster, and less time is lost trying to piece together fragmented information.&amp;rdquo;&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Gleeds names four activities where it sees gains. Each one has a unit a contractor already tracks, and the table pairs them.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;The four activities Gleeds names, and a unit to track for each&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Activity&lt;/th&gt;&lt;th&gt;What the visual record supplies&lt;/th&gt;&lt;th&gt;Unit to track in a pilot&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Progress reporting&lt;/td&gt;&lt;td&gt;Dated 360-degree images of each area to compare across walks&lt;/td&gt;&lt;td&gt;Hours to assemble the monthly progress report&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Change management&lt;/td&gt;&lt;td&gt;Images of an area before and after an instruction was issued&lt;/td&gt;&lt;td&gt;Days from change event notice to agreed scope&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Claims assessment&lt;/td&gt;&lt;td&gt;Time-stamped evidence of which work was in place on a given date&lt;/td&gt;&lt;td&gt;Hours spent reconstructing site conditions per claim&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Defects resolution&lt;/td&gt;&lt;td&gt;Field Notes pinned to the floor plan with photos and an assignee&lt;/td&gt;&lt;td&gt;Days from defect logged to closed&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;Start with progress report hours, the staff hours spent each month collecting site photos and writing the owner&amp;rsquo;s progress report. It maps to the first activity on Gleeds&amp;rsquo; list, and the PM can log it each month without a new system. Capture the hours on the last three monthly reports before the pilot, split into photo collection and writing. During the pilot, log the same split each month and record how many scheduled walks were completed. IN Site points out that areas the camera skips stay undocumented, so a missed walk shows up later as a gap in the record.&lt;/p&gt;
&lt;p&gt;The other metrics below need a few weeks of baseline from mileage logs, calendars and the issue log.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Metrics to capture before piloting 360-degree reality capture on one job&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Metric&lt;/th&gt;&lt;th&gt;Definition&lt;/th&gt;&lt;th&gt;Baseline to capture before the pilot&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Progress report hours&lt;/td&gt;&lt;td&gt;Staff hours spent each month collecting site photos and writing the owner progress report&lt;/td&gt;&lt;td&gt;Hours logged on the last three monthly reports&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Site trips for verification&lt;/td&gt;&lt;td&gt;Trips made only to check a condition or measure installed work&lt;/td&gt;&lt;td&gt;Count from mileage logs or calendars for the last 8 weeks&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Days to close a field issue&lt;/td&gt;&lt;td&gt;Calendar days from an issue being logged to being closed&lt;/td&gt;&lt;td&gt;Median for issues closed in the last 8 weeks&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Disputed conditions resolved from records&lt;/td&gt;&lt;td&gt;Share of disputed site conditions settled from existing photos without a new site visit&lt;/td&gt;&lt;td&gt;Count for the last 10 change events or back charges&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;Our post on &lt;a href="https://constructionmetrics.com/2026/10/31/ncc-buildots-preferred-supplier-plan-complete/"&gt;NCC and Buildots&lt;/a&gt; shows how one contractor measured a 360-camera tool that compares captures with the schedule. If closeout is the target, pair this pilot with the document tracking in our post on &lt;a href="https://constructionmetrics.com/2026/11/02/zutec-handover-ai-closeout-documents/"&gt;Zutec Handover AI&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;A first step on one job: ask the PM to log the hours spent on this month&amp;rsquo;s owner progress report, split into gathering photos and writing.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;OpenSpace sells two subscriptions, Core and Enterprise, priced by the customer&amp;rsquo;s annual construction volume. Enterprise adds single sign-on, access to OpenSpace&amp;rsquo;s APIs and extra onboarding. Progress tracking, sold as OpenSpace Track, is an add-on to either tier. OpenSpace says an annual subscription can cover a single project, and buyers get a price through its quote form. For a progress tracking product that lists a per-square-foot price, see our post on &lt;a href="https://constructionmetrics.com/2026/10/12/track3d-progress-tracking-price-per-square-foot/"&gt;Track3D&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;Visualise itself is a Gleeds consulting service for Gleeds&amp;rsquo; clients. Its service page sends inquiries to Sheldon Atkinson, head of Visualise, in London.&lt;/p&gt;</content:encoded></item><item><title>How to set a winter shift start from Naval Observatory twilight times and OSHA's lighting minimums, with a Detroit example</title><link>https://constructionmetrics.com/2026/11/12/winter-shift-start-twilight-osha-lighting/</link><pubDate>Thu, 12 Nov 2026 10:33:59 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/12/winter-shift-start-twilight-osha-lighting/</guid><category>Data</category><description>Naval Observatory twilight times show how much of a winter shift falls in darkness, where OSHA's lighting minimums call for temporary light.</description><content:encoded>&lt;p&gt;A superintendent who keeps a 7:00 a.m. start through December puts the first minutes of the shift in the dark in four of the seven cities below. The amount depends on the date, the latitude and where the site sits inside its time zone. The U.S. Naval Observatory (USNO) publishes the sunrise and twilight times to compute it for any site, and OSHA&amp;rsquo;s construction standards set how much light the work needs while it is in progress.&lt;/p&gt;
&lt;h2 id="what-osha-requires"&gt;What OSHA requires&lt;/h2&gt;
&lt;p&gt;OSHA 1926.26 says construction areas, aisles, stairs, ramps, runways, corridors, offices, shops and storage areas where work is in progress must be lighted with natural or artificial illumination. The minimums sit in Table D-3 of 1926.56, stated in foot-candles, a measure of how much light reaches a surface. The table lists these minimums:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;5 foot-candles for general construction area lighting.&lt;/li&gt;
&lt;li&gt;3 foot-candles for general construction areas, concrete placement, excavation and waste areas, access ways, active storage areas, loading platforms, refueling and field maintenance areas.&lt;/li&gt;
&lt;li&gt;5 foot-candles for indoor warehouses, corridors, hallways and exitways, and for tunnels, shafts and general underground work, with 10 at a tunnel or shaft heading during drilling, mucking and scaling.&lt;/li&gt;
&lt;li&gt;10 foot-candles for general construction plant and shops, such as batch plants, mechanical and electrical equipment rooms and carpenter shops.&lt;/li&gt;
&lt;li&gt;30 foot-candles for first aid stations, infirmaries and offices.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;For areas the table does not cover, 1926.56(b) refers to ANSI A11.1-1965, R1970, Practice for Industrial Lighting.&lt;/p&gt;
&lt;h2 id="read-the-twilight-times"&gt;Read the twilight times&lt;/h2&gt;
&lt;p&gt;USNO defines sunrise and sunset as the moments the upper edge of the Sun&amp;rsquo;s disk sits on the horizon, assuming average atmospheric conditions and level ground. Civil twilight begins in the morning and ends in the evening when the center of the Sun is 6 degrees below the horizon. The observatory&amp;rsquo;s definition page says that before morning civil twilight and after evening civil twilight, &amp;ldquo;artificial illumination is normally required to carry on ordinary outdoor activities.&amp;rdquo;&lt;/p&gt;
&lt;p&gt;That gives a schedule three bands. Before civil twilight, the work runs on temporary light. Between civil twilight and sunrise, natural light is building, and USNO notes that the amount at any moment depends on cloud cover, local atmospheric conditions and the view of the horizon. After sunrise, a cleared outdoor site has daylight, though shaded floors and interiors still need their own lighting under Table D-3.&lt;/p&gt;
&lt;p&gt;USNO&amp;rsquo;s Complete Sun and Moon Data for One Day service returns these times for any date from 1700 to 2100 from a latitude, longitude and time zone. A companion service builds a one-page table for a full year at one location, and the observatory&amp;rsquo;s API returns the same data as JSON. USNO says computed rise and set times can be off by a minute or more, and that hills on the horizon and the observer&amp;rsquo;s height can move them further.&lt;/p&gt;
&lt;h2 id="seven-cities-on-december-21"&gt;Seven cities on December 21&lt;/h2&gt;
&lt;p&gt;The first table pulls December 21, 2026, from the USNO API for seven cities, in local standard time. It assumes a 7:00 a.m. start and counts the minutes of that start that fall before civil twilight and before sunrise.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Sunrise, sunset and civil twilight on December 21, 2026, local standard time, with the minutes of a 7:00 a.m. start that fall before each&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;City&lt;/th&gt;&lt;th&gt;Time zone&lt;/th&gt;&lt;th&gt;Civil twilight begins&lt;/th&gt;&lt;th&gt;Sunrise&lt;/th&gt;&lt;th&gt;Sunset&lt;/th&gt;&lt;th&gt;Civil twilight ends&lt;/th&gt;&lt;th&gt;Twilight-to-twilight window (h:mm)&lt;/th&gt;&lt;th class="num"&gt;Minutes of a 7:00 start before civil twilight&lt;/th&gt;&lt;th class="num"&gt;Minutes of a 7:00 start before sunrise&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Detroit&lt;/td&gt;&lt;td&gt;Eastern&lt;/td&gt;&lt;td&gt;7:26 a.m.&lt;/td&gt;&lt;td&gt;7:58 a.m.&lt;/td&gt;&lt;td&gt;5:03 p.m.&lt;/td&gt;&lt;td&gt;5:35 p.m.&lt;/td&gt;&lt;td&gt;10:09&lt;/td&gt;&lt;td class="num"&gt;26&lt;/td&gt;&lt;td class="num"&gt;58&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Seattle&lt;/td&gt;&lt;td&gt;Pacific&lt;/td&gt;&lt;td&gt;7:19 a.m.&lt;/td&gt;&lt;td&gt;7:55 a.m.&lt;/td&gt;&lt;td&gt;4:20 p.m.&lt;/td&gt;&lt;td&gt;4:56 p.m.&lt;/td&gt;&lt;td&gt;9:37&lt;/td&gt;&lt;td class="num"&gt;19&lt;/td&gt;&lt;td class="num"&gt;55&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Minneapolis&lt;/td&gt;&lt;td&gt;Central&lt;/td&gt;&lt;td&gt;7:14 a.m.&lt;/td&gt;&lt;td&gt;7:48 a.m.&lt;/td&gt;&lt;td&gt;4:34 p.m.&lt;/td&gt;&lt;td&gt;5:08 p.m.&lt;/td&gt;&lt;td&gt;9:54&lt;/td&gt;&lt;td class="num"&gt;14&lt;/td&gt;&lt;td class="num"&gt;48&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Atlanta&lt;/td&gt;&lt;td&gt;Eastern&lt;/td&gt;&lt;td&gt;7:11 a.m.&lt;/td&gt;&lt;td&gt;7:38 a.m.&lt;/td&gt;&lt;td&gt;5:33 p.m.&lt;/td&gt;&lt;td&gt;6:01 p.m.&lt;/td&gt;&lt;td&gt;10:50&lt;/td&gt;&lt;td class="num"&gt;11&lt;/td&gt;&lt;td class="num"&gt;38&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dallas&lt;/td&gt;&lt;td&gt;Central&lt;/td&gt;&lt;td&gt;6:58 a.m.&lt;/td&gt;&lt;td&gt;7:26 a.m.&lt;/td&gt;&lt;td&gt;5:25 p.m.&lt;/td&gt;&lt;td&gt;5:52 p.m.&lt;/td&gt;&lt;td&gt;10:54&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;26&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Chicago&lt;/td&gt;&lt;td&gt;Central&lt;/td&gt;&lt;td&gt;6:43 a.m.&lt;/td&gt;&lt;td&gt;7:15 a.m.&lt;/td&gt;&lt;td&gt;4:23 p.m.&lt;/td&gt;&lt;td&gt;4:54 p.m.&lt;/td&gt;&lt;td&gt;10:11&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Boston&lt;/td&gt;&lt;td&gt;Eastern&lt;/td&gt;&lt;td&gt;6:38 a.m.&lt;/td&gt;&lt;td&gt;7:10 a.m.&lt;/td&gt;&lt;td&gt;4:15 p.m.&lt;/td&gt;&lt;td&gt;4:47 p.m.&lt;/td&gt;&lt;td&gt;10:09&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;10&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://aa.usno.navy.mil/data/RS_OneDay" rel="noopener"&gt;aa.usno.navy.mil&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Where a city sits inside its time zone shows up in these numbers alongside latitude. Atlanta is far south of Boston, yet a 7:00 start in Atlanta has 11 minutes before civil twilight and Boston has none. Atlanta sits toward the western side of the Eastern time zone, and its sunrise comes at 7:38 a.m. against 7:10 in Boston. Detroit and Boston have the same window from morning to evening civil twilight, 10 hours 9 minutes, but Detroit&amp;rsquo;s opens 48 minutes later on the clock.&lt;/p&gt;
&lt;p&gt;Seattle has the shortest window of the seven at 9 hours 37 minutes. An 8.5-hour shift with a 30-minute lunch still fits inside it if the start falls between 7:19 and 8:26 a.m.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;A job in Detroit runs a 7:00 a.m. to 3:30 p.m. shift with a 30-minute lunch. The second table compares that start with a 7:30 a.m. start, ending at 4:00 p.m., on the 21st of each month from November through February. The times come from the USNO API in Eastern Standard Time.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Detroit sunrise, sunset and civil twilight on the 21st of each month, November 2026 to February 2027, with minutes of darkness and partial light for two shift starts. Example calculations.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Date&lt;/th&gt;&lt;th&gt;Civil twilight begins&lt;/th&gt;&lt;th&gt;Sunrise&lt;/th&gt;&lt;th&gt;Sunset&lt;/th&gt;&lt;th class="num"&gt;7:00 start: minutes before civil twilight&lt;/th&gt;&lt;th class="num"&gt;7:00 start: minutes before sunrise&lt;/th&gt;&lt;th class="num"&gt;7:30 start: minutes before civil twilight&lt;/th&gt;&lt;th class="num"&gt;7:30 start: minutes before sunrise&lt;/th&gt;&lt;th class="num"&gt;7:30 start: minutes from 4:00 p.m. end to sunset&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Nov 21 2026&lt;/td&gt;&lt;td&gt;7:00 a.m.&lt;/td&gt;&lt;td&gt;7:30 a.m.&lt;/td&gt;&lt;td&gt;5:05 p.m.&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;30&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;65&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec 21 2026&lt;/td&gt;&lt;td&gt;7:26 a.m.&lt;/td&gt;&lt;td&gt;7:58 a.m.&lt;/td&gt;&lt;td&gt;5:03 p.m.&lt;/td&gt;&lt;td class="num"&gt;26&lt;/td&gt;&lt;td class="num"&gt;58&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;28&lt;/td&gt;&lt;td class="num"&gt;63&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jan 21 2027&lt;/td&gt;&lt;td&gt;7:25 a.m.&lt;/td&gt;&lt;td&gt;7:55 a.m.&lt;/td&gt;&lt;td&gt;5:32 p.m.&lt;/td&gt;&lt;td class="num"&gt;25&lt;/td&gt;&lt;td class="num"&gt;55&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;25&lt;/td&gt;&lt;td class="num"&gt;92&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb 21 2027&lt;/td&gt;&lt;td&gt;6:52 a.m.&lt;/td&gt;&lt;td&gt;7:20 a.m.&lt;/td&gt;&lt;td&gt;6:12 p.m.&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;132&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://aa.usno.navy.mil/data/RS_OneDay" rel="noopener"&gt;aa.usno.navy.mil&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;December and January carry nearly the same dark time at a 7:00 start, 26 and 25 minutes, even though sunset on January 21 comes 29 minutes later than on December 21. Sunrise moves only 3 minutes earlier between those dates. Moving the start to 7:30 removes the minutes before civil twilight in all four months and still ends the shift at least 63 minutes before sunset.&lt;/p&gt;
&lt;p&gt;The 7:30 start leaves 28 minutes of partial light before sunrise on December 21 and 25 on January 21. Those minutes fall in the band where USNO says the light depends on cloud cover, so a light meter reading at the work surface decides whether the general area meets 5 foot-candles or the towers stay on.&lt;/p&gt;
&lt;p&gt;A round-number example shows what the dark minutes add up to. A 10-person crew that keeps the 7:00 start for 20 working days with 25 minutes before civil twilight each day works 5,000 crew-minutes, about 83 crew-hours, entirely under temporary light, with towers or task lights set and fueled for each of those mornings.&lt;/p&gt;
&lt;p&gt;Daylight saving time moves every clock time one hour later. USNO&amp;rsquo;s service adds that hour when the option is selected and the date falls in the daylight saving period, so turn it on for any dates after the March clock change.&lt;/p&gt;
&lt;h2 id="how-to-use-it-on-your-jobs"&gt;How to use it on your jobs&lt;/h2&gt;
&lt;p&gt;Put the twilight times next to the lookahead schedule. The USNO one-year table gives every date for the site&amp;rsquo;s coordinates. In Excel, with the shift start in A2 and the civil twilight time in B2, both formatted as times, &lt;code&gt;=MAX(0,(B2-A2)*1440)&lt;/code&gt; returns the dark minutes for that day.&lt;/p&gt;
&lt;p&gt;Then price the lighting in general conditions the same way the &lt;a href="https://constructionmetrics.com/2026/11/08/budget-temporary-heat-heating-degree-days/"&gt;temporary heat post&lt;/a&gt; prices heat from degree days: run hours per day, times working days, times the cost per tower hour. The &lt;a href="https://constructionmetrics.com/2026/11/04/plan-winter-crew-hours-wind-chill/"&gt;wind chill post&lt;/a&gt; covers the warm-up breaks that come out of the same winter shifts, and the &lt;a href="https://constructionmetrics.com/2026/10/27/weather-delay-days-noaa-climate-normals/"&gt;weather delay days post&lt;/a&gt; covers the days lost outright.&lt;/p&gt;
&lt;p&gt;Record what happened. The superintendent logs the start time, the time the towers went off and a foot-candle reading in the daily log. After a winter of entries, the method in the &lt;a href="https://constructionmetrics.com/2026/10/06/measure-labor-productivity-daily-logs-timecards/"&gt;labor productivity post&lt;/a&gt; can compare units installed in the first hour under temporary light with the same hour later in the season.&lt;/p&gt;
&lt;p&gt;To start, pick one job with outdoor work planned for December through February. Pull the USNO one-year table for the site&amp;rsquo;s coordinates and compute the dark minutes for each week at the current start time.&lt;/p&gt;</content:encoded></item><item><title>Archiboost raises $6.2 million for AI drawing review it says has covered 550,000 sheets</title><link>https://constructionmetrics.com/2026/11/12/archiboost-raises-6-2-million-ai-drawing-review/</link><pubDate>Thu, 12 Nov 2026 06:34:41 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/12/archiboost-raises-6-2-million-ai-drawing-review/</guid><category>AI</category><description>Archiboost's software checks drawing sets and specs for code, coordination and spec conflicts and ties each finding to its source sheet.</description><content:encoded>&lt;p&gt;Archiboost, a San Francisco company whose software reviews construction document sets, announced $6.2 million in combined pre-seed and seed funding on November 3, 2026, led by Hanabi Capital and Marathon Venture Capital. AEC Magazine covered the round on November 11. The product reads drawings and specifications and flags code, coordination and spec conflicts, which puts it in the bid-set review a general contractor&amp;rsquo;s preconstruction team runs before pricing a job. A beta agent, software that runs a multi-step task on its own, also drafts RFI responses and submittal reviews.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;A team uploads the drawing set, the specifications and any other project documents, or connects the folders where they already live in Autodesk Forma or Procore. Archiboost says the software then checks the whole package in one pass: cross-sheet coordination, code and accessibility, specs against schedules, and the firm&amp;rsquo;s own standards. Each finding is marked on the sheet with the code section, spec section or detail it conflicts with, and a reviewer can assign it to someone or open it in Revit.&lt;/p&gt;
&lt;p&gt;The examples on the general contractor page read like a preconstruction question list. One flags a duct crossing a beam with no sleeve, citing sheets M-201 and S-301. Another finds a hardware set on the drawings that has no match in spec section 08 71 00. A third catches a detail referenced on A-501 that was never drawn. Archiboost frames each of these as a would-be RFI that the estimator or project manager can send to the design team before procurement or construction starts.&lt;/p&gt;
&lt;p&gt;CEO Georgios Kontominas told Commercial Observer that the software reads PDF drawings and Revit files together, pairing computer vision, software that reads images, on the PDFs with metadata pulled from the model. He also said no person checks the results before the client sees them, and contrasted that with competitors that have a human review the output.&lt;/p&gt;
&lt;p&gt;There are other modules. Rus, a code copilot, answers zoning and building code questions for all 50 states. A weekly coordination run collects the latest consultant drawings on Friday evening and delivers a coordination report on Monday morning. The Construction Administration agent, listed as beta in the announcement and early access on the pricing page, keeps RFIs and submittals in one inbox and drafts responses with citations.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Archiboost&amp;rsquo;s announcement and website, testimonials from customers quoted there, and an interview Kontominas gave Commercial Observer. The customers named in those sources are architecture firms, including WRNS Studio, OTJ Architects and JLS Architects, plus the developer RXR, which also invested through RXR Arden Digital Ventures.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Figures Archiboost and its customers report&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Figure&lt;/th&gt;&lt;th&gt;Value&lt;/th&gt;&lt;th&gt;Reported by&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Drawing sheets reviewed since launch&lt;/td&gt;&lt;td&gt;More than 550,000&lt;/td&gt;&lt;td&gt;Archiboost&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Project value covered by those reviews&lt;/td&gt;&lt;td&gt;More than $3.5 billion&lt;/td&gt;&lt;td&gt;Archiboost&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Potential issues flagged&lt;/td&gt;&lt;td&gt;More than 120,000&lt;/td&gt;&lt;td&gt;Archiboost&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Building code questions answered&lt;/td&gt;&lt;td&gt;More than 15,000&lt;/td&gt;&lt;td&gt;Archiboost&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Issues surfaced compared with manual QA/QC&lt;/td&gt;&lt;td&gt;Up to 6 times as many&lt;/td&gt;&lt;td&gt;Archiboost&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Coordination problems in the field for teams using it&lt;/td&gt;&lt;td&gt;Up to 70% fewer&lt;/td&gt;&lt;td&gt;Archiboost&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Redlines returned on one 230-sheet project&lt;/td&gt;&lt;td&gt;448&lt;/td&gt;&lt;td&gt;Jesse Smith, JLS Architects, on Archiboost&amp;#39;s site&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Owner requirements checked on one design-build DD review&lt;/td&gt;&lt;td&gt;About 4,000 pages&lt;/td&gt;&lt;td&gt;WRNS Studio in Archiboost&amp;#39;s announcement&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://archiboost.ai/blogs/archiboost-raises-6-2-million" rel="noopener"&gt;archiboost.ai&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The platform totals measure volume. More than 120,000 issues across more than 550,000 sheets works out to about 22 flags per 100 sheets. The JLS project, with 448 redlines on 230 sheets, ran at about 195 per 100 sheets, nearly nine times the platform rate. A set can produce more or fewer flags depending on its design stage, its size and which checks a firm turns on, so the two rates say little about each other.&lt;/p&gt;
&lt;p&gt;The comparison figures carry &amp;ldquo;up to,&amp;rdquo; which marks each as the high end of what customers saw. The number of projects behind the six-times and 70% figures, and precision, meaning the share of flags a reviewer accepts as real issues, are not yet public.&lt;/p&gt;
&lt;p&gt;So the figures a contractor needs will come from a pilot on its own sets: how many real conflicts the tool catches, and how many false flags the team clears to get them.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Catch rate is the share of a job&amp;rsquo;s design-related RFIs that the tool flagged on the bid set. A design-related RFI is one caused by a drawing or spec conflict. Means-and-methods questions and owner changes go in a separate bucket. Pair it with flag precision, because a tool that flagged every line on every sheet would score a perfect catch rate.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Metrics to capture before piloting AI drawing review&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Metric&lt;/th&gt;&lt;th&gt;Definition&lt;/th&gt;&lt;th&gt;Baseline to capture before the pilot&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Design RFIs per 100 sheets&lt;/td&gt;&lt;td&gt;RFIs caused by a drawing or spec conflict divided by sheets in the bid set times 100&lt;/td&gt;&lt;td&gt;Count from the RFI log of one or two closed-out jobs&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Catch rate&lt;/td&gt;&lt;td&gt;Share of those design RFIs that the tool flagged on the bid set&lt;/td&gt;&lt;td&gt;Run the closed-out job&amp;#39;s bid set through the tool and match flags to the RFI log&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Flag precision&lt;/td&gt;&lt;td&gt;Share of the tool&amp;#39;s flags your team accepts as real issues&lt;/td&gt;&lt;td&gt;Have the estimator or PM mark each flag accepted or rejected&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Review hours per set&lt;/td&gt;&lt;td&gt;Staff hours spent on the bid-set review including working through flags&lt;/td&gt;&lt;td&gt;Hours your team logged on the last comparable bid review&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;A closed-out job gives you a test with a known answer:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Pull the bid set and the full RFI log for one job that finished in the last two years.&lt;/li&gt;
&lt;li&gt;Tag each RFI as design-related or other, and count design RFIs per 100 sheets.&lt;/li&gt;
&lt;li&gt;Run the bid set through the tool and match its flags to the tagged RFIs.&lt;/li&gt;
&lt;li&gt;Have your reviewer mark each flag that matched no RFI as accepted or rejected.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The tagging step is the same work our post on &lt;a href="https://constructionmetrics.com/2026/10/04/measure-change-order-rate-by-cause/"&gt;change order rate by cause&lt;/a&gt; describes. To track how fast the design team answers the RFIs the tool helps you send early, use the method in &lt;a href="https://constructionmetrics.com/2026/10/20/measure-rfi-turnaround-before-ai-pilot/"&gt;measuring RFI turnaround before an AI pilot&lt;/a&gt;. For other reviewers in this category, see the posts on &lt;a href="https://constructionmetrics.com/2026/10/07/buildcheck-raises-12-million-ai-drawing-review/"&gt;Buildcheck&lt;/a&gt; and &lt;a href="https://constructionmetrics.com/2026/10/13/upcodes-ai-plan-review-180000-issues/"&gt;UpCodes&lt;/a&gt;.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;Archiboost prices by quote, based on team size, project types and the modules chosen. The pricing page lists integrations with Revit, Autodesk, Procore, Bluebeam, Newforma, SharePoint and Outlook, says the company holds a SOC 2 Type II audit, and says it does not train its models on customer uploads. Kontominas told Commercial Observer the company has 10 full-time employees, has recently expanded to Canada, and will use the funding on the QA/QC engine and the construction administration agent.&lt;/p&gt;</content:encoded></item><item><title>How to compute working capital the way a surety does, with a $1.3 million bonding example</title><link>https://constructionmetrics.com/2026/11/11/compute-working-capital-surety-bonding-capacity/</link><pubDate>Wed, 11 Nov 2026 10:33:33 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/11/compute-working-capital-surety-bonding-capacity/</guid><category>Data</category><description>Sureties size a bond program from adjusted working capital. This example adjusts a $2.0 million balance to $1.3 million and converts it to capacity.</description><content:encoded>&lt;p&gt;Working capital is current assets minus current liabilities. A surety underwriter computes it from the contractor&amp;rsquo;s year-end statement, then removes assets it doubts will turn into cash, and multiplies what is left to set the aggregate bond program. The controller or CFO prepares the statement, and the bonding agent presents it.&lt;/p&gt;
&lt;p&gt;That adjusted figure decides how much bonded work a contractor can carry at once. This post walks through the adjustments on an example balance sheet and converts the result into capacity, so a CFO can run the same arithmetic before the surety does.&lt;/p&gt;
&lt;h2 id="what-the-surety-counts"&gt;What the surety counts&lt;/h2&gt;
&lt;p&gt;Chad Bell of the accounting firm CBIZ, writing in the Pipeline newsletter of the National Association of Surety Bond Producers (NASBP), lists the pieces. Current assets include cash, accounts receivable, inventories, underbillings and other current assets. For bonding purposes, current liabilities usually include debt and the current portion of debt, accounts payable, overbillings, accrued expenses and other current liabilities.&lt;/p&gt;
&lt;p&gt;Underbillings and overbillings come straight from the &lt;a href="https://constructionmetrics.com/2026/09/26/build-work-in-progress-schedule-job-cost/"&gt;work-in-progress schedule&lt;/a&gt;. Bell notes that sureties calculate working capital differently from one another, and that many focus on liquid assets and immediate liabilities.&lt;/p&gt;
&lt;p&gt;The CPA firm Pease Bell names the assets underwriters commonly exclude. These come from Pease Bell:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;Accounts receivable aged beyond 90 days&lt;/li&gt;
&lt;li&gt;Related-party and officer receivables&lt;/li&gt;
&lt;li&gt;Prepaid expenses&lt;/li&gt;
&lt;li&gt;Inventory that has not turned over&lt;/li&gt;
&lt;li&gt;Intangible assets&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Dan Huckabay of the Commercial Surety Bond Agency (CSBA) gives a shorter version of the same formula, which counts only cash and receivables under 90 days as current assets and only payables and bank debt as current liabilities.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The figures below are an example with round numbers. A general contractor with $25 million in annual revenue closes its fiscal year with $6.0 million of current assets and $4.0 million of current liabilities. Its statement shows $2.0 million of working capital.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Working capital as reported and as a surety adjusts it, fiscal year end (example figures)&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Line&lt;/th&gt;&lt;th class="num"&gt;As reported&lt;/th&gt;&lt;th class="num"&gt;Surety-adjusted&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Cash&lt;/td&gt;&lt;td class="num"&gt;$1,200,000&lt;/td&gt;&lt;td class="num"&gt;$1,200,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Receivables under 90 days&lt;/td&gt;&lt;td class="num"&gt;$3,000,000&lt;/td&gt;&lt;td class="num"&gt;$3,000,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Receivables over 90 days&lt;/td&gt;&lt;td class="num"&gt;$400,000&lt;/td&gt;&lt;td class="num"&gt;$0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Retainage receivable&lt;/td&gt;&lt;td class="num"&gt;$800,000&lt;/td&gt;&lt;td class="num"&gt;$800,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Underbillings&lt;/td&gt;&lt;td class="num"&gt;$300,000&lt;/td&gt;&lt;td class="num"&gt;$300,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Inventory not turned over&lt;/td&gt;&lt;td class="num"&gt;$200,000&lt;/td&gt;&lt;td class="num"&gt;$0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Prepaid expenses&lt;/td&gt;&lt;td class="num"&gt;$100,000&lt;/td&gt;&lt;td class="num"&gt;$0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total current assets&lt;/td&gt;&lt;td class="num"&gt;$6,000,000&lt;/td&gt;&lt;td class="num"&gt;$5,300,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Accounts payable&lt;/td&gt;&lt;td class="num"&gt;$2,500,000&lt;/td&gt;&lt;td class="num"&gt;$2,500,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Overbillings&lt;/td&gt;&lt;td class="num"&gt;$900,000&lt;/td&gt;&lt;td class="num"&gt;$900,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Current debt and line of credit&lt;/td&gt;&lt;td class="num"&gt;$400,000&lt;/td&gt;&lt;td class="num"&gt;$400,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Accrued expenses&lt;/td&gt;&lt;td class="num"&gt;$200,000&lt;/td&gt;&lt;td class="num"&gt;$200,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total current liabilities&lt;/td&gt;&lt;td class="num"&gt;$4,000,000&lt;/td&gt;&lt;td class="num"&gt;$4,000,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Working capital&lt;/td&gt;&lt;td class="num"&gt;$2,000,000&lt;/td&gt;&lt;td class="num"&gt;$1,300,000&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;The surety in this example removes three items. Receivables over 90 days come out ($400,000), the whole $200,000 of inventory comes out because it has not turned over, and prepaid expenses come out ($100,000). Liabilities stay as reported. Adjusted working capital is $1.3 million, 35% less than the statement shows.&lt;/p&gt;
&lt;p&gt;Retainage receivable stays in. Pease Bell advises contractors to keep it documented and current, and the &lt;a href="https://constructionmetrics.com/2026/10/10/track-retainage-aging-by-job-owner/"&gt;retainage aging post&lt;/a&gt; shows how to track it by job and owner.&lt;/p&gt;
&lt;h2 id="from-working-capital-to-capacity"&gt;From working capital to capacity&lt;/h2&gt;
&lt;p&gt;Huckabay writes that sureties apply a multiple to working capital to find the maximum backlog they will bond, generally 10 to 20 times depending on the type of work. Pease Bell gives the same 10-to-20 range for aggregate capacity and says the multiple varies by surety, track record and type of work. The comparison runs against the cost to complete all backlog, bonded and unbonded, according to CSBA.&lt;/p&gt;
&lt;p&gt;Say this contractor carries $11 million of cost to complete on its open jobs. That figure is the cost-to-complete column of the WIP schedule, summed.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Aggregate bonding capacity at three multiples (example figures)&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Multiple&lt;/th&gt;&lt;th class="num"&gt;On reported working capital&lt;/th&gt;&lt;th class="num"&gt;On adjusted working capital&lt;/th&gt;&lt;th class="num"&gt;Room left after $11M cost to complete&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;10x&lt;/td&gt;&lt;td class="num"&gt;$20,000,000&lt;/td&gt;&lt;td class="num"&gt;$13,000,000&lt;/td&gt;&lt;td class="num"&gt;$2,000,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;15x&lt;/td&gt;&lt;td class="num"&gt;$30,000,000&lt;/td&gt;&lt;td class="num"&gt;$19,500,000&lt;/td&gt;&lt;td class="num"&gt;$8,500,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;20x&lt;/td&gt;&lt;td class="num"&gt;$40,000,000&lt;/td&gt;&lt;td class="num"&gt;$26,000,000&lt;/td&gt;&lt;td class="num"&gt;$15,000,000&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;At 10 times, the contractor reading its own statement would expect $20 million of capacity. The surety&amp;rsquo;s number is $13 million, which leaves $2 million of room. A new $4 million job would push cost to complete to $15 million, past the 10-times line and inside the 15-times line, so the multiple this surety applies decides whether the bid gets a bond.&lt;/p&gt;
&lt;p&gt;The single-job limit follows a separate rule. CSBA describes the general practice as jobs within 1.5 to 2 times the contractor&amp;rsquo;s largest completed project, with some sureties going to 3 or 4 times. If the largest completed job in the example was $3 million, a $4 million bid sits inside that range.&lt;/p&gt;
&lt;h2 id="comparing-your-ratio-to-industry-figures"&gt;Comparing your ratio to industry figures&lt;/h2&gt;
&lt;p&gt;Bell&amp;rsquo;s article uses Risk Management Association (RMA) benchmarks, compiled from financial statements that companies give their lenders, for NAICS 23622P, commercial and institutional building construction. From 2016 through 2025, working capital as a percentage of revenue rose from 8.3% to 17.8% for companies with $1 million to $10 million in revenue. For companies with $10 million to $50 million in revenue it rose from 7.6% to 12.1%.&lt;/p&gt;
&lt;p&gt;The example contractor falls in the second group. Its reported working capital is 8.0% of revenue, and its adjusted working capital is 5.2%. Matching the 12.1% figure would take about $3.0 million of working capital on $25 million of revenue.&lt;/p&gt;
&lt;p&gt;Bell offers two readings of the rise. Companies may be choosing to retain more capital, or they may need more capital to sustain the same revenue, and he lists Paycheck Protection Program cash, lower distributions and slower revenue growth among the possible causes. He also notes the trend does not hold for every construction sub-industry. Compare against the RMA group that matches your NAICS code and revenue band.&lt;/p&gt;
&lt;h2 id="moves-that-change-the-adjusted-number"&gt;Moves that change the adjusted number&lt;/h2&gt;
&lt;p&gt;Collecting the $400,000 of receivables over 90 days leaves reported working capital unchanged, since one current asset turns into another. The adjusted figure rises to $1.7 million, and capacity at 10 times rises to $17 million. No other single step in the example adds as much, and the &lt;a href="https://constructionmetrics.com/2026/10/11/adjust-dso-retainage-billing-cycles/"&gt;DSO post&lt;/a&gt; shows how to find those balances by owner.&lt;/p&gt;
&lt;p&gt;Pease Bell&amp;rsquo;s other recommendations are to repay or document officer loans, avoid unnecessary year-end distributions, and keep long-term assets out of the current section. It also suggests a committed bank line of credit, since available liquidity beyond reported working capital reassures underwriters.&lt;/p&gt;
&lt;p&gt;Backlog moves the other side of the ratio. The &lt;a href="https://constructionmetrics.com/2026/09/28/compute-backlog-in-months-abc-indicator/"&gt;backlog in months post&lt;/a&gt; explains how to compute coverage, and ABC&amp;rsquo;s &lt;a href="https://constructionmetrics.com/2026/11/10/abc-backlog-indicator-october-data-center/"&gt;October Backlog Indicator&lt;/a&gt; gives the industry reading.&lt;/p&gt;
&lt;h2 id="small-contracts-and-the-sba-guarantee"&gt;Small contracts and the SBA guarantee&lt;/h2&gt;
&lt;p&gt;The U.S. Small Business Administration guarantees bid, performance, payment and ancillary bonds that participating sureties write for small businesses that might not meet other sureties&amp;rsquo; criteria. Eligible contracts run up to $9 million for non-federal work and up to $14 million for federal work. The business still has to meet the surety&amp;rsquo;s credit, capacity and character requirements.&lt;/p&gt;
&lt;p&gt;SBA charges a guarantee fee of 0.6% of the contract price on performance and payment bonds, and no fee on bid bonds. On a $4 million contract, the fee is $24,000. The &lt;a href="https://constructionmetrics.com/2026/10/30/compute-average-annual-receipts-sba-size-standard/"&gt;SBA size standard post&lt;/a&gt; covers how to check whether the company counts as small.&lt;/p&gt;
&lt;h2 id="how-to-start-on-your-books"&gt;How to start on your books&lt;/h2&gt;
&lt;p&gt;Take last year&amp;rsquo;s balance sheet and the aged receivables report. Rebuild current assets in a spreadsheet with the five Pease Bell exclusions as separate lines, and compute working capital both ways. Then multiply the adjusted figure by 10 and subtract the cost-to-complete total from your latest WIP schedule.&lt;/p&gt;
&lt;p&gt;If that remainder is smaller than the largest bid on your list this quarter, ask your bonding agent which multiple your surety uses and which adjustments it applied to last year&amp;rsquo;s statement.&lt;/p&gt;</content:encoded></item><item><title>MasTec will use Gritt's robotic solar panel installers, which Gritt says have set more than 35,000 panels, on its utility-scale jobs</title><link>https://constructionmetrics.com/2026/11/11/mastec-gritt-robotic-solar-panel-installers/</link><pubDate>Wed, 11 Nov 2026 06:34:26 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/11/mastec-gritt-robotic-solar-panel-installers/</guid><category>AI</category><description>Gritt's AI-guided arms mount on skid steers and forklifts to set solar panels, and MasTec will use them on its utility-scale solar jobs.</description><content:encoded>&lt;p&gt;Gritt, a robotics company in South San Francisco, announced on November 10, 2026, that MasTec will deploy its AI-guided installation systems across MasTec Renewables projects. The work starts on MasTec&amp;rsquo;s utility-scale solar jobs in several states, where Gritt&amp;rsquo;s machines pick up solar panels and set them in the rows. MasTec Renewables tested the systems on active sites before signing on, and Gritt says its machines have placed more than 35,000 panels for all of its customers so far.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;On a utility-scale solar job, module installation is crew work. Installers carry each panel from the staged pallets and set it on the tracker by hand.&lt;/p&gt;
&lt;p&gt;Gritt mounts a robotic arm and its control software on equipment the contractor already runs, such as the skid steers and forklifts named in its July funding announcement. Gritt calls this physical AI, meaning AI models that steer a machine through a physical task. The arm picks a panel and places it in the row. According to the November release, craft workers guide the machine and check its work as it goes.&lt;/p&gt;
&lt;p&gt;Gritt&amp;rsquo;s solar page says the system handles several panel types on several tracker types. Purlin assembly, component transport and checks of completed work are next on its list. The company says the machines also record site activity that supervisors can use for planning.&lt;/p&gt;
&lt;p&gt;The install foreman and the superintendent would work with it most, since they lay out the day&amp;rsquo;s rows and set the crew around the machine. The equipment manager decides which skid steer or forklift carries the attachment. Gritt&amp;rsquo;s July release says a task that took months to train the first time now takes days.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence so far is Gritt&amp;rsquo;s announcement, a comment from MasTec&amp;rsquo;s construction leadership in that release, and figures on Gritt&amp;rsquo;s website. The release says MasTec Renewables evaluated the systems by installing megawatts of panels on active job sites.&lt;/p&gt;
&lt;p&gt;Rob Turner is vice president of construction at MasTec Renewables. Turner said in the release: &amp;ldquo;We&amp;rsquo;ve evaluated Gritt systems on active construction sites, and we see an opportunity to pair our teams&amp;rsquo; expertise with technology that supports them in the field.&amp;rdquo;&lt;/p&gt;
&lt;p&gt;These claims come from Gritt:&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Figures Gritt publishes for its solar installation systems, across all customers&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Measure&lt;/th&gt;&lt;th&gt;Gritt&amp;#39;s figure&lt;/th&gt;&lt;th&gt;Where Gritt states it&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Solar panels installed&lt;/td&gt;&lt;td&gt;More than 35,000&lt;/td&gt;&lt;td&gt;Solar page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Solar capacity installed&lt;/td&gt;&lt;td&gt;More than 18 MW&lt;/td&gt;&lt;td&gt;Solar page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Solar construction under contract&lt;/td&gt;&lt;td&gt;2.8 GW&lt;/td&gt;&lt;td&gt;Solar page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jobsites deployed&lt;/td&gt;&lt;td&gt;More than 7&lt;/td&gt;&lt;td&gt;Home page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Productivity&lt;/td&gt;&lt;td&gt;4X, as reported by EPC customers&lt;/td&gt;&lt;td&gt;Solar page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Cost compared with fully manual installation&lt;/td&gt;&lt;td&gt;50% lower&lt;/td&gt;&lt;td&gt;Solar page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Heavy-load injuries&lt;/td&gt;&lt;td&gt;80% fewer&lt;/td&gt;&lt;td&gt;Solar page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Panel breakages&lt;/td&gt;&lt;td&gt;Zero&lt;/td&gt;&lt;td&gt;Solar page and July release&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Time to deploy on a jobsite&lt;/td&gt;&lt;td&gt;1 to 4 weeks&lt;/td&gt;&lt;td&gt;Solar page&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.gritt.ai/solar" rel="noopener"&gt;gritt.ai&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The panel count and the 18 MW cover every Gritt customer across its deployed jobsites, and Gritt says those customers include top 10 US solar EPCs. Gritt attributes the 4X productivity figure to its EPC customers. MasTec&amp;rsquo;s own installed total, and the crew sizes and panel types behind the 4X and 50% comparisons, are not yet public.&lt;/p&gt;
&lt;aside class="note"&gt;A 4X productivity claim compares output per worker or per crew with and without the machine. Before you plan around it, find out whether the manual crew in the comparison was the same size and set the same panel model.&lt;/aside&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track modules set per labor hour. Divide the modules installed and fastened in a shift by every labor hour spent on that installation, including the equipment operator and anyone watching or guiding the machine. Keep the machine&amp;rsquo;s owning and operating cost in a separate column, so you can turn both into a cost per module at the end.&lt;/p&gt;
&lt;p&gt;Capture a baseline on a manual block with the same panel and tracker before the pilot starts:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Modules set per shift, from the foreman&amp;rsquo;s daily log.&lt;/li&gt;
&lt;li&gt;Crew size and labor hours per shift, from timecards.&lt;/li&gt;
&lt;li&gt;Modules broken or rejected, as a share of modules handled.&lt;/li&gt;
&lt;li&gt;Strains and lifting injuries, including first-aid cases, from your safety log.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;During the pilot, log the same four items for the Gritt block. Add each stop where the machine paused or a worker took over, with the minutes lost. Our post on &lt;a href="https://constructionmetrics.com/2026/10/06/measure-labor-productivity-daily-logs-timecards/"&gt;measuring labor productivity from daily logs and timecards&lt;/a&gt; shows how to line up the two data sources.&lt;/p&gt;
&lt;p&gt;A first step on one job: have the install foreman record modules set and crew hours for every shift on one block for two weeks.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;Gritt says it deploys on a jobsite in one to four weeks with minimal training. The MasTec work runs through a pipeline of projects, starting with solar. Gritt&amp;rsquo;s home page lists concrete and rebar work alongside solar and names data centers and large infrastructure as its next markets. Pricing is not public. Gritt&amp;rsquo;s site takes demo and site-visit requests through a contact form.&lt;/p&gt;
&lt;p&gt;Gritt launched in July with $32.4 million in pre-seed and Series A funding. Obvious Ventures led the $26 million Series A. For other machines that work next to a crew, see our posts on &lt;a href="https://constructionmetrics.com/2026/10/28/bedrock-robotics-600-million-autonomous-excavators/"&gt;Bedrock Robotics&amp;rsquo; autonomous excavators&lt;/a&gt; and &lt;a href="https://constructionmetrics.com/2026/10/19/origin-og-1-drywall-finishing-robot/"&gt;Origin&amp;rsquo;s OG-1 drywall finishing robot&lt;/a&gt;.&lt;/p&gt;</content:encoded></item><item><title>ABC's Construction Backlog Indicator fell to 8.1 months in October as backlog for contractors without data center work dropped to 7.6</title><link>https://constructionmetrics.com/2026/11/10/abc-backlog-indicator-october-data-center/</link><pubDate>Tue, 10 Nov 2026 10:33:23 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/10/abc-backlog-indicator-october-data-center/</guid><category>Data</category><description>ABC's backlog indicator fell 0.6 months to 8.1 in October, as firms without data center work dropped to 7.6 months and those with it rose to 11.5.</description><content:encoded>&lt;p&gt;Associated Builders and Contractors reported on November 10 that its Construction Backlog Indicator fell to 8.1 months in October 2026. That is 0.6 months below September&amp;rsquo;s 8.7 and 0.3 months below October 2025. The indicator measures work under contract but not yet performed, expressed as months of a firm&amp;rsquo;s prior-year revenue, and it comes from a survey of ABC member firms in commercial, industrial and infrastructure construction. ABC ran the October survey from October 20 to November 3. The 0.6-month drop is the largest since July, when the reading fell 0.8. Over the past 12 months the indicator has averaged 8.4 months, and in the last 25 months only January and July 2026, both at 8.0, came in lower.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Backlog fell to 8.1 months after two monthly gains&lt;/p&gt;&lt;p class="chart-subtitle"&gt;ABC Construction Backlog Indicator, months of work under contract, October 2024 to October 2026&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;Backlog fell to 8.1 months after two monthly gains&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 25 points from October 2024 to October 2026. Series: value. Values range from 8.0 to 9.1.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="210.0" y2="210.0"/&gt;&lt;line x1="72" x2="616" y1="114.0" y2="114.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;8.0&lt;/text&gt;&lt;text x="64" y="213.5" text-anchor="end"&gt;8.5&lt;/text&gt;&lt;text x="64" y="117.5" text-anchor="end"&gt;9.0&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;9.5&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2024-10&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;2025-03&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;2025-08&lt;/text&gt;&lt;text x="412.0" y="324" text-anchor="middle"&gt;2026-01&lt;/text&gt;&lt;text x="525.3" y="324" text-anchor="middle"&gt;2026-06&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="72" x2="616" y1="226.0" y2="226.0"/&gt;
&lt;text x="76" y="222.0"&gt;12-period average 8.4&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,229.2 L94.7,229.2 L117.3,248.4 L140.0,229.2 L162.7,248.4 L185.3,210.0 L208.0,171.6 L230.7,229.2 L253.3,171.6 L276.0,152.4 L298.7,210.0 L321.3,210.0 L344.0,229.2 L366.7,286.8 L389.3,267.6 L412.0,306.0 L434.7,286.8 L457.3,190.8 L480.0,152.4 L502.7,94.8 L525.3,152.4 L548.0,306.0 L570.7,210.0 L593.3,171.6 L616.0,286.8 L616.0,306.0 L72.0,306.0 Z"/&gt;
&lt;path class="line" d="M72.0,229.2 L94.7,229.2 L117.3,248.4 L140.0,229.2 L162.7,248.4 L185.3,210.0 L208.0,171.6 L230.7,229.2 L253.3,171.6 L276.0,152.4 L298.7,210.0 L321.3,210.0 L344.0,229.2 L366.7,286.8 L389.3,267.6 L412.0,306.0 L434.7,286.8 L457.3,190.8 L480.0,152.4 L502.7,94.8 L525.3,152.4 L548.0,306.0 L570.7,210.0 L593.3,171.6 L616.0,286.8"/&gt;
&lt;circle class="end" cx="616.0" cy="286.8" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="229.2" r="9"&gt;&lt;title&gt;October 2024: 8.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="229.2" r="9"&gt;&lt;title&gt;November 2024: 8.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="248.4" r="9"&gt;&lt;title&gt;December 2024: 8.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="229.2" r="9"&gt;&lt;title&gt;January 2025: 8.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="248.4" r="9"&gt;&lt;title&gt;February 2025: 8.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="210.0" r="9"&gt;&lt;title&gt;March 2025: 8.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="171.6" r="9"&gt;&lt;title&gt;April 2025: 8.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="229.2" r="9"&gt;&lt;title&gt;May 2025: 8.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="171.6" r="9"&gt;&lt;title&gt;June 2025: 8.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="152.4" r="9"&gt;&lt;title&gt;July 2025: 8.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="210.0" r="9"&gt;&lt;title&gt;August 2025: 8.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="210.0" r="9"&gt;&lt;title&gt;September 2025: 8.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="229.2" r="9"&gt;&lt;title&gt;October 2025: 8.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="286.8" r="9"&gt;&lt;title&gt;November 2025: 8.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="267.6" r="9"&gt;&lt;title&gt;December 2025: 8.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="306.0" r="9"&gt;&lt;title&gt;January 2026: 8.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="286.8" r="9"&gt;&lt;title&gt;February 2026: 8.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="190.8" r="9"&gt;&lt;title&gt;March 2026: 8.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="152.4" r="9"&gt;&lt;title&gt;April 2026: 8.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="94.8" r="9"&gt;&lt;title&gt;May 2026: 9.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="152.4" r="9"&gt;&lt;title&gt;June 2026: 8.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="306.0" r="9"&gt;&lt;title&gt;July 2026: 8.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="210.0" r="9"&gt;&lt;title&gt;August 2026: 8.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="171.6" r="9"&gt;&lt;title&gt;September 2026: 8.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="286.8" r="9"&gt;&lt;title&gt;October 2026: 8.1&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="290.8"&gt;8.1&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="279.8" y2="266.8"/&gt;
&lt;circle cx="616.0" cy="286.8" r="3.5"/&gt;&lt;text x="616.0" y="262.8" text-anchor="end"&gt;October 2026, 8.1&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;Backlog fell to 8.1 months after two monthly gains&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 25 points from October 2024 to October 2026. Series: value. Values range from 8.0 to 9.1.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="151.3" y2="151.3"/&gt;&lt;line x1="50" x2="276" y1="82.7" y2="82.7"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;8&lt;/text&gt;&lt;text x="42" y="154.8" text-anchor="end"&gt;8.5&lt;/text&gt;&lt;text x="42" y="86.2" text-anchor="end"&gt;9&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;9.5&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2024-10&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2025-10&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="50" x2="276" y1="162.8" y2="162.8"/&gt;
&lt;text x="54" y="158.8"&gt;12-period average 8.4&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,165.1 L59.4,165.1 L68.8,178.8 L78.2,165.1 L87.7,178.8 L97.1,151.3 L106.5,123.9 L115.9,165.1 L125.3,123.9 L134.8,110.1 L144.2,151.3 L153.6,151.3 L163.0,165.1 L172.4,206.3 L181.8,192.5 L191.2,220.0 L200.7,206.3 L210.1,137.6 L219.5,110.1 L228.9,68.9 L238.3,110.1 L247.8,220.0 L257.2,151.3 L266.6,123.9 L276.0,206.3 L276.0,220.0 L50.0,220.0 Z"/&gt;
&lt;path class="line" d="M50.0,165.1 L59.4,165.1 L68.8,178.8 L78.2,165.1 L87.7,178.8 L97.1,151.3 L106.5,123.9 L115.9,165.1 L125.3,123.9 L134.8,110.1 L144.2,151.3 L153.6,151.3 L163.0,165.1 L172.4,206.3 L181.8,192.5 L191.2,220.0 L200.7,206.3 L210.1,137.6 L219.5,110.1 L228.9,68.9 L238.3,110.1 L247.8,220.0 L257.2,151.3 L266.6,123.9 L276.0,206.3"/&gt;
&lt;circle class="end" cx="276.0" cy="206.3" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="165.1" r="9"&gt;&lt;title&gt;October 2024: 8.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="165.1" r="9"&gt;&lt;title&gt;November 2024: 8.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="178.8" r="9"&gt;&lt;title&gt;December 2024: 8.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="165.1" r="9"&gt;&lt;title&gt;January 2025: 8.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="178.8" r="9"&gt;&lt;title&gt;February 2025: 8.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="151.3" r="9"&gt;&lt;title&gt;March 2025: 8.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="123.9" r="9"&gt;&lt;title&gt;April 2025: 8.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="165.1" r="9"&gt;&lt;title&gt;May 2025: 8.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="123.9" r="9"&gt;&lt;title&gt;June 2025: 8.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="110.1" r="9"&gt;&lt;title&gt;July 2025: 8.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="151.3" r="9"&gt;&lt;title&gt;August 2025: 8.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="151.3" r="9"&gt;&lt;title&gt;September 2025: 8.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="165.1" r="9"&gt;&lt;title&gt;October 2025: 8.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="206.3" r="9"&gt;&lt;title&gt;November 2025: 8.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="192.5" r="9"&gt;&lt;title&gt;December 2025: 8.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="220.0" r="9"&gt;&lt;title&gt;January 2026: 8.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="206.3" r="9"&gt;&lt;title&gt;February 2026: 8.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="137.6" r="9"&gt;&lt;title&gt;March 2026: 8.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="110.1" r="9"&gt;&lt;title&gt;April 2026: 8.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="68.9" r="9"&gt;&lt;title&gt;May 2026: 9.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="110.1" r="9"&gt;&lt;title&gt;June 2026: 8.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="220.0" r="9"&gt;&lt;title&gt;July 2026: 8.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="151.3" r="9"&gt;&lt;title&gt;August 2026: 8.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="123.9" r="9"&gt;&lt;title&gt;September 2026: 8.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="206.3" r="9"&gt;&lt;title&gt;October 2026: 8.1&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="210.3"&gt;8.1&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="199.3" y2="186.3"/&gt;
&lt;circle cx="276.0" cy="206.3" r="3.5"/&gt;&lt;text x="276.0" y="170.3" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;October 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;8.1&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;Member survey. ABC&amp;#39;s methodology note does not describe a seasonal adjustment.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://www.abc.org/Portals/1/CEU/CCI_CBI_Time_Series_11.4.2026.xlsx?ver=h6yjinUup9m-X9uiTjbEbw%3d%3d" rel="noopener"&gt;abc.org&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;ABC Construction Backlog Indicator, last 13 months&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Backlog (months)&lt;/th&gt;&lt;th class="num"&gt;Change from prior month (months)&lt;/th&gt;&lt;th class="num"&gt;Change from a year earlier (months)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Oct 2025&lt;/td&gt;&lt;td class="num"&gt;8.4&lt;/td&gt;&lt;td class="num"&gt;-0.1&lt;/td&gt;&lt;td class="num"&gt;0.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nov 2025&lt;/td&gt;&lt;td class="num"&gt;8.1&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec 2025&lt;/td&gt;&lt;td class="num"&gt;8.2&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;&lt;td class="num"&gt;-0.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jan 2026&lt;/td&gt;&lt;td class="num"&gt;8.0&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;&lt;td class="num"&gt;-0.4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb 2026&lt;/td&gt;&lt;td class="num"&gt;8.1&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mar 2026&lt;/td&gt;&lt;td class="num"&gt;8.6&lt;/td&gt;&lt;td class="num"&gt;0.5&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Apr 2026&lt;/td&gt;&lt;td class="num"&gt;8.8&lt;/td&gt;&lt;td class="num"&gt;0.2&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;9.1&lt;/td&gt;&lt;td class="num"&gt;0.3&lt;/td&gt;&lt;td class="num"&gt;0.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jun 2026&lt;/td&gt;&lt;td class="num"&gt;8.8&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jul 2026&lt;/td&gt;&lt;td class="num"&gt;8.0&lt;/td&gt;&lt;td class="num"&gt;-0.8&lt;/td&gt;&lt;td class="num"&gt;-0.8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aug 2026&lt;/td&gt;&lt;td class="num"&gt;8.5&lt;/td&gt;&lt;td class="num"&gt;0.5&lt;/td&gt;&lt;td class="num"&gt;0.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Sep 2026&lt;/td&gt;&lt;td class="num"&gt;8.7&lt;/td&gt;&lt;td class="num"&gt;0.2&lt;/td&gt;&lt;td class="num"&gt;0.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oct 2026&lt;/td&gt;&lt;td class="num"&gt;8.1&lt;/td&gt;&lt;td class="num"&gt;-0.6&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.abc.org/Portals/1/CEU/CCI_CBI_Time_Series_11.4.2026.xlsx?ver=h6yjinUup9m-X9uiTjbEbw%3d%3d" rel="noopener"&gt;abc.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="what-moved"&gt;What moved&lt;/h2&gt;
&lt;p&gt;This month ABC split the national figure by whether a contractor has data center work. ABC chief economist Anirban Basu said the decline came mostly from the 88% of contractors with no data center contracts, whose backlog fell to 7.6 months from 8.3. Contractors with data center work rose to 11.5 months from 11.3, and Basu said most of them have more than $100 million in annual revenue. &amp;ldquo;Backlog fell sharply in October, returning to levels not consistently observed since last winter,&amp;rdquo; he said.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Backlog in months for contractors with and without data center work&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Group&lt;/th&gt;&lt;th class="num"&gt;Sep 2026&lt;/th&gt;&lt;th class="num"&gt;Oct 2026&lt;/th&gt;&lt;th class="num"&gt;Change from prior month (months)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Contractors with data center work&lt;/td&gt;&lt;td class="num"&gt;11.3&lt;/td&gt;&lt;td class="num"&gt;11.5&lt;/td&gt;&lt;td class="num"&gt;0.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Contractors without data center work (88% of contractors)&lt;/td&gt;&lt;td class="num"&gt;8.3&lt;/td&gt;&lt;td class="num"&gt;7.6&lt;/td&gt;&lt;td class="num"&gt;-0.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;All contractors&lt;/td&gt;&lt;td class="num"&gt;8.7&lt;/td&gt;&lt;td class="num"&gt;8.1&lt;/td&gt;&lt;td class="num"&gt;-0.6&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.abc.org/News-Media/News-Releases/abcs-construction-backlog-indicator-drops-in-october" rel="noopener"&gt;abc.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;On average, then, members without a data center job carry 3.9 fewer months of work than members with one. The segment rows in ABC&amp;rsquo;s workbook show where the drop landed. Commercial and institutional backlog fell a full month to 8.0, tying July for the segment&amp;rsquo;s lowest reading of 2026. ABC&amp;rsquo;s methodology note puts data centers in that segment, along with offices, schools, hospitals, multifamily and warehouses. Infrastructure fell to 8.7 months, which ABC says is the lowest since May 2025. Heavy industrial went the other way, rising 2.0 months to 10.1, a 15-month high by ABC&amp;rsquo;s count.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Backlog in months by segment, region and firm revenue&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Group&lt;/th&gt;&lt;th class="num"&gt;Oct 2025&lt;/th&gt;&lt;th class="num"&gt;Sep 2026&lt;/th&gt;&lt;th class="num"&gt;Oct 2026&lt;/th&gt;&lt;th class="num"&gt;Change from prior month (months)&lt;/th&gt;&lt;th class="num"&gt;Change from a year earlier (months)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Commercial and institutional&lt;/td&gt;&lt;td class="num"&gt;8.5&lt;/td&gt;&lt;td class="num"&gt;9.0&lt;/td&gt;&lt;td class="num"&gt;8.0&lt;/td&gt;&lt;td class="num"&gt;-1.0&lt;/td&gt;&lt;td class="num"&gt;-0.5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Heavy industrial&lt;/td&gt;&lt;td class="num"&gt;8.8&lt;/td&gt;&lt;td class="num"&gt;8.1&lt;/td&gt;&lt;td class="num"&gt;10.1&lt;/td&gt;&lt;td class="num"&gt;2.0&lt;/td&gt;&lt;td class="num"&gt;1.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Infrastructure&lt;/td&gt;&lt;td class="num"&gt;9.8&lt;/td&gt;&lt;td class="num"&gt;9.4&lt;/td&gt;&lt;td class="num"&gt;8.7&lt;/td&gt;&lt;td class="num"&gt;-0.7&lt;/td&gt;&lt;td class="num"&gt;-1.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Middle States&lt;/td&gt;&lt;td class="num"&gt;8.1&lt;/td&gt;&lt;td class="num"&gt;6.7&lt;/td&gt;&lt;td class="num"&gt;7.8&lt;/td&gt;&lt;td class="num"&gt;1.1&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Northeast&lt;/td&gt;&lt;td class="num"&gt;7.7&lt;/td&gt;&lt;td class="num"&gt;8.5&lt;/td&gt;&lt;td class="num"&gt;7.5&lt;/td&gt;&lt;td class="num"&gt;-1.0&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;South&lt;/td&gt;&lt;td class="num"&gt;9.6&lt;/td&gt;&lt;td class="num"&gt;10.3&lt;/td&gt;&lt;td class="num"&gt;10.1&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;&lt;td class="num"&gt;0.5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;West&lt;/td&gt;&lt;td class="num"&gt;8.1&lt;/td&gt;&lt;td class="num"&gt;8.1&lt;/td&gt;&lt;td class="num"&gt;6.6&lt;/td&gt;&lt;td class="num"&gt;-1.5&lt;/td&gt;&lt;td class="num"&gt;-1.5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Revenue under $30 million&lt;/td&gt;&lt;td class="num"&gt;7.3&lt;/td&gt;&lt;td class="num"&gt;7.7&lt;/td&gt;&lt;td class="num"&gt;7.1&lt;/td&gt;&lt;td class="num"&gt;-0.6&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Revenue $30 million to $50 million&lt;/td&gt;&lt;td class="num"&gt;9.4&lt;/td&gt;&lt;td class="num"&gt;6.4&lt;/td&gt;&lt;td class="num"&gt;9.2&lt;/td&gt;&lt;td class="num"&gt;2.8&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Revenue $50 million to $100 million&lt;/td&gt;&lt;td class="num"&gt;10.4&lt;/td&gt;&lt;td class="num"&gt;11.3&lt;/td&gt;&lt;td class="num"&gt;9.2&lt;/td&gt;&lt;td class="num"&gt;-2.1&lt;/td&gt;&lt;td class="num"&gt;-1.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Revenue $100 million or more&lt;/td&gt;&lt;td class="num"&gt;12.2&lt;/td&gt;&lt;td class="num"&gt;11.8&lt;/td&gt;&lt;td class="num"&gt;11.6&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;&lt;td class="num"&gt;-0.6&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.abc.org/Portals/1/CEU/CCI_CBI_Time_Series_11.4.2026.xlsx?ver=h6yjinUup9m-X9uiTjbEbw%3d%3d" rel="noopener"&gt;abc.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Three of the four regions fell. The West dropped 1.5 months to 6.6, matching February for its lowest reading this year, and the Northeast fell to 7.5 from 8.5. The South slipped 0.2 months to 10.1, still the highest of the four. The Middle States, ABC&amp;rsquo;s 12-state block from Ohio and Michigan west to the Dakotas and Kansas, recovered to 7.8 after September&amp;rsquo;s 6.7.&lt;/p&gt;
&lt;p&gt;The revenue bands moved in large, opposite steps. The $50 million to $100 million band fell 2.1 months to 9.2, and the $30 million to $50 million band rose 2.8 months to the same 9.2, undoing most of its September drop. The $100 million-plus band slipped to 11.6 from 11.8. That last figure sits a little oddly next to Basu&amp;rsquo;s account, since he describes the data center group as mostly large firms and that group gained. Both can hold if large firms without data center work lost enough backlog to offset the gain. The release does not break the top revenue band down further, so the data cannot settle it.&lt;/p&gt;
&lt;p&gt;The Construction Confidence Index comes from the same survey. It is a diffusion index, meaning a reading above 50 says more firms expect growth than decline over the next six months. Profit margins rose to 53.3 from 52.0, the highest since March. Sales fell to 59.9 from 60.1 and staffing to 59.4 from 60.7, both the lowest since November 2025.&lt;/p&gt;
&lt;figure class="chart" id="chart-4"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Margin expectations rose while sales and staffing slipped&lt;/p&gt;&lt;p class="chart-subtitle"&gt;ABC Construction Confidence Index, six-month outlook, October 2024 to October 2026, 50 = as many firms expect a decline as a rise&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-4-w-title chart-4-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-4-w-title"&gt;Margin expectations rose while sales and staffing slipped&lt;/title&gt;
&lt;desc id="chart-4-w-desc"&gt;Line chart with 25 points from October 2024 to October 2026. Series: Sales, Profit margins, Staffing levels. Values range from 51 to 66.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="234.0" y2="234.0"/&gt;&lt;line x1="72" x2="616" y1="162.0" y2="162.0"/&gt;&lt;line x1="72" x2="616" y1="90.0" y2="90.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;50&lt;/text&gt;&lt;text x="64" y="237.5" text-anchor="end"&gt;55&lt;/text&gt;&lt;text x="64" y="165.5" text-anchor="end"&gt;60&lt;/text&gt;&lt;text x="64" y="93.5" text-anchor="end"&gt;65&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;70&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2024-10&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;2025-03&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;2025-08&lt;/text&gt;&lt;text x="412.0" y="324" text-anchor="middle"&gt;2026-01&lt;/text&gt;&lt;text x="525.3" y="324" text-anchor="middle"&gt;2026-06&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="line" d="M72.0,176.4 L94.7,114.5 L117.3,101.5 L140.0,97.2 L162.7,97.2 L185.3,124.6 L208.0,131.8 L230.7,156.2 L253.3,121.7 L276.0,156.2 L298.7,156.2 L321.3,167.8 L344.0,167.8 L366.7,164.9 L389.3,120.2 L412.0,94.3 L434.7,78.5 L457.3,94.3 L480.0,72.7 L502.7,146.2 L525.3,110.2 L548.0,144.7 L570.7,133.2 L593.3,160.6 L616.0,163.4"/&gt;
&lt;circle class="end" cx="616.0" cy="163.4" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="176.4" r="9"&gt;&lt;title&gt;October 2024: 59.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="114.5" r="9"&gt;&lt;title&gt;November 2024: 63.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="101.5" r="9"&gt;&lt;title&gt;December 2024: 64.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="97.2" r="9"&gt;&lt;title&gt;January 2025: 64.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="97.2" r="9"&gt;&lt;title&gt;February 2025: 64.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="124.6" r="9"&gt;&lt;title&gt;March 2025: 62.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="131.8" r="9"&gt;&lt;title&gt;April 2025: 62.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="156.2" r="9"&gt;&lt;title&gt;May 2025: 60.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="121.7" r="9"&gt;&lt;title&gt;June 2025: 62.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="156.2" r="9"&gt;&lt;title&gt;July 2025: 60.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="156.2" r="9"&gt;&lt;title&gt;August 2025: 60.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="167.8" r="9"&gt;&lt;title&gt;September 2025: 59.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="167.8" r="9"&gt;&lt;title&gt;October 2025: 59.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="164.9" r="9"&gt;&lt;title&gt;November 2025: 59.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="120.2" r="9"&gt;&lt;title&gt;December 2025: 62.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="94.3" r="9"&gt;&lt;title&gt;January 2026: 64.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="78.5" r="9"&gt;&lt;title&gt;February 2026: 65.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="94.3" r="9"&gt;&lt;title&gt;March 2026: 64.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="72.7" r="9"&gt;&lt;title&gt;April 2026: 66.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="146.2" r="9"&gt;&lt;title&gt;May 2026: 61.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="110.2" r="9"&gt;&lt;title&gt;June 2026: 63.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="144.7" r="9"&gt;&lt;title&gt;July 2026: 61.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="133.2" r="9"&gt;&lt;title&gt;August 2026: 62.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="160.6" r="9"&gt;&lt;title&gt;September 2026: 60.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="163.4" r="9"&gt;&lt;title&gt;October 2026: 59.9&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="167.4"&gt;59.9&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s2"&gt;
&lt;path class="line" d="M72.0,294.5 L94.7,229.7 L117.3,244.1 L140.0,218.2 L162.7,236.9 L185.3,267.1 L208.0,261.4 L230.7,258.5 L253.3,255.6 L276.0,280.1 L298.7,278.6 L321.3,272.9 L344.0,287.3 L366.7,290.2 L389.3,280.1 L412.0,257.0 L434.7,264.2 L457.3,254.2 L480.0,235.4 L502.7,270.0 L525.3,271.4 L548.0,267.1 L570.7,264.2 L593.3,277.2 L616.0,258.5"/&gt;
&lt;circle class="end" cx="616.0" cy="258.5" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="294.5" r="9"&gt;&lt;title&gt;October 2024: 50.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="229.7" r="9"&gt;&lt;title&gt;November 2024: 55.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="244.1" r="9"&gt;&lt;title&gt;December 2024: 54.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="218.2" r="9"&gt;&lt;title&gt;January 2025: 56.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="236.9" r="9"&gt;&lt;title&gt;February 2025: 54.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="267.1" r="9"&gt;&lt;title&gt;March 2025: 52.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="261.4" r="9"&gt;&lt;title&gt;April 2025: 53.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="258.5" r="9"&gt;&lt;title&gt;May 2025: 53.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="255.6" r="9"&gt;&lt;title&gt;June 2025: 53.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="280.1" r="9"&gt;&lt;title&gt;July 2025: 51.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="278.6" r="9"&gt;&lt;title&gt;August 2025: 51.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="272.9" r="9"&gt;&lt;title&gt;September 2025: 52.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="287.3" r="9"&gt;&lt;title&gt;October 2025: 51.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="290.2" r="9"&gt;&lt;title&gt;November 2025: 51.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="280.1" r="9"&gt;&lt;title&gt;December 2025: 51.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="257.0" r="9"&gt;&lt;title&gt;January 2026: 53.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="264.2" r="9"&gt;&lt;title&gt;February 2026: 52.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="254.2" r="9"&gt;&lt;title&gt;March 2026: 53.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="235.4" r="9"&gt;&lt;title&gt;April 2026: 54.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="270.0" r="9"&gt;&lt;title&gt;May 2026: 52.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="271.4" r="9"&gt;&lt;title&gt;June 2026: 52.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="267.1" r="9"&gt;&lt;title&gt;July 2026: 52.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="264.2" r="9"&gt;&lt;title&gt;August 2026: 52.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="277.2" r="9"&gt;&lt;title&gt;September 2026: 52.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="258.5" r="9"&gt;&lt;title&gt;October 2026: 53.3&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="262.5"&gt;53.3&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s3"&gt;
&lt;path class="line" d="M72.0,182.2 L94.7,126.0 L117.3,115.9 L140.0,121.7 L162.7,104.4 L185.3,101.5 L208.0,124.6 L230.7,137.5 L253.3,170.6 L276.0,127.4 L298.7,163.4 L321.3,157.7 L344.0,160.6 L366.7,187.9 L389.3,162.0 L412.0,144.7 L434.7,118.8 L457.3,100.1 L480.0,82.8 L502.7,143.3 L525.3,123.1 L548.0,128.9 L570.7,169.2 L593.3,151.9 L616.0,170.6"/&gt;
&lt;circle class="end" cx="616.0" cy="170.6" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="182.2" r="9"&gt;&lt;title&gt;October 2024: 58.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="126.0" r="9"&gt;&lt;title&gt;November 2024: 62.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="115.9" r="9"&gt;&lt;title&gt;December 2024: 63.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="121.7" r="9"&gt;&lt;title&gt;January 2025: 62.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="104.4" r="9"&gt;&lt;title&gt;February 2025: 64.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="101.5" r="9"&gt;&lt;title&gt;March 2025: 64.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="124.6" r="9"&gt;&lt;title&gt;April 2025: 62.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="137.5" r="9"&gt;&lt;title&gt;May 2025: 61.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="170.6" r="9"&gt;&lt;title&gt;June 2025: 59.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="127.4" r="9"&gt;&lt;title&gt;July 2025: 62.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="163.4" r="9"&gt;&lt;title&gt;August 2025: 59.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="157.7" r="9"&gt;&lt;title&gt;September 2025: 60.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="160.6" r="9"&gt;&lt;title&gt;October 2025: 60.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="187.9" r="9"&gt;&lt;title&gt;November 2025: 58.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="162.0" r="9"&gt;&lt;title&gt;December 2025: 60.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="144.7" r="9"&gt;&lt;title&gt;January 2026: 61.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="118.8" r="9"&gt;&lt;title&gt;February 2026: 63.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="100.1" r="9"&gt;&lt;title&gt;March 2026: 64.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="82.8" r="9"&gt;&lt;title&gt;April 2026: 65.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="143.3" r="9"&gt;&lt;title&gt;May 2026: 61.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="123.1" r="9"&gt;&lt;title&gt;June 2026: 62.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="128.9" r="9"&gt;&lt;title&gt;July 2026: 62.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="169.2" r="9"&gt;&lt;title&gt;August 2026: 59.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="151.9" r="9"&gt;&lt;title&gt;September 2026: 60.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="170.6" r="9"&gt;&lt;title&gt;October 2026: 59.4&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="174.6"&gt;59.4&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-4-n-title chart-4-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-4-n-title"&gt;Margin expectations rose while sales and staffing slipped&lt;/title&gt;
&lt;desc id="chart-4-n-desc"&gt;Line chart with 25 points from October 2024 to October 2026. Series: Sales, Profit margins, Staffing levels. Values range from 51 to 66.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="117.0" y2="117.0"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;50&lt;/text&gt;&lt;text x="42" y="120.5" text-anchor="end"&gt;60&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;70&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2024-10&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2025-10&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="line" d="M50.0,127.3 L59.4,83.0 L68.8,73.7 L78.2,70.7 L87.7,70.7 L97.1,90.2 L106.5,95.4 L115.9,112.9 L125.3,88.2 L134.8,112.9 L144.2,112.9 L153.6,121.1 L163.0,121.1 L172.4,119.1 L181.8,87.1 L191.2,68.6 L200.7,57.3 L210.1,68.6 L219.5,53.1 L228.9,105.7 L238.3,79.9 L247.8,104.6 L257.2,96.4 L266.6,116.0 L276.0,118.0"/&gt;
&lt;circle class="end" cx="276.0" cy="118.0" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="127.3" r="9"&gt;&lt;title&gt;October 2024: 59.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="83.0" r="9"&gt;&lt;title&gt;November 2024: 63.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="73.7" r="9"&gt;&lt;title&gt;December 2024: 64.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="70.7" r="9"&gt;&lt;title&gt;January 2025: 64.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="70.7" r="9"&gt;&lt;title&gt;February 2025: 64.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="90.2" r="9"&gt;&lt;title&gt;March 2025: 62.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="95.4" r="9"&gt;&lt;title&gt;April 2025: 62.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="112.9" r="9"&gt;&lt;title&gt;May 2025: 60.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="88.2" r="9"&gt;&lt;title&gt;June 2025: 62.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="112.9" r="9"&gt;&lt;title&gt;July 2025: 60.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="112.9" r="9"&gt;&lt;title&gt;August 2025: 60.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="121.1" r="9"&gt;&lt;title&gt;September 2025: 59.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="121.1" r="9"&gt;&lt;title&gt;October 2025: 59.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="119.1" r="9"&gt;&lt;title&gt;November 2025: 59.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="87.1" r="9"&gt;&lt;title&gt;December 2025: 62.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="68.6" r="9"&gt;&lt;title&gt;January 2026: 64.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="57.3" r="9"&gt;&lt;title&gt;February 2026: 65.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="68.6" r="9"&gt;&lt;title&gt;March 2026: 64.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="53.1" r="9"&gt;&lt;title&gt;April 2026: 66.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="105.7" r="9"&gt;&lt;title&gt;May 2026: 61.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="79.9" r="9"&gt;&lt;title&gt;June 2026: 63.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="104.6" r="9"&gt;&lt;title&gt;July 2026: 61.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="96.4" r="9"&gt;&lt;title&gt;August 2026: 62.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="116.0" r="9"&gt;&lt;title&gt;September 2026: 60.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="118.0" r="9"&gt;&lt;title&gt;October 2026: 59.9&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="122.0"&gt;59.9&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s2"&gt;
&lt;path class="line" d="M50.0,211.8 L59.4,165.4 L68.8,175.7 L78.2,157.2 L87.7,170.6 L97.1,192.2 L106.5,188.1 L115.9,186.0 L125.3,183.9 L134.8,201.5 L144.2,200.4 L153.6,196.3 L163.0,206.6 L172.4,208.7 L181.8,201.5 L191.2,185.0 L200.7,190.1 L210.1,182.9 L219.5,169.5 L228.9,194.2 L238.3,195.3 L247.8,192.2 L257.2,190.1 L266.6,199.4 L276.0,186.0"/&gt;
&lt;circle class="end" cx="276.0" cy="186.0" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="211.8" r="9"&gt;&lt;title&gt;October 2024: 50.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="165.4" r="9"&gt;&lt;title&gt;November 2024: 55.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="175.7" r="9"&gt;&lt;title&gt;December 2024: 54.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="157.2" r="9"&gt;&lt;title&gt;January 2025: 56.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="170.6" r="9"&gt;&lt;title&gt;February 2025: 54.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="192.2" r="9"&gt;&lt;title&gt;March 2025: 52.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="188.1" r="9"&gt;&lt;title&gt;April 2025: 53.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="186.0" r="9"&gt;&lt;title&gt;May 2025: 53.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="183.9" r="9"&gt;&lt;title&gt;June 2025: 53.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="201.5" r="9"&gt;&lt;title&gt;July 2025: 51.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="200.4" r="9"&gt;&lt;title&gt;August 2025: 51.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="196.3" r="9"&gt;&lt;title&gt;September 2025: 52.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="206.6" r="9"&gt;&lt;title&gt;October 2025: 51.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="208.7" r="9"&gt;&lt;title&gt;November 2025: 51.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="201.5" r="9"&gt;&lt;title&gt;December 2025: 51.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="185.0" r="9"&gt;&lt;title&gt;January 2026: 53.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="190.1" r="9"&gt;&lt;title&gt;February 2026: 52.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="182.9" r="9"&gt;&lt;title&gt;March 2026: 53.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="169.5" r="9"&gt;&lt;title&gt;April 2026: 54.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="194.2" r="9"&gt;&lt;title&gt;May 2026: 52.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="195.3" r="9"&gt;&lt;title&gt;June 2026: 52.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="192.2" r="9"&gt;&lt;title&gt;July 2026: 52.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="190.1" r="9"&gt;&lt;title&gt;August 2026: 52.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="199.4" r="9"&gt;&lt;title&gt;September 2026: 52.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="186.0" r="9"&gt;&lt;title&gt;October 2026: 53.3&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="190.0"&gt;53.3&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s3"&gt;
&lt;path class="line" d="M50.0,131.4 L59.4,91.2 L68.8,84.0 L78.2,88.2 L87.7,75.8 L97.1,73.7 L106.5,90.2 L115.9,99.5 L125.3,123.2 L134.8,92.3 L144.2,118.0 L153.6,113.9 L163.0,116.0 L172.4,135.5 L181.8,117.0 L191.2,104.6 L200.7,86.1 L210.1,72.7 L219.5,60.4 L228.9,103.6 L238.3,89.2 L247.8,93.3 L257.2,122.2 L266.6,109.8 L276.0,123.2"/&gt;
&lt;circle class="end" cx="276.0" cy="123.2" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="131.4" r="9"&gt;&lt;title&gt;October 2024: 58.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="91.2" r="9"&gt;&lt;title&gt;November 2024: 62.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="84.0" r="9"&gt;&lt;title&gt;December 2024: 63.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="88.2" r="9"&gt;&lt;title&gt;January 2025: 62.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="75.8" r="9"&gt;&lt;title&gt;February 2025: 64.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="73.7" r="9"&gt;&lt;title&gt;March 2025: 64.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="90.2" r="9"&gt;&lt;title&gt;April 2025: 62.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="99.5" r="9"&gt;&lt;title&gt;May 2025: 61.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="123.2" r="9"&gt;&lt;title&gt;June 2025: 59.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="92.3" r="9"&gt;&lt;title&gt;July 2025: 62.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="118.0" r="9"&gt;&lt;title&gt;August 2025: 59.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="113.9" r="9"&gt;&lt;title&gt;September 2025: 60.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="116.0" r="9"&gt;&lt;title&gt;October 2025: 60.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="135.5" r="9"&gt;&lt;title&gt;November 2025: 58.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="117.0" r="9"&gt;&lt;title&gt;December 2025: 60.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="104.6" r="9"&gt;&lt;title&gt;January 2026: 61.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="86.1" r="9"&gt;&lt;title&gt;February 2026: 63.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="72.7" r="9"&gt;&lt;title&gt;March 2026: 64.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="60.4" r="9"&gt;&lt;title&gt;April 2026: 65.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="103.6" r="9"&gt;&lt;title&gt;May 2026: 61.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="89.2" r="9"&gt;&lt;title&gt;June 2026: 62.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="93.3" r="9"&gt;&lt;title&gt;July 2026: 62.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="122.2" r="9"&gt;&lt;title&gt;August 2026: 59.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="109.8" r="9"&gt;&lt;title&gt;September 2026: 60.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="123.2" r="9"&gt;&lt;title&gt;October 2026: 59.4&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="127.2"&gt;59.4&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;ul class="chart-legend"&gt;
&lt;li class="s1"&gt;&lt;span class="swatch"&gt;&lt;/span&gt;Sales&lt;/li&gt;
&lt;li class="s2"&gt;&lt;span class="swatch"&gt;&lt;/span&gt;Profit margins&lt;/li&gt;
&lt;li class="s3"&gt;&lt;span class="swatch"&gt;&lt;/span&gt;Staffing levels&lt;/li&gt;
&lt;/ul&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-source"&gt;Source: &lt;a href="https://www.abc.org/Portals/1/CEU/CCI_CBI_Time_Series_11.4.2026.xlsx?ver=h6yjinUup9m-X9uiTjbEbw%3d%3d" rel="noopener"&gt;abc.org&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Basu called the margin reading encouraging given recent increases in materials prices and borrowing costs, and added that roughly 1 in 4 contractors still expect margins to shrink. In the workbook that share is 23.6%, with 20.0% expecting margins to fall a little and 3.6% a lot. On sales, 5.1% of respondents expect a large decline over the next six months, the highest share since June 2023.&lt;/p&gt;
&lt;h2 id="how-to-use-this-number"&gt;How to use this number&lt;/h2&gt;
&lt;p&gt;ABC computes each firm&amp;rsquo;s figure as current backlog dollars divided by prior fiscal-year revenue, times 12. You can run the same arithmetic on your own books:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Take signed backlog from your &lt;a href="https://constructionmetrics.com/2026/09/26/build-work-in-progress-schedule-job-cost/"&gt;work-in-progress schedule&lt;/a&gt; at the end of October.&lt;/li&gt;
&lt;li&gt;Divide by last fiscal year&amp;rsquo;s revenue and multiply by 12.&lt;/li&gt;
&lt;li&gt;Compare the result with the national 8.1, the 7.6 for contractors without data center work, and the rows in the segment table that match your market, region and size.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;As an example with round numbers, a firm with $60 million in prior-year revenue and $36 million of signed, unbilled work has 36 divided by 60, times 12, or 7.2 months. That is 0.9 months below the national figure but only 0.4 months below members without data center work. If the firm has no data center contracts, the 7.6 is the closer benchmark. The site&amp;rsquo;s post on &lt;a href="https://constructionmetrics.com/2026/09/28/compute-backlog-in-months-abc-indicator/"&gt;computing backlog in months&lt;/a&gt; walks through the calculation in more detail.&lt;/p&gt;
&lt;p&gt;The second use is tracking the split over time. The data center figures appear in the release text and are not a column in ABC&amp;rsquo;s workbook, so you would need to record them from each monthly release. Put your own monthly figure next to the no-data-center line in the same sheet or Power BI table you use for WIP. A gap between the two that persists for several months is a reason to check your own pipeline, starting with bid volume and hit rate.&lt;/p&gt;
&lt;h2 id="revisions-and-caveats"&gt;Revisions and caveats&lt;/h2&gt;
&lt;p&gt;September&amp;rsquo;s 8.7 was not revised. ABC reported 8.7 in its October 13 release, and the November 4 workbook carries the same figure. The workbook replaces the full history each month, so earlier months could change without a mention in the release text.&lt;/p&gt;
&lt;p&gt;The indicator is a member survey, and the number of responding firms is not in the release or the methodology note. Subgroups such as a single region or revenue band rest on fewer responses than the national figure, which may explain one-month swings like the 2.8-month rise in the $30 million to $50 million band. The data center split also appears only in the release text, so its history cannot be checked against the workbook. In September Basu put the share of members with data center work at 15%. The October release&amp;rsquo;s 88% without it implies about 12%, and neither release says whether the difference comes from the sample or from firms finishing or starting data center jobs.&lt;/p&gt;
&lt;p&gt;ABC&amp;rsquo;s methodology note says the backlog figure covers the previous month&amp;rsquo;s work under contract, based on the latest financials each firm has. ABC revised the reference months for the whole series in May 2020 to better match the survey period. The note does not describe a seasonal adjustment. (Last year the indicator also slipped in October and fell again in November.) The year-over-year comparison avoids that issue, and on that basis backlog is down 0.3 months.&lt;/p&gt;</content:encoded></item><item><title>Trimble Connect Scheduling flags at-risk tasks from open RFIs, submittals and weather for $588 per user a year</title><link>https://constructionmetrics.com/2026/11/10/trimble-connect-scheduling-flags-at-risk-tasks/</link><pubDate>Tue, 10 Nov 2026 06:34:17 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/10/trimble-connect-scheduling-flags-at-risk-tasks/</guid><category>AI</category><description>Trimble Connect Scheduling links a CPM schedule to field look-aheads and uses an AI agent to flag tasks at risk from open RFIs, submittals and weather.</description><content:encoded>&lt;p&gt;Trimble introduced Trimble Connect Scheduling on November 9, 2026, at its Dimensions user conference in Las Vegas. The product keeps a contractor&amp;rsquo;s master CPM schedule and the field&amp;rsquo;s weekly look-ahead in one plan. An AI agent inside it watches open RFIs, pending submittals and local weather forecasts, and it flags tasks that are at risk before a crew is committed. The workflows it changes are the master schedule update and the weekly look-ahead.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;On most jobs today, the scheduler keeps the master schedule in Primavera P6 or Microsoft Project. The superintendent runs the look-ahead on a whiteboard or a spreadsheet, and the project engineer tracks RFIs and submittals in a third system. Someone has to notice that an open RFI sits under next Tuesday&amp;rsquo;s slab pour. Trimble built this product to make that check automatically.&lt;/p&gt;
&lt;p&gt;Trimble describes the work in this order:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;The scheduler builds a schedule in the product or imports one from P6, Microsoft Project or Excel. Trimble says imports keep multi-path logic and calendars.&lt;/li&gt;
&lt;li&gt;RFIs and submittals are tied to the tasks they hold up. The office works in a Gantt view, and the field works on a drag-and-drop look-ahead board. A change in one shows up in the other.&lt;/li&gt;
&lt;li&gt;A planning agent reads RFIs, submittals, daily reports, weather forecasts and BCF topics. BCF, the BIM Collaboration Format, is the file standard for model coordination issues, such as a clash logged during MEP coordination. An agent here is software that runs a multi-step task on its own, in this case checking each task&amp;rsquo;s open constraints every day.&lt;/li&gt;
&lt;li&gt;The agent marks tasks at risk and suggests a fix, such as using float or resequencing activities. The team reviews and approves the suggestion before it changes the schedule.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Control of the logic stays with the office. Field users update actual dates and look-ahead tasks, while the project manager or scheduler keeps the master logic. Trade partners can get view-only access, and a setting hides float and the critical path from trade role members so they see only committed dates and durations. Every change goes into an audit log. Schedules export as .xer for P6, .xml for Microsoft Project, and JSON.&lt;/p&gt;
&lt;p&gt;The RFI and submittal sync runs through Trimble ProjectSight, Trimble&amp;rsquo;s project management product. When ProjectSight is linked to Viewpoint Vista or Trimble Spectrum, vendor IDs and job cost codes carry over to the project team records. Trimble says the planning engine uses a domain-specific model trained on Trimble construction project data, and that it compares current data with historical patterns to predict schedule threats.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Trimble&amp;rsquo;s two November 9 releases, its product page and comments from two pilot customers. These claims come from Trimble:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;The product was built with contractors who used it over the past several months to organize schedules and communication.&lt;/li&gt;
&lt;li&gt;The agent catches small delays early enough to stop them from turning into project-wide overruns.&lt;/li&gt;
&lt;li&gt;Every AI agent and model now available in the Trimble Connect AI layer carries a safety label documenting safety, security design and data provenance.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;The two customers spoke about ease of use. Brendan Myers, vice president of DILFO Mechanical, said the product meets the planning needs of his operations team and is simple enough for field teams to learn quickly. Shelly Klarner, software specialist at Consolidated Construction, said the scheduling covers everything from milestones down to small task details.&lt;/p&gt;
&lt;p&gt;The share of flags that turned out to be real delays, and schedule days saved on pilot jobs, are not yet public.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Percent Plan Complete, or PPC, is the share of look-ahead tasks a crew committed to for the week that were finished that week. It is the most direct test of a tool that claims to catch constraints before work is committed. If the flags work, fewer committed tasks should slip because of an open RFI, a late submittal or a rain day.&lt;/p&gt;
&lt;p&gt;Capture eight weeks of PPC before the pilot. From the daily reports, count the tasks that slipped because of one of those three constraints. During the pilot, log each flag with the date it appeared and whether the team acted on it.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Metrics to capture before piloting AI risk flags on a look-ahead schedule&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Metric&lt;/th&gt;&lt;th&gt;Definition&lt;/th&gt;&lt;th&gt;Baseline to capture before the pilot&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Percent Plan Complete (PPC)&lt;/td&gt;&lt;td&gt;Look-ahead tasks finished in the week they were committed divided by tasks committed that week&lt;/td&gt;&lt;td&gt;Weekly PPC for the last 8 weeks from your look-ahead sheets&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Constraint slips&lt;/td&gt;&lt;td&gt;Count of look-ahead tasks that moved because of an open RFI or a pending submittal or weather&lt;/td&gt;&lt;td&gt;Last 8 weeks from daily reports and look-ahead notes&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Flag lead time&lt;/td&gt;&lt;td&gt;Calendar days from the first at-risk flag on a task to its planned start&lt;/td&gt;&lt;td&gt;None before the pilot. Record from week one&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Flags acted on&lt;/td&gt;&lt;td&gt;Share of at-risk flags that led to a resequence or an RFI escalation or a crew move&lt;/td&gt;&lt;td&gt;None before the pilot. Record from week one&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;Our post on &lt;a href="https://constructionmetrics.com/2026/10/31/ncc-buildots-preferred-supplier-plan-complete/"&gt;Buildots and NCC&lt;/a&gt; shows how one contractor reported a PPC change from an AI progress tool. Track float on the same job using the method in &lt;a href="https://constructionmetrics.com/2026/10/12/track-total-float-across-schedule-updates/"&gt;tracking total float across schedule updates&lt;/a&gt;. That way an accepted suggestion to use float shows up as float consumed. For weather flags, compare the agent&amp;rsquo;s forecast-driven warnings with the planned weather days you set from &lt;a href="https://constructionmetrics.com/2026/10/27/weather-delay-days-noaa-climate-normals/"&gt;NOAA climate normals&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;Start with one job whose RFIs and submittals already live in ProjectSight. Pull its last eight weekly look-aheads and compute PPC for each week.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;Trimble says the product is available now in North America to general contractors and subcontractors of all sizes in all construction sectors. The product page lists it at $588 per user per year in US dollars, excluding tax. It runs on the Trimble Connect platform, which Trimble says has more than 55 million cumulative users and more than 400 integrations.&lt;/p&gt;</content:encoded></item><item><title>How to adjust construction spending for inflation, which turns September's 2.3% nonresidential gain into a 3.0% decline</title><link>https://constructionmetrics.com/2026/11/09/adjust-construction-spending-for-inflation/</link><pubDate>Mon, 09 Nov 2026 10:33:40 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/09/adjust-construction-spending-for-inflation/</guid><category>Data</category><description>Dividing Census spending by a BLS construction price index separates price from volume, for national data and for your own revenue and backlog.</description><content:encoded>&lt;p&gt;Census reported on November 2 that private nonresidential construction spending ran at a seasonally adjusted annual rate (SAAR) of $790.6 billion in September 2026, 2.3% above September 2025. That figure counts dollars of work put in place at the prices paid that month. Over the same year, the BLS producer price index for new nonresidential building construction rose 5.4%. Divide one by the other and September&amp;rsquo;s spending bought about 3.0% less building than a year earlier.&lt;/p&gt;
&lt;p&gt;A CFO comparing this year&amp;rsquo;s revenue or backlog to last year&amp;rsquo;s faces the same arithmetic. The method below comes from the way the Federal Reserve Bank of Richmond and the Bureau of Economic Analysis convert spending to constant dollars, meaning dollars held at one period&amp;rsquo;s prices.&lt;/p&gt;
&lt;h2 id="what-the-two-numbers-measure"&gt;What the two numbers measure&lt;/h2&gt;
&lt;p&gt;Census&amp;rsquo;s Value of Construction Put in Place survey estimates the dollar value of construction work done each month. The Richmond Fed describes those dollars as covering materials, labor, contractor profit, architectural and engineering work, overhead, and interest and taxes paid during construction. AGC&amp;rsquo;s weekly Data DIGest notes that the series is not adjusted for inflation.&lt;/p&gt;
&lt;p&gt;A producer price index (PPI) tracks what sellers receive for the same output over time. BLS builds the nonresidential building indexes from model buildings broken into assemblies, such as a 5-inch reinforced slab on grade. A cost-estimating firm updates material and installation costs for each assembly every quarter. Each month BLS asks general contractors and trade contractors what overhead and profit they would add if they bid that work now. The index therefore moves with input costs and with contractor markups.&lt;/p&gt;
&lt;p&gt;AGC&amp;rsquo;s guide to construction cost indexes explains that BLS combines its five building indexes, for warehouses, schools, offices, industrial buildings and health care buildings, into the PPI for new nonresidential building construction, series WPU801. It is not seasonally adjusted, and its base is June 2009 = 100.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;The nonresidential building price index rose 5.4% in the year to September&lt;/p&gt;&lt;p class="chart-subtitle"&gt;BLS producer price index for new nonresidential building construction, index June 2009 = 100, not seasonally adjusted&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;The nonresidential building price index rose 5.4% in the year to September&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: New nonresidential building PPI. Values range from 175 to 186.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="210.0" y2="210.0"/&gt;&lt;line x1="72" x2="616" y1="114.0" y2="114.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;175&lt;/text&gt;&lt;text x="64" y="213.5" text-anchor="end"&gt;180&lt;/text&gt;&lt;text x="64" y="117.5" text-anchor="end"&gt;185&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;190&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;2025-02&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;2025-07&lt;/text&gt;&lt;text x="412.0" y="324" text-anchor="middle"&gt;2025-12&lt;/text&gt;&lt;text x="525.3" y="324" text-anchor="middle"&gt;2026-05&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,296.8 L94.7,304.3 L117.3,304.2 L140.0,298.8 L162.7,275.1 L185.3,278.3 L208.0,282.9 L230.7,296.6 L253.3,290.9 L276.0,287.3 L298.7,267.3 L321.3,272.2 L344.0,272.4 L366.7,214.1 L389.3,215.0 L412.0,218.1 L434.7,177.8 L457.3,175.7 L480.0,171.8 L502.7,177.3 L525.3,173.7 L548.0,171.3 L570.7,90.8 L593.3,91.2 L616.0,90.1 L616.0,306.0 L72.0,306.0 Z"/&gt;
&lt;path class="line" d="M72.0,296.8 L94.7,304.3 L117.3,304.2 L140.0,298.8 L162.7,275.1 L185.3,278.3 L208.0,282.9 L230.7,296.6 L253.3,290.9 L276.0,287.3 L298.7,267.3 L321.3,272.2 L344.0,272.4 L366.7,214.1 L389.3,215.0 L412.0,218.1 L434.7,177.8 L457.3,175.7 L480.0,171.8 L502.7,177.3 L525.3,173.7 L548.0,171.3 L570.7,90.8 L593.3,91.2 L616.0,90.1"/&gt;
&lt;circle class="end" cx="616.0" cy="90.1" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="296.8" r="9"&gt;&lt;title&gt;September 2024: 175.48&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="304.3" r="9"&gt;&lt;title&gt;October 2024: 175.09&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="304.2" r="9"&gt;&lt;title&gt;November 2024: 175.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="298.8" r="9"&gt;&lt;title&gt;December 2024: 175.38&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="275.1" r="9"&gt;&lt;title&gt;January 2025: 176.61&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="278.3" r="9"&gt;&lt;title&gt;February 2025: 176.44&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="282.9" r="9"&gt;&lt;title&gt;March 2025: 176.21&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="296.6" r="9"&gt;&lt;title&gt;April 2025: 175.49&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="290.9" r="9"&gt;&lt;title&gt;May 2025: 175.79&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="287.3" r="9"&gt;&lt;title&gt;June 2025: 175.98&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="267.3" r="9"&gt;&lt;title&gt;July 2025: 177.01&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="272.2" r="9"&gt;&lt;title&gt;August 2025: 176.76&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="272.4" r="9"&gt;&lt;title&gt;September 2025: 176.75&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="214.1" r="9"&gt;&lt;title&gt;October 2025: 179.79&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="215.0" r="9"&gt;&lt;title&gt;November 2025: 179.74&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="218.1" r="9"&gt;&lt;title&gt;December 2025: 179.58&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="177.8" r="9"&gt;&lt;title&gt;January 2026: 181.68&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="175.7" r="9"&gt;&lt;title&gt;February 2026: 181.78&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="171.8" r="9"&gt;&lt;title&gt;March 2026: 181.99&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="177.3" r="9"&gt;&lt;title&gt;April 2026: 181.70&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="173.7" r="9"&gt;&lt;title&gt;May 2026: 181.89&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="171.3" r="9"&gt;&lt;title&gt;June 2026: 182.02&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="90.8" r="9"&gt;&lt;title&gt;July 2026: 186.21&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="91.2" r="9"&gt;&lt;title&gt;August 2026: 186.19&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="90.1" r="9"&gt;&lt;title&gt;September 2026: 186.24&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="94.1"&gt;186.24&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="83.1" y2="70.1"/&gt;
&lt;circle cx="616.0" cy="90.1" r="3.5"/&gt;&lt;text x="616.0" y="66.1" text-anchor="end"&gt;September 2026, 186.24&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;The nonresidential building price index rose 5.4% in the year to September&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: New nonresidential building PPI. Values range from 175 to 186.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="151.3" y2="151.3"/&gt;&lt;line x1="50" x2="276" y1="82.7" y2="82.7"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;175&lt;/text&gt;&lt;text x="42" y="154.8" text-anchor="end"&gt;180&lt;/text&gt;&lt;text x="42" y="86.2" text-anchor="end"&gt;185&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;190&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2025-09&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,213.4 L59.4,218.8 L68.8,218.7 L78.2,214.8 L87.7,197.9 L97.1,200.2 L106.5,203.5 L115.9,213.3 L125.3,209.2 L134.8,206.6 L144.2,192.3 L153.6,195.9 L163.0,196.0 L172.4,154.3 L181.8,154.9 L191.2,157.1 L200.7,128.3 L210.1,126.8 L219.5,124.0 L228.9,127.9 L238.3,125.3 L247.8,123.6 L257.2,66.1 L266.6,66.4 L276.0,65.6 L276.0,220.0 L50.0,220.0 Z"/&gt;
&lt;path class="line" d="M50.0,213.4 L59.4,218.8 L68.8,218.7 L78.2,214.8 L87.7,197.9 L97.1,200.2 L106.5,203.5 L115.9,213.3 L125.3,209.2 L134.8,206.6 L144.2,192.3 L153.6,195.9 L163.0,196.0 L172.4,154.3 L181.8,154.9 L191.2,157.1 L200.7,128.3 L210.1,126.8 L219.5,124.0 L228.9,127.9 L238.3,125.3 L247.8,123.6 L257.2,66.1 L266.6,66.4 L276.0,65.6"/&gt;
&lt;circle class="end" cx="276.0" cy="65.6" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="213.4" r="9"&gt;&lt;title&gt;September 2024: 175.48&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="218.8" r="9"&gt;&lt;title&gt;October 2024: 175.09&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="218.7" r="9"&gt;&lt;title&gt;November 2024: 175.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="214.8" r="9"&gt;&lt;title&gt;December 2024: 175.38&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="197.9" r="9"&gt;&lt;title&gt;January 2025: 176.61&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="200.2" r="9"&gt;&lt;title&gt;February 2025: 176.44&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="203.5" r="9"&gt;&lt;title&gt;March 2025: 176.21&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="213.3" r="9"&gt;&lt;title&gt;April 2025: 175.49&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="209.2" r="9"&gt;&lt;title&gt;May 2025: 175.79&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="206.6" r="9"&gt;&lt;title&gt;June 2025: 175.98&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="192.3" r="9"&gt;&lt;title&gt;July 2025: 177.01&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="195.9" r="9"&gt;&lt;title&gt;August 2025: 176.76&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="196.0" r="9"&gt;&lt;title&gt;September 2025: 176.75&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="154.3" r="9"&gt;&lt;title&gt;October 2025: 179.79&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="154.9" r="9"&gt;&lt;title&gt;November 2025: 179.74&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="157.1" r="9"&gt;&lt;title&gt;December 2025: 179.58&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="128.3" r="9"&gt;&lt;title&gt;January 2026: 181.68&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="126.8" r="9"&gt;&lt;title&gt;February 2026: 181.78&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="124.0" r="9"&gt;&lt;title&gt;March 2026: 181.99&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="127.9" r="9"&gt;&lt;title&gt;April 2026: 181.70&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="125.3" r="9"&gt;&lt;title&gt;May 2026: 181.89&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="123.6" r="9"&gt;&lt;title&gt;June 2026: 182.02&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="66.1" r="9"&gt;&lt;title&gt;July 2026: 186.21&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="66.4" r="9"&gt;&lt;title&gt;August 2026: 186.19&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="65.6" r="9"&gt;&lt;title&gt;September 2026: 186.24&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="69.6"&gt;186&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="58.6" y2="45.6"/&gt;
&lt;circle cx="276.0" cy="65.6" r="3.5"/&gt;&lt;text x="276.0" y="29.6" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;September 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;186.24&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;Data from BLS via FRED. Recent months are subject to revision for four months after first publication.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/WPU801" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Most of the index&amp;rsquo;s movement comes in the first month of a quarter. It rose 1.7% in October 2025 and 2.3% in July 2026, and changed by less than 0.1% in each of the next two months. That pattern fits the quarterly cost update in the BLS method, with monthly markup surveys adding smaller moves in between.&lt;/p&gt;
&lt;h2 id="the-calculation"&gt;The calculation&lt;/h2&gt;
&lt;ol&gt;
&lt;li&gt;Pick a base month whose prices you want to hold constant. The example below uses September 2026.&lt;/li&gt;
&lt;li&gt;Divide each month&amp;rsquo;s spending by that month&amp;rsquo;s price index.&lt;/li&gt;
&lt;li&gt;Multiply by the base month&amp;rsquo;s index. The result is spending in base-month prices.&lt;/li&gt;
&lt;li&gt;Compare the adjusted figures across months the same way you would compare the raw ones.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;For September 2025, that is $773.1 billion times 186.243 divided by 176.749, or $814.7 billion in September 2026 prices. September 2026 spending of $790.6 billion is 3.0% below it.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Private nonresidential construction spending in current dollars and in September 2026 prices, deflated by the BLS new nonresidential building PPI. Changes are from the same month a year earlier, in percent.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Private nonresidential spending ($ billions SAAR)&lt;/th&gt;&lt;th class="num"&gt;New nonresidential building PPI (Jun 2009=100)&lt;/th&gt;&lt;th class="num"&gt;Spending in September 2026 prices ($ billions)&lt;/th&gt;&lt;th class="num"&gt;Change in current dollars&lt;/th&gt;&lt;th class="num"&gt;Change in prices&lt;/th&gt;&lt;th class="num"&gt;Change in September 2026 prices&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;September 2024&lt;/td&gt;&lt;td class="num"&gt;802.3&lt;/td&gt;&lt;td class="num"&gt;175.48&lt;/td&gt;&lt;td class="num"&gt;851.5&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;September 2025&lt;/td&gt;&lt;td class="num"&gt;773.1&lt;/td&gt;&lt;td class="num"&gt;176.75&lt;/td&gt;&lt;td class="num"&gt;814.7&lt;/td&gt;&lt;td class="num"&gt;-3.6%&lt;/td&gt;&lt;td class="num"&gt;0.7%&lt;/td&gt;&lt;td class="num"&gt;-4.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;September 2026&lt;/td&gt;&lt;td class="num"&gt;790.6&lt;/td&gt;&lt;td class="num"&gt;186.24&lt;/td&gt;&lt;td class="num"&gt;790.6&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;5.4%&lt;/td&gt;&lt;td class="num"&gt;-3.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/PNRESCONS" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Over two years the difference is larger. Current-dollar spending fell 1.5% from September 2024 to September 2026, and the adjusted figure fell 7.2%.&lt;/p&gt;
&lt;h2 id="matching-the-index-to-the-work"&gt;Matching the index to the work&lt;/h2&gt;
&lt;p&gt;One index for all private nonresidential spending is a shortcut. The Richmond Fed, following BEA&amp;rsquo;s method, matches each Census category to its own deflator. Office and health care spending get their own construction PPIs. The warehouse PPI stands in for retail, food service and other commercial buildings. Residential spending is deflated with Census price indexes for new houses under construction, and BEA uses the ENR and Turner cost indexes for some other categories.&lt;/p&gt;
&lt;p&gt;That matters for September&amp;rsquo;s figure. The AGC summary reports that data center spending, which Census counts inside private office, rose 90% from a year earlier, and that private power is the largest private nonresidential segment. The electrical scope of a data hall and the work on a substation differ from the five model buildings that BLS prices for WPU801. Read the 3.0% decline as an estimate for building work in general. A firm that builds mostly power or data center projects would want a deflator closer to that work.&lt;/p&gt;
&lt;p&gt;For your own firm, use the index closest to your scope. BLS publishes separate indexes for the five building types and for nonresidential electrical, plumbing and HVAC, roofing and concrete contractors. The &lt;a href="https://constructionmetrics.com/2026/10/14/steel-escalation-clause-bls-producer-price-index/"&gt;steel escalation post&lt;/a&gt; covers how to find and pull a single BLS series.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;This example uses round numbers. A general contractor builds schools and offices, and the price index for that work averaged 5% higher this year than last year.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Example calculation with round numbers. Changes are in percent. The last column divides each dollar change by the 5% price increase.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Measure&lt;/th&gt;&lt;th class="num"&gt;Last year&lt;/th&gt;&lt;th class="num"&gt;This year&lt;/th&gt;&lt;th class="num"&gt;Change in dollars&lt;/th&gt;&lt;th class="num"&gt;Change in the price index&lt;/th&gt;&lt;th class="num"&gt;Change in last year&amp;#39;s prices&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Revenue&lt;/td&gt;&lt;td class="num"&gt;$40,000,000&lt;/td&gt;&lt;td class="num"&gt;$42,000,000&lt;/td&gt;&lt;td class="num"&gt;5.0%&lt;/td&gt;&lt;td class="num"&gt;5.0%&lt;/td&gt;&lt;td class="num"&gt;0.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Backlog at year end&lt;/td&gt;&lt;td class="num"&gt;$55,000,000&lt;/td&gt;&lt;td class="num"&gt;$60,000,000&lt;/td&gt;&lt;td class="num"&gt;9.1%&lt;/td&gt;&lt;td class="num"&gt;5.0%&lt;/td&gt;&lt;td class="num"&gt;3.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Bids submitted&lt;/td&gt;&lt;td class="num"&gt;$100,000,000&lt;/td&gt;&lt;td class="num"&gt;$98,000,000&lt;/td&gt;&lt;td class="num"&gt;-2.0%&lt;/td&gt;&lt;td class="num"&gt;5.0%&lt;/td&gt;&lt;td class="num"&gt;-6.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;Revenue grew 5%, the same as prices, so the firm put in place about the same amount of work as last year. Backlog grew 9.1% in dollars and 3.9% after the price change. Bid volume fell 2.0% in dollars, which is a 6.7% drop in the work the firm chased.&lt;/p&gt;
&lt;p&gt;A crew-count check helps here. If field headcount is flat and adjusted revenue is flat, the two agree. If adjusted revenue is flat and headcount rose, productivity or mix changed and the job cost reports should show where.&lt;/p&gt;
&lt;h2 id="limits-of-the-method"&gt;Limits of the method&lt;/h2&gt;
&lt;p&gt;BLS revises PPIs for up to four months after first publication. The September spending figure is Census&amp;rsquo;s first estimate for the month, and Census revised August spending in the same release. Re-run the calculation when either series updates. The next PPI release is November 13, and the next Census spending release is December 1.&lt;/p&gt;
&lt;p&gt;The Census figure is seasonally adjusted and WPU801 is not. Over a 12-month comparison the mismatch matters little, because both ends fall in the same calendar month. For month-to-month changes it adds noise.&lt;/p&gt;
&lt;p&gt;BLS leaves site preparation, landscaping and design fees out of the building PPIs, while Census counts architectural and engineering costs in spending. A firm with heavy sitework will see its own price change differ from the building index.&lt;/p&gt;
&lt;h2 id="how-to-use-it-on-your-jobs"&gt;How to use it on your jobs&lt;/h2&gt;
&lt;p&gt;Add one column to the annual review. Next to revenue, backlog and bid volume, show the change in the price index that best fits your work and the change after dividing by it. The &lt;a href="https://constructionmetrics.com/2026/09/28/compute-backlog-in-months-abc-indicator/"&gt;backlog in months post&lt;/a&gt; covers the companion measure, how many months of revenue the current backlog represents.&lt;/p&gt;
&lt;p&gt;To start, download WPU801 from FRED, or the BLS index for your building type or trade. Average it by fiscal year, divide this year&amp;rsquo;s revenue by the ratio of this year&amp;rsquo;s average to last year&amp;rsquo;s, and compare the result with last year&amp;rsquo;s revenue.&lt;/p&gt;</content:encoded></item><item><title>CMiC's NexusAI lets construction ERP users set up jobs, budgets and invoices from a typed request</title><link>https://constructionmetrics.com/2026/11/09/cmic-nexusai-jobs-budgets-invoices-plain-language/</link><pubDate>Mon, 09 Nov 2026 06:34:22 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/09/cmic-nexusai-jobs-budgets-invoices-plain-language/</guid><category>AI</category><description>CMiC's NexusAI takes plain-language requests in its construction ERP and drafts jobs, budgets and invoices for a user to review and confirm.</description><content:encoded>&lt;p&gt;CMiC, a Toronto company that sells construction ERP software to general contractors, subcontractors and civil firms, introduced NexusAI on November 2, 2026, at CONNECT, its customer conference in Orlando. CMiC calls NexusAI the AI launchpad in NEXUS, the AI-enabled version of its ERP. A user types a request in plain English, and the system either answers from ERP data or starts an agent that drafts a new job, a job budget or an invoice for the user to check and confirm. The workflows it names are job setup, budgeting and billing.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;In most CMiC shops today, opening a job is a sequence of screens. A project accountant enters the job record, an estimator or project manager hands over the budget as a spreadsheet, someone imports it against the cost code structure, and billing sets up the contract before the first pay application. NexusAI puts those steps behind one request.&lt;/p&gt;
&lt;p&gt;CMiC describes the work in this order:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;The user types a request, such as setting up a new job, or uploads a document.&lt;/li&gt;
&lt;li&gt;NexusAI launches one of CMiC&amp;rsquo;s agents. An agent here is software that carries out a multi-step task in the ERP, such as filling in every field of a new job record, from a short instruction.&lt;/li&gt;
&lt;li&gt;The agent drafts the record and shows it to the user.&lt;/li&gt;
&lt;li&gt;The user reviews it and confirms. CMiC calls this a &amp;ldquo;request, review, and confirmation process.&amp;rdquo;&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;CMiC&amp;rsquo;s September NEXUS release added agents for the same tasks. It listed a Job Budget Agent that creates or imports budgets with built-in validation, a Job Initiation Agent that puts job setup, budgeting and billing contracts into one guided workflow, and a Job Costing Transaction and Posting Impact Agent that shows how a cost entry changes the budget, cost and forecast before it posts. It also listed a Create PCI Agent, which drafts potential change items from a typed description, and AI Daily Journals, which turns a spoken end-of-day summary into a daily journal entry.&lt;/p&gt;
&lt;p&gt;NexusAI also shows real-time KPIs and alerts. CMiC says each request runs through the CMiC MCP Server and inside the user&amp;rsquo;s existing security settings and permissions. MCP, short for Model Context Protocol, is a standard way for an AI model to call another system&amp;rsquo;s functions. By CMiC&amp;rsquo;s description, the model reaches only what the user&amp;rsquo;s CMiC role already allows.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is CMiC&amp;rsquo;s announcement, its September release notes and its product page. These claims come from CMiC:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;NexusAI can create jobs, budgets, invoices and other records from a plain-language request, with a review step before anything is saved.&lt;/li&gt;
&lt;li&gt;Every request respects existing security settings and user permissions.&lt;/li&gt;
&lt;li&gt;CMiC&amp;rsquo;s chief product officer, Steve Cangiano, said the new capabilities make job costing run &amp;ldquo;more efficiently and accurately.&amp;rdquo;&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;The NEXUS product page lists other AI features, including AI drawing upload that reads sheet numbers and titles from PDF drawings, a spec book organizer that splits a PDF spec into CSI sections, and a submittal assistant that pre-fills submittal log records.&lt;/p&gt;
&lt;p&gt;Accuracy rates for the agents and time saved on job setup are not yet public.&lt;/p&gt;
&lt;p&gt;Impact Integrated, an independent CMiC consultancy, published an FAQ on NexusAI the day after the launch. Its point was about permissions. Because NexusAI follows existing roles, a role that grants more than intended, such as access to pay rates, bank details or job margins, becomes easier to query. The firm also lists misposted job costs, costs outside a commitment and payroll burden posted at the wrong rate as reasons an answer could come back wrong.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Job setup cycle time is the cleanest metric for a pilot. Define it as business days from the signed contract date to the day the job is open in CMiC with its budget loaded. Pull those two dates for your last 20 jobs before the pilot starts.&lt;/p&gt;
&lt;p&gt;Pair it with a quality count. Budget lines corrected in the first 30 days, for any reason other than an owner change order, show whether faster setup is creating cleanup work later. During the pilot, also log each agent draft as confirmed unchanged, edited or rejected. Edited drafts still take an accountant&amp;rsquo;s time.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Metrics to capture before piloting NexusAI job setup and billing agents&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Metric&lt;/th&gt;&lt;th&gt;Definition&lt;/th&gt;&lt;th&gt;Baseline to capture before the pilot&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Job setup cycle time&lt;/td&gt;&lt;td&gt;Business days from the signed contract date to the day the job is open in CMiC with its budget loaded&lt;/td&gt;&lt;td&gt;Contract date and job open date for the last 20 jobs&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Budget lines corrected after setup&lt;/td&gt;&lt;td&gt;Budget lines changed in the first 30 days for a reason other than an owner change order&lt;/td&gt;&lt;td&gt;Budget change log for the same 20 jobs&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Agent drafts confirmed unchanged&lt;/td&gt;&lt;td&gt;Share of the jobs, budgets and invoices the agent drafted that the reviewer confirmed with no edits&lt;/td&gt;&lt;td&gt;None before the pilot; log every draft once it starts&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Invoices reversed or reissued&lt;/td&gt;&lt;td&gt;Invoices voided or reissued within 30 days of entry&lt;/td&gt;&lt;td&gt;Last 90 days of AR and AP entries&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;Clean budgets also feed the WIP schedule. Our post on &lt;a href="https://constructionmetrics.com/2026/09/26/build-work-in-progress-schedule-job-cost/"&gt;building a work-in-progress schedule from job cost data&lt;/a&gt; shows where a misloaded budget line shows up in percent complete and over or under billing. NetSuite has &lt;a href="https://constructionmetrics.com/2026/10/27/netsuite-ai-agents-estimates-pay-applications/"&gt;announced similar agents&lt;/a&gt; that turn estimates into job budgets, so the same baseline lets you compare the two.&lt;/p&gt;
&lt;p&gt;Before the pilot, run a permissions review of the CMiC roles the pilot users hold, since NexusAI answers within them. Then pick one division and pull contract and job open dates for its last 20 jobs.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;CMiC introduced NexusAI at CONNECT 2026, held November 1 to 4. A release date for NexusAI is not yet public. The September agents were available then to existing and new enterprise customers, with cloud customers scheduled to receive the update in the fall. Pricing for NexusAI is not public, and CMiC&amp;rsquo;s product page directs buyers to a demo request.&lt;/p&gt;</content:encoded></item><item><title>How to budget temporary heat from heating degree days, with a Midwest example that burns 20,000 gallons of propane</title><link>https://constructionmetrics.com/2026/11/08/budget-temporary-heat-heating-degree-days/</link><pubDate>Sun, 08 Nov 2026 10:32:51 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/08/budget-temporary-heat-heating-degree-days/</guid><category>Data</category><description>Heating degree days, an enclosure's heat-loss rate and EIA propane prices turn winter temporary heat into a monthly fuel budget.</description><content:encoded>&lt;p&gt;The estimator who carries temporary heat in general conditions needs a fuel number before the enclosure goes up. Heating degree days turn the weather into that number, and they give the project manager a way to check it at every propane delivery. The method here combines a heat-loss formula from a University of Arizona engineering course with degree-day forecasts and propane prices from the U.S. Energy Information Administration (EIA).&lt;/p&gt;
&lt;h2 id="heating-degree-days"&gt;Heating degree days&lt;/h2&gt;
&lt;p&gt;A heating degree day measures how far a day&amp;rsquo;s average temperature falls below 65°F. EIA takes the average as the day&amp;rsquo;s high plus its low, divided by two. In EIA&amp;rsquo;s own example, a high of 33°F and a low of 25°F average 29°F, which counts as 36 heating degree days. Adding the days gives a month or a season.&lt;/p&gt;
&lt;p&gt;EIA forecasts degree days by Census region in its Winter Fuels Outlook. The 2026-27 edition, published October 6, assumes 4,802 heating degree days in the Midwest from November through March, 2% fewer than last winter. EIA also runs side cases 10% colder and 10% warmer, because weather is a significant source of uncertainty in its forecast.&lt;/p&gt;
&lt;h2 id="from-degree-days-to-gallons"&gt;From degree days to gallons&lt;/h2&gt;
&lt;p&gt;The course notes, by Gene Giacomelli of the university&amp;rsquo;s Controlled Environment Agriculture Center, size a greenhouse heater with one equation. Heat loss in Btu per hour equals U times the surface area times the temperature difference between inside and outside. U is the overall heat transfer coefficient, meaning the Btu per hour that one square foot of covering loses for each degree of difference.&lt;/p&gt;
&lt;p&gt;The notes give U as 1.2 for a single layer of polyethylene and 0.8 for a double layer, both with air infiltration counted. A greenhouse is a poly enclosure with a heater in it, which makes it a close match for a building shell wrapped for winter work.&lt;/p&gt;
&lt;p&gt;The notes keep two numbers apart. Heater size comes from the coldest expected outside temperature. Fuel use depends on the temperature difference at every hour of the season, and the degree-day procedure estimates it from monthly totals. To use it at any setpoint, convert the month&amp;rsquo;s degree days to an average temperature and measure the gap from your setpoint. At 50°F, that means subtracting 15 degree days for each day in the month.&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Multiply U by the enclosure&amp;rsquo;s surface area to get UA, the heat loss per degree.&lt;/li&gt;
&lt;li&gt;Multiply UA by 24 hours and by the month&amp;rsquo;s degree days at your setpoint to get Btu for the month.&lt;/li&gt;
&lt;li&gt;Divide by the fuel&amp;rsquo;s heat content times the heater&amp;rsquo;s efficiency to get gallons. EIA lists propane at 91,452 Btu per gallon.&lt;/li&gt;
&lt;li&gt;Multiply gallons by the delivered price.&lt;/li&gt;
&lt;/ol&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;This example uses round numbers. A contractor wraps a building shell in 20,000 square feet of single-layer poly and holds 50°F inside from November through March, using EIA&amp;rsquo;s Midwest forecast. With U at 1.2, UA is 24,000 Btu per hour per degree. The example assumes 80% of the propane&amp;rsquo;s heat reaches the space and a price of $2.30 a gallon. EIA&amp;rsquo;s weekly survey put the Midwest residential propane average at $2.298 on November 2.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;January burns 5,865 gallons, 29% of the season&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Propane for a 20,000 sq. ft. single-poly enclosure held at 50°F, gallons per month. Example calculation.&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;January burns 5,865 gallons, 29% of the season&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Bar chart with 5 points from Nov to Mar. Series: Propane gallons. Values range from 0 to 5,865.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="210.0" y2="210.0"/&gt;&lt;line x1="72" x2="616" y1="114.0" y2="114.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;0&lt;/text&gt;&lt;text x="64" y="213.5" text-anchor="end"&gt;2,000&lt;/text&gt;&lt;text x="64" y="117.5" text-anchor="end"&gt;4,000&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;6,000&lt;/text&gt;&lt;text x="126.4" y="324" text-anchor="start"&gt;Nov&lt;/text&gt;&lt;text x="235.2" y="324" text-anchor="middle"&gt;Dec&lt;/text&gt;&lt;text x="344.0" y="324" text-anchor="middle"&gt;Jan&lt;/text&gt;&lt;text x="452.8" y="324" text-anchor="middle"&gt;Feb&lt;/text&gt;&lt;text x="561.6" y="324" text-anchor="end"&gt;Mar&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;rect x="85.6" y="201.7" width="81.6" height="104.3"&gt;&lt;title&gt;Nov: 2,173&lt;/title&gt;&lt;/rect&gt;&lt;rect x="194.4" y="80.4" width="81.6" height="225.6"&gt;&lt;title&gt;Dec: 4,700&lt;/title&gt;&lt;/rect&gt;&lt;rect x="303.2" y="24.5" width="81.6" height="281.5"&gt;&lt;title&gt;Jan: 5,865&lt;/title&gt;&lt;/rect&gt;&lt;rect x="412.0" y="87.9" width="81.6" height="218.1"&gt;&lt;title&gt;Feb: 4,543&lt;/title&gt;&lt;/rect&gt;&lt;rect x="520.8" y="177.1" width="81.6" height="128.9"&gt;&lt;title&gt;Mar: 2,685&lt;/title&gt;&lt;/rect&gt;
&lt;text class="label" x="561.6" y="172.1" text-anchor="middle"&gt;2,685&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="344.0" x2="344.0" y1="31.5" y2="43.5"/&gt;
&lt;circle cx="344.0" cy="24.5" r="3.5"/&gt;&lt;text x="344.0" y="54.5" text-anchor="middle"&gt;Jan, 5,865&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;January burns 5,865 gallons, 29% of the season&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Bar chart with 5 points from Nov to Mar. Series: Propane gallons. Values range from 0 to 5,865.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="151.3" y2="151.3"/&gt;&lt;line x1="50" x2="276" y1="82.7" y2="82.7"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;0&lt;/text&gt;&lt;text x="42" y="154.8" text-anchor="end"&gt;2,000&lt;/text&gt;&lt;text x="42" y="86.2" text-anchor="end"&gt;4,000&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;6,000&lt;/text&gt;&lt;text x="72.6" y="237" text-anchor="start"&gt;Nov&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;Jan&lt;/text&gt;&lt;text x="253.4" y="237" text-anchor="end"&gt;Mar&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;rect x="55.6" y="145.4" width="33.9" height="74.6"&gt;&lt;title&gt;Nov: 2,173&lt;/title&gt;&lt;/rect&gt;&lt;rect x="100.9" y="58.6" width="33.9" height="161.4"&gt;&lt;title&gt;Dec: 4,700&lt;/title&gt;&lt;/rect&gt;&lt;rect x="146.1" y="18.6" width="33.9" height="201.4"&gt;&lt;title&gt;Jan: 5,865&lt;/title&gt;&lt;/rect&gt;&lt;rect x="191.3" y="64.0" width="33.9" height="156.0"&gt;&lt;title&gt;Feb: 4,543&lt;/title&gt;&lt;/rect&gt;&lt;rect x="236.5" y="127.8" width="33.9" height="92.2"&gt;&lt;title&gt;Mar: 2,685&lt;/title&gt;&lt;/rect&gt;
&lt;text class="label" x="253.4" y="122.8" text-anchor="middle"&gt;2,685&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="163.0" x2="163.0" y1="25.6" y2="37.6"/&gt;
&lt;circle cx="163.0" cy="18.6" r="3.5"/&gt;&lt;text x="163.0" y="48.6" text-anchor="middle"&gt;&lt;tspan x="163.0"&gt;Jan&lt;/tspan&gt;&lt;tspan x="163.0" dy="12"&gt;5,865&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;Degree days from EIA&amp;#39;s base-case Midwest forecast, October 2026. U = 1.2, 80% heater efficiency.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://www.eia.gov/outlooks/steo/report/perspectives/2026/10-winterfuels/article.php" rel="noopener"&gt;eia.gov&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Monthly temporary heat budget for a 20,000 sq. ft. single-poly enclosure held at 50°F. Example calculation with EIA&amp;#39;s Midwest degree-day forecast.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;EIA Midwest heating degree days (base 65F)&lt;/th&gt;&lt;th class="num"&gt;Days&lt;/th&gt;&lt;th class="num"&gt;Degree days at a 50F setpoint&lt;/th&gt;&lt;th class="num"&gt;Heat needed (million Btu)&lt;/th&gt;&lt;th class="num"&gt;Propane gallons&lt;/th&gt;&lt;th class="num"&gt;Propane cost at $2.30&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Nov&lt;/td&gt;&lt;td class="num"&gt;726&lt;/td&gt;&lt;td class="num"&gt;30&lt;/td&gt;&lt;td class="num"&gt;276&lt;/td&gt;&lt;td class="num"&gt;159.0&lt;/td&gt;&lt;td class="num"&gt;2,173&lt;/td&gt;&lt;td class="num"&gt;$4,998&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec&lt;/td&gt;&lt;td class="num"&gt;1,062&lt;/td&gt;&lt;td class="num"&gt;31&lt;/td&gt;&lt;td class="num"&gt;597&lt;/td&gt;&lt;td class="num"&gt;343.9&lt;/td&gt;&lt;td class="num"&gt;4,700&lt;/td&gt;&lt;td class="num"&gt;$10,810&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jan&lt;/td&gt;&lt;td class="num"&gt;1,210&lt;/td&gt;&lt;td class="num"&gt;31&lt;/td&gt;&lt;td class="num"&gt;745&lt;/td&gt;&lt;td class="num"&gt;429.1&lt;/td&gt;&lt;td class="num"&gt;5,865&lt;/td&gt;&lt;td class="num"&gt;$13,490&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb&lt;/td&gt;&lt;td class="num"&gt;997&lt;/td&gt;&lt;td class="num"&gt;28&lt;/td&gt;&lt;td class="num"&gt;577&lt;/td&gt;&lt;td class="num"&gt;332.4&lt;/td&gt;&lt;td class="num"&gt;4,543&lt;/td&gt;&lt;td class="num"&gt;$10,448&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mar&lt;/td&gt;&lt;td class="num"&gt;806&lt;/td&gt;&lt;td class="num"&gt;31&lt;/td&gt;&lt;td class="num"&gt;341&lt;/td&gt;&lt;td class="num"&gt;196.4&lt;/td&gt;&lt;td class="num"&gt;2,685&lt;/td&gt;&lt;td class="num"&gt;$6,175&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.eia.gov/outlooks/steo/report/perspectives/2026/10-winterfuels/article.php" rel="noopener"&gt;eia.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The season needs about 1,461 million Btu, close to 20,000 gallons and $45,900 of propane. Each degree day at the setpoint burns 7.9 gallons, about $18. That rate is the figure to track on site.&lt;/p&gt;
&lt;p&gt;Heater capacity comes from the sizing equation. With a design low of 0°F, the enclosure loses 24,000 times 50, or 1.2 million Btu per hour, and the heaters together have to deliver that output.&lt;/p&gt;
&lt;h2 id="how-weather-moves-the-budget"&gt;How weather moves the budget&lt;/h2&gt;
&lt;p&gt;EIA&amp;rsquo;s side cases shift degree days 10% in either direction. At a 50°F setpoint the fuel shifts further, because the 15-per-day subtraction stays fixed while the total changes.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Season fuel for the example enclosure under EIA&amp;#39;s base case and its 10% colder and warmer side cases. Example calculation. Monthly forecasts sum to 4,801 degree days; EIA&amp;#39;s published total is 4,802.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Case&lt;/th&gt;&lt;th class="num"&gt;Season degree days (base 65F)&lt;/th&gt;&lt;th class="num"&gt;Degree days at a 50F setpoint&lt;/th&gt;&lt;th class="num"&gt;Propane gallons&lt;/th&gt;&lt;th class="num"&gt;Propane cost at $2.30&lt;/th&gt;&lt;th class="num"&gt;Change in fuel&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;EIA base case&lt;/td&gt;&lt;td class="num"&gt;4,801&lt;/td&gt;&lt;td class="num"&gt;2,536&lt;/td&gt;&lt;td class="num"&gt;19,966&lt;/td&gt;&lt;td class="num"&gt;$45,922&lt;/td&gt;&lt;td class="num"&gt;0.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;10% colder&lt;/td&gt;&lt;td class="num"&gt;5,281&lt;/td&gt;&lt;td class="num"&gt;3,016&lt;/td&gt;&lt;td class="num"&gt;23,746&lt;/td&gt;&lt;td class="num"&gt;$54,615&lt;/td&gt;&lt;td class="num"&gt;18.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;10% warmer&lt;/td&gt;&lt;td class="num"&gt;4,321&lt;/td&gt;&lt;td class="num"&gt;2,056&lt;/td&gt;&lt;td class="num"&gt;16,186&lt;/td&gt;&lt;td class="num"&gt;$37,228&lt;/td&gt;&lt;td class="num"&gt;-18.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.eia.gov/outlooks/steo/report/perspectives/2026/10-winterfuels/article.php" rel="noopener"&gt;eia.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;A 10% colder winter adds about 3,780 gallons and $8,700 to the example, a 19% increase. An estimator can carry the colder case as contingency, or write temporary heat as an allowance tied to measured degree days.&lt;/p&gt;
&lt;h2 id="limits-of-the-method"&gt;Limits of the method&lt;/h2&gt;
&lt;p&gt;EIA weights its regional degree days by population, so the Midwest figure leans toward its cities. A job in northern Minnesota will see more degree days than the regional number. EIA points to the National Weather Service Climate Prediction Center for degree days by location, and the &lt;a href="https://constructionmetrics.com/2026/10/27/weather-delay-days-noaa-climate-normals/"&gt;weather delay days post&lt;/a&gt; shows how to pull NOAA normals for a single station.&lt;/p&gt;
&lt;p&gt;The monthly shortcut runs low in months that include days warmer than the setpoint, which matters most in November and March. The Arizona notes also leave out solar gain and assume the same temperature difference all day. The poly U values assume a closed enclosure. Open hoistways and doors left up for deliveries add air leakage that the coefficient does not cover.&lt;/p&gt;
&lt;p&gt;Ventilation adds load as well. OSHA&amp;rsquo;s standard for temporary heating devices, 1926.154, requires enough fresh air to protect workers, with mechanical ventilation where natural supply is inadequate, and that air has to be heated. The same standard keeps heaters at least 10 feet from combustible tarps, canvas or similar coverings, which affects where heaters go inside a wrapped shell.&lt;/p&gt;
&lt;h2 id="how-to-use-it-on-your-jobs"&gt;How to use it on your jobs&lt;/h2&gt;
&lt;p&gt;Track gallons per degree day. At each propane fill, log the gallons delivered and the degree days at your setpoint since the last fill, using the nearest weather station. Divide the first by the second. The example estimate is 7.9, so a job running at 11 is losing more heat than the estimate assumed, and the project manager can see the overrun by December.&lt;/p&gt;
&lt;p&gt;After a winter or two, the measured rates by enclosure type become the basis for the next bid. The &lt;a href="https://constructionmetrics.com/2026/10/26/fuel-price-adjustment-clause-eia-diesel/"&gt;fuel price adjustment post&lt;/a&gt; shows how to tie a fuel clause to an EIA price series, and the &lt;a href="https://constructionmetrics.com/2026/11/04/plan-winter-crew-hours-wind-chill/"&gt;wind chill post&lt;/a&gt; covers the crew side of the same cold days.&lt;/p&gt;
&lt;p&gt;To start, pick one job that will be enclosed this winter. Measure the poly area from the enclosure plan, then run the four steps against EIA&amp;rsquo;s regional forecast and your supplier&amp;rsquo;s current propane quote.&lt;/p&gt;</content:encoded></item><item><title>Denver opens an AI completeness check for permit applications, using the CivCheck tool that caught 87% of in-scope intake errors in Seattle's test</title><link>https://constructionmetrics.com/2026/11/08/denver-ai-permit-intake-check-civcheck/</link><pubDate>Sun, 08 Nov 2026 06:33:59 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/08/denver-ai-permit-intake-check-civcheck/</guid><category>AI</category><description>Denver's free StartSmart tool, built on CivCheck, checks building permit and site plan applications against city intake rules before they are submitted.</description><content:encoded>&lt;p&gt;The City and County of Denver launched StartSmart: Application Intake Assistant on November 5, 2026. It is a free web tool that reads a building permit or formal site development plan application before it is submitted and flags missing or incomplete items against the city&amp;rsquo;s intake requirements. Denver built it with CivCheck, the AI pre-screening product that Seattle tested on 29 past residential applications in 2025. In that test, CivCheck caught 87% of the in-scope reasons city staff had given for rejecting those packages at intake. The workflow it changes is permit intake, the gate a package has to pass before plan review starts.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;Today a permit coordinator, or the architect&amp;rsquo;s team on a design-build job, uploads the plan set and forms to E-permits, Denver&amp;rsquo;s online permitting portal, and waits for an intake screener to say whether the package is complete. Denver says an incomplete package comes back with a request to resubmit, and that exchange can run for days. StartSmart moves the completeness check to the applicant&amp;rsquo;s side, before the city receives anything.&lt;/p&gt;
&lt;p&gt;Denver&amp;rsquo;s FAQ describes the work in this order:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;The applicant creates a free account on CivCheck&amp;rsquo;s Denver portal, using the same email as the E-permits account, starts a project and uploads the PDFs.&lt;/li&gt;
&lt;li&gt;AI reads the plan sheets and forms and pulls out dimensions, labels and required data fields. Denver says this extraction is the only step that uses AI.&lt;/li&gt;
&lt;li&gt;The extracted data runs through fixed rules the city wrote for that project type. Each flag carries an explanation and a citation to the requirement behind it, and the applicant either fixes the document or explains the item.&lt;/li&gt;
&lt;li&gt;The tool writes a pre-screening report, watermarks the checked documents and creates the E-permits record, where the applicant finishes and submits. Intake staff read the report alongside the package and still decide whether it is ready for review.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Denver calls the rule checks deterministic, meaning the same sheet gets the same pass or fail every time. The city says the rules do not change with usage, and uploaded documents are not used to train AI models.&lt;/p&gt;
&lt;p&gt;Denver lists architects, engineers, contractors and homeowners as users and says the person who knows the design best should run the check. On a GC-pulled permit that is usually the project engineer or design manager who assembles the package. The tool covers first submissions only. Reviewer corrections and resubmittals stay in E-permits.&lt;/p&gt;
&lt;p&gt;Eligible applications are LOG building permits for commercial, multifamily, single-unit, two-unit, ADU and industrial work, including the Main, Intermediate and Walk Through tracks, plus residential interior remodels and formal site development plans. Denver says more application types are expected in 2027.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Denver&amp;rsquo;s announcement and FAQ, a March 2026 Denverite report on the contract, and a June 2026 evaluation report from Seattle&amp;rsquo;s Innovation &amp;amp; Performance team on its own test of CivCheck. Denver is in an evaluation period, and results from its own use of the tool are not yet public.&lt;/p&gt;
&lt;p&gt;Denver&amp;rsquo;s stated goal came up when the City Council approved a $4.6 million contract for the tool in March, 10 votes to 1. Robert Peek of the planning department told the council the city approves 37% of applications on first review and hopes to reach 80% with the new technology, Denverite reported. Councilmember Sarah Parady asked the planning department to review the contract after a year.&lt;/p&gt;
&lt;p&gt;Seattle&amp;rsquo;s test is the closest measurement. From March to October 2025, CivCheck staff loaded historical applications for small residential projects, such as townhouses, single-family homes and ADUs, and Seattle Department of Construction and Inspections (SDCI) reviewers compared the output with their own decisions. Applicants did not use the tool during the test. These results come from Seattle&amp;rsquo;s report:&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;How CivCheck&amp;#39;s checks compared with Seattle reviewers, March to October 2025&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Stage&lt;/th&gt;&lt;th class="num"&gt;Applications&lt;/th&gt;&lt;th&gt;What was compared&lt;/th&gt;&lt;th&gt;Result&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Intake screening&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;&lt;td&gt;90 rejection reasons logged by SDCI reviewers&lt;/td&gt;&lt;td&gt;35 outside the 34 configured checks&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Intake screening&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;&lt;td&gt;55 in-scope rejection reasons&lt;/td&gt;&lt;td&gt;48 caught by CivCheck (87%)&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Intake screening&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;&lt;td&gt;55 in-scope rejection reasons&lt;/td&gt;&lt;td&gt;7 missed by CivCheck&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Intake screening&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;&lt;td&gt;Extra flags&lt;/td&gt;&lt;td&gt;4 topographic survey flags that screeners had waived&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Plan review&lt;/td&gt;&lt;td class="num"&gt;57&lt;/td&gt;&lt;td&gt;1,262 zoning and ordinance/structural checks&lt;/td&gt;&lt;td&gt;91.7% agreement with reviewers&amp;#39; final decisions&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Plan review&lt;/td&gt;&lt;td class="num"&gt;57&lt;/td&gt;&lt;td&gt;1,262 zoning and ordinance/structural checks&lt;/td&gt;&lt;td&gt;6.4% passed by CivCheck but sent back for correction by reviewers&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Plan review&lt;/td&gt;&lt;td class="num"&gt;57&lt;/td&gt;&lt;td&gt;1,262 zoning and ordinance/structural checks&lt;/td&gt;&lt;td&gt;1.9% flagged by CivCheck but approved by reviewers&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://seattle.gov/documents/Departments/Performance/Publications/2026CivCheckEvaluationReport.pdf" rel="noopener"&gt;seattle.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The 87% figure is recall, the share of real intake problems the tool flagged. It applies to the 34 completeness checks Seattle configured. Another 35 of the 90 rejection reasons fell outside those checks, so a package that passed the pilot setup could still have come back. The four extra flags were topographic surveys that screeners had waived, including one for basement-only work on a steep lot.&lt;/p&gt;
&lt;p&gt;Seattle then modeled what pre-screening would do to calendar time, assuming applicants fix every flagged item before they submit. Scenario A uses the checks from the pilot. Scenario B assumes every intake check is automated and removes one full plan review cycle.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Seattle&amp;#39;s modeled effect of CivCheck pre-screening on middle housing permits&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Measure&lt;/th&gt;&lt;th class="num"&gt;Actual (no pre-screen)&lt;/th&gt;&lt;th class="num"&gt;Scenario A (pilot checks)&lt;/th&gt;&lt;th class="num"&gt;Scenario B (all intake checks)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Median calendar days to pass intake screening&lt;/td&gt;&lt;td class="num"&gt;54.5&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Average intake review cycles&lt;/td&gt;&lt;td class="num"&gt;2.55&lt;/td&gt;&lt;td class="num"&gt;1.75&lt;/td&gt;&lt;td class="num"&gt;1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Average intake reviews (zoning plus ordinance/structural)&lt;/td&gt;&lt;td class="num"&gt;3.86&lt;/td&gt;&lt;td class="num"&gt;3.34&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Median calendar days to pass plan review&lt;/td&gt;&lt;td class="num"&gt;161&lt;/td&gt;&lt;td class="num"&gt;146&lt;/td&gt;&lt;td class="num"&gt;117&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Median correction cycles to pass plan review&lt;/td&gt;&lt;td class="num"&gt;3.72&lt;/td&gt;&lt;td class="num"&gt;3.39&lt;/td&gt;&lt;td class="num"&gt;2.72&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://seattle.gov/documents/Departments/Performance/Publications/2026CivCheckEvaluationReport.pdf" rel="noopener"&gt;seattle.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The intake rows are where the model moves most, from a median of 54.5 days to 29 with the pilot checks. Plan review moves less, because about six review teams work in parallel and the overall time only drops when the slowest review gets shorter. Seattle&amp;rsquo;s authors say each review cycle takes about a month, and they recommended a production pilot limited to completeness screening.&lt;/p&gt;
&lt;p&gt;The report also lists which code checks failed most often in the sampled applications. Smoke and carbon monoxide alarm issues each turned up in 8 applications in the ordinance/structural sample, an error rate of 44%. Maximum lot coverage was the most common zoning miss.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Most common code issues in Seattle&amp;#39;s sampled applications&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Review&lt;/th&gt;&lt;th&gt;Check&lt;/th&gt;&lt;th class="num"&gt;Applications with the issue&lt;/th&gt;&lt;th class="num"&gt;Error rate (%)&lt;/th&gt;&lt;th&gt;Issue type&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Zoning&lt;/td&gt;&lt;td&gt;Maximum lot coverage&lt;/td&gt;&lt;td class="num"&gt;9&lt;/td&gt;&lt;td class="num"&gt;75&lt;/td&gt;&lt;td&gt;Code noncompliance&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Zoning&lt;/td&gt;&lt;td&gt;Trees: caliper inches&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;&lt;td class="num"&gt;67&lt;/td&gt;&lt;td&gt;Missing information&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Zoning&lt;/td&gt;&lt;td&gt;Building height&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;&lt;td class="num"&gt;50&lt;/td&gt;&lt;td&gt;Missing information, code noncompliance&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Zoning&lt;/td&gt;&lt;td&gt;Front yard&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;&lt;td class="num"&gt;50&lt;/td&gt;&lt;td&gt;Code noncompliance&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Zoning&lt;/td&gt;&lt;td&gt;Floor area ratio&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;42&lt;/td&gt;&lt;td&gt;Code noncompliance&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Zoning&lt;/td&gt;&lt;td&gt;Rear yard&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;42&lt;/td&gt;&lt;td&gt;Code noncompliance&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ordinance/structural&lt;/td&gt;&lt;td&gt;Carbon monoxide alarms&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;&lt;td class="num"&gt;44&lt;/td&gt;&lt;td&gt;Code noncompliance&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ordinance/structural&lt;/td&gt;&lt;td&gt;Smoke alarms&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;&lt;td class="num"&gt;44&lt;/td&gt;&lt;td&gt;Code noncompliance&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ordinance/structural&lt;/td&gt;&lt;td&gt;Fire separation distance (non-sprinklered)&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;28&lt;/td&gt;&lt;td&gt;Code noncompliance&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ordinance/structural&lt;/td&gt;&lt;td&gt;Fire separation distance between buildings (detached ADUs)&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;17&lt;/td&gt;&lt;td&gt;Code noncompliance&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ordinance/structural&lt;/td&gt;&lt;td&gt;Required heating&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;17&lt;/td&gt;&lt;td&gt;Code noncompliance&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ordinance/structural&lt;/td&gt;&lt;td&gt;Stairway: handrail&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;17&lt;/td&gt;&lt;td&gt;Code noncompliance&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://seattle.gov/documents/Departments/Performance/Publications/2026CivCheckEvaluationReport.pdf" rel="noopener"&gt;seattle.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Seattle&amp;rsquo;s test covered projects under the Seattle Residential Code. Denver offers the tool for commercial and multifamily permits as well, and the Seattle report has no figures for that work.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track intake attempts per application and calendar days to intake acceptance. The first counts how many times a package goes to the city before it is accepted for plan review. The second runs from the first upload to the acceptance date in E-permits. Both come from E-permits records you already keep.&lt;/p&gt;
&lt;p&gt;Capture the baseline from your last several Denver applications before your team runs its first StartSmart check, and list every intake rejection reason by sheet or form. Once you start using the tool, log how many flags led to a document change, how many the city waived, and what intake still caught after a clean report. Those last two counts match the misses and extra flags in Seattle&amp;rsquo;s results.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Metrics for a StartSmart pilot on Denver permits&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Metric&lt;/th&gt;&lt;th&gt;Definition&lt;/th&gt;&lt;th&gt;Baseline to capture&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Intake attempts per application&lt;/td&gt;&lt;td&gt;Times a package goes to the city before it is accepted for plan review&lt;/td&gt;&lt;td&gt;Your last several Denver applications from E-permits records&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Calendar days to intake acceptance&lt;/td&gt;&lt;td&gt;Days from the first upload to the date the city accepts the package for plan review&lt;/td&gt;&lt;td&gt;The same applications and their E-permits dates&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Intake rejection reasons&lt;/td&gt;&lt;td&gt;Each reason the city gave for returning a package at intake&lt;/td&gt;&lt;td&gt;A list by sheet or form for the same applications&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Flags your team acted on&lt;/td&gt;&lt;td&gt;Share of StartSmart flags that led to a document change&lt;/td&gt;&lt;td&gt;Starts with the first StartSmart submission&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Flags the city waived&lt;/td&gt;&lt;td&gt;StartSmart flags that intake staff set aside for the project&lt;/td&gt;&lt;td&gt;Starts with the first StartSmart submission&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Items intake still caught&lt;/td&gt;&lt;td&gt;Rejection reasons the city gave after a clean StartSmart report&lt;/td&gt;&lt;td&gt;Starts with the first StartSmart submission&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;Keep intake separate from the rest of review time. Denver&amp;rsquo;s review time dashboard showed an average of 58 days from submittal to approval over the prior 90 days in its opening view on November 8, a figure that counts city time and applicant time together. It also lists 90-day estimates by discipline, which is where most of a permit&amp;rsquo;s calendar time sits after intake.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Denver review tasks, prior 90 days, as shown on November 8, 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Review task&lt;/th&gt;&lt;th class="num"&gt;Initial reviews completed&lt;/th&gt;&lt;th&gt;Initial review estimated days&lt;/th&gt;&lt;th class="num"&gt;Resubmittal reviews completed&lt;/th&gt;&lt;th&gt;Resubmittal estimated days&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Access Control&lt;/td&gt;&lt;td class="num"&gt;114&lt;/td&gt;&lt;td&gt;5 to 15&lt;/td&gt;&lt;td class="num"&gt;69&lt;/td&gt;&lt;td&gt;3 to 7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Architectural&lt;/td&gt;&lt;td class="num"&gt;482&lt;/td&gt;&lt;td&gt;11 to 18&lt;/td&gt;&lt;td class="num"&gt;404&lt;/td&gt;&lt;td&gt;5 to 13&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;DDPHE&lt;/td&gt;&lt;td class="num"&gt;393&lt;/td&gt;&lt;td&gt;9 to 14&lt;/td&gt;&lt;td class="num"&gt;50&lt;/td&gt;&lt;td&gt;7 to 12&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Electrical&lt;/td&gt;&lt;td class="num"&gt;813&lt;/td&gt;&lt;td&gt;8 to 14&lt;/td&gt;&lt;td class="num"&gt;455&lt;/td&gt;&lt;td&gt;4 to 8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Energy&lt;/td&gt;&lt;td class="num"&gt;263&lt;/td&gt;&lt;td&gt;12 to 22&lt;/td&gt;&lt;td class="num"&gt;206&lt;/td&gt;&lt;td&gt;8 to 14&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Fire&lt;/td&gt;&lt;td class="num"&gt;480&lt;/td&gt;&lt;td&gt;15 to 22&lt;/td&gt;&lt;td class="num"&gt;156&lt;/td&gt;&lt;td&gt;9 to 15&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Forestry&lt;/td&gt;&lt;td class="num"&gt;93&lt;/td&gt;&lt;td&gt;13 to 30&lt;/td&gt;&lt;td class="num"&gt;77&lt;/td&gt;&lt;td&gt;12 to 31&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Landmark&lt;/td&gt;&lt;td class="num"&gt;471&lt;/td&gt;&lt;td&gt;1 to 3&lt;/td&gt;&lt;td class="num"&gt;91&lt;/td&gt;&lt;td&gt;4 to 7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mechanical&lt;/td&gt;&lt;td class="num"&gt;382&lt;/td&gt;&lt;td&gt;9 to 16&lt;/td&gt;&lt;td class="num"&gt;230&lt;/td&gt;&lt;td&gt;4 to 10&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Parkview&lt;/td&gt;&lt;td class="num"&gt;11&lt;/td&gt;&lt;td&gt;16 to 28&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;&lt;td&gt;about 16&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Plumbing&lt;/td&gt;&lt;td class="num"&gt;285&lt;/td&gt;&lt;td&gt;10 to 17&lt;/td&gt;&lt;td class="num"&gt;156&lt;/td&gt;&lt;td&gt;5 to 12&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Residential&lt;/td&gt;&lt;td class="num"&gt;757&lt;/td&gt;&lt;td&gt;6 to 13&lt;/td&gt;&lt;td class="num"&gt;504&lt;/td&gt;&lt;td&gt;5 to 13&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Structural&lt;/td&gt;&lt;td class="num"&gt;563&lt;/td&gt;&lt;td&gt;11 to 17&lt;/td&gt;&lt;td class="num"&gt;406&lt;/td&gt;&lt;td&gt;6 to 14&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;SUDP&lt;/td&gt;&lt;td class="num"&gt;1396&lt;/td&gt;&lt;td&gt;7 to 14&lt;/td&gt;&lt;td class="num"&gt;1369&lt;/td&gt;&lt;td&gt;5 to 8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Transportation&lt;/td&gt;&lt;td class="num"&gt;388&lt;/td&gt;&lt;td&gt;7 to 15&lt;/td&gt;&lt;td class="num"&gt;85&lt;/td&gt;&lt;td&gt;5 to 14&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Urban Design&lt;/td&gt;&lt;td class="num"&gt;82&lt;/td&gt;&lt;td&gt;8 to 18&lt;/td&gt;&lt;td class="num"&gt;31&lt;/td&gt;&lt;td&gt;5 to 10&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Zone Lot Verification&lt;/td&gt;&lt;td class="num"&gt;306&lt;/td&gt;&lt;td&gt;8 to 13&lt;/td&gt;&lt;td class="num"&gt;26&lt;/td&gt;&lt;td&gt;5 to 11&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Zoning (Commercial)&lt;/td&gt;&lt;td class="num"&gt;645&lt;/td&gt;&lt;td&gt;11 to 17&lt;/td&gt;&lt;td class="num"&gt;540&lt;/td&gt;&lt;td&gt;5 to 8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Zoning (Residential)&lt;/td&gt;&lt;td class="num"&gt;693&lt;/td&gt;&lt;td&gt;6 to 13&lt;/td&gt;&lt;td class="num"&gt;556&lt;/td&gt;&lt;td&gt;5 to 12&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.denvergov.org/Government/Agencies-Departments-Offices/Agencies-Departments-Offices-Directory/Community-Planning-and-Development/Plan-Review-Permits-and-Inspections/Average-Plan-Review-Times" rel="noopener"&gt;denvergov.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The same before-and-after method appears in our post on &lt;a href="https://constructionmetrics.com/2026/10/20/measure-rfi-turnaround-before-ai-pilot/"&gt;measuring RFI turnaround before an AI pilot&lt;/a&gt;, and &lt;a href="https://constructionmetrics.com/2026/10/13/upcodes-ai-plan-review-180000-issues/"&gt;UpCodes&amp;rsquo; AI Plan Review&lt;/a&gt; runs a similar code check from the design side.&lt;/p&gt;
&lt;p&gt;A first step on one job: for your next Denver submission, write down the first upload date, every intake rejection reason and the acceptance date, then pull the same three items for the last three packages your office submitted without the tool.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;StartSmart is free for applicants, with no fee per account or per project. It is voluntary during Denver&amp;rsquo;s evaluation period, and the city says any decision to require it would come with stakeholder engagement and advance notice. The StartSmart and E-permits accounts are separate.&lt;/p&gt;
&lt;p&gt;Seattle&amp;rsquo;s report says CivCheck, now owned by Clariti, has worked with 13 jurisdictions across North America. Seattle&amp;rsquo;s 2026 budget includes funding for a production pilot of completeness screening.&lt;/p&gt;</content:encoded></item><item><title>Dodge Momentum Index fell 9.0% in October to 260.4 as commercial planning dropped 13.4%</title><link>https://constructionmetrics.com/2026/11/07/dodge-momentum-index-october-commercial-planning/</link><pubDate>Sat, 07 Nov 2026 10:33:34 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/07/dodge-momentum-index-october-commercial-planning/</guid><category>Data</category><description>The Dodge Momentum Index fell 9.0% in October to 260.4, its first year-over-year decline in 13 releases, as data center and warehouse planning slowed.</description><content:encoded>&lt;p&gt;The Dodge Momentum Index (DMI) fell 9.0% in October 2026 to 260.4, Dodge Construction Network reported on November 6. The drop is measured from September, which Dodge revised down to 286.0 from the 288.0 it first published. The index was 2.4% below October 2025, the first year-over-year decline in the 13 monthly releases opened for this post. The DMI tracks the value of nonresidential building projects entering planning as a three-month moving value, seasonally adjusted and scaled so that 2000 equals 100. October&amp;rsquo;s 260.4 is preliminary. It ties April&amp;rsquo;s revised reading as the lowest since March, and it sits 10.8 points under the 12-month average of 271.2.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Planning value fell back to its April level&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Dodge Momentum Index, 2000 = 100, seasonally adjusted three-month moving value of nonresidential projects entering planning&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;Planning value fell back to its April level&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 13 points from October 2025 to October 2026. Series: value. Values range from 246 to 291.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="210.0" y2="210.0"/&gt;&lt;line x1="72" x2="616" y1="114.0" y2="114.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;240&lt;/text&gt;&lt;text x="64" y="213.5" text-anchor="end"&gt;260&lt;/text&gt;&lt;text x="64" y="117.5" text-anchor="end"&gt;280&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;300&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2025-10&lt;/text&gt;&lt;text x="208.0" y="324" text-anchor="middle"&gt;2026-01&lt;/text&gt;&lt;text x="344.0" y="324" text-anchor="middle"&gt;2026-04&lt;/text&gt;&lt;text x="480.0" y="324" text-anchor="middle"&gt;2026-07&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,114.0 L117.3,126.5 L162.7,61.2 L208.0,163.0 L253.3,276.2 L298.7,263.8 L344.0,208.1 L389.3,127.9 L434.7,147.6 L480.0,99.6 L525.3,107.8 L570.7,85.2 L616.0,208.1 L616.0,306.0 L72.0,306.0 Z"/&gt;
&lt;path class="line" d="M72.0,114.0 L117.3,126.5 L162.7,61.2 L208.0,163.0 L253.3,276.2 L298.7,263.8 L344.0,208.1 L389.3,127.9 L434.7,147.6 L480.0,99.6 L525.3,107.8 L570.7,85.2 L616.0,208.1"/&gt;
&lt;circle class="end" cx="616.0" cy="208.1" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="114.0" r="9"&gt;&lt;title&gt;October 2025: 280.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="126.5" r="9"&gt;&lt;title&gt;November 2025: 277.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="61.2" r="9"&gt;&lt;title&gt;December 2025: 291.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="163.0" r="9"&gt;&lt;title&gt;January 2026: 269.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="276.2" r="9"&gt;&lt;title&gt;February 2026: 246.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="263.8" r="9"&gt;&lt;title&gt;March 2026: 248.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="208.1" r="9"&gt;&lt;title&gt;April 2026: 260.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="127.9" r="9"&gt;&lt;title&gt;May 2026: 277.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="147.6" r="9"&gt;&lt;title&gt;June 2026: 273.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="99.6" r="9"&gt;&lt;title&gt;July 2026: 283.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="107.8" r="9"&gt;&lt;title&gt;August 2026: 281.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="85.2" r="9"&gt;&lt;title&gt;September 2026: 286.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="208.1" r="9"&gt;&lt;title&gt;October 2026: 260.4&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="212.1"&gt;260.4&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="201.1" y2="188.1"/&gt;
&lt;circle cx="616.0" cy="208.1" r="3.5"/&gt;&lt;text x="616.0" y="184.1" text-anchor="end"&gt;October 2026, 260.4&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;Planning value fell back to its April level&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 13 points from October 2025 to October 2026. Series: value. Values range from 246 to 291.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="151.3" y2="151.3"/&gt;&lt;line x1="50" x2="276" y1="82.7" y2="82.7"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;240&lt;/text&gt;&lt;text x="42" y="154.8" text-anchor="end"&gt;260&lt;/text&gt;&lt;text x="42" y="86.2" text-anchor="end"&gt;280&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;300&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2025-10&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2026-04&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,82.7 L68.8,91.6 L87.7,44.9 L106.5,117.7 L125.3,198.7 L144.2,189.8 L163.0,150.0 L181.8,92.6 L200.7,106.7 L219.5,72.4 L238.3,78.2 L257.2,62.1 L276.0,150.0 L276.0,220.0 L50.0,220.0 Z"/&gt;
&lt;path class="line" d="M50.0,82.7 L68.8,91.6 L87.7,44.9 L106.5,117.7 L125.3,198.7 L144.2,189.8 L163.0,150.0 L181.8,92.6 L200.7,106.7 L219.5,72.4 L238.3,78.2 L257.2,62.1 L276.0,150.0"/&gt;
&lt;circle class="end" cx="276.0" cy="150.0" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="82.7" r="9"&gt;&lt;title&gt;October 2025: 280.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="91.6" r="9"&gt;&lt;title&gt;November 2025: 277.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="44.9" r="9"&gt;&lt;title&gt;December 2025: 291.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="117.7" r="9"&gt;&lt;title&gt;January 2026: 269.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="198.7" r="9"&gt;&lt;title&gt;February 2026: 246.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="189.8" r="9"&gt;&lt;title&gt;March 2026: 248.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="150.0" r="9"&gt;&lt;title&gt;April 2026: 260.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="92.6" r="9"&gt;&lt;title&gt;May 2026: 277.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="106.7" r="9"&gt;&lt;title&gt;June 2026: 273.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="72.4" r="9"&gt;&lt;title&gt;July 2026: 283.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="78.2" r="9"&gt;&lt;title&gt;August 2026: 281.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="62.1" r="9"&gt;&lt;title&gt;September 2026: 286.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="150.0" r="9"&gt;&lt;title&gt;October 2026: 260.4&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="154.0"&gt;260&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="143.0" y2="130.0"/&gt;
&lt;circle cx="276.0" cy="150.0" r="3.5"/&gt;&lt;text x="276.0" y="114.0" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;October 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;260.4&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;October 2025 through September 2026 as revised in the following month&amp;#39;s Dodge release. October 2026 is the first estimate. Dodge&amp;#39;s current figures for late 2025 appear lower; see Revisions and caveats.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://www.construction.com/dodge-momentum-index-falls-9-in-october/" rel="noopener"&gt;construction.com&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Dodge Momentum Index, October 2025 through October 2026, first-reported and revised readings&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;First reported&lt;/th&gt;&lt;th class="num"&gt;Revised next month&lt;/th&gt;&lt;th class="num"&gt;Revision (points)&lt;/th&gt;&lt;th class="num"&gt;Monthly change as first reported (%)&lt;/th&gt;&lt;th class="num"&gt;Year over year as first reported (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Oct 2025&lt;/td&gt;&lt;td class="num"&gt;283.3&lt;/td&gt;&lt;td class="num"&gt;280.0&lt;/td&gt;&lt;td class="num"&gt;-3.3&lt;/td&gt;&lt;td class="num"&gt;-7.1&lt;/td&gt;&lt;td class="num"&gt;52&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nov 2025&lt;/td&gt;&lt;td class="num"&gt;276.8&lt;/td&gt;&lt;td class="num"&gt;277.4&lt;/td&gt;&lt;td class="num"&gt;0.6&lt;/td&gt;&lt;td class="num"&gt;-1.1&lt;/td&gt;&lt;td class="num"&gt;50&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec 2025&lt;/td&gt;&lt;td class="num"&gt;296.8&lt;/td&gt;&lt;td class="num"&gt;291.0&lt;/td&gt;&lt;td class="num"&gt;-5.8&lt;/td&gt;&lt;td class="num"&gt;7.0&lt;/td&gt;&lt;td class="num"&gt;50&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jan 2026&lt;/td&gt;&lt;td class="num"&gt;272.7&lt;/td&gt;&lt;td class="num"&gt;269.8&lt;/td&gt;&lt;td class="num"&gt;-2.9&lt;/td&gt;&lt;td class="num"&gt;-6.3&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb 2026&lt;/td&gt;&lt;td class="num"&gt;250.0&lt;/td&gt;&lt;td class="num"&gt;246.2&lt;/td&gt;&lt;td class="num"&gt;-3.8&lt;/td&gt;&lt;td class="num"&gt;-7.3&lt;/td&gt;&lt;td class="num"&gt;18.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mar 2026&lt;/td&gt;&lt;td class="num"&gt;250.5&lt;/td&gt;&lt;td class="num"&gt;248.8&lt;/td&gt;&lt;td class="num"&gt;-1.7&lt;/td&gt;&lt;td class="num"&gt;1.8&lt;/td&gt;&lt;td class="num"&gt;25.8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Apr 2026&lt;/td&gt;&lt;td class="num"&gt;264.2&lt;/td&gt;&lt;td class="num"&gt;260.4&lt;/td&gt;&lt;td class="num"&gt;-3.8&lt;/td&gt;&lt;td class="num"&gt;6.2&lt;/td&gt;&lt;td class="num"&gt;14.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;275.7&lt;/td&gt;&lt;td class="num"&gt;277.1&lt;/td&gt;&lt;td class="num"&gt;1.4&lt;/td&gt;&lt;td class="num"&gt;5.9&lt;/td&gt;&lt;td class="num"&gt;33.8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jun 2026&lt;/td&gt;&lt;td class="num"&gt;271.7&lt;/td&gt;&lt;td class="num"&gt;273.0&lt;/td&gt;&lt;td class="num"&gt;1.3&lt;/td&gt;&lt;td class="num"&gt;-1.9&lt;/td&gt;&lt;td class="num"&gt;21.8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jul 2026&lt;/td&gt;&lt;td class="num"&gt;291.7&lt;/td&gt;&lt;td class="num"&gt;283.0&lt;/td&gt;&lt;td class="num"&gt;-8.7&lt;/td&gt;&lt;td class="num"&gt;6.9&lt;/td&gt;&lt;td class="num"&gt;11.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aug 2026&lt;/td&gt;&lt;td class="num"&gt;282.0&lt;/td&gt;&lt;td class="num"&gt;281.3&lt;/td&gt;&lt;td class="num"&gt;-0.7&lt;/td&gt;&lt;td class="num"&gt;-0.4&lt;/td&gt;&lt;td class="num"&gt;4.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Sep 2026&lt;/td&gt;&lt;td class="num"&gt;288.0&lt;/td&gt;&lt;td class="num"&gt;286.0&lt;/td&gt;&lt;td class="num"&gt;-2.0&lt;/td&gt;&lt;td class="num"&gt;2.4&lt;/td&gt;&lt;td class="num"&gt;3.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oct 2026&lt;/td&gt;&lt;td class="num"&gt;260.4&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;-9.0&lt;/td&gt;&lt;td class="num"&gt;-2.4&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.construction.com/dodge-momentum-index-falls-9-in-october/" rel="noopener"&gt;construction.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="what-moved"&gt;What moved&lt;/h2&gt;
&lt;p&gt;Commercial planning accounted for most of the decline. The commercial index fell 13.4% to 279.4 and the institutional index fell 1.5% to 236.9, according to the table in Dodge&amp;rsquo;s release. Dodge lists data centers, warehouses, parking garages, office buildings and hotels as the commercial sectors that slowed, with retail stores the only one that grew. On the institutional side, education and religious building planning slowed while healthcare, public government and recreational buildings picked up.&lt;/p&gt;
&lt;p&gt;Sarah Martin, Dodge&amp;rsquo;s director of economic research, put the commercial drop on weaker data center and warehouse planning. &amp;ldquo;Some volatility is to be expected, as data center activity fluctuates considerably from month to month, while mounting macroeconomic pressures continue to constrain other commercial sectors,&amp;rdquo; she said.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Dodge Momentum Index and its two components, September and October 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Index&lt;/th&gt;&lt;th class="num"&gt;September 2026 (revised)&lt;/th&gt;&lt;th class="num"&gt;October 2026&lt;/th&gt;&lt;th class="num"&gt;Monthly change (%)&lt;/th&gt;&lt;th class="num"&gt;Year over year (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Dodge Momentum Index&lt;/td&gt;&lt;td class="num"&gt;286.0&lt;/td&gt;&lt;td class="num"&gt;260.4&lt;/td&gt;&lt;td class="num"&gt;-9.0%&lt;/td&gt;&lt;td class="num"&gt;-2.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Commercial building&lt;/td&gt;&lt;td class="num"&gt;322.8&lt;/td&gt;&lt;td class="num"&gt;279.4&lt;/td&gt;&lt;td class="num"&gt;-13.4%&lt;/td&gt;&lt;td class="num"&gt;-17.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Institutional building&lt;/td&gt;&lt;td class="num"&gt;240.4&lt;/td&gt;&lt;td class="num"&gt;236.9&lt;/td&gt;&lt;td class="num"&gt;-1.5%&lt;/td&gt;&lt;td class="num"&gt;33.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.construction.com/dodge-momentum-index-falls-9-in-october/" rel="noopener"&gt;construction.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Over the year the halves went opposite ways. Commercial planning was 17.6% below October 2025 and institutional planning was 33.4% above it. Dodge says commercial would be down 16.6% with data centers removed, because data center planning surged in late 2025 and sets a high comparison. So institutional is now the only half above its year-ago level, though the commercial index is still the higher of the two at 279.4 against 236.9.&lt;/p&gt;
&lt;p&gt;The count of large projects fell by about half. Dodge counted 23 projects valued at $100 million or more entering planning in October, down from 45 in September. Data centers still topped the commercial list: the $451 million Orchard Hills Data Center Campus in Cheyenne, Wyoming, the $368 million Centra Technology Data Center (Phase 1) in Des Moines, Iowa, and the $366 million Project Longhorn Data Center (Building 1) in Cedar Creek, Texas. The largest institutional projects were the $336 million Green Valley Medical Campus in Fairfield, California, the $257 million Atrium Health Acute Care Building in Cornelius, North Carolina, and a $200 million life science laboratory in San Diego.&lt;/p&gt;
&lt;h2 id="how-to-use-this-number"&gt;How to use this number&lt;/h2&gt;
&lt;p&gt;Dodge says the DMI leads nonresidential building construction spending by a full year to 18 months. If that lead holds, October&amp;rsquo;s planning value bears on spending from late 2027 into spring 2028. Two ways to set it beside your own numbers:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;If you build private commercial work other than data centers, use the ex-data-center figure. At 16.6% below a year ago, it covers the office, warehouse, hotel, retail and parking planning that the headline folds in with data centers. Compare it with the year-over-year change in your commercial bid invitations for August through October, the same three months the index averages.&lt;/li&gt;
&lt;li&gt;If your backlog leans institutional, compare the 33.4% yearly gain with your count of healthcare, education and public-building pursuits this year against last. Dodge named healthcare and public government buildings among the sectors that grew in October, and two of the three largest institutional projects were medical buildings.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The DMI measures dollar value, so a few large projects can move it. The three data centers at the top of October&amp;rsquo;s list add up to $1.19 billion on their own. Check the project list before reading one month as a turn in your market. The post on &lt;a href="https://constructionmetrics.com/2026/10/21/architecture-billings-september-lowest-since-may/"&gt;September architecture billings&lt;/a&gt; covers a design-stage indicator with a shorter lead, and the &lt;a href="https://constructionmetrics.com/2026/10/07/dodge-momentum-index-september-institutional-planning/"&gt;September DMI post&lt;/a&gt; has the prior month&amp;rsquo;s detail.&lt;/p&gt;
&lt;h2 id="revisions-and-caveats"&gt;Revisions and caveats&lt;/h2&gt;
&lt;p&gt;October&amp;rsquo;s 260.4 is preliminary. Dodge revises each month in the next release, and over the past year the revisions have mostly gone down:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;In the 12 releases from November 2025 through October 2026, Dodge revised the prior month down nine times and up three times.&lt;/li&gt;
&lt;li&gt;The revisions ranged from 0.6 points up (November 2025) to 8.7 points down (July 2026), and averaged 2.5 points down.&lt;/li&gt;
&lt;li&gt;September&amp;rsquo;s revision, from 288.0 to 286.0, was 2.0 points.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;October&amp;rsquo;s fall of 25.6 points is nearly three times the largest of those revisions.&lt;/p&gt;
&lt;p&gt;Dodge&amp;rsquo;s year-over-year figures also do not line up with the levels it published a year ago. A 2.4% decline to 260.4 puts October 2025 near 266.8 in Dodge&amp;rsquo;s current data. Dodge first put October 2025 at 283.3 and revised it to 280.0 in its December 2025 release. September shows the same pattern: a 3.7% gain to 288.0 implies September 2025 near 277.7, while the November 2025 release put that month at 304.8. The releases opened for this post do not describe a restatement of 2025, so the cause could not be verified. The chart and table use each month as first revised, so their late-2025 levels likely run high. On those published levels October 2026 would be 7.0% below October 2025, against the 2.4% decline Dodge reports.&lt;/p&gt;
&lt;p&gt;Because the index is a three-month moving value, October still carries projects that entered planning in August and September. The releases do not publish the underlying dollar totals, so the index can be compared only with itself.&lt;/p&gt;</content:encoded></item><item><title>BuildOps AI agents draft quotes and invoices from technician visit notes, with full release in January 2027</title><link>https://constructionmetrics.com/2026/11/07/buildops-ai-agents-quotes-invoices-visit-notes/</link><pubDate>Sat, 07 Nov 2026 06:34:13 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/07/buildops-ai-agents-quotes-invoices-visit-notes/</guid><category>AI</category><description>BuildOps' new AI agents read technician visit notes, draft quotes for unquoted work, flag stalled service jobs and build invoices from billing rules.</description><content:encoded>&lt;p&gt;BuildOps, a Los Angeles software company that sells service, project and financial software to commercial specialty contractors, announced three AI agents on November 5, 2026, at Forge 2026, its customer conference. The agents work on the service side of the business. They read technician visit notes, quotes, open jobs and customer contracts, then draft quotes, follow-up messages and invoices for office staff to approve. The Revenue Agent is in early access now, and BuildOps says the full set reaches customers in January 2027.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;In a mechanical or electrical service shop today, a technician writes up a failing compressor in the visit notes, and someone in the office has to notice it, price it and send a quote. A service coordinator chases open jobs that are missing a timesheet or waiting on parts. A billing clerk applies each customer&amp;rsquo;s contract rates before the invoice goes out. BuildOps assigns an agent to each of those desks. An agent here means software that watches the records in BuildOps, finds a gap, and drafts the next step for a person to approve.&lt;/p&gt;
&lt;p&gt;The release describes the agents in the order a job moves:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;The Revenue Agent reads visit notes and watches quotes, service agreements and equipment records. It flags repairs that were written up but never quoted, equipment on a serviced property that sits outside the service agreement, quotes drafted but never sent, and approved work with nothing on the schedule. For each one it drafts a quote, a follow-up email or a new job. The BuildOps website says quotes idle for 14 days or more get flagged.&lt;/li&gt;
&lt;li&gt;The Service Coordinator Agent checks every open job each day against more than 20 reasons work stalls, including a missed visit, parts not received, or a passed not-to-exceed limit. It drafts the message to whoever has to act, and it finds billable parts, fees and time in visit notes that never reached the job.&lt;/li&gt;
&lt;li&gt;The Billing Agent applies each customer&amp;rsquo;s billing rules, reads the contract and builds the invoice. It flags low markups and negative margins before the invoice is sent, and catches completed jobs that were never invoiced.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The approval step sits with a person. BuildOps says nothing an agent writes reaches a customer until someone approves it, each finding shows the evidence behind it, and each declined suggestion records a reason. The agents draw on the jobs, equipment, agreements and pricing a contractor keeps in BuildOps, so a shop that runs quoting or dispatch in another system would give them less to read.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is BuildOps&amp;rsquo; announcement, which includes comments from two customers, and the company&amp;rsquo;s website. These claims come from BuildOps:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;In early access, one contractor used the Revenue Agent to act on $2 million of quotes that had gone cold within a single 30-day period.&lt;/li&gt;
&lt;li&gt;About 16,000 people use OpsAI, the AI layer inside BuildOps, each month.&lt;/li&gt;
&lt;li&gt;Its 2026 benchmark report, built from a year of jobs, invoices and work orders across more than 1,500 contractors, found that BuildOps shops average about five field technicians per back-office employee, and the top 20% support nearly seven.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Collin Drovdahl, operations manager at Jolma Electric, said in the release, &amp;ldquo;The Revenue Agent picks up things the guys mentioned in our daily reports that the PM might miss.&amp;rdquo; Jonathan Clark of Omnia Mechanical Group said the agent&amp;rsquo;s follow-ups get customers to approve proposals they had set aside.&lt;/p&gt;
&lt;p&gt;The $2 million figure counts quotes the contractor acted on. How many of those quotes were approved, and how often a flagged item turned out to be a real miss, are not yet public.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;The cleanest pilot metric for the Revenue Agent is unquoted recommendations: repairs a technician wrote up in visit notes that have no quote 14 days after the visit. Count them, and total their dollar value at your price book rates.&lt;/p&gt;
&lt;p&gt;To capture the baseline, export the last 90 days of visit notes and quotes, match each recommendation to a quote by job and asset, and list the ones with no match. A pivot table in Excel by technician and by customer will show where the misses cluster. During the pilot, also log how many agent drafts the office sent unchanged, edited or discarded, since edited drafts still take review time.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Metrics to capture before piloting BuildOps&amp;#39; service agents&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Agent&lt;/th&gt;&lt;th&gt;Metric&lt;/th&gt;&lt;th&gt;Definition&lt;/th&gt;&lt;th&gt;Baseline to capture&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Revenue Agent&lt;/td&gt;&lt;td&gt;Unquoted recommendations&lt;/td&gt;&lt;td&gt;Repairs a technician wrote up in visit notes with no quote 14 days after the visit&lt;/td&gt;&lt;td&gt;Count and dollar value from the last 90 days of visit notes&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Revenue Agent&lt;/td&gt;&lt;td&gt;Quote approval rate&lt;/td&gt;&lt;td&gt;Share of quotes sent that the customer approved within 30 days&lt;/td&gt;&lt;td&gt;Last 90 days of sent quotes&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Service Coordinator Agent&lt;/td&gt;&lt;td&gt;Days from job complete to invoice&lt;/td&gt;&lt;td&gt;Calendar days from the last field visit to the invoice going out&lt;/td&gt;&lt;td&gt;Median and slowest 10% of service jobs closed last quarter&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Billing Agent&lt;/td&gt;&lt;td&gt;Invoices corrected after sending&lt;/td&gt;&lt;td&gt;Invoices credited or reissued because of a rate or line-item error&lt;/td&gt;&lt;td&gt;Count from the last three months&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;For the Billing Agent, track calendar days from the last field visit to the invoice going out. Our post on &lt;a href="https://constructionmetrics.com/2026/10/11/adjust-dso-retainage-billing-cycles/"&gt;adjusting DSO for retainage and billing cycles&lt;/a&gt; shows how that delay feeds into days sales outstanding. The same baseline works for comparing BuildOps with the invoice agent in &lt;a href="https://constructionmetrics.com/2026/10/11/servicetitan-max-pilot-commercial-daily-log-invoice/"&gt;ServiceTitan&amp;rsquo;s Max pilot&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;A first step on one service line: pull last quarter&amp;rsquo;s visit notes for your busiest technician and count the written-up repairs that never got a quote.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;The Revenue Agent is in early access, and the Service Coordinator and Billing agents join it in January 2027 for BuildOps customers. BuildOps also previewed a Collections Agent for past-due invoices and unapplied payments, and AP Automation, which matches vendor bills to purchase orders and codes them to jobs. Both are expected in early 2027.&lt;/p&gt;
&lt;p&gt;BuildOps prices by quote, based on the number of field and office users on the account. Its pricing page lists integrations with Viewpoint Vista, Viewpoint Spectrum, Sage Intacct, NetSuite and QuickBooks. Contractors can sign up for the agents at buildops.com/platform/opsai.&lt;/p&gt;</content:encoded></item><item><title>Construction employment slipped by 3,000 in October as residential specialty trade contractors cut 15,200 jobs</title><link>https://constructionmetrics.com/2026/11/06/construction-employment-october-residential-trades/</link><pubDate>Fri, 06 Nov 2026 10:33:49 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/06/construction-employment-october-residential-trades/</guid><category>Data</category><description>BLS says construction employment fell by 3,000 to 8,367,000 in October 2026 as residential specialty trade contractors cut 15,200 jobs.</description><content:encoded>&lt;p&gt;Construction employment fell by 3,000 in October 2026 to 8,367,000, according to the Employment Situation report the Bureau of Labor Statistics released on November 6. The figure is seasonally adjusted and preliminary. It is 0.04% below September and 124,000, or 1.5%, above October 2025. October ranks second among the 25 months in the chart, behind the revised September figure, and sits about 46,000 above the 12-month average of 8,321,000. BLS also revised September up to 8,370,000 from the 8,364,000 it first published, so the September gain is now 16,000 instead of 11,000.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Construction employment held near its 25-month high in October&lt;/p&gt;&lt;p class="chart-subtitle"&gt;All employees, construction, thousands, seasonally adjusted&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;Construction employment held near its 25-month high in October&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 25 points from October 2024 to October 2026. Series: value. Values range from 8,239 to 8,370.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="234.0" y2="234.0"/&gt;&lt;line x1="72" x2="616" y1="162.0" y2="162.0"/&gt;&lt;line x1="72" x2="616" y1="90.0" y2="90.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;8,200&lt;/text&gt;&lt;text x="64" y="237.5" text-anchor="end"&gt;8,250&lt;/text&gt;&lt;text x="64" y="165.5" text-anchor="end"&gt;8,300&lt;/text&gt;&lt;text x="64" y="93.5" text-anchor="end"&gt;8,350&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;8,400&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2024-10&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;2025-03&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;2025-08&lt;/text&gt;&lt;text x="412.0" y="324" text-anchor="middle"&gt;2026-01&lt;/text&gt;&lt;text x="525.3" y="324" text-anchor="middle"&gt;2026-06&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="72" x2="616" y1="131.8" y2="131.8"/&gt;
&lt;text x="76" y="127.8"&gt;12-period average 8,321&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,216.7 L94.7,209.5 L117.3,196.6 L140.0,213.8 L162.7,209.5 L185.3,200.9 L208.0,203.8 L230.7,206.6 L253.3,209.5 L276.0,218.2 L298.7,249.8 L321.3,226.8 L344.0,244.1 L366.7,192.2 L389.3,202.3 L412.0,137.5 L434.7,167.8 L457.3,146.2 L480.0,141.8 L502.7,139.0 L525.3,134.6 L548.0,108.7 L570.7,84.2 L593.3,61.2 L616.0,65.5 L616.0,306.0 L72.0,306.0 Z"/&gt;
&lt;path class="line" d="M72.0,216.7 L94.7,209.5 L117.3,196.6 L140.0,213.8 L162.7,209.5 L185.3,200.9 L208.0,203.8 L230.7,206.6 L253.3,209.5 L276.0,218.2 L298.7,249.8 L321.3,226.8 L344.0,244.1 L366.7,192.2 L389.3,202.3 L412.0,137.5 L434.7,167.8 L457.3,146.2 L480.0,141.8 L502.7,139.0 L525.3,134.6 L548.0,108.7 L570.7,84.2 L593.3,61.2 L616.0,65.5"/&gt;
&lt;circle class="end" cx="616.0" cy="65.5" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="216.7" r="9"&gt;&lt;title&gt;October 2024: 8,262&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="209.5" r="9"&gt;&lt;title&gt;November 2024: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="196.6" r="9"&gt;&lt;title&gt;December 2024: 8,276&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="213.8" r="9"&gt;&lt;title&gt;January 2025: 8,264&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="209.5" r="9"&gt;&lt;title&gt;February 2025: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="200.9" r="9"&gt;&lt;title&gt;March 2025: 8,273&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="203.8" r="9"&gt;&lt;title&gt;April 2025: 8,271&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="206.6" r="9"&gt;&lt;title&gt;May 2025: 8,269&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="209.5" r="9"&gt;&lt;title&gt;June 2025: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="218.2" r="9"&gt;&lt;title&gt;July 2025: 8,261&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="249.8" r="9"&gt;&lt;title&gt;August 2025: 8,239&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="226.8" r="9"&gt;&lt;title&gt;September 2025: 8,255&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="244.1" r="9"&gt;&lt;title&gt;October 2025: 8,243&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="192.2" r="9"&gt;&lt;title&gt;November 2025: 8,279&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="202.3" r="9"&gt;&lt;title&gt;December 2025: 8,272&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="137.5" r="9"&gt;&lt;title&gt;January 2026: 8,317&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="167.8" r="9"&gt;&lt;title&gt;February 2026: 8,296&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="146.2" r="9"&gt;&lt;title&gt;March 2026: 8,311&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="141.8" r="9"&gt;&lt;title&gt;April 2026: 8,314&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="139.0" r="9"&gt;&lt;title&gt;May 2026: 8,316&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="134.6" r="9"&gt;&lt;title&gt;June 2026: 8,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="108.7" r="9"&gt;&lt;title&gt;July 2026: 8,337&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="84.2" r="9"&gt;&lt;title&gt;August 2026: 8,354&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="61.2" r="9"&gt;&lt;title&gt;September 2026: 8,370&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="65.5" r="9"&gt;&lt;title&gt;October 2026: 8,367&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="69.5"&gt;8,367&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="58.5" y2="45.5"/&gt;
&lt;circle cx="616.0" cy="65.5" r="3.5"/&gt;&lt;text x="616.0" y="41.5" text-anchor="end"&gt;October 2026, 8,367&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;Construction employment held near its 25-month high in October&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 25 points from October 2024 to October 2026. Series: value. Values range from 8,239 to 8,370.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="168.5" y2="168.5"/&gt;&lt;line x1="50" x2="276" y1="117.0" y2="117.0"/&gt;&lt;line x1="50" x2="276" y1="65.5" y2="65.5"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;8,200&lt;/text&gt;&lt;text x="42" y="172.0" text-anchor="end"&gt;8,250&lt;/text&gt;&lt;text x="42" y="120.5" text-anchor="end"&gt;8,300&lt;/text&gt;&lt;text x="42" y="69.0" text-anchor="end"&gt;8,350&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;8,400&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2024-10&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2025-10&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-10&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="50" x2="276" y1="95.4" y2="95.4"/&gt;
&lt;text x="54" y="91.4"&gt;12-period average 8,321&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,156.1 L59.4,151.0 L68.8,141.7 L78.2,154.1 L87.7,151.0 L97.1,144.8 L106.5,146.9 L115.9,148.9 L125.3,151.0 L134.8,157.2 L144.2,179.8 L153.6,163.3 L163.0,175.7 L172.4,138.6 L181.8,145.8 L191.2,99.5 L200.7,121.1 L210.1,105.7 L219.5,102.6 L228.9,100.5 L238.3,97.4 L247.8,78.9 L257.2,61.4 L266.6,44.9 L276.0,48.0 L276.0,220.0 L50.0,220.0 Z"/&gt;
&lt;path class="line" d="M50.0,156.1 L59.4,151.0 L68.8,141.7 L78.2,154.1 L87.7,151.0 L97.1,144.8 L106.5,146.9 L115.9,148.9 L125.3,151.0 L134.8,157.2 L144.2,179.8 L153.6,163.3 L163.0,175.7 L172.4,138.6 L181.8,145.8 L191.2,99.5 L200.7,121.1 L210.1,105.7 L219.5,102.6 L228.9,100.5 L238.3,97.4 L247.8,78.9 L257.2,61.4 L266.6,44.9 L276.0,48.0"/&gt;
&lt;circle class="end" cx="276.0" cy="48.0" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="156.1" r="9"&gt;&lt;title&gt;October 2024: 8,262&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="151.0" r="9"&gt;&lt;title&gt;November 2024: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="141.7" r="9"&gt;&lt;title&gt;December 2024: 8,276&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="154.1" r="9"&gt;&lt;title&gt;January 2025: 8,264&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="151.0" r="9"&gt;&lt;title&gt;February 2025: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="144.8" r="9"&gt;&lt;title&gt;March 2025: 8,273&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="146.9" r="9"&gt;&lt;title&gt;April 2025: 8,271&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="148.9" r="9"&gt;&lt;title&gt;May 2025: 8,269&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="151.0" r="9"&gt;&lt;title&gt;June 2025: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="157.2" r="9"&gt;&lt;title&gt;July 2025: 8,261&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="179.8" r="9"&gt;&lt;title&gt;August 2025: 8,239&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="163.3" r="9"&gt;&lt;title&gt;September 2025: 8,255&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="175.7" r="9"&gt;&lt;title&gt;October 2025: 8,243&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="138.6" r="9"&gt;&lt;title&gt;November 2025: 8,279&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="145.8" r="9"&gt;&lt;title&gt;December 2025: 8,272&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="99.5" r="9"&gt;&lt;title&gt;January 2026: 8,317&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="121.1" r="9"&gt;&lt;title&gt;February 2026: 8,296&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="105.7" r="9"&gt;&lt;title&gt;March 2026: 8,311&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="102.6" r="9"&gt;&lt;title&gt;April 2026: 8,314&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="100.5" r="9"&gt;&lt;title&gt;May 2026: 8,316&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="97.4" r="9"&gt;&lt;title&gt;June 2026: 8,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="78.9" r="9"&gt;&lt;title&gt;July 2026: 8,337&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="61.4" r="9"&gt;&lt;title&gt;August 2026: 8,354&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="44.9" r="9"&gt;&lt;title&gt;September 2026: 8,370&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="48.0" r="9"&gt;&lt;title&gt;October 2026: 8,367&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="52.0"&gt;8,367&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="55.0" y2="67.0"/&gt;
&lt;circle cx="276.0" cy="48.0" r="3.5"/&gt;&lt;text x="276.0" y="78.0" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;October 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;8,367&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;October 2026 is preliminary. September 2026 is revised and still preliminary.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://api.bls.gov/publicAPI/v1/timeseries/data/CES2000000001" rel="noopener"&gt;api.bls.gov&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;U.S. construction employment, last 13 months&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Employment (000s)&lt;/th&gt;&lt;th class="num"&gt;MoM change (000s)&lt;/th&gt;&lt;th class="num"&gt;YoY&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Oct 2025&lt;/td&gt;&lt;td class="num"&gt;8,243&lt;/td&gt;&lt;td class="num"&gt;-12&lt;/td&gt;&lt;td class="num"&gt;-0.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nov 2025&lt;/td&gt;&lt;td class="num"&gt;8,279&lt;/td&gt;&lt;td class="num"&gt;36&lt;/td&gt;&lt;td class="num"&gt;0.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec 2025&lt;/td&gt;&lt;td class="num"&gt;8,272&lt;/td&gt;&lt;td class="num"&gt;-7&lt;/td&gt;&lt;td class="num"&gt;-0.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jan 2026&lt;/td&gt;&lt;td class="num"&gt;8,317&lt;/td&gt;&lt;td class="num"&gt;45&lt;/td&gt;&lt;td class="num"&gt;0.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb 2026&lt;/td&gt;&lt;td class="num"&gt;8,296&lt;/td&gt;&lt;td class="num"&gt;-21&lt;/td&gt;&lt;td class="num"&gt;0.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mar 2026&lt;/td&gt;&lt;td class="num"&gt;8,311&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;&lt;td class="num"&gt;0.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Apr 2026&lt;/td&gt;&lt;td class="num"&gt;8,314&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;0.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;8,316&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;0.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jun 2026&lt;/td&gt;&lt;td class="num"&gt;8,319&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;0.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jul 2026&lt;/td&gt;&lt;td class="num"&gt;8,337&lt;/td&gt;&lt;td class="num"&gt;18&lt;/td&gt;&lt;td class="num"&gt;0.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aug 2026&lt;/td&gt;&lt;td class="num"&gt;8,354&lt;/td&gt;&lt;td class="num"&gt;17&lt;/td&gt;&lt;td class="num"&gt;1.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Sep 2026&lt;/td&gt;&lt;td class="num"&gt;8,370&lt;/td&gt;&lt;td class="num"&gt;16&lt;/td&gt;&lt;td class="num"&gt;1.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oct 2026&lt;/td&gt;&lt;td class="num"&gt;8,367&lt;/td&gt;&lt;td class="num"&gt;-3&lt;/td&gt;&lt;td class="num"&gt;1.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://api.bls.gov/publicAPI/v1/timeseries/data/CES2000000001" rel="noopener"&gt;api.bls.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="what-moved"&gt;What moved&lt;/h2&gt;
&lt;p&gt;BLS put construction on its list of industries where employment &amp;ldquo;showed little change over the month.&amp;rdquo; The detail in table B-1 shows where the 3,000 came from. Residential specialty trade contractors lost 15,200 jobs, the largest move of any construction line, and residential building construction lost 1,200. The three nonresidential lines added 13,300 between them, with 7,900 at nonresidential specialty trade contractors, 2,900 at nonresidential builders and 2,500 in heavy and civil engineering.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Construction employment by segment, seasonally adjusted&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Segment&lt;/th&gt;&lt;th class="num"&gt;Oct 2025 (000s)&lt;/th&gt;&lt;th class="num"&gt;Sep 2026 (000s)&lt;/th&gt;&lt;th class="num"&gt;Oct 2026 (000s)&lt;/th&gt;&lt;th class="num"&gt;Change from Sep (000s)&lt;/th&gt;&lt;th class="num"&gt;Change from Oct 2025 (000s)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Residential building construction&lt;/td&gt;&lt;td class="num"&gt;925.3&lt;/td&gt;&lt;td class="num"&gt;922.1&lt;/td&gt;&lt;td class="num"&gt;920.9&lt;/td&gt;&lt;td class="num"&gt;-1.2&lt;/td&gt;&lt;td class="num"&gt;-4.4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nonresidential building construction&lt;/td&gt;&lt;td class="num"&gt;918.3&lt;/td&gt;&lt;td class="num"&gt;949.7&lt;/td&gt;&lt;td class="num"&gt;952.6&lt;/td&gt;&lt;td class="num"&gt;2.9&lt;/td&gt;&lt;td class="num"&gt;34.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Heavy and civil engineering construction&lt;/td&gt;&lt;td class="num"&gt;1,183.5&lt;/td&gt;&lt;td class="num"&gt;1,210.2&lt;/td&gt;&lt;td class="num"&gt;1,212.7&lt;/td&gt;&lt;td class="num"&gt;2.5&lt;/td&gt;&lt;td class="num"&gt;29.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Residential specialty trade contractors&lt;/td&gt;&lt;td class="num"&gt;2,368.2&lt;/td&gt;&lt;td class="num"&gt;2,347.6&lt;/td&gt;&lt;td class="num"&gt;2,332.4&lt;/td&gt;&lt;td class="num"&gt;-15.2&lt;/td&gt;&lt;td class="num"&gt;-35.8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nonresidential specialty trade contractors&lt;/td&gt;&lt;td class="num"&gt;2,847.5&lt;/td&gt;&lt;td class="num"&gt;2,940.7&lt;/td&gt;&lt;td class="num"&gt;2,948.6&lt;/td&gt;&lt;td class="num"&gt;7.9&lt;/td&gt;&lt;td class="num"&gt;101.1&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bls.gov/news.release/empsit.t17.htm" rel="noopener"&gt;bls.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The 12-month view runs the same way and by a wider margin. The three nonresidential lines have added 164,600 jobs since October 2025, and the two residential lines have lost 40,200. Nonresidential specialty trade contractors grew 3.6% to 2,948,600 and supplied 101,100 of that gain on their own. Residential specialty trade contractors are down 1.5% to 2,332,400, and October&amp;rsquo;s 15,200 decline is 0.6% of that segment in a single month. The spending side of the same split is in the &lt;a href="https://constructionmetrics.com/2026/11/02/construction-spending-september-residential-improvements/"&gt;September construction spending post&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;So, turning to pay, average hourly earnings for all construction employees rose 38 cents in October to $42.03, a 0.9% monthly gain, and are up 4.7% from $40.14 in October 2025. Across all private employers BLS reports a 3.1% rise over the same 12 months. Average weekly earnings in construction reached $1,655.98, up 6.1% from a year earlier, since weekly pay moves with hours worked as well as with the hourly rate.&lt;/p&gt;
&lt;h2 id="how-to-use-this-number"&gt;How to use this number&lt;/h2&gt;
&lt;ol&gt;
&lt;li&gt;Compare your field headcount to your segment. A residential trade contractor whose headcount is down about 1.5% from October 2025 has moved with residential specialty trades as a whole. A nonresidential trade contractor up less than 3.6% has grown more slowly than its segment. Your own payroll count is not seasonally adjusted, so compare October to October, the same 12-month window BLS uses for this figure.&lt;/li&gt;
&lt;li&gt;Check the labor escalation in bids for 2027 work. Construction hourly earnings rose 4.7% over the year, faster than the 3.1% across all private employers. If your estimates carry a lower escalation rate on labor, test it against your own payroll for the same 12 months, and read it next to the &lt;a href="https://constructionmetrics.com/2026/11/03/construction-job-openings-september-quits/"&gt;September job openings and quits figures&lt;/a&gt;. The BLS average covers every trade, region and pay arrangement in construction, so your crews may run above or below it.&lt;/li&gt;
&lt;/ol&gt;
&lt;h2 id="revisions-and-caveats"&gt;Revisions and caveats&lt;/h2&gt;
&lt;p&gt;October is preliminary, and so is the revised September. BLS will revise both when it publishes November data on December 4, 2026. This month&amp;rsquo;s revision worked like this:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;On October 2, BLS first published September construction employment at 8,364,000 and August at 8,353,000. FRED&amp;rsquo;s USCONS series still carried those figures when this post was written.&lt;/li&gt;
&lt;li&gt;The November 6 release revised September to 8,370,000 and August to 8,354,000.&lt;/li&gt;
&lt;li&gt;The September gain is now 16,000, and October&amp;rsquo;s 3,000 decline is measured from the higher September figure.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;If BLS had left September at its first estimate, October&amp;rsquo;s 8,367,000 would show as a gain of 3,000. The sign of this month&amp;rsquo;s change comes from the revision. A move of 3,000 in either direction is 0.04% of the total, and BLS grouped construction with the industries that showed little change. BLS says monthly revisions come from reports that businesses and government agencies send in after the first estimate, and from recalculated seasonal factors. Across all industries, BLS revised August and September combined up by 84,000.&lt;/p&gt;
&lt;p&gt;Before seasonal adjustment, construction employment rose to 8,525,000 in October from 8,512,000 in September, a gain of 13,000. The seasonally adjusted series shows a decline of 3,000, which means employers added fewer construction jobs in October than the seasonal factors expected. (Unadjusted construction employment was 8,413,000 in October 2025, so the unadjusted count is also up from a year ago.)&lt;/p&gt;
&lt;p&gt;The figures come from the Current Employment Statistics survey of employer payrolls. FRED&amp;rsquo;s series notes say the construction count includes working supervisors, craft workers, apprentices, helpers and laborers, whether they work at the site or in shops and yards on work the construction trades normally perform. The B-1 table notes that the data have been revised to March 2025 benchmark levels, so the history in the chart will move again when BLS applies its next annual benchmark. The chart and the 13-month table come from the BLS data API, because FRED had not yet posted the October figure when this post was written.&lt;/p&gt;</content:encoded></item><item><title>Mach9 adds drone and aerial LiDAR to its AI survey drafting, and Langan says it cut delivery time about 40%</title><link>https://constructionmetrics.com/2026/11/06/mach9-aerial-lidar-ai-survey-linework/</link><pubDate>Fri, 06 Nov 2026 06:34:15 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/06/mach9-aerial-lidar-ai-survey-linework/</guid><category>AI</category><description>Mach9's web-based AI CAD tool now drafts linework, classified point clouds and ground surfaces from drone, helicopter and plane scans.</description><content:encoded>&lt;p&gt;Mach9, a San Francisco company that sells web-based AI CAD software for civil survey work, said on November 4, 2026, that its platform now takes aerial LiDAR and photogrammetry data from drones, helicopters and planes. Until now it worked from mobile and terrestrial scans. The release affects the step between a site flight and a usable topo: classifying the point cloud, drafting the linework and building the ground surface that goes into Civil 3D or OpenRoads.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;On a site job today, a drone pilot can fly the parcel in a morning. Then a survey technician spends hours in the office classifying points, tracing curbs and pavement edges, and building a surface in several different programs. Mach9&amp;rsquo;s release says one day of flying on a detailed electric utility project can turn into months of office work.&lt;/p&gt;
&lt;p&gt;Mach9 puts those steps in one browser application. The survey team uploads LAS or LAZ point clouds from LiDAR or photogrammetry, along with an orthomosaic, which is a stitched aerial photo corrected to map scale. Mach9 says its AI produces a first draft in hours. The draft includes 3D points and lines for curbs, building footprints, pavement edges and vegetation outlines, plus a classified point cloud, meaning each point is tagged as ground, building, vegetation or another class.&lt;/p&gt;
&lt;p&gt;The surveyor then checks and edits the draft in the same tool. Surface tools build ground surfaces, breaklines and contours, and a deviation heatmap shows where the surface departs from the points. Exports include DXF, DWG, SHP, GDB and LandXML. For utility work, the release says the software also drafts utility poles and the curved 3D lines of overhead wires for clearance analysis and make-ready design.&lt;/p&gt;
&lt;p&gt;On a contractor&amp;rsquo;s side, the users are an in-house survey or VDC group on a sitework, heavy civil or utility job. The output feeds existing-conditions surfaces for earthwork quantities on land development, solar and data center sites, along with site and ALTA surveys and corridor basemaps.&lt;/p&gt;
&lt;p&gt;Mach9&amp;rsquo;s own guidance on drone data sets limits. Its density guide says a flight needs at least 100 points per square meter for automated linework, and it recommends 400 or more. The same guide lists vegetation edges and overhead wires as beta on drone data. It says signs, poles and manholes are extracted from mobile mapping data but still need an operator on drone data.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Drone LiDAR density and what Mach9 says its automation drafts&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Drone LiDAR density (points per sq m)&lt;/th&gt;&lt;th&gt;Approximate point spacing&lt;/th&gt;&lt;th&gt;What Mach9&amp;#39;s guide says to expect&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Below 100&lt;/td&gt;&lt;td&gt;More than 10 cm (4 in)&lt;/td&gt;&lt;td&gt;Ground classification still runs; most linework is drafted by hand&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;100&lt;/td&gt;&lt;td&gt;About 10 cm (4 in)&lt;/td&gt;&lt;td&gt;Minimum for automated linework; a 6-inch curb gets one or two points&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;400 or more&lt;/td&gt;&lt;td&gt;About 5 cm (2 in)&lt;/td&gt;&lt;td&gt;Recommended; a curb gets about three points&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;About 650 and up in a cross-grid&lt;/td&gt;&lt;td&gt;Not stated&lt;/td&gt;&lt;td&gt;Separate curb lines plus crosshatch and guardrail came through in Mach9&amp;#39;s drone projects&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://mach9.ai/blog/drone-lidar-point-density-for-automated-linework" rel="noopener"&gt;mach9.ai&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence so far is Mach9&amp;rsquo;s release and blog posts, with comments from survey managers at three engineering firms that use the software. AEC Magazine&amp;rsquo;s coverage repeats the same customer figures.&lt;/p&gt;
&lt;p&gt;These claims come from Mach9 and its customers:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;Russ Hall, senior survey project manager at Langan, said Mach9 cut the firm&amp;rsquo;s delivery time by weeks, about 40%, on several multi-thousand-acre projects in Texas that it could not otherwise have finished on time.&lt;/li&gt;
&lt;li&gt;Thomas Tucker, survey project manager at Welch Comer, said he saves an average of four to five hours per project. &amp;ldquo;[Every] two projects, we&amp;rsquo;re saving a day,&amp;rdquo; he said.&lt;/li&gt;
&lt;li&gt;Welch Comer flies a GeoCue TrueView 540 at 150 to 200 feet above ground and about 5 meters per second. Mach9 calculates from GeoCue&amp;rsquo;s published figures that those settings give roughly 900 to 1,200 points per square meter in one pass.&lt;/li&gt;
&lt;li&gt;Mach9 says it has been used on more than 2,500 projects in all 50 states and that teams work up to 10 times faster at one-fifth the cost.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;All three quoted firms are engineering and survey consultants. Mach9 describes its accuracy as centimeter-level at infrastructure scale. A breakdown of Langan&amp;rsquo;s 40% by step and an accuracy report against surveyed checkpoints are not yet public.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track office hours per acre of finished topo. Start the clock when the flight data reaches the office and stop it when the LandXML or DWG goes to the estimator or the engineer. Count classification, drafting, surface building and QA. Log any return trip to the field for missed features as a separate count.&lt;/p&gt;
&lt;p&gt;Capture the baseline before the pilot:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Pull three recent drone topos of similar site type, with acreage and the flight&amp;rsquo;s point density.&lt;/li&gt;
&lt;li&gt;Get the office hours on each from timesheets or from the technician.&lt;/li&gt;
&lt;li&gt;Note how many features were added after the first delivery, and whether anyone went back to the site.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;On the pilot, log the same figures, plus the hours spent fixing the AI draft. Check the finished surface against your own control shots, and record the vertical difference at each check point. That gives you an accuracy figure for your own sites.&lt;/p&gt;
&lt;p&gt;A first step on one job is to check the point density of a flight you have already processed. If it falls below 100 points per square meter, Mach9&amp;rsquo;s guide says most linework will still be drawn by hand, so plan the next flight lower and slower before the pilot.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;The aerial support is available now. Mach9 prices by quote through a demo request. The company is holding a webinar on the aerial workflow on November 17, 2026.&lt;/p&gt;
&lt;p&gt;Related reading: &lt;a href="https://constructionmetrics.com/2026/10/28/bedrock-robotics-600-million-autonomous-excavators/"&gt;Bedrock Robotics raises $600 million after its retrofitted excavators began paid, operator-free earthwork in August&lt;/a&gt;.&lt;/p&gt;</content:encoded></item><item><title>How to weigh crew hours by BLS fatal injury rates, from roofers at 48.7 to electricians at 5.3</title><link>https://constructionmetrics.com/2026/11/05/weigh-crew-hours-bls-fatal-injury-rates/</link><pubDate>Thu, 05 Nov 2026 10:33:43 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/05/weigh-crew-hours-bls-fatal-injury-rates/</guid><category>Data</category><description>BLS fatal injury rates by trade turn a contractor's hours by occupation into a blended rate that shows which crews carry its fatality exposure.</description><content:encoded>&lt;p&gt;A safety director who reports to the owner each year usually brings TRIR, DART and the experience mod. None of the three says much about the risk of a death on the job, because a firm&amp;rsquo;s own fatality count is almost always zero. The Bureau of Labor Statistics (BLS) publishes fatal injury rates by occupation, and a contractor can weight them by its own payroll hours to see which crews carry the most exposure.&lt;/p&gt;
&lt;p&gt;The source is the Census of Fatal Occupational Injuries (CFOI), a count of every fatal work injury in the US in a calendar year. BLS published the 2024 census on February 19, 2026. It recorded 5,070 fatal work injuries, down 4.0% from 5,283 in 2023, and an all-worker rate of 3.3 per 100,000 full-time equivalent (FTE) workers. Construction had 1,034 of those deaths and a rate of 9.2.&lt;/p&gt;
&lt;h2 id="the-formula"&gt;The formula&lt;/h2&gt;
&lt;p&gt;The BLS Handbook of Methods gives one formula. Divide the number of fatal injuries by the total hours the group worked in the year, then multiply by 200,000,000. That base stands for 100,000 full-time workers at 40 hours a week for 50 weeks, the same convention as the 200,000-hour base in the &lt;a href="https://constructionmetrics.com/2026/10/08/compute-trir-dart-osha-300-log/"&gt;TRIR and DART post&lt;/a&gt;, scaled up a thousandfold.&lt;/p&gt;
&lt;p&gt;The hours come from the Current Population Survey (CPS), a monthly household survey. BLS says hours-based rates are generally considered more accurate than rates built on headcount, because they measure risk per standard length of exposure. In 2024 construction workers logged 22.5 billion hours, about 7.6% of the 297.6 billion hours worked by all workers, and accounted for about 20% of fatal work injuries.&lt;/p&gt;
&lt;p&gt;The formula also shows why a single contractor cannot compute a useful rate of its own. A firm with 500,000 hours a year that had one fatality would post a rate of 400 per 100,000 FTE. A firm with none would post zero. Neither number tells the owner much about next year, so the useful step is to apply the national rates to the firm&amp;rsquo;s hours.&lt;/p&gt;
&lt;h2 id="rates-by-trade"&gt;Rates by trade&lt;/h2&gt;
&lt;p&gt;BLS publishes a rate for an occupation only when it had at least 5 fatal injuries and 40 million hours worked in the year. The chart and table show ten construction occupations from the 2024 file.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Roofers had the highest fatal injury rate of any construction trade in 2024&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Fatal work injuries per 100,000 full-time equivalent workers, 2024, hours-based&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;Roofers had the highest fatal injury rate of any construction trade in 2024&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Bar chart with 10 points from Roofers to Electricians. Series: Fatal injury rate per 100000 FTE. Values range from 0 to 49.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="210.0" y2="210.0"/&gt;&lt;line x1="72" x2="616" y1="114.0" y2="114.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;0&lt;/text&gt;&lt;text x="64" y="213.5" text-anchor="end"&gt;20&lt;/text&gt;&lt;text x="64" y="117.5" text-anchor="end"&gt;40&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;60&lt;/text&gt;&lt;text x="99.2" y="324" text-anchor="start"&gt;Roofers&lt;/text&gt;&lt;text x="208.0" y="324" text-anchor="middle"&gt;Construction trades helpers&lt;/text&gt;&lt;text x="316.8" y="324" text-anchor="middle"&gt;Construction supervisors&lt;/text&gt;&lt;text x="425.6" y="324" text-anchor="middle"&gt;Carpenters&lt;/text&gt;&lt;text x="588.8" y="324" text-anchor="end"&gt;Electricians&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;rect x="78.8" y="72.2" width="40.8" height="233.8"&gt;&lt;title&gt;Roofers: 48.7&lt;/title&gt;&lt;/rect&gt;&lt;rect x="133.2" y="124.6" width="40.8" height="181.4"&gt;&lt;title&gt;Structural iron and steel workers: 37.8&lt;/title&gt;&lt;/rect&gt;&lt;rect x="187.6" y="134.2" width="40.8" height="171.8"&gt;&lt;title&gt;Construction trades helpers: 35.8&lt;/title&gt;&lt;/rect&gt;&lt;rect x="242.0" y="230.2" width="40.8" height="75.8"&gt;&lt;title&gt;Construction laborers: 15.8&lt;/title&gt;&lt;/rect&gt;&lt;rect x="296.4" y="244.6" width="40.8" height="61.4"&gt;&lt;title&gt;Construction supervisors: 12.8&lt;/title&gt;&lt;/rect&gt;&lt;rect x="350.8" y="249.8" width="40.8" height="56.2"&gt;&lt;title&gt;Construction equipment operators: 11.7&lt;/title&gt;&lt;/rect&gt;&lt;rect x="405.2" y="270.0" width="40.8" height="36.0"&gt;&lt;title&gt;Carpenters: 7.5&lt;/title&gt;&lt;/rect&gt;&lt;rect x="459.6" y="272.9" width="40.8" height="33.1"&gt;&lt;title&gt;Plumbers and pipefitters: 6.9&lt;/title&gt;&lt;/rect&gt;&lt;rect x="514.0" y="274.3" width="40.8" height="31.7"&gt;&lt;title&gt;Painters: 6.6&lt;/title&gt;&lt;/rect&gt;&lt;rect x="568.4" y="280.6" width="40.8" height="25.4"&gt;&lt;title&gt;Electricians: 5.3&lt;/title&gt;&lt;/rect&gt;
&lt;text class="label" x="588.8" y="275.6" text-anchor="middle"&gt;5.3&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="262.4" x2="262.4" y1="223.2" y2="210.2"/&gt;
&lt;circle cx="262.4" cy="230.2" r="3.5"/&gt;&lt;text x="262.4" y="206.2" text-anchor="middle"&gt;Construction laborers, 15.8&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;Roofers had the highest fatal injury rate of any construction trade in 2024&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Bar chart with 10 points from Roofers to Electricians. Series: Fatal injury rate per 100000 FTE. Values range from 0 to 49.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="151.3" y2="151.3"/&gt;&lt;line x1="50" x2="276" y1="82.7" y2="82.7"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;0&lt;/text&gt;&lt;text x="42" y="154.8" text-anchor="end"&gt;20&lt;/text&gt;&lt;text x="42" y="86.2" text-anchor="end"&gt;40&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;60&lt;/text&gt;&lt;text x="61.3" y="237" text-anchor="start"&gt;Roofers&lt;/text&gt;&lt;text x="174.3" y="237" text-anchor="middle"&gt;Construction equipment operators&lt;/text&gt;&lt;text x="264.7" y="237" text-anchor="end"&gt;Electricians&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;rect x="52.8" y="52.8" width="17.0" height="167.2"&gt;&lt;title&gt;Roofers: 48.7&lt;/title&gt;&lt;/rect&gt;&lt;rect x="75.4" y="90.2" width="17.0" height="129.8"&gt;&lt;title&gt;Structural iron and steel workers: 37.8&lt;/title&gt;&lt;/rect&gt;&lt;rect x="98.0" y="97.1" width="17.0" height="122.9"&gt;&lt;title&gt;Construction trades helpers: 35.8&lt;/title&gt;&lt;/rect&gt;&lt;rect x="120.6" y="165.8" width="17.0" height="54.2"&gt;&lt;title&gt;Construction laborers: 15.8&lt;/title&gt;&lt;/rect&gt;&lt;rect x="143.2" y="176.1" width="17.0" height="43.9"&gt;&lt;title&gt;Construction supervisors: 12.8&lt;/title&gt;&lt;/rect&gt;&lt;rect x="165.8" y="179.8" width="17.0" height="40.2"&gt;&lt;title&gt;Construction equipment operators: 11.7&lt;/title&gt;&lt;/rect&gt;&lt;rect x="188.4" y="194.2" width="17.0" height="25.8"&gt;&lt;title&gt;Carpenters: 7.5&lt;/title&gt;&lt;/rect&gt;&lt;rect x="211.0" y="196.3" width="17.0" height="23.7"&gt;&lt;title&gt;Plumbers and pipefitters: 6.9&lt;/title&gt;&lt;/rect&gt;&lt;rect x="233.6" y="197.3" width="17.0" height="22.7"&gt;&lt;title&gt;Painters: 6.6&lt;/title&gt;&lt;/rect&gt;&lt;rect x="256.2" y="201.8" width="17.0" height="18.2"&gt;&lt;title&gt;Electricians: 5.3&lt;/title&gt;&lt;/rect&gt;
&lt;text class="label" x="264.7" y="196.8" text-anchor="middle"&gt;5.3&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="129.1" x2="129.1" y1="158.8" y2="145.8"/&gt;
&lt;circle cx="129.1" cy="165.8" r="3.5"/&gt;&lt;text x="129.1" y="129.8" text-anchor="middle"&gt;&lt;tspan x="129.1"&gt;Construction laborers&lt;/tspan&gt;&lt;tspan x="129.1" dy="12"&gt;15.8&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;Final 2024 data. Occupation rates include workers in that occupation in every industry.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://www.bls.gov/iif/fatal-injuries-tables/fatal-occupational-injuries-hours-based-rates-2024.xlsx" rel="noopener"&gt;bls.gov&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Hours worked, fatal injury rate and 95% margin of error for construction occupations, 2024&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Occupation&lt;/th&gt;&lt;th&gt;SOC code&lt;/th&gt;&lt;th class="num"&gt;Hours worked 2024 (millions)&lt;/th&gt;&lt;th class="num"&gt;Fatal injury rate per 100000 FTE&lt;/th&gt;&lt;th class="num"&gt;Margin of error (95%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Roofers&lt;/td&gt;&lt;td&gt;47-2181&lt;/td&gt;&lt;td class="num"&gt;400&lt;/td&gt;&lt;td class="num"&gt;48.7&lt;/td&gt;&lt;td class="num"&gt;7.38&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Structural iron and steel workers&lt;/td&gt;&lt;td&gt;47-2221&lt;/td&gt;&lt;td class="num"&gt;100&lt;/td&gt;&lt;td class="num"&gt;37.8&lt;/td&gt;&lt;td class="num"&gt;13.35&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Helpers, construction trades&lt;/td&gt;&lt;td&gt;47-3010&lt;/td&gt;&lt;td class="num"&gt;100&lt;/td&gt;&lt;td class="num"&gt;35.8&lt;/td&gt;&lt;td class="num"&gt;9.63&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Construction laborers&lt;/td&gt;&lt;td&gt;47-2061&lt;/td&gt;&lt;td class="num"&gt;4,200&lt;/td&gt;&lt;td class="num"&gt;15.8&lt;/td&gt;&lt;td class="num"&gt;0.86&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;First-line supervisors of construction trades and extraction workers&lt;/td&gt;&lt;td&gt;47-1011&lt;/td&gt;&lt;td class="num"&gt;1,600&lt;/td&gt;&lt;td class="num"&gt;12.8&lt;/td&gt;&lt;td class="num"&gt;0.87&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Construction equipment operators&lt;/td&gt;&lt;td&gt;47-2070&lt;/td&gt;&lt;td class="num"&gt;800&lt;/td&gt;&lt;td class="num"&gt;11.7&lt;/td&gt;&lt;td class="num"&gt;1.28&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Carpenters&lt;/td&gt;&lt;td&gt;47-2031&lt;/td&gt;&lt;td class="num"&gt;2,400&lt;/td&gt;&lt;td class="num"&gt;7.5&lt;/td&gt;&lt;td class="num"&gt;0.52&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Pipelayers, plumbers, pipefitters, and steamfitters&lt;/td&gt;&lt;td&gt;47-2150&lt;/td&gt;&lt;td class="num"&gt;1,400&lt;/td&gt;&lt;td class="num"&gt;6.9&lt;/td&gt;&lt;td class="num"&gt;0.73&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Painters and paperhangers&lt;/td&gt;&lt;td&gt;47-2140&lt;/td&gt;&lt;td class="num"&gt;1,000&lt;/td&gt;&lt;td class="num"&gt;6.6&lt;/td&gt;&lt;td class="num"&gt;0.68&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Electricians&lt;/td&gt;&lt;td&gt;47-2111&lt;/td&gt;&lt;td class="num"&gt;2,000&lt;/td&gt;&lt;td class="num"&gt;5.3&lt;/td&gt;&lt;td class="num"&gt;0.40&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;All construction and extraction occupations&lt;/td&gt;&lt;td&gt;47-0000&lt;/td&gt;&lt;td class="num"&gt;16,300&lt;/td&gt;&lt;td class="num"&gt;12.6&lt;/td&gt;&lt;td class="num"&gt;0.34&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;All workers&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td class="num"&gt;297,600&lt;/td&gt;&lt;td class="num"&gt;3.3&lt;/td&gt;&lt;td class="num"&gt;0.01&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bls.gov/iif/fatal-injuries-tables/fatal-occupational-injuries-hours-based-rates-2024.xlsx" rel="noopener"&gt;bls.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The margin of error is the range around the rate that BLS gives at 95% confidence. It comes from sampling error in the CPS hours, and it widens for small trades. Roofers, at 48.7 with a margin of 7.38, logged 400 million hours and had 104 fatal injuries. Structural iron and steel workers had 14 fatal injuries on 100 million hours, so their rate of 37.8 carries a margin of 13.35.&lt;/p&gt;
&lt;p&gt;Construction laborers sit at 15.8 with a margin under 1 point, on 4.2 billion hours, the most of any trade in the table. A contractor with a large self-perform labor force will find that this row drives its weighted result.&lt;/p&gt;
&lt;h2 id="where-construction-deaths-come-from"&gt;Where construction deaths come from&lt;/h2&gt;
&lt;p&gt;BLS also breaks the 1,034 construction deaths down by the event that caused them. Falls, slips and trips caused 389, or 37.6%. Transportation incidents caused 244, about 23.6%, and exposure to harmful substances or environments caused 187.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Fatal work injuries in private construction by event or exposure, 2024. Blank cells are not published by BLS.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Industry&lt;/th&gt;&lt;th class="num"&gt;NAICS&lt;/th&gt;&lt;th class="num"&gt;Total fatal injuries&lt;/th&gt;&lt;th class="num"&gt;Falls, slips, trips&lt;/th&gt;&lt;th class="num"&gt;Transportation incidents&lt;/th&gt;&lt;th class="num"&gt;Exposure to harmful substances or environments&lt;/th&gt;&lt;th class="num"&gt;Contact incidents&lt;/th&gt;&lt;th class="num"&gt;Violent acts&lt;/th&gt;&lt;th class="num"&gt;Explosions and fires&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Construction&lt;/td&gt;&lt;td class="num"&gt;23&lt;/td&gt;&lt;td class="num"&gt;1,034&lt;/td&gt;&lt;td class="num"&gt;389&lt;/td&gt;&lt;td class="num"&gt;244&lt;/td&gt;&lt;td class="num"&gt;187&lt;/td&gt;&lt;td class="num"&gt;161&lt;/td&gt;&lt;td class="num"&gt;46&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Construction of buildings&lt;/td&gt;&lt;td class="num"&gt;236&lt;/td&gt;&lt;td class="num"&gt;220&lt;/td&gt;&lt;td class="num"&gt;96&lt;/td&gt;&lt;td class="num"&gt;32&lt;/td&gt;&lt;td class="num"&gt;46&lt;/td&gt;&lt;td class="num"&gt;34&lt;/td&gt;&lt;td class="num"&gt;12&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Heavy and civil engineering construction&lt;/td&gt;&lt;td class="num"&gt;237&lt;/td&gt;&lt;td class="num"&gt;158&lt;/td&gt;&lt;td class="num"&gt;16&lt;/td&gt;&lt;td class="num"&gt;69&lt;/td&gt;&lt;td class="num"&gt;24&lt;/td&gt;&lt;td class="num"&gt;41&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Highway, street, and bridge construction&lt;/td&gt;&lt;td class="num"&gt;2373&lt;/td&gt;&lt;td class="num"&gt;60&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;&lt;td class="num"&gt;36&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;11&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Specialty trade contractors&lt;/td&gt;&lt;td class="num"&gt;238&lt;/td&gt;&lt;td class="num"&gt;606&lt;/td&gt;&lt;td class="num"&gt;253&lt;/td&gt;&lt;td class="num"&gt;134&lt;/td&gt;&lt;td class="num"&gt;106&lt;/td&gt;&lt;td class="num"&gt;82&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Foundation, structure, and building exterior contractors&lt;/td&gt;&lt;td class="num"&gt;2381&lt;/td&gt;&lt;td class="num"&gt;261&lt;/td&gt;&lt;td class="num"&gt;153&lt;/td&gt;&lt;td class="num"&gt;35&lt;/td&gt;&lt;td class="num"&gt;34&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Roofing contractors&lt;/td&gt;&lt;td class="num"&gt;23816&lt;/td&gt;&lt;td class="num"&gt;120&lt;/td&gt;&lt;td class="num"&gt;96&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;13&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bls.gov/iif/fatal-injuries-tables/fatal-occupational-injuries-table-a-1-2024.htm" rel="noopener"&gt;bls.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The mix changes by subsector. Falls caused 96 of 120 deaths at roofing contractors, or 80%. At heavy and civil contractors, transportation incidents caused 69 of 158, and highway, street and bridge work accounts for 36 of them. For a highway contractor, that points the safety plan toward work zones and haul routes.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The table below is an example with round numbers. A general contractor self-performs 500,000 field hours a year across five occupations. Each line multiplies the hours by the BLS 2024 rate for that occupation. The blended rate is the sum of those products divided by total hours.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Fatal injury exposure for a general contractor&amp;#39;s self-perform hours, weighted by BLS 2024 occupation rates. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Occupation&lt;/th&gt;&lt;th class="num"&gt;BLS 2024 rate&lt;/th&gt;&lt;th class="num"&gt;Example hours&lt;/th&gt;&lt;th class="num"&gt;Share of hours&lt;/th&gt;&lt;th class="num"&gt;Hours x rate&lt;/th&gt;&lt;th class="num"&gt;Share of exposure&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Construction laborers&lt;/td&gt;&lt;td class="num"&gt;15.8&lt;/td&gt;&lt;td class="num"&gt;200,000&lt;/td&gt;&lt;td class="num"&gt;40.0%&lt;/td&gt;&lt;td class="num"&gt;3,160,000&lt;/td&gt;&lt;td class="num"&gt;54.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Carpenters&lt;/td&gt;&lt;td class="num"&gt;7.5&lt;/td&gt;&lt;td class="num"&gt;150,000&lt;/td&gt;&lt;td class="num"&gt;30.0%&lt;/td&gt;&lt;td class="num"&gt;1,125,000&lt;/td&gt;&lt;td class="num"&gt;19.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Construction supervisors&lt;/td&gt;&lt;td class="num"&gt;12.8&lt;/td&gt;&lt;td class="num"&gt;50,000&lt;/td&gt;&lt;td class="num"&gt;10.0%&lt;/td&gt;&lt;td class="num"&gt;640,000&lt;/td&gt;&lt;td class="num"&gt;11.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Construction equipment operators&lt;/td&gt;&lt;td class="num"&gt;11.7&lt;/td&gt;&lt;td class="num"&gt;50,000&lt;/td&gt;&lt;td class="num"&gt;10.0%&lt;/td&gt;&lt;td class="num"&gt;585,000&lt;/td&gt;&lt;td class="num"&gt;10.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Electricians&lt;/td&gt;&lt;td class="num"&gt;5.3&lt;/td&gt;&lt;td class="num"&gt;50,000&lt;/td&gt;&lt;td class="num"&gt;10.0%&lt;/td&gt;&lt;td class="num"&gt;265,000&lt;/td&gt;&lt;td class="num"&gt;4.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total (blended rate)&lt;/td&gt;&lt;td class="num"&gt;11.6&lt;/td&gt;&lt;td class="num"&gt;500,000&lt;/td&gt;&lt;td class="num"&gt;100.0%&lt;/td&gt;&lt;td class="num"&gt;5,775,000&lt;/td&gt;&lt;td class="num"&gt;100.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bls.gov/iif/fatal-injuries-tables/fatal-occupational-injuries-hours-based-rates-2024.xlsx" rel="noopener"&gt;bls.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Laborers work 40% of the hours and carry 54.7% of the weighted exposure. Electricians work 10% and carry 4.6%. The blended rate of 11.6 sits above the construction industry&amp;rsquo;s 9.2, because this firm&amp;rsquo;s hours lean toward laborers and supervisors.&lt;/p&gt;
&lt;p&gt;The same arithmetic turns the blended rate into an expected count at national rates. Divide the total of 5,775,000 by 200,000,000 and the result is 0.029 fatal injuries a year, about one in 35 years. That figure applies the national experience to this hour mix. The firm&amp;rsquo;s own controls do not enter the calculation.&lt;/p&gt;
&lt;p&gt;Subcontracted scopes can go through the same table. Twenty thousand roofing hours at 48.7 come to 974,000, more than three and a half times the electricians&amp;rsquo; line at 50,000 hours. Those hours sit on the roofing sub&amp;rsquo;s payroll, and adding them to the table shows how much exposure the scope brings onto the site.&lt;/p&gt;
&lt;h2 id="how-to-use-it-on-your-jobs"&gt;How to use it on your jobs&lt;/h2&gt;
&lt;p&gt;Pull last year&amp;rsquo;s field hours from payroll by craft code, map each code to the closest BLS occupation, and build the table above. Use the margin of error column to decide how much weight a trade deserves. The iron worker rate of 37.8 has a margin of 13.35, so any value from about 24 to 51 fits the 2024 data.&lt;/p&gt;
&lt;p&gt;Then put the shares next to where the safety budget goes. If laborers carry half the weighted exposure, check what share of site audits, job hazard analyses and training hours they get. Do the same for the event mix in your subsector, since a highway contractor and a roofer face different causes.&lt;/p&gt;
&lt;p&gt;To start, take one active job, total its hours by craft from the last month of certified payroll, and run them through the BLS rates. The &lt;a href="https://constructionmetrics.com/2026/10/06/measure-labor-productivity-daily-logs-timecards/"&gt;labor productivity post&lt;/a&gt; covers pulling hours by craft from timecards.&lt;/p&gt;
&lt;h2 id="limits-of-the-rates"&gt;Limits of the rates&lt;/h2&gt;
&lt;p&gt;Occupation rates count workers in that occupation in every industry, so the laborer rate mixes building, highway and other work. CPS counts each worker by primary job, while CFOI records the job held at the time of the fatal injury. BLS notes that small counts swing from year to year, and that a single incident with several deaths can move a rate.&lt;/p&gt;
&lt;p&gt;CFOI excludes deaths from illness unless an injury event set them off. BLS lists the 2020 to 2024 figures as revised and final. Construction and extraction occupations recorded 976 fatal injuries in 2020, a high of 1,056 in 2022 and 1,032 in 2024.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Fatal work injuries by occupation group, 2020-24, final&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th class="num"&gt;Year&lt;/th&gt;&lt;th class="num"&gt;Construction and extraction occupations&lt;/th&gt;&lt;th class="num"&gt;Construction trades workers&lt;/th&gt;&lt;th class="num"&gt;Supervisors of construction and extraction workers&lt;/th&gt;&lt;th class="num"&gt;All workers&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td class="num"&gt;2020&lt;/td&gt;&lt;td class="num"&gt;976&lt;/td&gt;&lt;td class="num"&gt;771&lt;/td&gt;&lt;td class="num"&gt;88&lt;/td&gt;&lt;td class="num"&gt;4,764&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;2021&lt;/td&gt;&lt;td class="num"&gt;951&lt;/td&gt;&lt;td class="num"&gt;726&lt;/td&gt;&lt;td class="num"&gt;117&lt;/td&gt;&lt;td class="num"&gt;5,190&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;2022&lt;/td&gt;&lt;td class="num"&gt;1,056&lt;/td&gt;&lt;td class="num"&gt;811&lt;/td&gt;&lt;td class="num"&gt;113&lt;/td&gt;&lt;td class="num"&gt;5,486&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;2023&lt;/td&gt;&lt;td class="num"&gt;1,055&lt;/td&gt;&lt;td class="num"&gt;809&lt;/td&gt;&lt;td class="num"&gt;113&lt;/td&gt;&lt;td class="num"&gt;5,283&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;2024&lt;/td&gt;&lt;td class="num"&gt;1,032&lt;/td&gt;&lt;td class="num"&gt;788&lt;/td&gt;&lt;td class="num"&gt;105&lt;/td&gt;&lt;td class="num"&gt;5,070&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bls.gov/news.release/cfoi.t03.htm" rel="noopener"&gt;bls.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;</content:encoded></item><item><title>Shackleton AI launches agents that draft RFIs and chase overdue submittals, with $1 billion of projects on its platform</title><link>https://constructionmetrics.com/2026/11/05/shackleton-ai-agents-rfis-submittals-daily-reports/</link><pubDate>Thu, 05 Nov 2026 06:34:37 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/05/shackleton-ai-agents-rfis-submittals-daily-reports/</guid><category>AI</category><description>Shackleton puts bids, budgets, RFIs, submittals and field reports in one system, and its AI agents draft RFIs, chase submittals and write daily reports.</description><content:encoded>&lt;p&gt;Shackleton AI, a New York software company, came out of stealth on November 4, 2026, with a project management platform for general contractors and owners that runs AI agents on the paperwork. The company says the agents draft RFIs, follow up on overdue submittals, flag budget variances before a payment request goes for approval, and turn field notes into daily reports. It also announced a $5 million seed round led by Battery Ventures. Shackleton says the platform launched in June 2026 and now manages more than $1 billion in project value across more than 15 states.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;On most jobs today, a project engineer logs RFIs and submittals in one system, the superintendent writes the daily report in another, and the project manager checks the budget in a spreadsheet or the accounting package. Shackleton&amp;rsquo;s announcement says a company commonly runs 7 to 10 such systems, and that teams spend 10 to 15 hours a week on data entry and administrative work.&lt;/p&gt;
&lt;p&gt;Shackleton puts those records in one system. Its website lists projects, bids, budgets, RFIs, submittals, change orders and field reports in a single data model. An AI agent here is software that reads those records and prepares the next step, such as a draft RFI or a reminder on an overdue submittal, for a person to approve.&lt;/p&gt;
&lt;p&gt;The work moves through the system in the order a job runs:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Field staff mark up sheets and record walkthroughs on the mobile app. Sheets stay readable and can be annotated offline, then sync when the crew has signal again.&lt;/li&gt;
&lt;li&gt;A field agent turns field notes into daily reports. The homepage demo shows it turning a floor walk&amp;rsquo;s photos into punch items.&lt;/li&gt;
&lt;li&gt;An office agent drafts RFIs and follows up on submittals that are past due.&lt;/li&gt;
&lt;li&gt;A finance agent flags budget variances before the payment request is submitted for approval.&lt;/li&gt;
&lt;li&gt;The project manager reviews the agents&amp;rsquo; work. The release says review and approval workflows keep people in charge of it.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The website names seven agents in all: field, growth, planning, development, procurement, legal, and office and finance. The browser side holds the Gantt schedule and look-aheads.&lt;/p&gt;
&lt;p&gt;Shackleton sells to midsize general contractors in multifamily, industrial and commercial work, and to owners that run rollouts across many locations. The release names Red Lobster, Dog Haus and Pepper Lunch as customers.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Shackleton&amp;rsquo;s launch announcement and its website. The three founders previously grew Ernest, a commercial general contractor in the Southeast, to $35 million in revenue. &amp;ldquo;I was spending more time moving data between systems than running my jobs at Ernest,&amp;rdquo; CEO Michael Ragheb said in the release.&lt;/p&gt;
&lt;p&gt;These claims come from Shackleton:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Ragheb said multi-location customers have finished buildouts up to 35% ahead of schedule and as much as 18% under budget.&lt;/li&gt;
&lt;li&gt;The website credits the growth agent with bid turnaround three times faster, and the development agent with a 29% shorter time from concept to construction start.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The 35% and 18% figures describe the best results, as the words &amp;ldquo;up to&amp;rdquo; and &amp;ldquo;as much as&amp;rdquo; indicate. The number of projects behind them, the baseline they were measured against, and any RFI or submittal turnaround times are not yet public.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track RFI turnaround in calendar days, from the date a field question is first raised to the date the answer reaches the crew. Shackleton&amp;rsquo;s agents draft the RFI and chase the reply, so log three dates for each one: when the question came up, when the RFI went to the architect, and when the answer was distributed.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Metrics to capture before piloting an agent on RFIs, submittals and daily reports&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Workflow&lt;/th&gt;&lt;th&gt;Metric&lt;/th&gt;&lt;th&gt;Definition&lt;/th&gt;&lt;th&gt;Baseline to capture&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;RFIs&lt;/td&gt;&lt;td&gt;RFI turnaround (calendar days)&lt;/td&gt;&lt;td&gt;Date the question is raised in the field to the date the answer reaches the crew&lt;/td&gt;&lt;td&gt;Median and slowest 10% from two or three recent jobs&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;RFIs&lt;/td&gt;&lt;td&gt;Draft acceptance rate&lt;/td&gt;&lt;td&gt;Share of agent-drafted RFIs sent with no edits&lt;/td&gt;&lt;td&gt;None before the pilot; count from the first week&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Submittals&lt;/td&gt;&lt;td&gt;Overdue submittals&lt;/td&gt;&lt;td&gt;Count of submittals past their required-by date on the log each Monday&lt;/td&gt;&lt;td&gt;Weekly count from a current job&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Daily reports&lt;/td&gt;&lt;td&gt;Same-day filing rate&lt;/td&gt;&lt;td&gt;Share of daily reports filed before midnight on the day of the work&lt;/td&gt;&lt;td&gt;Last 30 working days on one job&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Pay applications&lt;/td&gt;&lt;td&gt;Variances caught before approval&lt;/td&gt;&lt;td&gt;Budget variances found before the pay request goes out for approval&lt;/td&gt;&lt;td&gt;Count from the last three pay apps&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;Capture a baseline from the RFI and submittal logs of two or three recent jobs of similar size and delivery method. Our post on &lt;a href="https://constructionmetrics.com/2026/10/20/measure-rfi-turnaround-before-ai-pilot/"&gt;measuring RFI turnaround before an AI pilot&lt;/a&gt; covers setting up that baseline. During the pilot, also count how many agent drafts the project engineer sent unchanged, edited, or discarded, since edited drafts still cost review time.&lt;/p&gt;
&lt;p&gt;For daily reports, record the time between the end of the shift and the report being filed, and the share of reports filed the same day. Compare it with the voice-first approach in our post on &lt;a href="https://constructionmetrics.com/2026/10/17/punch-voice-daily-reports-superintendent/"&gt;Punch&amp;rsquo;s daily reports for superintendents&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;A first step on one job: export the RFI log for your most recent closed project and add a column for the date each question was first raised in the field.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;Shackleton takes demo requests at shackleton.ai/demo. Prices are not listed on its website. The agents work on records stored in Shackleton&amp;rsquo;s own data model, so a contractor would move its RFI, submittal and daily report logs onto the platform to use them. The company says it will spend the seed money on more agent workflows and on sales.&lt;/p&gt;</content:encoded></item><item><title>How to plan winter crew hours from wind chill and the ACGIH warm-up schedule, with a steel erection example</title><link>https://constructionmetrics.com/2026/11/04/plan-winter-crew-hours-wind-chill/</link><pubDate>Wed, 04 Nov 2026 10:34:03 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/04/plan-winter-crew-hours-wind-chill/</guid><category>Data</category><description>The NWS wind chill formula and the ACGIH work/warm-up schedule turn a cold-day forecast into break minutes and crew hours a contractor can budget.</description><content:encoded>&lt;p&gt;A superintendent setting steel in January has to decide how many hours the raising gang will spend in the warming trailer. That number belongs in the lookahead schedule and in the labor budget, and it can be set before the cold arrives. Two public sources cover the calculation: the National Weather Service (NWS) wind chill formula and a work/warm-up schedule from the American Conference of Governmental Industrial Hygienists (ACGIH) that OSHA posts on its winter weather pages.&lt;/p&gt;
&lt;p&gt;OSHA has no specific standard for working in the cold. Its cold stress page says employers still have a duty under the OSH Act of 1970 to protect workers from recognized hazards, cold stress among them. The same page tells employers to know the wind chill so they can gauge exposure and plan the work, and it recommends frequent short breaks in warm, dry areas.&lt;/p&gt;
&lt;h2 id="compute-the-wind-chill"&gt;Compute the wind chill&lt;/h2&gt;
&lt;p&gt;Wind chill is the temperature exposed skin feels once wind is added to the air temperature. The NWS publishes the formula, with T as air temperature in degrees Fahrenheit and V as wind speed in miles per hour:&lt;/p&gt;
&lt;p&gt;Wind chill (°F) = 35.74 + 0.6215T - 35.75(V^0.16) + 0.4275T(V^0.16)&lt;/p&gt;
&lt;p&gt;The formula holds only at or below 50°F and for wind above 3 mph. The NWS bases it on a model of a human face, adjusts the wind reading from the 33-foot anemometer height down to 5 feet, and assumes no sun. Bright sunshine can raise the wind chill by 10°F to 18°F, according to the agency.&lt;/p&gt;
&lt;p&gt;Two published examples check the arithmetic. The NWS gives 0°F with a 15 mph wind as a wind chill of -19°F, where exposed skin can freeze in 30 minutes. OSHA gives 40°F with a 35 mph wind as 28°F. In Excel, with air temperature in A2 and wind in B2, the formula is &lt;code&gt;=35.74+0.6215*A2-35.75*B2^0.16+0.4275*A2*B2^0.16&lt;/code&gt;.&lt;/p&gt;
&lt;p&gt;Wind chill applies to people and animals. The NWS notes that a radiator or a water pipe cools to the air temperature faster in wind but never below it. Frostbite also requires an air temperature below freezing. Freeze protection for concrete and piping is planned from the air temperature, and crew exposure from the air temperature and the wind together.&lt;/p&gt;
&lt;h2 id="read-the-warm-up-schedule"&gt;Read the warm-up schedule&lt;/h2&gt;
&lt;p&gt;The ACGIH schedule is keyed to air temperature and wind speed, and it starts at -15°F. For each combination it gives a maximum continuous work period and a number of 10-minute breaks in a warm location within a 4-hour period. It assumes moderate to heavy work and an extended warm break, such as lunch, at the end of each 4-hour period. Cells at the cold, windy corner of the table read &amp;ldquo;non-emergency work should cease.&amp;rdquo; That point arrives at -25°F with a 20 mph wind, or -45°F with no noticeable wind.&lt;/p&gt;
&lt;p&gt;A copy of the table in a U.S. Army site health and safety plan carries four ACGIH notes that OSHA&amp;rsquo;s one-page version leaves off.&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Light work with little physical movement takes the schedule one step colder. An equipment operator or a signal person at -20°F with a 10 mph wind would get the 40-minute, 4-break row instead of the 55-minute, 3-break row.&lt;/li&gt;
&lt;li&gt;Without a wind reading, a light flag that moves means about 5 mph, a fully extended flag about 10 mph, a newspaper sheet lifted about 15 mph, and blowing and drifting snow about 20 mph.&lt;/li&gt;
&lt;li&gt;The schedule slightly under-compensates for wind at the warmer temperatures and slightly over-compensates at the coldest ones.&lt;/li&gt;
&lt;li&gt;The limits apply only to workers in dry clothing.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The table marks its mildest rows &amp;ldquo;normal breaks&amp;rdquo; with a count of one. This example reads that row as the usual mid-period break, so the added warm-up time is the break count minus one, times 10 minutes. An 8-hour shift has two 4-hour periods.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The first table is an example. It runs seven forecast conditions through the NWS formula, rounds to whole degrees and looks each one up in the ACGIH schedule.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Wind chill and ACGIH warm-up requirement for seven example forecasts, moderate to heavy work. Example calculations.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th class="num"&gt;Air temperature (°F)&lt;/th&gt;&lt;th class="num"&gt;Wind (mph)&lt;/th&gt;&lt;th class="num"&gt;Wind chill (°F)&lt;/th&gt;&lt;th&gt;Maximum work period&lt;/th&gt;&lt;th class="num"&gt;Breaks per 4 hours&lt;/th&gt;&lt;th class="num"&gt;Added warm-up minutes per 8-hour shift&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td class="num"&gt;30&lt;/td&gt;&lt;td class="num"&gt;10&lt;/td&gt;&lt;td class="num"&gt;21&lt;/td&gt;&lt;td&gt;Normal breaks&lt;/td&gt;&lt;td class="num"&gt;1&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;10&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;&lt;td class="num"&gt;-7&lt;/td&gt;&lt;td&gt;Normal breaks&lt;/td&gt;&lt;td class="num"&gt;1&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;-15&lt;/td&gt;&lt;td class="num"&gt;10&lt;/td&gt;&lt;td class="num"&gt;-35&lt;/td&gt;&lt;td&gt;75 min&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;-20&lt;/td&gt;&lt;td class="num"&gt;10&lt;/td&gt;&lt;td class="num"&gt;-41&lt;/td&gt;&lt;td&gt;55 min&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;40&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;-30&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;-46&lt;/td&gt;&lt;td&gt;40 min&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;&lt;td class="num"&gt;60&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;-20&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;&lt;td class="num"&gt;-48&lt;/td&gt;&lt;td&gt;30 min&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;80&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;-25&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;&lt;td class="num"&gt;-51&lt;/td&gt;&lt;td&gt;30 min&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;80&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.osha.gov/sites/default/files/windchill_table.pdf" rel="noopener"&gt;osha.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Wind chill alone does not pick the row. Air at -30°F with a 5 mph wind has a wind chill of -46°F and calls for 4 breaks. Air at -20°F with a 20 mph wind has a slightly warmer wind chill of -48°F and calls for 5. Read the schedule from the air temperature and the wind, and use the wind chill for the frostbite risk and for the NWS cold weather advisories in the area.&lt;/p&gt;
&lt;p&gt;The second table is also an example, with round numbers. A six-person ironworker crew erects steel through a three-day cold snap on a job near Duluth. The estimator carries a loaded labor rate of $100 per hour.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Added warm-up time for a six-person crew over three cold days, 8-hour shifts. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Day&lt;/th&gt;&lt;th&gt;Forecast&lt;/th&gt;&lt;th class="num"&gt;Breaks per 4 hours&lt;/th&gt;&lt;th class="num"&gt;Added warm-up minutes per worker&lt;/th&gt;&lt;th class="num"&gt;Crew size&lt;/th&gt;&lt;th class="num"&gt;Crew hours of warm-up&lt;/th&gt;&lt;th class="num"&gt;Labor cost at $100 per hour&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Mon&lt;/td&gt;&lt;td&gt;-15°F and 10 mph&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;&lt;td class="num"&gt;2.0&lt;/td&gt;&lt;td class="num"&gt;$200&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Tue&lt;/td&gt;&lt;td&gt;-20°F and 10 mph&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;40&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;&lt;td class="num"&gt;4.0&lt;/td&gt;&lt;td class="num"&gt;$400&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Wed&lt;/td&gt;&lt;td&gt;-20°F and 20 mph&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;80&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;&lt;td class="num"&gt;8.0&lt;/td&gt;&lt;td class="num"&gt;$800&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total&lt;/td&gt;&lt;td&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;140&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;14.0&lt;/td&gt;&lt;td class="num"&gt;$1,400&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.osha.gov/sites/default/files/windchill_table.pdf" rel="noopener"&gt;osha.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The crew spends 14 hours in warm-up breaks over the three days, $1,400 of labor that produces no steel. Wednesday alone accounts for 8 of those hours because the wind rose to 20 mph at the same air temperature as Tuesday. The &lt;a href="https://constructionmetrics.com/2026/10/16/compute-labor-burden-per-hour-worked/"&gt;labor burden post&lt;/a&gt; shows how to build the loaded rate this example rounds to $100.&lt;/p&gt;
&lt;p&gt;New or returning workers add a second cost. New York&amp;rsquo;s Department of Labor recommends starting a worker on an 8-hour shift at two hours of full-intensity work on the first day, then four, six and eight. A new hire on a cold Monday works 12 fewer full-intensity hours across the first three days.&lt;/p&gt;
&lt;h2 id="how-to-use-it-on-your-jobs"&gt;How to use it on your jobs&lt;/h2&gt;
&lt;p&gt;Add the warm-up hours to the weather allowance in the baseline schedule for winter work. The &lt;a href="https://constructionmetrics.com/2026/10/27/weather-delay-days-noaa-climate-normals/"&gt;weather delay days post&lt;/a&gt; builds the allowance for lost days from NOAA climate normals. The warm-up schedule adds the shorter work periods on days the crew stays on site.&lt;/p&gt;
&lt;p&gt;Then record it. Each morning the superintendent logs the air temperature, the wind speed and the schedule row in the daily log, along with the warm-up breaks the crew took. After a winter of entries, the hours compare directly with units installed, and the &lt;a href="https://constructionmetrics.com/2026/10/06/measure-labor-productivity-daily-logs-timecards/"&gt;labor productivity post&lt;/a&gt; shows how to divide one by the other.&lt;/p&gt;
&lt;p&gt;To start, pick one job with outdoor work scheduled for December through February. Put the Excel formula and the ACGIH table on one sheet, enter the next 10-day forecast, and price the added warm-up minutes for each crew on the lookahead.&lt;/p&gt;</content:encoded></item><item><title>AI cross-check of structural calculations against rebar schedules found 253 errors, 29 of them critical, on a 19-story Seoul apartment building</title><link>https://constructionmetrics.com/2026/11/04/ai-cross-check-structural-calculations-drawings-errors/</link><pubDate>Wed, 04 Nov 2026 06:34:44 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/04/ai-cross-check-structural-calculations-drawings-errors/</guid><category>AI</category><description>A Seoul research team's AI reads a structural calculation package and the structural drawings, matches each beam and column, and flags where they disagree.</description><content:encoded>&lt;p&gt;A research team led by Jaewook Jeong, an associate professor at Seoul National University of Science and Technology, has published an AI pipeline that reads a building&amp;rsquo;s structural calculation package and its structural drawings, matches every beam and column across the two, and flags where they disagree. The paper, by Minsang Gu, Jaewook Jeong and Louis Kumi, went online in &lt;em&gt;Engineering Applications of Artificial Intelligence&lt;/em&gt; on October 13, 2026, and the university announced it on November 3. On a 19-story reinforced concrete apartment building in Seoul, the system found 253 discrepancies, and the authors class 29 of them as critical to structural stability. The workflow it targets is structural document review, the check of rebar sizes, bar counts, stirrup spacing and member dimensions between what the engineer calculated and what the drawings tell the field to build.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;Two documents go in. The calculation package comes out of analysis and design software (MIDAS ADS and MIDAS SDS on the case project) and lists each member&amp;rsquo;s loads, reinforcement and layout. The structural drawings are the schedule-type sheets a drafter builds from that package in CAD. The paper&amp;rsquo;s premise is that this hand transfer between two formats, often by different people, is where omissions and typos get in.&lt;/p&gt;
&lt;p&gt;The pipeline then runs in three stages:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;It collects the documents and drops low-quality pages.&lt;/li&gt;
&lt;li&gt;It pulls member data out of each document. On the calculation pages, a layout model called DocLayNet-YOLO finds the regions that hold member information, and Surya-OCR, an optical character recognition model that turns a page image into text, reads them. On the drawings, the software finds the member codes first, then uses OCR with edge and line detection to locate the schedule tables, whose rows and columns vary in width.&lt;/li&gt;
&lt;li&gt;It matches each member across the two documents by member code and direction, compares reinforcement and dimensions, and sorts every disagreement by type.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Results come out in a web application the team built. The method works from the documents alone, with no BIM model, and the authors aim it at small and mid-size projects that do not build one. They name structural engineers, design consultants, contractors and construction supervision teams as the people who would use it. The paper also notes that US practice splits structural documents among architects, structural engineers and CAD technicians, which is the kind of divided authorship the check is built for.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is one case study the authors ran on the Seoul project, reported in the paper&amp;rsquo;s abstract and the preview ScienceDirect shows of the full text. The authors declare no competing interests, and a Korean government grant for commercializing research outcomes funded the work.&lt;/p&gt;
&lt;p&gt;Extraction accuracy, the share of fields the software read correctly, was 95.56% on the calculation package and 90.47% on the drawings. The 253 discrepancies were all in beams and columns.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Discrepancies between the calculation package and the structural drawings, by type&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Discrepancy type&lt;/th&gt;&lt;th class="num"&gt;Count&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Missing entries&lt;/td&gt;&lt;td class="num"&gt;224&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Main reinforcement mismatches&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dimension mismatches&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Stirrup mismatches&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Duplicate entries&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total&lt;/td&gt;&lt;td class="num"&gt;253&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://techxplore.com/news/2026-11-ai-method-documents-errors.html" rel="noopener"&gt;techxplore.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;So the 29 critical errors are the 253 minus the 224 missing entries. Every mismatch in bar size, bar count, stirrup spacing or member height, plus the three duplicates, landed in the critical group.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;The 29 errors the authors class as critical to structural stability&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Critical error&lt;/th&gt;&lt;th class="num"&gt;Count&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Dimension height&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Bottom rebar diameter&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Top rebar diameter&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Top rebar count&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Bottom rebar count&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Stirrup spacing&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Duplication&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.sciencedirect.com/science/article/abs/pii/S095219762602840X" rel="noopener"&gt;sciencedirect.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The two accuracy figures matter for reading the larger number. If the software misread about one drawing field in ten, some of the 224 missing entries could be fields it failed to read and not gaps in the drawings, and the preview does not show how the authors confirmed each flag. The time the check took, and a manual review of the same documents for comparison, are not in the abstract or the preview. (The paper cites conflicting design documents as a contributing factor in the New World Hotel collapse in Singapore and an underground parking structure collapse in Incheon.)&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;The metric to borrow is confirmed discrepancies per structural sheet, counted before rebar detailing starts and sorted into the paper&amp;rsquo;s five types. Count a flag only after the engineer of record or your detailer confirms it, so OCR misreads do not inflate the total. Dividing confirmed flags by all flags gives you the tool&amp;rsquo;s precision, the share of its flags that turned out to be real errors.&lt;/p&gt;
&lt;p&gt;You need the calculation package for this, and the engineer of record does not always issue it to the contractor. Ask for it at the start of the pilot.&lt;/p&gt;
&lt;p&gt;Capture two baselines on a recent concrete job: the RFIs that traced back to a conflict between the calculations and the beam or column schedules, and the hours your detailer or project engineer spent checking schedules by hand. A first step on one job is to take a single floor&amp;rsquo;s beam schedule and the matching calculation pages, check them by hand, and log the hours and each discrepancy by type. Run the tool on the same floor afterward and compare both counts and both times.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;This is a research system. The paper describes a web application, and the abstract and preview do not mention a public code release, a commercial version or a price. The full text sits behind Elsevier&amp;rsquo;s paywall.&lt;/p&gt;
&lt;p&gt;Earlier posts covered commercial drawing review tools, including &lt;a href="https://constructionmetrics.com/2026/10/07/buildcheck-raises-12-million-ai-drawing-review/"&gt;Buildcheck&lt;/a&gt;, &lt;a href="https://constructionmetrics.com/2026/10/26/document-crunch-drawings-review-contracts-specs/"&gt;Document Crunch&amp;rsquo;s drawing review&lt;/a&gt; and &lt;a href="https://constructionmetrics.com/2026/10/29/bluebeam-max-ai-drawing-review-revu/"&gt;Bluebeam Max&lt;/a&gt;.&lt;/p&gt;</content:encoded></item><item><title>Construction job openings rose 14% to 298,000 in September as quits reached 198,000, the most in 25 months</title><link>https://constructionmetrics.com/2026/11/03/construction-job-openings-september-quits/</link><pubDate>Tue, 03 Nov 2026 10:33:29 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/03/construction-job-openings-september-quits/</guid><category>Data</category><description>BLS says construction job openings rose to 298,000 in September 2026 from a revised 262,000 in August, and quits rose to 198,000.</description><content:encoded>&lt;p&gt;Construction employers had 298,000 job openings on the last business day of September 2026, according to the Job Openings and Labor Turnover Survey (JOLTS) the Bureau of Labor Statistics released on November 3. The figure is seasonally adjusted and preliminary. It is 36,000 above a revised August, a gain of 13.7%, and 92,000 above September 2025, a gain of 44.7%. The construction job openings rate, which is openings as a share of employment plus openings, rose to 3.4% from 3.0%. September sits above the 12-month average of about 259,000 and ties June for third-highest of the last 25 months, behind July 2025 at 305,000 and July 2026 at 299,000.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Openings returned to their June and July level&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Construction job openings, thousands, seasonally adjusted, last business day of the month&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;Openings returned to their June and July level&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: value. Values range from 135 to 305.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="248.4" y2="248.4"/&gt;&lt;line x1="72" x2="616" y1="190.8" y2="190.8"/&gt;&lt;line x1="72" x2="616" y1="133.2" y2="133.2"/&gt;&lt;line x1="72" x2="616" y1="75.6" y2="75.6"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;100&lt;/text&gt;&lt;text x="64" y="251.9" text-anchor="end"&gt;150&lt;/text&gt;&lt;text x="64" y="194.3" text-anchor="end"&gt;200&lt;/text&gt;&lt;text x="64" y="136.7" text-anchor="end"&gt;250&lt;/text&gt;&lt;text x="64" y="79.1" text-anchor="end"&gt;300&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;350&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;2025-02&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;2025-07&lt;/text&gt;&lt;text x="412.0" y="324" text-anchor="middle"&gt;2025-12&lt;/text&gt;&lt;text x="525.3" y="324" text-anchor="middle"&gt;2026-05&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="72" x2="616" y1="122.4" y2="122.4"/&gt;
&lt;text x="76" y="118.4"&gt;12-period average 259&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,137.8 L94.7,143.6 L117.3,152.8 L140.0,265.7 L162.7,153.9 L185.3,127.4 L208.0,100.9 L230.7,182.7 L253.3,165.5 L276.0,163.2 L298.7,69.8 L321.3,175.8 L344.0,183.9 L366.7,195.4 L389.3,84.8 L412.0,139.0 L434.7,156.2 L457.3,189.6 L480.0,151.6 L502.7,114.8 L525.3,86.0 L548.0,77.9 L570.7,76.8 L593.3,119.4 L616.0,77.9 L616.0,306.0 L72.0,306.0 Z"/&gt;
&lt;path class="line" d="M72.0,137.8 L94.7,143.6 L117.3,152.8 L140.0,265.7 L162.7,153.9 L185.3,127.4 L208.0,100.9 L230.7,182.7 L253.3,165.5 L276.0,163.2 L298.7,69.8 L321.3,175.8 L344.0,183.9 L366.7,195.4 L389.3,84.8 L412.0,139.0 L434.7,156.2 L457.3,189.6 L480.0,151.6 L502.7,114.8 L525.3,86.0 L548.0,77.9 L570.7,76.8 L593.3,119.4 L616.0,77.9"/&gt;
&lt;circle class="end" cx="616.0" cy="77.9" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="137.8" r="9"&gt;&lt;title&gt;September 2024: 246&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="143.6" r="9"&gt;&lt;title&gt;October 2024: 241&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="152.8" r="9"&gt;&lt;title&gt;November 2024: 233&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="265.7" r="9"&gt;&lt;title&gt;December 2024: 135&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="153.9" r="9"&gt;&lt;title&gt;January 2025: 232&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="127.4" r="9"&gt;&lt;title&gt;February 2025: 255&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="100.9" r="9"&gt;&lt;title&gt;March 2025: 278&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="182.7" r="9"&gt;&lt;title&gt;April 2025: 207&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="165.5" r="9"&gt;&lt;title&gt;May 2025: 222&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="163.2" r="9"&gt;&lt;title&gt;June 2025: 224&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="69.8" r="9"&gt;&lt;title&gt;July 2025: 305&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="175.8" r="9"&gt;&lt;title&gt;August 2025: 213&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="183.9" r="9"&gt;&lt;title&gt;September 2025: 206&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="195.4" r="9"&gt;&lt;title&gt;October 2025: 196&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="84.8" r="9"&gt;&lt;title&gt;November 2025: 292&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="139.0" r="9"&gt;&lt;title&gt;December 2025: 245&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="156.2" r="9"&gt;&lt;title&gt;January 2026: 230&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="189.6" r="9"&gt;&lt;title&gt;February 2026: 201&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="151.6" r="9"&gt;&lt;title&gt;March 2026: 234&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="114.8" r="9"&gt;&lt;title&gt;April 2026: 266&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="86.0" r="9"&gt;&lt;title&gt;May 2026: 291&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="77.9" r="9"&gt;&lt;title&gt;June 2026: 298&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="76.8" r="9"&gt;&lt;title&gt;July 2026: 299&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="119.4" r="9"&gt;&lt;title&gt;August 2026: 262&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="77.9" r="9"&gt;&lt;title&gt;September 2026: 298&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="81.9"&gt;298&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="70.9" y2="57.9"/&gt;
&lt;circle cx="616.0" cy="77.9" r="3.5"/&gt;&lt;text x="616.0" y="53.9" text-anchor="end"&gt;September 2026, 298&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;Openings returned to their June and July level&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: value. Values range from 135 to 305.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="151.3" y2="151.3"/&gt;&lt;line x1="50" x2="276" y1="82.7" y2="82.7"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;100&lt;/text&gt;&lt;text x="42" y="154.8" text-anchor="end"&gt;200&lt;/text&gt;&lt;text x="42" y="86.2" text-anchor="end"&gt;300&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;400&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2025-09&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="50" x2="276" y1="110.6" y2="110.6"/&gt;
&lt;text x="54" y="106.6"&gt;12-period average 259&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,119.7 L59.4,123.2 L68.8,128.7 L78.2,196.0 L87.7,129.4 L97.1,113.6 L106.5,97.8 L115.9,146.5 L125.3,136.2 L134.8,134.9 L144.2,79.2 L153.6,142.4 L163.0,147.2 L172.4,154.1 L181.8,88.2 L191.2,120.4 L200.7,130.7 L210.1,150.6 L219.5,128.0 L228.9,106.0 L238.3,88.8 L247.8,84.0 L257.2,83.4 L266.6,108.8 L276.0,84.0 L276.0,220.0 L50.0,220.0 Z"/&gt;
&lt;path class="line" d="M50.0,119.7 L59.4,123.2 L68.8,128.7 L78.2,196.0 L87.7,129.4 L97.1,113.6 L106.5,97.8 L115.9,146.5 L125.3,136.2 L134.8,134.9 L144.2,79.2 L153.6,142.4 L163.0,147.2 L172.4,154.1 L181.8,88.2 L191.2,120.4 L200.7,130.7 L210.1,150.6 L219.5,128.0 L228.9,106.0 L238.3,88.8 L247.8,84.0 L257.2,83.4 L266.6,108.8 L276.0,84.0"/&gt;
&lt;circle class="end" cx="276.0" cy="84.0" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="119.7" r="9"&gt;&lt;title&gt;September 2024: 246&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="123.2" r="9"&gt;&lt;title&gt;October 2024: 241&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="128.7" r="9"&gt;&lt;title&gt;November 2024: 233&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="196.0" r="9"&gt;&lt;title&gt;December 2024: 135&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="129.4" r="9"&gt;&lt;title&gt;January 2025: 232&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="113.6" r="9"&gt;&lt;title&gt;February 2025: 255&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="97.8" r="9"&gt;&lt;title&gt;March 2025: 278&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="146.5" r="9"&gt;&lt;title&gt;April 2025: 207&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="136.2" r="9"&gt;&lt;title&gt;May 2025: 222&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="134.9" r="9"&gt;&lt;title&gt;June 2025: 224&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="79.2" r="9"&gt;&lt;title&gt;July 2025: 305&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="142.4" r="9"&gt;&lt;title&gt;August 2025: 213&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="147.2" r="9"&gt;&lt;title&gt;September 2025: 206&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="154.1" r="9"&gt;&lt;title&gt;October 2025: 196&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="88.2" r="9"&gt;&lt;title&gt;November 2025: 292&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="120.4" r="9"&gt;&lt;title&gt;December 2025: 245&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="130.7" r="9"&gt;&lt;title&gt;January 2026: 230&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="150.6" r="9"&gt;&lt;title&gt;February 2026: 201&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="128.0" r="9"&gt;&lt;title&gt;March 2026: 234&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="106.0" r="9"&gt;&lt;title&gt;April 2026: 266&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="88.8" r="9"&gt;&lt;title&gt;May 2026: 291&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="84.0" r="9"&gt;&lt;title&gt;June 2026: 298&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="83.4" r="9"&gt;&lt;title&gt;July 2026: 299&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="108.8" r="9"&gt;&lt;title&gt;August 2026: 262&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="84.0" r="9"&gt;&lt;title&gt;September 2026: 298&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="88.0"&gt;298&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="77.0" y2="64.0"/&gt;
&lt;circle cx="276.0" cy="84.0" r="3.5"/&gt;&lt;text x="276.0" y="48.0" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;September 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;298&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;September 2026 is preliminary. August 2026 is revised.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/JTS2300JOL" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Construction job openings, last 13 months&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Openings (000s)&lt;/th&gt;&lt;th class="num"&gt;MoM&lt;/th&gt;&lt;th class="num"&gt;YoY&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Sep 2025&lt;/td&gt;&lt;td class="num"&gt;206&lt;/td&gt;&lt;td class="num"&gt;-3.3%&lt;/td&gt;&lt;td class="num"&gt;-16.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oct 2025&lt;/td&gt;&lt;td class="num"&gt;196&lt;/td&gt;&lt;td class="num"&gt;-4.8%&lt;/td&gt;&lt;td class="num"&gt;-18.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nov 2025&lt;/td&gt;&lt;td class="num"&gt;292&lt;/td&gt;&lt;td class="num"&gt;49.0%&lt;/td&gt;&lt;td class="num"&gt;25.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec 2025&lt;/td&gt;&lt;td class="num"&gt;245&lt;/td&gt;&lt;td class="num"&gt;-16.1%&lt;/td&gt;&lt;td class="num"&gt;81.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jan 2026&lt;/td&gt;&lt;td class="num"&gt;230&lt;/td&gt;&lt;td class="num"&gt;-6.1%&lt;/td&gt;&lt;td class="num"&gt;-0.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb 2026&lt;/td&gt;&lt;td class="num"&gt;201&lt;/td&gt;&lt;td class="num"&gt;-12.6%&lt;/td&gt;&lt;td class="num"&gt;-21.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mar 2026&lt;/td&gt;&lt;td class="num"&gt;234&lt;/td&gt;&lt;td class="num"&gt;16.4%&lt;/td&gt;&lt;td class="num"&gt;-15.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Apr 2026&lt;/td&gt;&lt;td class="num"&gt;266&lt;/td&gt;&lt;td class="num"&gt;13.7%&lt;/td&gt;&lt;td class="num"&gt;28.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;291&lt;/td&gt;&lt;td class="num"&gt;9.4%&lt;/td&gt;&lt;td class="num"&gt;31.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jun 2026&lt;/td&gt;&lt;td class="num"&gt;298&lt;/td&gt;&lt;td class="num"&gt;2.4%&lt;/td&gt;&lt;td class="num"&gt;33.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jul 2026&lt;/td&gt;&lt;td class="num"&gt;299&lt;/td&gt;&lt;td class="num"&gt;0.3%&lt;/td&gt;&lt;td class="num"&gt;-2.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aug 2026&lt;/td&gt;&lt;td class="num"&gt;262&lt;/td&gt;&lt;td class="num"&gt;-12.4%&lt;/td&gt;&lt;td class="num"&gt;23.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Sep 2026&lt;/td&gt;&lt;td class="num"&gt;298&lt;/td&gt;&lt;td class="num"&gt;13.7%&lt;/td&gt;&lt;td class="num"&gt;44.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bls.gov/news.release/jolts.t01.htm" rel="noopener"&gt;bls.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="what-moved"&gt;What moved&lt;/h2&gt;
&lt;p&gt;Quits rose faster than any other construction flow in the release. Construction workers who left their jobs voluntarily numbered 198,000 in September, up 46,000 from August and 71,000 from September 2025. The quits rate rose to 2.4% from 1.8%, where it had held for June, July and August. On the FRED series, 198,000 is the highest monthly count in the 25 months shown in the chart, and the previous high in that window was 173,000 in February 2025.&lt;/p&gt;
&lt;p&gt;Hires rose too, to 356,000 from 307,000, and the hires rate went to 4.3% from 3.7%. Layoffs and discharges rose to 138,000 from 113,000. That is still well below the 194,000 of September 2025.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Construction labor flows, seasonally adjusted&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Measure&lt;/th&gt;&lt;th class="num"&gt;Sep 2025 (000s)&lt;/th&gt;&lt;th class="num"&gt;Aug 2026 (000s)&lt;/th&gt;&lt;th class="num"&gt;Sep 2026 (000s)&lt;/th&gt;&lt;th class="num"&gt;Sep 2026 rate&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Job openings&lt;/td&gt;&lt;td class="num"&gt;206&lt;/td&gt;&lt;td class="num"&gt;262&lt;/td&gt;&lt;td class="num"&gt;298&lt;/td&gt;&lt;td class="num"&gt;3.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Hires&lt;/td&gt;&lt;td class="num"&gt;337&lt;/td&gt;&lt;td class="num"&gt;307&lt;/td&gt;&lt;td class="num"&gt;356&lt;/td&gt;&lt;td class="num"&gt;4.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Quits&lt;/td&gt;&lt;td class="num"&gt;127&lt;/td&gt;&lt;td class="num"&gt;152&lt;/td&gt;&lt;td class="num"&gt;198&lt;/td&gt;&lt;td class="num"&gt;2.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Layoffs and discharges&lt;/td&gt;&lt;td class="num"&gt;194&lt;/td&gt;&lt;td class="num"&gt;113&lt;/td&gt;&lt;td class="num"&gt;138&lt;/td&gt;&lt;td class="num"&gt;1.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bls.gov/news.release/jolts.t02.htm" rel="noopener"&gt;bls.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Put the four lines together and September looks like a month with more movement between employers. More workers quit, more were hired, and more positions were open at month&amp;rsquo;s end. That fits workers leaving for other construction jobs, and it also fits workers leaving the industry. JOLTS counts a quit as a separation from the payroll of the establishment the worker left, so the release does not show where those workers went.&lt;/p&gt;
&lt;p&gt;For the economy as a whole, openings were little changed at 7.5 million and quits rose to 3.4 million. The release names the industries where openings, hires, quits or layoffs changed over the month, and construction is not among them. BLS conducts its analyses at a 90% confidence level, and the release does not treat construction&amp;rsquo;s September gains as significant at that level.&lt;/p&gt;
&lt;h2 id="how-to-use-this-number"&gt;How to use this number&lt;/h2&gt;
&lt;ol&gt;
&lt;li&gt;Compare your own quit rate to the industry&amp;rsquo;s. BLS divides quits during the month by employment. As an example, a contractor with 150 field and office employees and 4 voluntary departures in September has a quit rate of 4 / 150, or 2.7%, against 2.4% for construction. Run it monthly from payroll terminations coded as voluntary. If your rate runs above the industry&amp;rsquo;s for three months or more, sort the departures by trade and compare your wage rates for those trades with what competitors post.&lt;/li&gt;
&lt;li&gt;Use openings and quits together when you price a job that starts in the spring. One reading of openings at 298,000 and quits at 198,000 is that many of the workers you would recruit already have other offers. If both stay near these levels through the winter, build a few more weeks of recruiting into the staffing plan, and check whether the labor rates in your estimate still match what you are paying new hires.&lt;/li&gt;
&lt;/ol&gt;
&lt;h2 id="revisions-and-caveats"&gt;Revisions and caveats&lt;/h2&gt;
&lt;p&gt;September is preliminary. BLS will revise it on December 1, 2026, when it publishes October data. This release revised August:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;BLS first published August construction openings at 251,000, in the release at the end of September.&lt;/li&gt;
&lt;li&gt;The November 3 release revised August up to 262,000, an increase of 11,000.&lt;/li&gt;
&lt;li&gt;Against the first-published August, September would look like a gain of 47,000. Against the revised August it is 36,000.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;July and June openings were unchanged at 299,000 and 298,000. BLS says monthly revisions come from reports that arrive after the first estimate and from recalculated seasonal factors.&lt;/p&gt;
&lt;p&gt;JOLTS is a stratified random sample of about 21,000 business and government establishments across all industries, and construction is one part of it. A job counts as open only if a specific position exists, the work could start within 30 days, and the employer is recruiting from outside the establishment. Openings are a count on the last business day of the month, while hires, quits and layoffs cover the whole month. BLS revises five years of estimates with the January data each year, using updated employment benchmarks and seasonal factors, so the history in the chart will change again early next year.&lt;/p&gt;
&lt;p&gt;The construction series swings widely. Openings rose 96,000 from October to November 2025 and fell 29,000 from January to February 2026, and the monthly change was 30,000 or more in six of the last 12 months. The 12-month average line in the chart is a steadier guide than any single month.&lt;/p&gt;</content:encoded></item><item><title>Bluebeam survey of 750 US AEC firms finds 28% run AI in production and 17% credit it with less rework</title><link>https://constructionmetrics.com/2026/11/03/bluebeam-survey-28-percent-ai-production/</link><pubDate>Tue, 03 Nov 2026 06:34:15 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/03/bluebeam-survey-28-percent-ai-production/</guid><category>AI</category><description>Bluebeam surveyed 750 US design and construction decision-makers on AI adoption, barriers to scaling, reported benefits, savings and hiring.</description><content:encoded>&lt;p&gt;Bluebeam released its 2027 AEC Technology Outlook Report on October 13, 2026. Hanover Research ran the survey online for Bluebeam in July 2026, and the US edition covers 750 decision-makers at architecture, engineering and construction firms. About 28% of those firms say AI is in production, and 7% say it runs across several core workflows. Among the 448 firms using AI in any form, 64% name greater cost predictability as a benefit and 17% name reduced rework. The questions follow AI from estimating and design through the handoff to the field, and then ask what stops firms from scaling it and whom they can hire to run it.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;The survey tests no product. Respondents work full time at AEC firms, at manager level or above, with authority or influence over technology decisions. The 750 US answers come from a wider study of 1,100. Each firm placed itself on a five-point adoption scale.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Where US AEC firms stand on AI, July 2026 survey (n=750)&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Adoption stage&lt;/th&gt;&lt;th class="num"&gt;Share of US AEC firms (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;AI embedded across multiple core workflows&lt;/td&gt;&lt;td class="num"&gt;7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;AI supporting a few specific workflows&lt;/td&gt;&lt;td class="num"&gt;21&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Piloting AI in limited or experimental use cases&lt;/td&gt;&lt;td class="num"&gt;32&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Not using AI, but exploring future use&lt;/td&gt;&lt;td class="num"&gt;31&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Not using AI, and no plans to&lt;/td&gt;&lt;td class="num"&gt;10&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/resources/ebooks/aec-technology-outlook-report-2027/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;&amp;ldquo;In production&amp;rdquo; is Bluebeam&amp;rsquo;s grouping of the top two rows, 7% and 21%. Add the 32% piloting and 60% of firms have started with AI in some form. (The five rows add to 101% from rounding.)&lt;/p&gt;
&lt;p&gt;Most figures below come from one of three groups of respondents:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;All 750 firms answered the adoption question.&lt;/li&gt;
&lt;li&gt;The 448 firms using AI, pilots included, answered the questions on where they use it, what it delivers and what blocks scaling.&lt;/li&gt;
&lt;li&gt;The 210 firms past the pilot stage answered what got them there and what they saved.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Bluebeam says this year&amp;rsquo;s 28% cannot be compared with the 27% in its 2026 edition, because the question wording and the set of countries both changed. The report page does not split results for contractors apart from architects and engineers. It does note that 58% of respondents are aged 35 to 44 and under 1% are 55 or older.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is one survey of self-reported answers, commissioned and analyzed by a software vendor. Bluebeam sells Revu and the AI tier &lt;a href="https://constructionmetrics.com/2026/10/29/bluebeam-max-ai-drawing-review-revu/"&gt;Bluebeam Max&lt;/a&gt;. Bluebeam also ran its own analysis of Hanover&amp;rsquo;s respondent-level file to compare firms that scaled with firms still piloting.&lt;/p&gt;
&lt;h3 id="where-ai-sits-and-what-it-delivers"&gt;Where AI sits and what it delivers&lt;/h3&gt;
&lt;p&gt;Among firms using AI, the most common uses are office and preconstruction work.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Most common uses of AI among firms using it&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Where firms use AI&lt;/th&gt;&lt;th class="num"&gt;Share of firms using AI (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Cost estimation&lt;/td&gt;&lt;td class="num"&gt;69&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Design and modeling&lt;/td&gt;&lt;td class="num"&gt;69&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Project planning&lt;/td&gt;&lt;td class="num"&gt;63&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Document management&lt;/td&gt;&lt;td class="num"&gt;60&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/resources/ebooks/aec-technology-outlook-report-2027/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Benefits reported from AI, firms using AI (n=448)&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Benefit reported from AI&lt;/th&gt;&lt;th class="num"&gt;Share of firms using AI (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Greater cost predictability&lt;/td&gt;&lt;td class="num"&gt;64&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Earlier identification of risks and issues&lt;/td&gt;&lt;td class="num"&gt;58&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Reduced administrative burden&lt;/td&gt;&lt;td class="num"&gt;55&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Enhanced team coordination knowledge&lt;/td&gt;&lt;td class="num"&gt;53&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Reduced project delays&lt;/td&gt;&lt;td class="num"&gt;47&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Improved output quality and consistency&lt;/td&gt;&lt;td class="num"&gt;43&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Faster workflows and internal processes&lt;/td&gt;&lt;td class="num"&gt;38&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Easier access to information and insights&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Stronger compliance/audit readiness&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Improved safety outcomes&lt;/td&gt;&lt;td class="num"&gt;25&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Reduced rework/late-stage changes&lt;/td&gt;&lt;td class="num"&gt;17&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Reduced cognitive load for staff&lt;/td&gt;&lt;td class="num"&gt;14&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/resources/ebooks/aec-technology-outlook-report-2027/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Bluebeam groups the top three benefits as ways of knowing about a problem sooner. Reduced rework ranks 11th of 12. Bluebeam&amp;rsquo;s reading is that AI sits in estimating, design and planning, while rework happens in the field, where the people who could stop it have the least access to the systems that flagged it. The report puts the direct cost of rework near 5% of total construction cost, citing Construction Industry Institute research and a 2009 study by Hwang, Thomas, Haas and Caldas, and it adds that those studies lean toward industrial capital projects. Bluebeam CEO Usman Shuja says in the report that he has watched a model flag a clash three weeks early and seen the same clash get built anyway. &amp;ldquo;Prediction is a data problem, and we have largely won it,&amp;rdquo; he says.&lt;/p&gt;
&lt;h3 id="barriers-to-scaling"&gt;Barriers to scaling&lt;/h3&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Barriers to scaling AI, by adoption stage (Bluebeam analysis of respondent-level data)&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Barrier to scaling AI&lt;/th&gt;&lt;th class="num"&gt;Still piloting (n=238) (%)&lt;/th&gt;&lt;th class="num"&gt;Scaled past pilot (n=210) (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;High implementation costs&lt;/td&gt;&lt;td class="num"&gt;50&lt;/td&gt;&lt;td class="num"&gt;50&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Lack of internal AI skills&lt;/td&gt;&lt;td class="num"&gt;34&lt;/td&gt;&lt;td class="num"&gt;34&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Resistance to change&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;17&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Security and compliance&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;&lt;td class="num"&gt;22&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Moving beyond pilots&lt;/td&gt;&lt;td class="num"&gt;16&lt;/td&gt;&lt;td class="num"&gt;10&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Identifying right use cases&lt;/td&gt;&lt;td class="num"&gt;10&lt;/td&gt;&lt;td class="num"&gt;18&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Unclear business value&lt;/td&gt;&lt;td class="num"&gt;11&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Data quality issues&lt;/td&gt;&lt;td class="num"&gt;9&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Difficulty accessing data&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Lack of trust in outputs&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/resources/ebooks/aec-technology-outlook-report-2027/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Cost is named by exactly half of each group, so it does not separate the firms that scaled from the ones that stalled. The press release gives different figures for some rows, 22% for resistance to change and 18% for security, because it pools both groups. The arithmetic checks out:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;27% of 238 piloting firms is about 64 firms, and 17% of 210 scaled firms is about 36.&lt;/li&gt;
&lt;li&gt;That is 100 of 448 firms, or 22%.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The same weighting turns 15% and 22% on security into 18%, and 3% and 0% on trust into the 2% the release quotes.&lt;/p&gt;
&lt;p&gt;Trust shows up twice in the survey. Only 2% call a lack of trust in outputs a barrier, while 20% of scaled firms list trust in AI outputs as something that carried them to production. The barrier question and the success question ask about different things, so a firm can count trust as a help without ever having found it missing.&lt;/p&gt;
&lt;h3 id="what-the-scaled-firms-credit"&gt;What the scaled firms credit&lt;/h3&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;What carried firms from pilot to production&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Factor that carried AI from pilot to production&lt;/th&gt;&lt;th class="num"&gt;Share of firms past the pilot stage (n=210) (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Integration with existing systems/tools&lt;/td&gt;&lt;td class="num"&gt;47&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Cross-team collaboration&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Transparency of AI results&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;High-quality data&lt;/td&gt;&lt;td class="num"&gt;26&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Employee training&lt;/td&gt;&lt;td class="num"&gt;26&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ease of use for employees&lt;/td&gt;&lt;td class="num"&gt;22&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Trust in AI outputs/recommendations&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ability to tailor solutions to project needs&lt;/td&gt;&lt;td class="num"&gt;19&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;High vendor expertise&lt;/td&gt;&lt;td class="num"&gt;17&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Clear value/return on investment&lt;/td&gt;&lt;td class="num"&gt;12&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Strong leadership support&lt;/td&gt;&lt;td class="num"&gt;11&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ability to validate or audit AI-generated results&lt;/td&gt;&lt;td class="num"&gt;11&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Adequate vendor support&lt;/td&gt;&lt;td class="num"&gt;10&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Accessible data&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/resources/ebooks/aec-technology-outlook-report-2027/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Integration with existing systems leads at 47%, and a clear return on investment sits at 12%. Bluebeam itself calls this question the weakest evidence in the study, since firms describe their own success after the fact. The use pattern lines up with it: 41% of firms using AI use it mainly to connect data across tools they already own.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;How firms use AI relative to their existing tools (single response)&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Use of AI relative to existing tools&lt;/th&gt;&lt;th class="num"&gt;Share of firms using AI (n=448) (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;To connect and coordinate data across existing tools&lt;/td&gt;&lt;td class="num"&gt;41&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;To automate tasks within individual tools&lt;/td&gt;&lt;td class="num"&gt;37&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;To replace multiple tools with a single platform&lt;/td&gt;&lt;td class="num"&gt;23&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/resources/ebooks/aec-technology-outlook-report-2027/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Where project workflows break down, US respondents&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Where project workflows break down&lt;/th&gt;&lt;th class="num"&gt;Share of US AEC firms (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Design to construction handoffs&lt;/td&gt;&lt;td class="num"&gt;41&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Between office teams and field teams&lt;/td&gt;&lt;td class="num"&gt;41&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Document management&lt;/td&gt;&lt;td class="num"&gt;38&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Construction to operations handoffs&lt;/td&gt;&lt;td class="num"&gt;32&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Between internal teams and external partners&lt;/td&gt;&lt;td class="num"&gt;32&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;During reviews, approvals, or sign-offs&lt;/td&gt;&lt;td class="num"&gt;30&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Between different software tools/platforms&lt;/td&gt;&lt;td class="num"&gt;24&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Between disciplines&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/resources/ebooks/aec-technology-outlook-report-2027/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Among the 210 firms in production, 40% estimate AI savings above $500,000 and another 31% between $100,000 and $500,000. The period and the baseline behind those estimates are not part of the published report.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Self-reported savings from AI, firms in production&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Self-reported AI savings&lt;/th&gt;&lt;th class="num"&gt;Share of firms running AI in production (n=210) (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;More than $500,000&lt;/td&gt;&lt;td class="num"&gt;40&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;$100,000 to $500,000&lt;/td&gt;&lt;td class="num"&gt;31&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/resources/ebooks/aec-technology-outlook-report-2027/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h3 id="hiring-and-shortages"&gt;Hiring and shortages&lt;/h3&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Capabilities firms prioritize in hiring and find hardest to hire&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Capability&lt;/th&gt;&lt;th class="num"&gt;Prioritized when hiring (%)&lt;/th&gt;&lt;th class="num"&gt;Hardest to find in candidates (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Digital tools proficiency&lt;/td&gt;&lt;td class="num"&gt;93&lt;/td&gt;&lt;td class="num"&gt;77&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Project management skills&lt;/td&gt;&lt;td class="num"&gt;82&lt;/td&gt;&lt;td class="num"&gt;40&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Problem-solving and adaptability&lt;/td&gt;&lt;td class="num"&gt;74&lt;/td&gt;&lt;td class="num"&gt;31&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ability to work across multiple tools and platforms&lt;/td&gt;&lt;td class="num"&gt;73&lt;/td&gt;&lt;td class="num"&gt;43&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;AI-related knowledge/experience&lt;/td&gt;&lt;td class="num"&gt;69&lt;/td&gt;&lt;td class="num"&gt;59&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Traditional technical/design expertise&lt;/td&gt;&lt;td class="num"&gt;58&lt;/td&gt;&lt;td class="num"&gt;33&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Data analysis and interpretation&lt;/td&gt;&lt;td class="num"&gt;46&lt;/td&gt;&lt;td class="num"&gt;23&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/resources/ebooks/aec-technology-outlook-report-2027/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Digital tools proficiency is both the most sought skill, at 93%, and the hardest to find, at 77%. AI knowledge is second-hardest at 59%. Only 16% of firms report no labor or skills shortage, and 82% of all respondents say shortages limit their ability to deliver projects to some degree. (Bluebeam&amp;rsquo;s hiring chart lists field and trade experience on two rows with different values, so this table leaves that capability out.)&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Effects of labor and skills shortages&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Effect of labor and skills shortages&lt;/th&gt;&lt;th class="num"&gt;Share of firms reporting a shortage (n=631) (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Increased workload for existing employees&lt;/td&gt;&lt;td class="num"&gt;74&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Delayed project timelines&lt;/td&gt;&lt;td class="num"&gt;49&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Increased project costs&lt;/td&gt;&lt;td class="num"&gt;39&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Limited the number of projects taken on&lt;/td&gt;&lt;td class="num"&gt;36&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Increased reliance on subcontractors/external partners&lt;/td&gt;&lt;td class="num"&gt;33&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Reduced quality/increased rework needed&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Increased safety risks&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/resources/ebooks/aec-technology-outlook-report-2027/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;The rework finding points at one number a contractor can track: the flag-to-fix rate. It is the share of coordination issues flagged before installation that were resolved before the affected work went in. Flags can come from clash detection or from an AI review tool, and the rate counts only whether the fix arrived before the work went in.&lt;/p&gt;
&lt;p&gt;Build the baseline on one active job before any pilot:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Export the last three months of the coordination issue log, including clash items and the RFIs they generated.&lt;/li&gt;
&lt;li&gt;For each issue, record the date flagged, the date a design response or RFI answer closed it, and the date the affected scope was installed, taken from daily logs.&lt;/li&gt;
&lt;li&gt;Count the issues whose scope is already in place, and divide the ones closed before installation by that count.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Track the same rate on jobs where an AI review tool supplies flags, and keep the baseline job&amp;rsquo;s rate beside it. Pair it with &lt;a href="https://constructionmetrics.com/2026/10/20/measure-rfi-turnaround-before-ai-pilot/"&gt;RFI turnaround in calendar days&lt;/a&gt;, since a late answer is the usual reason a flagged issue gets built. To start, add an installed-date column to the coordination log on one job this week.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;The full US report is a free page on Bluebeam&amp;rsquo;s site. This year&amp;rsquo;s study covered three countries, reported as two separate markets, and this page is the US edition. Construction Briefing covered the US findings on November 2.&lt;/p&gt;</content:encoded></item><item><title>Construction spending fell 1.9% in September as residential improvement spending dropped</title><link>https://constructionmetrics.com/2026/11/02/construction-spending-september-residential-improvements/</link><pubDate>Mon, 02 Nov 2026 10:33:36 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/02/construction-spending-september-residential-improvements/</guid><category>Data</category><description>Census puts September 2026 construction spending at $2,186.1 billion SAAR, down 1.9% from a revised August, as private residential fell 5.5%.</description><content:encoded>&lt;p&gt;US construction spending ran at a seasonally adjusted annual rate (SAAR) of $2,186.1 billion in September 2026, according to the preliminary estimate the Census Bureau released this morning. SAAR means the month&amp;rsquo;s spending, adjusted for normal seasonal swings and scaled up to a full year. September is 1.9% below a revised August figure of $2,227.4 billion and 2.7% below September 2025. Census also raised August by $24.2 billion from its first estimate, which turns August&amp;rsquo;s reported 0.9% gain into a 2.0% gain, and September&amp;rsquo;s $41.2 billion decline offsets most of it. September sits $12.6 billion below the 12-month average of $2,198.7 billion and ranks 22nd of the last 25 months.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;September fell back below the 12-month average&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Total construction spending, billions of dollars, seasonally adjusted annual rate&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;September fell back below the 12-month average&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: value. Values range from 2,168 to 2,266.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="210.0" y2="210.0"/&gt;&lt;line x1="72" x2="616" y1="114.0" y2="114.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;2,150&lt;/text&gt;&lt;text x="64" y="213.5" text-anchor="end"&gt;2,200&lt;/text&gt;&lt;text x="64" y="117.5" text-anchor="end"&gt;2,250&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;2,300&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;2025-02&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;2025-07&lt;/text&gt;&lt;text x="412.0" y="324" text-anchor="middle"&gt;2025-12&lt;/text&gt;&lt;text x="525.3" y="324" text-anchor="middle"&gt;2026-05&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="72" x2="616" y1="212.6" y2="212.6"/&gt;
&lt;text x="76" y="208.6"&gt;12-period average 2,198.7&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,88.8 L94.7,87.5 L117.3,89.8 L140.0,97.1 L162.7,92.7 L185.3,83.7 L208.0,101.9 L230.7,87.5 L253.3,124.8 L276.0,137.6 L298.7,128.2 L321.3,129.4 L344.0,122.1 L366.7,131.1 L389.3,170.3 L412.0,179.3 L434.7,218.4 L457.3,229.8 L480.0,211.2 L502.7,271.1 L525.3,270.7 L548.0,234.2 L570.7,240.7 L593.3,157.4 L616.0,236.7 L616.0,306.0 L72.0,306.0 Z"/&gt;
&lt;path class="line" d="M72.0,88.8 L94.7,87.5 L117.3,89.8 L140.0,97.1 L162.7,92.7 L185.3,83.7 L208.0,101.9 L230.7,87.5 L253.3,124.8 L276.0,137.6 L298.7,128.2 L321.3,129.4 L344.0,122.1 L366.7,131.1 L389.3,170.3 L412.0,179.3 L434.7,218.4 L457.3,229.8 L480.0,211.2 L502.7,271.1 L525.3,270.7 L548.0,234.2 L570.7,240.7 L593.3,157.4 L616.0,236.7"/&gt;
&lt;circle class="end" cx="616.0" cy="236.7" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="88.8" r="9"&gt;&lt;title&gt;September 2024: 2,263.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="87.5" r="9"&gt;&lt;title&gt;October 2024: 2,263.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="89.8" r="9"&gt;&lt;title&gt;November 2024: 2,262.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="97.1" r="9"&gt;&lt;title&gt;December 2024: 2,258.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="92.7" r="9"&gt;&lt;title&gt;January 2025: 2,261.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="83.7" r="9"&gt;&lt;title&gt;February 2025: 2,265.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="101.9" r="9"&gt;&lt;title&gt;March 2025: 2,256.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="87.5" r="9"&gt;&lt;title&gt;April 2025: 2,263.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="124.8" r="9"&gt;&lt;title&gt;May 2025: 2,244.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="137.6" r="9"&gt;&lt;title&gt;June 2025: 2,237.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="128.2" r="9"&gt;&lt;title&gt;July 2025: 2,242.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="129.4" r="9"&gt;&lt;title&gt;August 2025: 2,242.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="122.1" r="9"&gt;&lt;title&gt;September 2025: 2,245.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="131.1" r="9"&gt;&lt;title&gt;October 2025: 2,241.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="170.3" r="9"&gt;&lt;title&gt;November 2025: 2,220.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="179.3" r="9"&gt;&lt;title&gt;December 2025: 2,216.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="218.4" r="9"&gt;&lt;title&gt;January 2026: 2,195.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="229.8" r="9"&gt;&lt;title&gt;February 2026: 2,189.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="211.2" r="9"&gt;&lt;title&gt;March 2026: 2,199.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="271.1" r="9"&gt;&lt;title&gt;April 2026: 2,168.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="270.7" r="9"&gt;&lt;title&gt;May 2026: 2,168.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="234.2" r="9"&gt;&lt;title&gt;June 2026: 2,187.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="240.7" r="9"&gt;&lt;title&gt;July 2026: 2,184.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="157.4" r="9"&gt;&lt;title&gt;August 2026: 2,227.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="236.7" r="9"&gt;&lt;title&gt;September 2026: 2,186.1&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="240.7"&gt;2,186.1&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="229.7" y2="216.7"/&gt;
&lt;circle cx="616.0" cy="236.7" r="3.5"/&gt;&lt;text x="616.0" y="212.7" text-anchor="end"&gt;September 2026, 2,186.1&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;September fell back below the 12-month average&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: value. Values range from 2,168 to 2,266.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="151.3" y2="151.3"/&gt;&lt;line x1="50" x2="276" y1="82.7" y2="82.7"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;2,150&lt;/text&gt;&lt;text x="42" y="154.8" text-anchor="end"&gt;2,200&lt;/text&gt;&lt;text x="42" y="86.2" text-anchor="end"&gt;2,250&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;2,300&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2025-09&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="50" x2="276" y1="153.2" y2="153.2"/&gt;
&lt;text x="54" y="149.2"&gt;12-period average 2,198.7&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,64.7 L59.4,63.7 L68.8,65.4 L78.2,70.6 L87.7,67.4 L97.1,61.0 L106.5,74.0 L115.9,63.7 L125.3,90.4 L134.8,99.6 L144.2,92.8 L153.6,93.7 L163.0,88.4 L172.4,94.9 L181.8,122.9 L191.2,129.4 L200.7,157.4 L210.1,165.5 L219.5,152.2 L228.9,195.0 L238.3,194.7 L247.8,168.6 L257.2,173.3 L266.6,113.7 L276.0,170.4 L276.0,220.0 L50.0,220.0 Z"/&gt;
&lt;path class="line" d="M50.0,64.7 L59.4,63.7 L68.8,65.4 L78.2,70.6 L87.7,67.4 L97.1,61.0 L106.5,74.0 L115.9,63.7 L125.3,90.4 L134.8,99.6 L144.2,92.8 L153.6,93.7 L163.0,88.4 L172.4,94.9 L181.8,122.9 L191.2,129.4 L200.7,157.4 L210.1,165.5 L219.5,152.2 L228.9,195.0 L238.3,194.7 L247.8,168.6 L257.2,173.3 L266.6,113.7 L276.0,170.4"/&gt;
&lt;circle class="end" cx="276.0" cy="170.4" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="64.7" r="9"&gt;&lt;title&gt;September 2024: 2,263.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="63.7" r="9"&gt;&lt;title&gt;October 2024: 2,263.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="65.4" r="9"&gt;&lt;title&gt;November 2024: 2,262.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="70.6" r="9"&gt;&lt;title&gt;December 2024: 2,258.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="67.4" r="9"&gt;&lt;title&gt;January 2025: 2,261.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="61.0" r="9"&gt;&lt;title&gt;February 2025: 2,265.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="74.0" r="9"&gt;&lt;title&gt;March 2025: 2,256.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="63.7" r="9"&gt;&lt;title&gt;April 2025: 2,263.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="90.4" r="9"&gt;&lt;title&gt;May 2025: 2,244.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="99.6" r="9"&gt;&lt;title&gt;June 2025: 2,237.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="92.8" r="9"&gt;&lt;title&gt;July 2025: 2,242.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="93.7" r="9"&gt;&lt;title&gt;August 2025: 2,242.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="88.4" r="9"&gt;&lt;title&gt;September 2025: 2,245.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="94.9" r="9"&gt;&lt;title&gt;October 2025: 2,241.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="122.9" r="9"&gt;&lt;title&gt;November 2025: 2,220.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="129.4" r="9"&gt;&lt;title&gt;December 2025: 2,216.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="157.4" r="9"&gt;&lt;title&gt;January 2026: 2,195.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="165.5" r="9"&gt;&lt;title&gt;February 2026: 2,189.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="152.2" r="9"&gt;&lt;title&gt;March 2026: 2,199.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="195.0" r="9"&gt;&lt;title&gt;April 2026: 2,168.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="194.7" r="9"&gt;&lt;title&gt;May 2026: 2,168.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="168.6" r="9"&gt;&lt;title&gt;June 2026: 2,187.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="173.3" r="9"&gt;&lt;title&gt;July 2026: 2,184.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="113.7" r="9"&gt;&lt;title&gt;August 2026: 2,227.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="170.4" r="9"&gt;&lt;title&gt;September 2026: 2,186.1&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="174.4"&gt;2,186&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="163.4" y2="150.4"/&gt;
&lt;circle cx="276.0" cy="170.4" r="3.5"/&gt;&lt;text x="276.0" y="134.4" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;September 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;2,186.1&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;September 2026 is preliminary. July and August 2026 are revised.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/TTLCONS" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Total construction spending, last 13 months&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Spending ($B SAAR)&lt;/th&gt;&lt;th class="num"&gt;MoM&lt;/th&gt;&lt;th class="num"&gt;YoY&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Sep 2025&lt;/td&gt;&lt;td class="num"&gt;$2,245.8&lt;/td&gt;&lt;td class="num"&gt;0.2%&lt;/td&gt;&lt;td class="num"&gt;-0.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oct 2025&lt;/td&gt;&lt;td class="num"&gt;$2,241.1&lt;/td&gt;&lt;td class="num"&gt;-0.2%&lt;/td&gt;&lt;td class="num"&gt;-1.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nov 2025&lt;/td&gt;&lt;td class="num"&gt;$2,220.7&lt;/td&gt;&lt;td class="num"&gt;-0.9%&lt;/td&gt;&lt;td class="num"&gt;-1.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec 2025&lt;/td&gt;&lt;td class="num"&gt;$2,216.0&lt;/td&gt;&lt;td class="num"&gt;-0.2%&lt;/td&gt;&lt;td class="num"&gt;-1.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jan 2026&lt;/td&gt;&lt;td class="num"&gt;$2,195.6&lt;/td&gt;&lt;td class="num"&gt;-0.9%&lt;/td&gt;&lt;td class="num"&gt;-2.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb 2026&lt;/td&gt;&lt;td class="num"&gt;$2,189.7&lt;/td&gt;&lt;td class="num"&gt;-0.3%&lt;/td&gt;&lt;td class="num"&gt;-3.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mar 2026&lt;/td&gt;&lt;td class="num"&gt;$2,199.4&lt;/td&gt;&lt;td class="num"&gt;0.4%&lt;/td&gt;&lt;td class="num"&gt;-2.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Apr 2026&lt;/td&gt;&lt;td class="num"&gt;$2,168.2&lt;/td&gt;&lt;td class="num"&gt;-1.4%&lt;/td&gt;&lt;td class="num"&gt;-4.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;$2,168.4&lt;/td&gt;&lt;td class="num"&gt;0.0%&lt;/td&gt;&lt;td class="num"&gt;-3.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jun 2026&lt;/td&gt;&lt;td class="num"&gt;$2,187.4&lt;/td&gt;&lt;td class="num"&gt;0.9%&lt;/td&gt;&lt;td class="num"&gt;-2.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jul 2026&lt;/td&gt;&lt;td class="num"&gt;$2,184.0&lt;/td&gt;&lt;td class="num"&gt;-0.1%&lt;/td&gt;&lt;td class="num"&gt;-2.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aug 2026&lt;/td&gt;&lt;td class="num"&gt;$2,227.4&lt;/td&gt;&lt;td class="num"&gt;2.0%&lt;/td&gt;&lt;td class="num"&gt;-0.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Sep 2026&lt;/td&gt;&lt;td class="num"&gt;$2,186.1&lt;/td&gt;&lt;td class="num"&gt;-1.9%&lt;/td&gt;&lt;td class="num"&gt;-2.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.census.gov/construction/c30/pdf/release.pdf" rel="noopener"&gt;census.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="what-moved"&gt;What moved&lt;/h2&gt;
&lt;p&gt;Private residential accounts for more than the whole decline. It fell 5.5% to $848.8 billion, a drop of $49.2 billion against a $41.2 billion drop in the total. Census reports that decline as statistically significant, meaning its 90% confidence interval of plus or minus 1.3 percentage points does not include zero.&lt;/p&gt;
&lt;p&gt;The new-construction lines inside residential barely moved. New single-family was flat at $403.4 billion and new multifamily rose 0.1% to $115.9 billion. The rest of private residential is improvements to owner-occupied homes, which Census defines as remodeling, additions and major replacements such as furnaces and water heaters, with maintenance and repair excluded. Table 1 does not give improvements a line of its own, so subtract the two new-construction lines from the residential total. That leaves $347.7 billion in July, $378.7 billion in the revised August and $329.5 billion in September. (The subtraction is our arithmetic on Table 1.) So the improvements figure fell about $49.3 billion, or 13.0%, in one month, and the September figure is below July&amp;rsquo;s.&lt;/p&gt;
&lt;p&gt;Private nonresidential rose 1.1% to $790.6 billion, a statistically significant gain, and is 2.3% above September 2025. Office supplied $7.5 billion of the $8.3 billion increase, rising 5.5% to $145.6 billion, 39.5% above a year earlier. Census definitions list data centers as a subcategory of office, though Table 1 does not show them separately. Private power rose 1.2% to $171.7 billion and is up 12.1% from a year ago. Private manufacturing slipped 0.3% to $167.2 billion, 17.9% below the $203.7 billion of September 2025, and commercial fell 0.3% to $115.9 billion.&lt;/p&gt;
&lt;p&gt;Public spending fell 0.1% to $546.8 billion and is 1.0% above September 2025. Highway and street fell 0.3% to $149.2 billion, and educational held at $113.1 billion. Census marks the public total and both of those changes as not statistically significant.&lt;/p&gt;
&lt;h2 id="how-to-use-this-number"&gt;How to use this number&lt;/h2&gt;
&lt;ol&gt;
&lt;li&gt;If your work is commercial, industrial or institutional, track the private nonresidential line alongside the headline. In the current vintage it has risen four months in a row, from $749.4 billion in May to $790.6 billion in September, a 5.5% gain. Office accounts for $30.5 billion of that $41.1 billion. Set your bid log for the same months next to those lines by building type. If your office and data center bid volume grew by less than the category&amp;rsquo;s spending over those four months, you are winning a smaller share of a growing segment.&lt;/li&gt;
&lt;li&gt;Compare your billed revenue with a three-month average of the total, which smooths out single-month swings like August&amp;rsquo;s and September&amp;rsquo;s. July through September 2026 averaged $2,199.2 billion, 2.0% below the same three months of 2025. Census adjusts these figures for seasonality and leaves out price changes, so if your material and labor costs rose over the year, physical volume fell by more than 2.0%.&lt;/li&gt;
&lt;/ol&gt;
&lt;h2 id="revisions-and-caveats"&gt;Revisions and caveats&lt;/h2&gt;
&lt;p&gt;Measured against the first August estimate of $2,203.1 billion, September would be down 0.8%. The revision added the rest:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;On October 1, Census put August at $2,203.1 billion, 0.9% above a July figure of $2,184.5 billion.&lt;/li&gt;
&lt;li&gt;On November 2, it revised August to $2,227.4 billion and July to $2,184.0 billion.&lt;/li&gt;
&lt;li&gt;August rose $24.2 billion, or 1.1%. Private residential went to $898.0 billion from $882.3 billion, and private nonresidential to $782.3 billion from $773.0 billion.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Census says the average absolute change from the preliminary estimate to the first revision is 0.65% for total construction, so August moved by close to twice the usual amount. The residential portion of that revision went into the derived improvements figure, which the first August estimate had put at $363.2 billion.&lt;/p&gt;
&lt;p&gt;September is preliminary, and Census will revise it on December 1, 2026, when it publishes October. The 1.9% decline carries a 90% confidence interval of plus or minus 0.7 percentage point, so Census treats it as statistically significant. The release adds that it can take two months to establish an underlying trend for total construction and up to eight months for specific categories. The estimates draw on several sources and surveys and carry both sampling and nonsampling error. For comparison with last month&amp;rsquo;s figures, see the &lt;a href="https://constructionmetrics.com/2026/10/01/construction-spending-august-july-revised-up/"&gt;August construction spending post&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;Through the first nine months of 2026, construction spending totaled $1,649.6 billion, 2.9% below the $1,698.6 billion for the same period of 2025.&lt;/p&gt;</content:encoded></item><item><title>Zutec launches Handover AI to sort subcontractor closeout documents and track what is still missing</title><link>https://constructionmetrics.com/2026/11/02/zutec-handover-ai-closeout-documents/</link><pubDate>Mon, 02 Nov 2026 06:34:33 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/02/zutec-handover-ai-closeout-documents/</guid><category>AI</category><description>Zutec Handover AI classifies, names and tags the closeout documents subcontractors upload and shows main contractors what is still outstanding.</description><content:encoded>&lt;p&gt;Zutec, a construction software company that sells mainly to contractors and building owners in the UK and Ireland, launched Zutec Handover AI on November 2, 2026. The &lt;a href="https://zutec.com/news/zutec-launches-handover-ai"&gt;announcement&lt;/a&gt; says the product is available now and is built for main contractors. It covers closeout: collecting O&amp;amp;M manuals, drawings, certificates and safety files from subcontractors and assembling the record the owner receives at practical completion, the UK term for substantial completion.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;On most jobs this work falls to a project engineer or document controller on the main contractor&amp;rsquo;s team. Zutec describes the current process as chasing subcontractors for files, receiving wrong or incomplete documents and keeping status in Excel trackers, which ends in a rush at practical completion.&lt;/p&gt;
&lt;p&gt;With Handover AI, subcontractors upload documents into Zutec&amp;rsquo;s platform through guided templates or by drag and drop. According to the announcement, Zutec&amp;rsquo;s own specialist staff chase missing submissions and quality-check each upload within 48 hours. The software then classifies, names and tags each file. Classification means the AI reads a document and assigns it to a slot in the handover structure, the way a document controller would file a pump data sheet under the mechanical O&amp;amp;M section.&lt;/p&gt;
&lt;p&gt;The main contractor&amp;rsquo;s team reviews, approves or returns each item in a workflow that keeps comments, tasks and an audit trail in one place. Dashboards show what has been submitted, what is outstanding and what is complete, for one project or across a portfolio. A chatbot answers questions about the documents collected so far.&lt;/p&gt;
&lt;p&gt;The output is the building manual. Zutec lists exports for UK requirements, including Building Safety Act and Regulation 38 fire safety packages, along with an asset register and a logbook. The &lt;a href="https://pressat.co.uk/releases/digital-safety-file-leader-zutec-launches-handover-ai-for-main-contractors-handover-built-better-handover-headache-solved-e653e0852ab855e345402bf9fa5ad549/"&gt;Irish version of the release&lt;/a&gt; names the Digital Safety File and BCAR documentation instead. After handover, an owner can load the record into &lt;a href="https://zutec.com/news/zutec-launches-building-ai"&gt;Building AI&lt;/a&gt;, a separate Zutec product launched in February that answers plain-language questions with a citation to the source document.&lt;/p&gt;
&lt;aside class="note"&gt;In plain terms, people at Zutec check each upload within 48 hours and the AI files and labels it. Someone on the contractor&amp;rsquo;s team still decides whether to accept it.&lt;/aside&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Zutec&amp;rsquo;s announcement, which includes comments from one main contractor and one subcontractor. These claims come from Zutec:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;The product draws on more than 25 years of handover work and data from over 5,000 projects.&lt;/li&gt;
&lt;li&gt;Zutec&amp;rsquo;s own research found that main contractors repeatedly cite supply chain chasing, incomplete information, slow responses and limited visibility as handover problems.&lt;/li&gt;
&lt;li&gt;Asset register, Regulation 38, Fire and Emergency File, BREEAM and logbook features, which were paid add-ons before, are now part of the core product without raising its cost.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Jet Maal, a senior technical coordinator at main contractor Mount Anvil, says in the release that the dashboard shows a project completion percentage, an activity log and the items waiting for review. Maal adds that consistent AI naming and tagging cuts administrative work. Thalia Rothwell, a quality engineer at subcontractor William Hare, says the subcontractor&amp;rsquo;s team knows what to submit and where, and spends less time asking for status updates.&lt;/p&gt;
&lt;p&gt;Time saved per project, the accuracy of the AI classification and the share of uploads that pass the 48-hour check on first submission are not yet public.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track closeout completeness at substantial completion. Divide the number of required closeout documents that were received and accepted by the substantial completion date by the total number the contract requires. Take the list from the closeout submittal requirements in Division 01 of the spec, and count each O&amp;amp;M manual, warranty, as-built set and test report as its own line item.&lt;/p&gt;
&lt;p&gt;Capture these baselines from three to five recently closed jobs of similar size:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;The completeness percentage on the substantial completion date.&lt;/li&gt;
&lt;li&gt;Calendar days from substantial completion to the owner&amp;rsquo;s acceptance of the full closeout package.&lt;/li&gt;
&lt;li&gt;Hours the project engineer or document controller charged to closeout in the job&amp;rsquo;s last 60 days, if your timekeeping separates them.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;During a pilot, log each document the AI classified and whether a reviewer had to rename or refile it. The share that needed a correction is the tool&amp;rsquo;s error rate on your own subcontractors&amp;rsquo; files. Closeout documents are the last submittals on a job, and our post on &lt;a href="https://constructionmetrics.com/2026/09/30/buildertrend-ai-submittals-log-from-spec-book/"&gt;Buildertrend&amp;rsquo;s AI Submittals&lt;/a&gt; covers a tool that drafts the submittal log at the start of a job.&lt;/p&gt;
&lt;p&gt;A first step on one job: pull the closeout log from your most recently finished project and count how many required items were still open on the substantial completion date.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;Zutec says Handover AI is available now. The releases carry London and Dublin datelines, and the regulatory packages they name are UK and Irish ones. Availability for US projects could not be verified. Pricing is not listed in the announcement.&lt;/p&gt;</content:encoded></item><item><title>How to adjust a crew wage rate to another metro with BLS OEWS data, from $26 in Houston to $42 in Chicago</title><link>https://constructionmetrics.com/2026/11/01/adjust-crew-wage-rate-metro-bls-oews/</link><pubDate>Sun, 01 Nov 2026 10:33:11 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/01/adjust-crew-wage-rate-metro-bls-oews/</guid><category>Data</category><description>BLS OEWS wages let an estimator scale a home-market crew rate to another metro. In this example a $26 Houston carpenter rate becomes $42 to $45 in Chicago.</description><content:encoded>&lt;p&gt;A contractor bidding outside its home market has a labor rate it trusts for its own city and no payroll history in the new one. The estimator still has to put an hourly rate on every crew in the bid. The Bureau of Labor Statistics publishes a starting point for that number, the Occupational Employment and Wage Statistics survey, known as OEWS.&lt;/p&gt;
&lt;p&gt;OEWS reports employment and wages for about 830 occupations, for the nation, each state and each metro area. The latest set is the May 2025 estimates, which BLS released on May 15, 2026. This post shows how to scale a home-market rate to another metro with them, and where the method stops working.&lt;/p&gt;
&lt;h2 id="what-oews-measures"&gt;What OEWS measures&lt;/h2&gt;
&lt;p&gt;BLS defines OEWS wages as straight-time gross pay, without premium pay. Base rates, piece rates, incentive pay and production bonuses count. Overtime pay, shift differentials, holiday and weekend premiums, and meal and lodging payments are left out.&lt;/p&gt;
&lt;p&gt;That definition lines up with the base rate in an estimate. Payroll taxes, insurance and benefits go on top through the &lt;a href="https://constructionmetrics.com/2026/10/16/compute-labor-burden-per-hour-worked/"&gt;labor burden rate&lt;/a&gt;. Extended workweeks and travel get their own lines, covered in the posts on the &lt;a href="https://constructionmetrics.com/2026/10/19/compute-overtime-premium-extended-workweek/"&gt;overtime premium&lt;/a&gt; and &lt;a href="https://constructionmetrics.com/2026/10/23/per-diem-traveling-crew-gsa-rates/"&gt;per diem&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;Each occupation and area gets a mean and five percentile wages. A percentile is a cutoff in the pay distribution: the 25th percentile is the rate that a quarter of workers earn less than, and the median is the 50th. This post uses the median because high earners raise the mean. Nationally, the May 2025 hourly mean for carpenters is $31.55 and the median is $29.12.&lt;/p&gt;
&lt;h2 id="the-wage-gap-between-metros"&gt;The wage gap between metros&lt;/h2&gt;
&lt;p&gt;The table below gives the May 2025 hourly medians for carpenters and electricians in five large metro areas. The &amp;ldquo;vs US&amp;rdquo; columns divide each metro median by the national median for that trade.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Hourly median wages, May 2025 OEWS estimates, with each metro&amp;#39;s ratio to the US median for the same occupation&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Area&lt;/th&gt;&lt;th class="num"&gt;Carpenters median ($)&lt;/th&gt;&lt;th class="num"&gt;Carpenters vs US&lt;/th&gt;&lt;th class="num"&gt;Electricians median ($)&lt;/th&gt;&lt;th class="num"&gt;Electricians vs US&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;United States&lt;/td&gt;&lt;td class="num"&gt;29.12&lt;/td&gt;&lt;td class="num"&gt;1.00&lt;/td&gt;&lt;td class="num"&gt;30.38&lt;/td&gt;&lt;td class="num"&gt;1.00&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Houston-Pasadena-The Woodlands TX&lt;/td&gt;&lt;td class="num"&gt;23.88&lt;/td&gt;&lt;td class="num"&gt;0.82&lt;/td&gt;&lt;td class="num"&gt;28.45&lt;/td&gt;&lt;td class="num"&gt;0.94&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Atlanta-Sandy Springs-Roswell GA&lt;/td&gt;&lt;td class="num"&gt;24.37&lt;/td&gt;&lt;td class="num"&gt;0.84&lt;/td&gt;&lt;td class="num"&gt;28.20&lt;/td&gt;&lt;td class="num"&gt;0.93&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Phoenix-Mesa-Chandler AZ&lt;/td&gt;&lt;td class="num"&gt;29.00&lt;/td&gt;&lt;td class="num"&gt;1.00&lt;/td&gt;&lt;td class="num"&gt;29.43&lt;/td&gt;&lt;td class="num"&gt;0.97&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Seattle-Tacoma-Bellevue WA&lt;/td&gt;&lt;td class="num"&gt;36.74&lt;/td&gt;&lt;td class="num"&gt;1.26&lt;/td&gt;&lt;td class="num"&gt;48.93&lt;/td&gt;&lt;td class="num"&gt;1.61&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Chicago-Naperville-Elgin IL-IN&lt;/td&gt;&lt;td class="num"&gt;38.68&lt;/td&gt;&lt;td class="num"&gt;1.33&lt;/td&gt;&lt;td class="num"&gt;49.21&lt;/td&gt;&lt;td class="num"&gt;1.62&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bls.gov/oes/tables.htm" rel="noopener"&gt;bls.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The ratios differ by trade within the same city. Houston carpenters sit at 0.82 of the national median and Houston electricians at 0.94. Chicago is at 1.33 for carpenters and 1.62 for electricians. A single city-wide labor factor applied to every trade would misprice at least one of them, so pull the ratio for each occupation in the bid.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The figures below are an example. A Houston contractor pays its carpenters $26.00 an hour base and is bidding a Chicago interiors job that the schedule carries at 4,000 carpenter hours.&lt;/p&gt;
&lt;p&gt;The quickest method scales the home rate by the ratio of the two metro medians:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Divide the destination median by the home median. For carpenters that is $38.68 / $23.88, or about 1.62.&lt;/li&gt;
&lt;li&gt;Multiply your home rate by that ratio. $26.00 times 38.68 / 23.88 is $42.11 an hour.&lt;/li&gt;
&lt;li&gt;Multiply by the hours. 4,000 hours at $42.11 is $168,440 in base wages, $64,440 more than the same hours at the Houston rate.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The ratio assumes your crew sits at the same relative point in both pay distributions. The table below compares the two distributions for carpenters.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Carpenter hourly wages at the 25th, 50th and 75th percentiles, May 2025 OEWS estimates&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Area&lt;/th&gt;&lt;th class="num"&gt;25th percentile ($)&lt;/th&gt;&lt;th class="num"&gt;Median ($)&lt;/th&gt;&lt;th class="num"&gt;75th percentile ($)&lt;/th&gt;&lt;th class="num"&gt;25th to 75th spread ($)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Houston-Pasadena-The Woodlands TX&lt;/td&gt;&lt;td class="num"&gt;22.40&lt;/td&gt;&lt;td class="num"&gt;23.88&lt;/td&gt;&lt;td class="num"&gt;28.94&lt;/td&gt;&lt;td class="num"&gt;6.54&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Chicago-Naperville-Elgin IL-IN&lt;/td&gt;&lt;td class="num"&gt;28.26&lt;/td&gt;&lt;td class="num"&gt;38.68&lt;/td&gt;&lt;td class="num"&gt;54.79&lt;/td&gt;&lt;td class="num"&gt;26.53&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bls.gov/oes/tables.htm" rel="noopener"&gt;bls.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The middle half of Houston carpenters earn within a $6.54 band. In Chicago the same band is $26.53 wide, from $28.26 to $54.79. A rate that sits a little above the median in Houston lands much further from the median in Chicago.&lt;/p&gt;
&lt;p&gt;A second method keeps your crew&amp;rsquo;s position in the distribution. The $26.00 Houston rate sits $2.12 above the Houston median of $23.88, which is 42% of the $5.06 gap to the Houston 75th percentile. The same share of Chicago&amp;rsquo;s $16.11 gap between median and 75th percentile, added to the $38.68 median, gives $45.43. This step assumes wages rise in a straight line between the two percentiles. BLS publishes only the cutoffs, so the result is an estimate.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Carpenter base wages for 4,000 hours on a Chicago job, from a $26.00 Houston rate. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Method&lt;/th&gt;&lt;th class="num"&gt;Carpenter rate ($ per hour)&lt;/th&gt;&lt;th class="num"&gt;Wages for 4000 hours ($)&lt;/th&gt;&lt;th class="num"&gt;Change from Houston ($)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Houston rate as paid at home&lt;/td&gt;&lt;td class="num"&gt;26.00&lt;/td&gt;&lt;td class="num"&gt;$104,000&lt;/td&gt;&lt;td class="num"&gt;$0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Chicago by ratio of medians&lt;/td&gt;&lt;td class="num"&gt;42.11&lt;/td&gt;&lt;td class="num"&gt;$168,440&lt;/td&gt;&lt;td class="num"&gt;$64,440&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Chicago by percentile position&lt;/td&gt;&lt;td class="num"&gt;45.43&lt;/td&gt;&lt;td class="num"&gt;$181,720&lt;/td&gt;&lt;td class="num"&gt;$77,720&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;The two methods differ by $3.32 an hour, or $13,280 across the job. When the destination spread is that wide, take both numbers to the people who will staff the job. A local subcontractor&amp;rsquo;s quote or the local union scale sheet shows where in the Chicago distribution your crew is likely to be hired.&lt;/p&gt;
&lt;h2 id="limits-of-the-data"&gt;Limits of the data&lt;/h2&gt;
&lt;p&gt;BLS builds each May estimate from six survey panels collected over three years. The May 2025 figures pool panels from November 2022 through May 2025, and BLS adjusts the older wages to the May 2025 reference date with a model. A rate taken from these tables is a May 2025 rate. A bid for work in 2027 needs your own escalation on top.&lt;/p&gt;
&lt;p&gt;BLS also says the survey is designed for comparing areas and industries at one point in time and does not encourage using it as a time series. A Houston to Chicago comparison within the May 2025 release fits that design. For the change in a metro&amp;rsquo;s wages from one year to the next, your own payroll records or local subcontractor quotes are the better guide.&lt;/p&gt;
&lt;p&gt;OEWS is not a prevailing wage source. The FAQ says the program cannot make classification determinations for non-statistical purposes such as prevailing wages. Work under Davis-Bacon uses the wage determination in the contract, covered in the &lt;a href="https://constructionmetrics.com/2026/10/18/annualize-davis-bacon-fringe-benefit-credit/"&gt;fringe benefit credit post&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;The metro series used here are cross-industry estimates, which BLS labels as covering private employers and federal, state and local government. A carpenter on a hospital&amp;rsquo;s maintenance staff counts alongside a carpenter at a framing contractor. Nationally, BLS counted 369,310 construction and extraction workers in local government, excluding schools and hospitals, in May 2025. For the trend in how many construction jobs each metro is adding, AGC&amp;rsquo;s metro analysis is summarized in the &lt;a href="https://constructionmetrics.com/2026/10/29/construction-jobs-metro-areas-september/"&gt;September metro employment post&lt;/a&gt;.&lt;/p&gt;
&lt;h2 id="how-to-start-on-your-jobs"&gt;How to start on your jobs&lt;/h2&gt;
&lt;p&gt;Take your current base rate for each trade you self-perform and look up where it falls in the OEWS distribution for your home metro. Record it as a position, such as &amp;ldquo;between the median and the 75th percentile,&amp;rdquo; and store it next to the rate in your estimating database.&lt;/p&gt;
&lt;p&gt;On the next out-of-town bid, pull the same occupations for the destination metro through the BLS data tables or the BLS Public Data API, where each figure has its own series ID. Price each trade both ways, ratio and percentile position, and put the gap in front of whoever approves the labor rates before the bid goes out.&lt;/p&gt;</content:encoded></item><item><title>Eastern Construction says Tyce's AI bid review cut its preconstruction time at least 40%</title><link>https://constructionmetrics.com/2026/11/01/tyce-ai-bid-review-eastern-construction/</link><pubDate>Sun, 01 Nov 2026 06:34:11 -0500</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/11/01/tyce-ai-bid-review-eastern-construction/</guid><category>AI</category><description>Tyce links drawings, specs, addenda and trade bids into one project model that flags scope gaps and contract risks and drafts proposals.</description><content:encoded>&lt;p&gt;Tyce, a Toronto software company, announced on October 19, 2026, that it raised C$2.8 million (about US$2 million) in pre-seed funding, an early round that comes before a seed round. BDC&amp;rsquo;s Thrive Venture Fund and the MaRS Investment Accelerator Fund led it. Tyce&amp;rsquo;s software reads a bid package, flags scope gaps and risky contract terms, and drafts proposals. In the same announcement, Ontario general contractor Eastern Construction says it rolled Tyce out across its preconstruction teams and cut the time spent bidding on and managing projects by at least 40%.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;On a typical pursuit, an estimator reads the drawings, specs and addenda, writes a scope sheet for each trade, and then levels the sub bids against those sheets. Tyce&amp;rsquo;s CEO and co-founder, Lylia Djait-Paulien, told The Construction Broadsheet that the product is meant to catch the item on page 400 that nobody had time to read.&lt;/p&gt;
&lt;p&gt;The inputs are the bid documents. Tyce pulls drawings, specifications, addenda and trade bids from Procore, Autodesk Construction Cloud or a direct upload. It links them into one project model that the team can question in plain language.&lt;/p&gt;
&lt;p&gt;The software then flags scope gaps, exclusions and risky contract terms. It supports takeoff and bid leveling, and it drafts proposals. Each flag shows the sheet, spec section or page it came from, so the estimator can open the source and confirm it. Scope sheets, bid leveling and risk summaries export to Excel.&lt;/p&gt;
&lt;p&gt;Tyce&amp;rsquo;s website adds two functions. It compares supplemental clauses with standard contract forms and flags risks against the company&amp;rsquo;s own risk profile. It also compares a new estimate with the firm&amp;rsquo;s past estimates and points out line items outside the usual range.&lt;/p&gt;
&lt;p&gt;Djait-Paulien said large general contractors use Tyce across estimating, preconstruction, contract review and project management. Smaller firms with one or two estimators use it to add capacity, and a drywall or formwork sub can pull out only its own trade&amp;rsquo;s scope.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Tyce&amp;rsquo;s funding announcement, a quote in it from Eastern Construction&amp;rsquo;s CEO, and Djait-Paulien&amp;rsquo;s interview with The Construction Broadsheet.&lt;/p&gt;
&lt;p&gt;These claims come from Tyce and Eastern Construction:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Eastern Construction has rolled Tyce out across its preconstruction teams and cut the time spent bidding on and managing projects by at least 40%.&lt;/li&gt;
&lt;li&gt;Dean Walker, Eastern&amp;rsquo;s CEO, said in the announcement: &amp;ldquo;With Tyce, tasks that took our preconstruction team five hours now take 15 minutes.&amp;rdquo;&lt;/li&gt;
&lt;li&gt;Djait-Paulien told the Broadsheet that the largest gains come from reviewing bid packages, leveling sub bids, reviewing contracts, and summarizing reports and meeting minutes.&lt;/li&gt;
&lt;li&gt;She also said customers are bidding more work with the same staff.&lt;/li&gt;
&lt;/ol&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Time savings reported for Tyce at Eastern Construction&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Measure&lt;/th&gt;&lt;th&gt;Reported by&lt;/th&gt;&lt;th&gt;Before Tyce&lt;/th&gt;&lt;th&gt;With Tyce&lt;/th&gt;&lt;th&gt;Change&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Unnamed preconstruction tasks&lt;/td&gt;&lt;td&gt;Dean Walker, CEO, Eastern Construction&lt;/td&gt;&lt;td&gt;5 hours&lt;/td&gt;&lt;td&gt;15 minutes&lt;/td&gt;&lt;td&gt;95% less (our arithmetic)&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Time spent bidding on and managing projects&lt;/td&gt;&lt;td&gt;Tyce announcement&lt;/td&gt;&lt;td&gt;Not stated&lt;/td&gt;&lt;td&gt;Not stated&lt;/td&gt;&lt;td&gt;At least 40% less&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.tyce.ai/news/pre-seed-funding" rel="noopener"&gt;tyce.ai&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Walker&amp;rsquo;s five hours to 15 minutes refers to preconstruction tasks that the quote leaves unnamed, and it works out to a 95% cut for those tasks. The 40% figure covers bidding and project management time together. The method, time period and number of bids behind it are not in the announcement.&lt;/p&gt;
&lt;p&gt;Accuracy rates are not yet public. Tyce told the Broadsheet that it benchmarks its output against customers&amp;rsquo; own estimates and plans to publish accuracy and win-rate figures as its customer base grows. Bricks &amp;amp; Bytes, a construction technology newsletter, said accuracy is the first question a chief estimator should ask.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track review hours per bid. Define it as the hours estimators and preconstruction staff log against one bid, from receipt of the documents to issued trade scope sheets and leveled sub bids. Split the hours by task: document review, scope sheets, bid leveling and proposal writing. That split lets you check which of Walker&amp;rsquo;s tasks moved on your own work.&lt;/p&gt;
&lt;p&gt;Capture the baseline on your next five to ten bids before the pilot starts, and note each bid&amp;rsquo;s size and delivery method. Review hours on a small tenant improvement and a large hospital bid differ widely, so compare pilot bids with baseline bids of similar size.&lt;/p&gt;
&lt;p&gt;Track what the review catches alongside the hours. For each pilot bid, record how many flags the tool raised and how many held up when an estimator checked the cited sheet. Then count the scope items the estimator found that the tool missed. After award, tag any change order that traces back to a scope gap at bid time. Our posts on &lt;a href="https://constructionmetrics.com/2026/10/04/measure-change-order-rate-by-cause/"&gt;change orders by cause&lt;/a&gt; and &lt;a href="https://constructionmetrics.com/2026/10/03/track-bid-hit-ratio-client-type-job-size/"&gt;bid-hit ratio&lt;/a&gt; show how to set up that tag and check whether the extra bids turn into wins.&lt;/p&gt;
&lt;p&gt;A first step on one job: on the next bid that comes in, have each estimator log hours by task in a shared sheet until the bid goes out.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;Tyce sells an annual subscription, tiered by company size and usage, with no per-project fee, according to the Broadsheet. Prices are not listed. Djait-Paulien said setup, including onboarding and training, usually takes a few weeks, and that past estimates and cost data are optional at the start. She also said customer data is never used to train models for other firms.&lt;/p&gt;
&lt;p&gt;Tyce says it serves customers in Canada and the United States, and it told the Broadsheet it expects the US to become its largest market. For a European product aimed at the same bid review work, see our post on &lt;a href="https://constructionmetrics.com/2026/10/02/kuro-ai-tender-review-general-contractors/"&gt;Kuro&amp;rsquo;s AI tender review&lt;/a&gt;.&lt;/p&gt;</content:encoded></item><item><title>Construction unemployment was 3.5% in September, and ABC's state estimates run from 1.7% in Maryland to 9.5% in North Dakota</title><link>https://constructionmetrics.com/2026/10/31/state-construction-unemployment-rates-september/</link><pubDate>Sat, 31 Oct 2026 11:33:12 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/31/state-construction-unemployment-rates-september/</guid><category>Data</category><description>BLS put September construction unemployment at 3.5%, and ABC's state estimates range from 1.7% in Maryland to 9.5% in North Dakota.</description><content:encoded>&lt;p&gt;The unemployment rate for construction workers was 3.5% in September 2026, not seasonally adjusted, according to the Bureau of Labor Statistics household survey. That is 0.3 percentage point below September 2025 and 0.4 point above August. On October 30, Associated Builders and Contractors (ABC) published state estimates for the same month, built by Markstein Advisors from BLS data. They put every state below 10%, with Maryland lowest at 1.7% and North Dakota highest at 9.5%. In the 25 months charted below, September ties for the fifth-lowest of 24 monthly readings. It sits under the 4.8% average for the last 12 months, an average of 11 readings because October 2025 has no value.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Construction unemployment was 3.5% in September, 0.3 point below a year earlier&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Unemployment rate, construction industry, private wage and salary workers, percent, not seasonally adjusted&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;Construction unemployment was 3.5% in September, 0.3 point below a year earlier&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: value. Values range from 3 to 7.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="210.0" y2="210.0"/&gt;&lt;line x1="72" x2="616" y1="114.0" y2="114.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;2&lt;/text&gt;&lt;text x="64" y="213.5" text-anchor="end"&gt;4&lt;/text&gt;&lt;text x="64" y="117.5" text-anchor="end"&gt;6&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;8&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;2025-02&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;2025-07&lt;/text&gt;&lt;text x="412.0" y="324" text-anchor="middle"&gt;2025-12&lt;/text&gt;&lt;text x="525.3" y="324" text-anchor="middle"&gt;2026-05&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,224.4 L94.7,200.4 L117.3,181.2 L140.0,152.4 L162.7,90.0 L185.3,56.4 L208.0,142.8 L230.7,133.2 L253.3,234.0 L276.0,238.8 L298.7,238.8 L321.3,248.4 L344.0,219.6M389.3,205.2 L412.0,162.0 L434.7,61.2 L457.3,70.8 L480.0,80.4 L502.7,219.6 L525.3,205.2 L548.0,176.4 L570.7,224.4 L593.3,253.2 L616.0,234.0 L616.0,306.0 L72.0,306.0 Z"/&gt;
&lt;path class="line" d="M72.0,224.4 L94.7,200.4 L117.3,181.2 L140.0,152.4 L162.7,90.0 L185.3,56.4 L208.0,142.8 L230.7,133.2 L253.3,234.0 L276.0,238.8 L298.7,238.8 L321.3,248.4 L344.0,219.6M389.3,205.2 L412.0,162.0 L434.7,61.2 L457.3,70.8 L480.0,80.4 L502.7,219.6 L525.3,205.2 L548.0,176.4 L570.7,224.4 L593.3,253.2 L616.0,234.0"/&gt;
&lt;circle class="end" cx="616.0" cy="234.0" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="224.4" r="9"&gt;&lt;title&gt;September 2024: 3.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="200.4" r="9"&gt;&lt;title&gt;October 2024: 4.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="181.2" r="9"&gt;&lt;title&gt;November 2024: 4.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="152.4" r="9"&gt;&lt;title&gt;December 2024: 5.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="90.0" r="9"&gt;&lt;title&gt;January 2025: 6.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="56.4" r="9"&gt;&lt;title&gt;February 2025: 7.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="142.8" r="9"&gt;&lt;title&gt;March 2025: 5.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="133.2" r="9"&gt;&lt;title&gt;April 2025: 5.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="234.0" r="9"&gt;&lt;title&gt;May 2025: 3.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="238.8" r="9"&gt;&lt;title&gt;June 2025: 3.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="238.8" r="9"&gt;&lt;title&gt;July 2025: 3.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="248.4" r="9"&gt;&lt;title&gt;August 2025: 3.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="219.6" r="9"&gt;&lt;title&gt;September 2025: 3.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="205.2" r="9"&gt;&lt;title&gt;November 2025: 4.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="162.0" r="9"&gt;&lt;title&gt;December 2025: 5.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="61.2" r="9"&gt;&lt;title&gt;January 2026: 7.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="70.8" r="9"&gt;&lt;title&gt;February 2026: 6.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="80.4" r="9"&gt;&lt;title&gt;March 2026: 6.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="219.6" r="9"&gt;&lt;title&gt;April 2026: 3.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="205.2" r="9"&gt;&lt;title&gt;May 2026: 4.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="176.4" r="9"&gt;&lt;title&gt;June 2026: 4.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="224.4" r="9"&gt;&lt;title&gt;July 2026: 3.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="253.2" r="9"&gt;&lt;title&gt;August 2026: 3.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="234.0" r="9"&gt;&lt;title&gt;September 2026: 3.5&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="238.0"&gt;3.5&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="227.0" y2="214.0"/&gt;
&lt;circle cx="616.0" cy="234.0" r="3.5"/&gt;&lt;text x="616.0" y="210.0" text-anchor="end"&gt;September 2026, 3.5&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;Construction unemployment was 3.5% in September, 0.3 point below a year earlier&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: value. Values range from 3 to 7.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="151.3" y2="151.3"/&gt;&lt;line x1="50" x2="276" y1="82.7" y2="82.7"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;2&lt;/text&gt;&lt;text x="42" y="154.8" text-anchor="end"&gt;4&lt;/text&gt;&lt;text x="42" y="86.2" text-anchor="end"&gt;6&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;8&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2025-09&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,161.6 L59.4,144.5 L68.8,130.7 L78.2,110.1 L87.7,65.5 L97.1,41.5 L106.5,103.3 L115.9,96.4 L125.3,168.5 L134.8,171.9 L144.2,171.9 L153.6,178.8 L163.0,158.2M181.8,147.9 L191.2,117.0 L200.7,44.9 L210.1,51.8 L219.5,58.6 L228.9,158.2 L238.3,147.9 L247.8,127.3 L257.2,161.6 L266.6,182.2 L276.0,168.5 L276.0,220.0 L50.0,220.0 Z"/&gt;
&lt;path class="line" d="M50.0,161.6 L59.4,144.5 L68.8,130.7 L78.2,110.1 L87.7,65.5 L97.1,41.5 L106.5,103.3 L115.9,96.4 L125.3,168.5 L134.8,171.9 L144.2,171.9 L153.6,178.8 L163.0,158.2M181.8,147.9 L191.2,117.0 L200.7,44.9 L210.1,51.8 L219.5,58.6 L228.9,158.2 L238.3,147.9 L247.8,127.3 L257.2,161.6 L266.6,182.2 L276.0,168.5"/&gt;
&lt;circle class="end" cx="276.0" cy="168.5" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="161.6" r="9"&gt;&lt;title&gt;September 2024: 3.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="144.5" r="9"&gt;&lt;title&gt;October 2024: 4.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="130.7" r="9"&gt;&lt;title&gt;November 2024: 4.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="110.1" r="9"&gt;&lt;title&gt;December 2024: 5.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="65.5" r="9"&gt;&lt;title&gt;January 2025: 6.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="41.5" r="9"&gt;&lt;title&gt;February 2025: 7.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="103.3" r="9"&gt;&lt;title&gt;March 2025: 5.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="96.4" r="9"&gt;&lt;title&gt;April 2025: 5.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="168.5" r="9"&gt;&lt;title&gt;May 2025: 3.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="171.9" r="9"&gt;&lt;title&gt;June 2025: 3.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="171.9" r="9"&gt;&lt;title&gt;July 2025: 3.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="178.8" r="9"&gt;&lt;title&gt;August 2025: 3.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="158.2" r="9"&gt;&lt;title&gt;September 2025: 3.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="147.9" r="9"&gt;&lt;title&gt;November 2025: 4.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="117.0" r="9"&gt;&lt;title&gt;December 2025: 5.0&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="44.9" r="9"&gt;&lt;title&gt;January 2026: 7.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="51.8" r="9"&gt;&lt;title&gt;February 2026: 6.9&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="58.6" r="9"&gt;&lt;title&gt;March 2026: 6.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="158.2" r="9"&gt;&lt;title&gt;April 2026: 3.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="147.9" r="9"&gt;&lt;title&gt;May 2026: 4.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="127.3" r="9"&gt;&lt;title&gt;June 2026: 4.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="161.6" r="9"&gt;&lt;title&gt;July 2026: 3.7&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="182.2" r="9"&gt;&lt;title&gt;August 2026: 3.1&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="168.5" r="9"&gt;&lt;title&gt;September 2026: 3.5&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="172.5"&gt;3.5&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="161.5" y2="148.5"/&gt;
&lt;circle cx="276.0" cy="168.5" r="3.5"/&gt;&lt;text x="276.0" y="132.5" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;September 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;3.5&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;The series has no value for October 2025.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/LNU04032231" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;U.S. construction unemployment rate, last 13 months, not seasonally adjusted&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Rate (%)&lt;/th&gt;&lt;th class="num"&gt;Change from prior month (pts)&lt;/th&gt;&lt;th class="num"&gt;Change from a year earlier (pts)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Sep 2025&lt;/td&gt;&lt;td class="num"&gt;3.8%&lt;/td&gt;&lt;td class="num"&gt;0.6&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oct 2025&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nov 2025&lt;/td&gt;&lt;td class="num"&gt;4.1%&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;-0.5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec 2025&lt;/td&gt;&lt;td class="num"&gt;5.0%&lt;/td&gt;&lt;td class="num"&gt;0.9&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jan 2026&lt;/td&gt;&lt;td class="num"&gt;7.1%&lt;/td&gt;&lt;td class="num"&gt;2.1&lt;/td&gt;&lt;td class="num"&gt;0.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb 2026&lt;/td&gt;&lt;td class="num"&gt;6.9%&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mar 2026&lt;/td&gt;&lt;td class="num"&gt;6.7%&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;&lt;td class="num"&gt;1.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Apr 2026&lt;/td&gt;&lt;td class="num"&gt;3.8%&lt;/td&gt;&lt;td class="num"&gt;-2.9&lt;/td&gt;&lt;td class="num"&gt;-1.8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;4.1%&lt;/td&gt;&lt;td class="num"&gt;0.3&lt;/td&gt;&lt;td class="num"&gt;0.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jun 2026&lt;/td&gt;&lt;td class="num"&gt;4.7%&lt;/td&gt;&lt;td class="num"&gt;0.6&lt;/td&gt;&lt;td class="num"&gt;1.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jul 2026&lt;/td&gt;&lt;td class="num"&gt;3.7%&lt;/td&gt;&lt;td class="num"&gt;-1.0&lt;/td&gt;&lt;td class="num"&gt;0.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aug 2026&lt;/td&gt;&lt;td class="num"&gt;3.1%&lt;/td&gt;&lt;td class="num"&gt;-0.6&lt;/td&gt;&lt;td class="num"&gt;-0.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Sep 2026&lt;/td&gt;&lt;td class="num"&gt;3.5%&lt;/td&gt;&lt;td class="num"&gt;0.4&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/LNU04032231" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Without seasonal adjustment, the rate generally rises in the fall and winter and falls in late spring and summer, ABC&amp;rsquo;s background note explains, so the September-to-September comparison is the one to read. The 0.4-point rise from August is smaller than last year&amp;rsquo;s, when the rate went from 3.2% in August 2025 to 3.8% in September.&lt;/p&gt;
&lt;h2 id="what-moved"&gt;What moved&lt;/h2&gt;
&lt;p&gt;BLS Table A-14 counts 359,000 unemployed construction workers in September 2026, down from 404,000 a year earlier. A worker is counted as unemployed in construction if construction was the last industry they worked in and they looked for work in the prior four weeks.&lt;/p&gt;
&lt;p&gt;ABC&amp;rsquo;s state numbers are estimates. BLS publishes a monthly construction unemployment rate only for the nation, so Markstein Advisors runs a model on state employment and unemployment data to produce one for each state.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Estimated construction unemployment rates by state, not seasonally adjusted, ranked lowest to highest for September 2026. *Delaware and Hawaii include mining and logging.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;State&lt;/th&gt;&lt;th&gt;Census division&lt;/th&gt;&lt;th class="num"&gt;Sep 2019 (%)&lt;/th&gt;&lt;th class="num"&gt;Sep 2025 (%)&lt;/th&gt;&lt;th class="num"&gt;Aug 2026 (%)&lt;/th&gt;&lt;th class="num"&gt;Sep 2026 (%)&lt;/th&gt;&lt;th class="num"&gt;Change from Sep 2025 (pts)&lt;/th&gt;&lt;th class="num"&gt;Change from Sep 2019 (pts)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Maryland&lt;/td&gt;&lt;td&gt;South Atlantic&lt;/td&gt;&lt;td class="num"&gt;4.7%&lt;/td&gt;&lt;td class="num"&gt;2.1%&lt;/td&gt;&lt;td class="num"&gt;1.7%&lt;/td&gt;&lt;td class="num"&gt;1.7%&lt;/td&gt;&lt;td class="num"&gt;-0.4&lt;/td&gt;&lt;td class="num"&gt;-3.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;North Carolina&lt;/td&gt;&lt;td&gt;South Atlantic&lt;/td&gt;&lt;td class="num"&gt;1.6%&lt;/td&gt;&lt;td class="num"&gt;2.2%&lt;/td&gt;&lt;td class="num"&gt;1.6%&lt;/td&gt;&lt;td class="num"&gt;1.8%&lt;/td&gt;&lt;td class="num"&gt;-0.4&lt;/td&gt;&lt;td class="num"&gt;0.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Georgia&lt;/td&gt;&lt;td&gt;South Atlantic&lt;/td&gt;&lt;td class="num"&gt;1.9%&lt;/td&gt;&lt;td class="num"&gt;2.0%&lt;/td&gt;&lt;td class="num"&gt;1.8%&lt;/td&gt;&lt;td class="num"&gt;2.1%&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;&lt;td class="num"&gt;0.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Tennessee&lt;/td&gt;&lt;td&gt;East South Central&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;2.4%&lt;/td&gt;&lt;td class="num"&gt;2.0%&lt;/td&gt;&lt;td class="num"&gt;2.1%&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;South Carolina&lt;/td&gt;&lt;td&gt;South Atlantic&lt;/td&gt;&lt;td class="num"&gt;1.5%&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;2.2%&lt;/td&gt;&lt;td class="num"&gt;-0.5&lt;/td&gt;&lt;td class="num"&gt;0.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Utah&lt;/td&gt;&lt;td&gt;Mountain&lt;/td&gt;&lt;td class="num"&gt;1.6%&lt;/td&gt;&lt;td class="num"&gt;2.6%&lt;/td&gt;&lt;td class="num"&gt;2.1%&lt;/td&gt;&lt;td class="num"&gt;2.2%&lt;/td&gt;&lt;td class="num"&gt;-0.4&lt;/td&gt;&lt;td class="num"&gt;0.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Florida&lt;/td&gt;&lt;td&gt;South Atlantic&lt;/td&gt;&lt;td class="num"&gt;2.2%&lt;/td&gt;&lt;td class="num"&gt;2.4%&lt;/td&gt;&lt;td class="num"&gt;2.2%&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;-0.1&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;New Hampshire&lt;/td&gt;&lt;td&gt;New England&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;4.6%&lt;/td&gt;&lt;td class="num"&gt;3.4%&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;-2.3&lt;/td&gt;&lt;td class="num"&gt;0.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Alabama&lt;/td&gt;&lt;td&gt;East South Central&lt;/td&gt;&lt;td class="num"&gt;3.0%&lt;/td&gt;&lt;td class="num"&gt;2.2%&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;0.5&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Idaho&lt;/td&gt;&lt;td&gt;Mountain&lt;/td&gt;&lt;td class="num"&gt;3.1%&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;1.9%&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;0.0&lt;/td&gt;&lt;td class="num"&gt;-0.4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Indiana&lt;/td&gt;&lt;td&gt;East North Central&lt;/td&gt;&lt;td class="num"&gt;4.0%&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;2.2%&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;0.0&lt;/td&gt;&lt;td class="num"&gt;-1.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Rhode Island&lt;/td&gt;&lt;td&gt;New England&lt;/td&gt;&lt;td class="num"&gt;7.1%&lt;/td&gt;&lt;td class="num"&gt;4.0%&lt;/td&gt;&lt;td class="num"&gt;3.3%&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;-1.3&lt;/td&gt;&lt;td class="num"&gt;-4.4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Iowa&lt;/td&gt;&lt;td&gt;West North Central&lt;/td&gt;&lt;td class="num"&gt;4.3%&lt;/td&gt;&lt;td class="num"&gt;3.0%&lt;/td&gt;&lt;td class="num"&gt;2.5%&lt;/td&gt;&lt;td class="num"&gt;2.9%&lt;/td&gt;&lt;td class="num"&gt;-0.1&lt;/td&gt;&lt;td class="num"&gt;-1.4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Maine&lt;/td&gt;&lt;td&gt;New England&lt;/td&gt;&lt;td class="num"&gt;4.2%&lt;/td&gt;&lt;td class="num"&gt;2.8%&lt;/td&gt;&lt;td class="num"&gt;2.1%&lt;/td&gt;&lt;td class="num"&gt;2.9%&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;&lt;td class="num"&gt;-1.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Missouri&lt;/td&gt;&lt;td&gt;West North Central&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;3.2%&lt;/td&gt;&lt;td class="num"&gt;2.6%&lt;/td&gt;&lt;td class="num"&gt;3.0%&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;&lt;td class="num"&gt;0.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ohio&lt;/td&gt;&lt;td&gt;East North Central&lt;/td&gt;&lt;td class="num"&gt;5.5%&lt;/td&gt;&lt;td class="num"&gt;3.7%&lt;/td&gt;&lt;td class="num"&gt;2.1%&lt;/td&gt;&lt;td class="num"&gt;3.0%&lt;/td&gt;&lt;td class="num"&gt;-0.7&lt;/td&gt;&lt;td class="num"&gt;-2.5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oregon&lt;/td&gt;&lt;td&gt;Pacific&lt;/td&gt;&lt;td class="num"&gt;3.3%&lt;/td&gt;&lt;td class="num"&gt;4.1%&lt;/td&gt;&lt;td class="num"&gt;3.0%&lt;/td&gt;&lt;td class="num"&gt;3.0%&lt;/td&gt;&lt;td class="num"&gt;-1.1&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Vermont&lt;/td&gt;&lt;td&gt;New England&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;3.5%&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;3.1%&lt;/td&gt;&lt;td class="num"&gt;-0.4&lt;/td&gt;&lt;td class="num"&gt;0.4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;California&lt;/td&gt;&lt;td&gt;Pacific&lt;/td&gt;&lt;td class="num"&gt;3.2%&lt;/td&gt;&lt;td class="num"&gt;3.6%&lt;/td&gt;&lt;td class="num"&gt;2.8%&lt;/td&gt;&lt;td class="num"&gt;3.2%&lt;/td&gt;&lt;td class="num"&gt;-0.4&lt;/td&gt;&lt;td class="num"&gt;0.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Pennsylvania&lt;/td&gt;&lt;td&gt;Middle Atlantic&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;4.4%&lt;/td&gt;&lt;td class="num"&gt;3.6%&lt;/td&gt;&lt;td class="num"&gt;3.3%&lt;/td&gt;&lt;td class="num"&gt;-1.1&lt;/td&gt;&lt;td class="num"&gt;0.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nebraska&lt;/td&gt;&lt;td&gt;West North Central&lt;/td&gt;&lt;td class="num"&gt;2.6%&lt;/td&gt;&lt;td class="num"&gt;4.4%&lt;/td&gt;&lt;td class="num"&gt;2.8%&lt;/td&gt;&lt;td class="num"&gt;3.5%&lt;/td&gt;&lt;td class="num"&gt;-0.9&lt;/td&gt;&lt;td class="num"&gt;0.9&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Colorado&lt;/td&gt;&lt;td&gt;Mountain&lt;/td&gt;&lt;td class="num"&gt;1.9%&lt;/td&gt;&lt;td class="num"&gt;3.7%&lt;/td&gt;&lt;td class="num"&gt;3.5%&lt;/td&gt;&lt;td class="num"&gt;3.6%&lt;/td&gt;&lt;td class="num"&gt;-0.1&lt;/td&gt;&lt;td class="num"&gt;1.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nevada&lt;/td&gt;&lt;td&gt;Mountain&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;3.9%&lt;/td&gt;&lt;td class="num"&gt;2.2%&lt;/td&gt;&lt;td class="num"&gt;3.6%&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;&lt;td class="num"&gt;0.9&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Wisconsin&lt;/td&gt;&lt;td&gt;East North Central&lt;/td&gt;&lt;td class="num"&gt;4.0%&lt;/td&gt;&lt;td class="num"&gt;3.0%&lt;/td&gt;&lt;td class="num"&gt;2.1%&lt;/td&gt;&lt;td class="num"&gt;3.6%&lt;/td&gt;&lt;td class="num"&gt;0.6&lt;/td&gt;&lt;td class="num"&gt;-0.4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Kansas&lt;/td&gt;&lt;td&gt;West North Central&lt;/td&gt;&lt;td class="num"&gt;3.3%&lt;/td&gt;&lt;td class="num"&gt;4.0%&lt;/td&gt;&lt;td class="num"&gt;3.6%&lt;/td&gt;&lt;td class="num"&gt;3.7%&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;&lt;td class="num"&gt;0.4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Washington&lt;/td&gt;&lt;td&gt;Pacific&lt;/td&gt;&lt;td class="num"&gt;4.7%&lt;/td&gt;&lt;td class="num"&gt;4.1%&lt;/td&gt;&lt;td class="num"&gt;3.3%&lt;/td&gt;&lt;td class="num"&gt;3.7%&lt;/td&gt;&lt;td class="num"&gt;-0.4&lt;/td&gt;&lt;td class="num"&gt;-1.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Arkansas&lt;/td&gt;&lt;td&gt;West South Central&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;4.3%&lt;/td&gt;&lt;td class="num"&gt;3.2%&lt;/td&gt;&lt;td class="num"&gt;3.8%&lt;/td&gt;&lt;td class="num"&gt;-0.5&lt;/td&gt;&lt;td class="num"&gt;1.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mississippi&lt;/td&gt;&lt;td&gt;East South Central&lt;/td&gt;&lt;td class="num"&gt;4.4%&lt;/td&gt;&lt;td class="num"&gt;4.1%&lt;/td&gt;&lt;td class="num"&gt;2.6%&lt;/td&gt;&lt;td class="num"&gt;3.8%&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;&lt;td class="num"&gt;-0.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;New Jersey&lt;/td&gt;&lt;td&gt;Middle Atlantic&lt;/td&gt;&lt;td class="num"&gt;2.1%&lt;/td&gt;&lt;td class="num"&gt;5.1%&lt;/td&gt;&lt;td class="num"&gt;3.6%&lt;/td&gt;&lt;td class="num"&gt;3.8%&lt;/td&gt;&lt;td class="num"&gt;-1.3&lt;/td&gt;&lt;td class="num"&gt;1.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Kentucky&lt;/td&gt;&lt;td&gt;East South Central&lt;/td&gt;&lt;td class="num"&gt;4.4%&lt;/td&gt;&lt;td class="num"&gt;3.7%&lt;/td&gt;&lt;td class="num"&gt;2.9%&lt;/td&gt;&lt;td class="num"&gt;3.9%&lt;/td&gt;&lt;td class="num"&gt;0.2&lt;/td&gt;&lt;td class="num"&gt;-0.5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Illinois&lt;/td&gt;&lt;td&gt;East North Central&lt;/td&gt;&lt;td class="num"&gt;2.9%&lt;/td&gt;&lt;td class="num"&gt;4.5%&lt;/td&gt;&lt;td class="num"&gt;3.8%&lt;/td&gt;&lt;td class="num"&gt;4.0%&lt;/td&gt;&lt;td class="num"&gt;-0.5&lt;/td&gt;&lt;td class="num"&gt;1.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;South Dakota&lt;/td&gt;&lt;td&gt;West North Central&lt;/td&gt;&lt;td class="num"&gt;2.5%&lt;/td&gt;&lt;td class="num"&gt;2.6%&lt;/td&gt;&lt;td class="num"&gt;3.2%&lt;/td&gt;&lt;td class="num"&gt;4.1%&lt;/td&gt;&lt;td class="num"&gt;1.5&lt;/td&gt;&lt;td class="num"&gt;1.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Texas&lt;/td&gt;&lt;td&gt;West South Central&lt;/td&gt;&lt;td class="num"&gt;2.5%&lt;/td&gt;&lt;td class="num"&gt;4.2%&lt;/td&gt;&lt;td class="num"&gt;3.6%&lt;/td&gt;&lt;td class="num"&gt;4.1%&lt;/td&gt;&lt;td class="num"&gt;-0.1&lt;/td&gt;&lt;td class="num"&gt;1.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Montana&lt;/td&gt;&lt;td&gt;Mountain&lt;/td&gt;&lt;td class="num"&gt;3.1%&lt;/td&gt;&lt;td class="num"&gt;4.9%&lt;/td&gt;&lt;td class="num"&gt;2.8%&lt;/td&gt;&lt;td class="num"&gt;4.2%&lt;/td&gt;&lt;td class="num"&gt;-0.7&lt;/td&gt;&lt;td class="num"&gt;1.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Virginia&lt;/td&gt;&lt;td&gt;South Atlantic&lt;/td&gt;&lt;td class="num"&gt;3.5%&lt;/td&gt;&lt;td class="num"&gt;4.0%&lt;/td&gt;&lt;td class="num"&gt;3.3%&lt;/td&gt;&lt;td class="num"&gt;4.2%&lt;/td&gt;&lt;td class="num"&gt;0.2&lt;/td&gt;&lt;td class="num"&gt;0.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Delaware*&lt;/td&gt;&lt;td&gt;South Atlantic&lt;/td&gt;&lt;td class="num"&gt;2.3%&lt;/td&gt;&lt;td class="num"&gt;4.8%&lt;/td&gt;&lt;td class="num"&gt;3.7%&lt;/td&gt;&lt;td class="num"&gt;4.3%&lt;/td&gt;&lt;td class="num"&gt;-0.5&lt;/td&gt;&lt;td class="num"&gt;2.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Louisiana&lt;/td&gt;&lt;td&gt;West South Central&lt;/td&gt;&lt;td class="num"&gt;3.8%&lt;/td&gt;&lt;td class="num"&gt;5.6%&lt;/td&gt;&lt;td class="num"&gt;3.4%&lt;/td&gt;&lt;td class="num"&gt;4.3%&lt;/td&gt;&lt;td class="num"&gt;-1.3&lt;/td&gt;&lt;td class="num"&gt;0.5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;New Mexico&lt;/td&gt;&lt;td&gt;Mountain&lt;/td&gt;&lt;td class="num"&gt;4.2%&lt;/td&gt;&lt;td class="num"&gt;4.3%&lt;/td&gt;&lt;td class="num"&gt;3.8%&lt;/td&gt;&lt;td class="num"&gt;4.3%&lt;/td&gt;&lt;td class="num"&gt;0.0&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oklahoma&lt;/td&gt;&lt;td&gt;West South Central&lt;/td&gt;&lt;td class="num"&gt;2.2%&lt;/td&gt;&lt;td class="num"&gt;4.2%&lt;/td&gt;&lt;td class="num"&gt;4.1%&lt;/td&gt;&lt;td class="num"&gt;4.3%&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;&lt;td class="num"&gt;2.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Hawaii*&lt;/td&gt;&lt;td&gt;Pacific&lt;/td&gt;&lt;td class="num"&gt;6.1%&lt;/td&gt;&lt;td class="num"&gt;2.7%&lt;/td&gt;&lt;td class="num"&gt;3.3%&lt;/td&gt;&lt;td class="num"&gt;4.4%&lt;/td&gt;&lt;td class="num"&gt;1.7&lt;/td&gt;&lt;td class="num"&gt;-1.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Arizona&lt;/td&gt;&lt;td&gt;Mountain&lt;/td&gt;&lt;td class="num"&gt;4.3%&lt;/td&gt;&lt;td class="num"&gt;4.8%&lt;/td&gt;&lt;td class="num"&gt;4.2%&lt;/td&gt;&lt;td class="num"&gt;4.5%&lt;/td&gt;&lt;td class="num"&gt;-0.3&lt;/td&gt;&lt;td class="num"&gt;0.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;West Virginia&lt;/td&gt;&lt;td&gt;South Atlantic&lt;/td&gt;&lt;td class="num"&gt;5.3%&lt;/td&gt;&lt;td class="num"&gt;4.6%&lt;/td&gt;&lt;td class="num"&gt;4.2%&lt;/td&gt;&lt;td class="num"&gt;4.7%&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;&lt;td class="num"&gt;-0.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;New York&lt;/td&gt;&lt;td&gt;Middle Atlantic&lt;/td&gt;&lt;td class="num"&gt;4.2%&lt;/td&gt;&lt;td class="num"&gt;5.0%&lt;/td&gt;&lt;td class="num"&gt;4.0%&lt;/td&gt;&lt;td class="num"&gt;4.8%&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;&lt;td class="num"&gt;0.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Connecticut&lt;/td&gt;&lt;td&gt;New England&lt;/td&gt;&lt;td class="num"&gt;2.1%&lt;/td&gt;&lt;td class="num"&gt;4.1%&lt;/td&gt;&lt;td class="num"&gt;3.7%&lt;/td&gt;&lt;td class="num"&gt;5.0%&lt;/td&gt;&lt;td class="num"&gt;0.9&lt;/td&gt;&lt;td class="num"&gt;2.9&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Wyoming&lt;/td&gt;&lt;td&gt;Mountain&lt;/td&gt;&lt;td class="num"&gt;4.3%&lt;/td&gt;&lt;td class="num"&gt;7.1%&lt;/td&gt;&lt;td class="num"&gt;3.7%&lt;/td&gt;&lt;td class="num"&gt;5.2%&lt;/td&gt;&lt;td class="num"&gt;-1.9&lt;/td&gt;&lt;td class="num"&gt;0.9&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Massachusetts&lt;/td&gt;&lt;td&gt;New England&lt;/td&gt;&lt;td class="num"&gt;3.7%&lt;/td&gt;&lt;td class="num"&gt;5.7%&lt;/td&gt;&lt;td class="num"&gt;4.6%&lt;/td&gt;&lt;td class="num"&gt;5.5%&lt;/td&gt;&lt;td class="num"&gt;-0.2&lt;/td&gt;&lt;td class="num"&gt;1.8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Michigan&lt;/td&gt;&lt;td&gt;East North Central&lt;/td&gt;&lt;td class="num"&gt;5.4%&lt;/td&gt;&lt;td class="num"&gt;5.8%&lt;/td&gt;&lt;td class="num"&gt;5.2%&lt;/td&gt;&lt;td class="num"&gt;5.8%&lt;/td&gt;&lt;td class="num"&gt;0.0&lt;/td&gt;&lt;td class="num"&gt;0.4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Minnesota&lt;/td&gt;&lt;td&gt;West North Central&lt;/td&gt;&lt;td class="num"&gt;4.5%&lt;/td&gt;&lt;td class="num"&gt;5.8%&lt;/td&gt;&lt;td class="num"&gt;5.2%&lt;/td&gt;&lt;td class="num"&gt;6.7%&lt;/td&gt;&lt;td class="num"&gt;0.9&lt;/td&gt;&lt;td class="num"&gt;2.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Alaska&lt;/td&gt;&lt;td&gt;Pacific&lt;/td&gt;&lt;td class="num"&gt;8.8%&lt;/td&gt;&lt;td class="num"&gt;6.3%&lt;/td&gt;&lt;td class="num"&gt;3.2%&lt;/td&gt;&lt;td class="num"&gt;7.5%&lt;/td&gt;&lt;td class="num"&gt;1.2&lt;/td&gt;&lt;td class="num"&gt;-1.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;North Dakota&lt;/td&gt;&lt;td&gt;West North Central&lt;/td&gt;&lt;td class="num"&gt;4.5%&lt;/td&gt;&lt;td class="num"&gt;3.9%&lt;/td&gt;&lt;td class="num"&gt;7.0%&lt;/td&gt;&lt;td class="num"&gt;9.5%&lt;/td&gt;&lt;td class="num"&gt;5.6&lt;/td&gt;&lt;td class="num"&gt;5.0&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.abc.org/Portals/1/CEU/State%20Construction%20UR%20Tables_ABC_Sep%202026%20Data.xlsx?ver=ax63AlmcMXYj2XJEH2gJ9A%3d%3d" rel="noopener"&gt;abc.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The low end is mostly the Southeast. After Maryland come North Carolina at 1.8%, Georgia and Tennessee at 2.1%, and South Carolina and Utah at 2.2%. ABC says Maryland&amp;rsquo;s 1.7% is its lowest September reading on record, and North Carolina and Tennessee had their second-lowest.&lt;/p&gt;
&lt;p&gt;The high end is the Upper Midwest, plus Alaska and Massachusetts. North Dakota (9.5%), Alaska (7.5%), Minnesota (6.7%), Michigan (5.8%) and Massachusetts (5.5%) have the five highest estimates. North Dakota is the outlier in the year-over-year column too, up 5.6 points from 3.9% in September 2025. No other state rose more than 1.7 points (Hawaii, where the estimate also counts mining and logging). Alaska&amp;rsquo;s estimate more than doubled in a month, from 3.2% in August to 7.5%, though it was 6.3% in September 2025, so the year-over-year rise is 1.2 points.&lt;/p&gt;
&lt;p&gt;Counted from ABC&amp;rsquo;s spreadsheet, 32 states had a lower estimated rate than in September 2025, 14 had a higher one and four were unchanged. The monthly count leans the other way. ABC reports that 44 states rose from August to September, four fell (New Hampshire, Pennsylvania, Rhode Island and South Carolina) and two were flat (Maryland and Oregon).&lt;/p&gt;
&lt;p&gt;So the comparison point matters. ABC says 39 states are below their February 2020 rates. Compared with September 2019, the same month before the pandemic, 17 states are lower, 31 are higher and California and New Hampshire are unchanged.&lt;/p&gt;
&lt;p&gt;ABC also notes that payroll construction employment, which comes from a separate survey of employers, was 103,000 higher than in September 2025 before seasonal adjustment, and 8.4 million after it. Bernard Markstein, who ran the analysis, pointed to large projects as one cause: &amp;ldquo;Data center construction is also absorbing a significant share of available skilled labor and contributing to elevated building materials prices.&amp;rdquo; The state tables do not split the unemployed by project type, so that link is his reading of the market.&lt;/p&gt;
&lt;h2 id="how-to-use-this-number"&gt;How to use this number&lt;/h2&gt;
&lt;p&gt;The state estimate is a rough measure of how many idle, experienced construction workers are in the labor pool where you hire. Two practical uses:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Before you price labor-heavy work in another state, look up its September rate and its change from a year ago. A rate near 2%, as in Maryland, the Carolinas, Georgia or Tennessee, means few experienced workers are looking. If you plan to hire locally there, budget for higher wages or for travel and per diem to bring crews in. A rate above 5% with a rising trend points to more local applicants.&lt;/li&gt;
&lt;li&gt;Track your own time to fill field positions, in calendar days from posting to start date, by state. If your time to fill in a state stays flat while its estimated rate fell by a point over the year, your recruiting is holding up against a tighter market. If both move the wrong way, raise your wage assumptions on the next bid there.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;For both uses, compare a month with the same month a year earlier.&lt;/p&gt;
&lt;h2 id="revisions-and-caveats"&gt;Revisions and caveats&lt;/h2&gt;
&lt;p&gt;The national rate comes from the Current Population Survey, the monthly household survey that ABC&amp;rsquo;s background note puts at roughly 60,000 households. The prior month was not revised. August&amp;rsquo;s 3.1% was the same in the September 4 and October 2 versions of the series in ALFRED, the St. Louis Fed&amp;rsquo;s archive of past data versions. BLS introduces new population controls each January, and the A-14 table notes that 2025 data use a new industry classification and are not strictly comparable with earlier years. That limits how much weight the 2019 comparisons can carry.&lt;/p&gt;
&lt;p&gt;The construction rate also comes from a small subset of the survey, so it has more sampling error than the overall rate. ABC&amp;rsquo;s background note says a monthly move may come from sampling error and that a sustained trend over several months is more reliable.&lt;/p&gt;
&lt;p&gt;The state figures carry two more layers of uncertainty. They are model estimates, and Markstein Advisors updates past months when states revise their employment data, so a state&amp;rsquo;s August or September value can change next month. Delaware and Hawaii are estimated for construction, mining and logging combined. For a small state such as North Dakota or Alaska, treat a single month&amp;rsquo;s jump as a reading to confirm against October&amp;rsquo;s estimate.&lt;/p&gt;</content:encoded></item><item><title>NCC makes Buildots a preferred supplier after AI progress tracking lifted one project's Percent Plan Complete 2.3 times</title><link>https://constructionmetrics.com/2026/10/31/ncc-buildots-preferred-supplier-plan-complete/</link><pubDate>Sat, 31 Oct 2026 07:34:22 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/31/ncc-buildots-preferred-supplier-plan-complete/</guid><category>AI</category><description>Buildots compares 360-degree site captures with the 3D model and schedule, and NCC's Nordic building unit has signed it as a preferred supplier.</description><content:encoded>&lt;p&gt;Buildots announced on October 28, 2026, that NCC&amp;rsquo;s Building Nordics business, which builds in Denmark, Finland and Norway, has signed a master services agreement naming Buildots a preferred supplier. Buildots sells AI progress tracking. The software compares what was installed on site with the 3D model and the schedule. The agreement follows several years of NCC projects in Finland and Denmark, and it affects the weekly progress check and the trade planning meeting that depends on it.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;On most jobs, a superintendent or project engineer collects progress by walking the floors and asking each trade where it stands. Before Buildots, NCC says in its case study, project managers judged progress from manual, subjective reports collected from third parties.&lt;/p&gt;
&lt;p&gt;With Buildots, a site team member walks the job wearing a 360-degree camera. Computer vision, software that recognizes objects in images, matches each captured element to the 3D model. Buildots then compares that status with the schedule and reports progress by trade and by area. NCC&amp;rsquo;s teams used a matrix view that showed, floor by floor and zone by zone, the percent complete for activities such as HVAC pipes, cable tray and first-fix plumbing.&lt;/p&gt;
&lt;p&gt;The output goes into the weekly trade meeting. In one example from the case study, Buildots counted 45 climate beam units still uninstalled out of 150 expected by that date, while the trade&amp;rsquo;s own report said only a few were left. On another NCC job, the data showed HVAC work running slower than planned, and the project manager and HVAC subcontractor agreed to add labor.&lt;/p&gt;
&lt;aside class="note"&gt;Percent Plan Complete, or PPC, comes from the Last Planner System. It is the share of tasks a crew committed to for the week that were finished that week. The Lean Construction Institute says that, on average, only 54% of the work planned for a given week gets done within the allotted schedule.&lt;/aside&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Buildots&amp;rsquo; press release, two Buildots case studies, a Buildots blog post, and comments from NCC staff quoted in those documents. Bricks &amp;amp; Bytes, a construction technology newsletter, labels the headline figure company-reported and not independently verified.&lt;/p&gt;
&lt;p&gt;These claims come from Buildots and NCC:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;NCC piloted Buildots on an 8,000-square-meter residential project in Helsinki. It then added three more projects, among them the 9,000-square-meter Fredriksberg D project and a hospital, for 68,500 square meters (737,000 square feet) tracked.&lt;/li&gt;
&lt;li&gt;Tasks finished on time, measured by PPC, rose 2.3 times. The blog post puts it as a rise from a 30% baseline on past projects to almost 70%.&lt;/li&gt;
&lt;li&gt;Time spent on manual reporting fell 70%.&lt;/li&gt;
&lt;li&gt;A later case study covers six Finnish projects with 172,000 square meters of construction area, and says weekly PPC ratios improved over time.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The release describes the PPC gain on one project as a 230% increase. The case study figures, 30% to almost 70%, work out to a ratio of 2.3, which is an increase of about 130%. The table below shows PPC readings at points through the job, as Buildots charts them in the case study.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;PPC on the NCC Buildots project compared with NCC&amp;#39;s traditionally managed projects, by share of project complete&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th class="num"&gt;Share of project complete&lt;/th&gt;&lt;th class="num"&gt;PPC managed traditionally (%)&lt;/th&gt;&lt;th class="num"&gt;PPC managed with Buildots (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td class="num"&gt;35%&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;52&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;40%&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;57&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;45%&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;71&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;50%&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;37&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;55%&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;32&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;60%&lt;/td&gt;&lt;td class="num"&gt;31&lt;/td&gt;&lt;td class="num"&gt;57&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;65%&lt;/td&gt;&lt;td class="num"&gt;22&lt;/td&gt;&lt;td class="num"&gt;72&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;70%&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;81&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;75%&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;90&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;80%&lt;/td&gt;&lt;td class="num"&gt;22&lt;/td&gt;&lt;td class="num"&gt;96&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://pages.buildots.com/hubfs/Use-Cases/NCC/NCC-Use-Case.pdf?hsLang=en" rel="noopener"&gt;pages.buildots.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The Buildots line falls to 37% and 32% at the 50% and 55% marks, then rises to 96%. The cause of the dip and the number of projects behind the traditional line are not stated in the case study. NCC compared Buildots with three alternatives before choosing it, according to the case study.&lt;/p&gt;
&lt;p&gt;Kati Tauriainen, who heads NCC&amp;rsquo;s Building Finland division, said in the release: &amp;ldquo;Our experience using Buildots on live projects gave us the evidence we needed.&amp;rdquo; NCC service manager Nithesh Frei Nadarajah says in the case study that his team spends less time in meetings and arguing with subcontractors.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track weekly PPC by trade. Divide the number of tasks finished as committed by the number each foreman committed to in the weekly work plan. A task that is 90% done counts as not done. Record the reason for every miss, such as an open RFI, a late delivery or a predecessor trade that has not released the area.&lt;/p&gt;
&lt;p&gt;Capture at least six weeks of baseline before the pilot starts, on the same job if you can. Log two other figures alongside it. The first is the hours the superintendent and project engineers spend each week collecting and writing up progress. The second is the number of times a trade&amp;rsquo;s reported percent complete differed from what a walk found. Score PPC by the same rule during the pilot, so any change can be traced to the tool. Our post on &lt;a href="https://constructionmetrics.com/2026/10/12/track-total-float-across-schedule-updates/"&gt;tracking total float across schedule updates&lt;/a&gt; covers the next step, since float shows how many days the misses cost.&lt;/p&gt;
&lt;p&gt;A first step on one job: have the superintendent score last week&amp;rsquo;s lookahead commitments as done or not done, and keep that sheet every Friday.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;The agreement covers NCC Building Nordics operations in Denmark, Finland and Norway. Buildots says its other customers include HOCHTIEF, Bouygues, Intel and VINCI Construction. Prices are not listed in the release, and Buildots&amp;rsquo; case study pages send buyers to a demo request. For a competitor that publishes per-square-foot pricing, see our post on &lt;a href="https://constructionmetrics.com/2026/10/12/track3d-progress-tracking-price-per-square-foot/"&gt;Track3D&amp;rsquo;s progress tracking&lt;/a&gt;.&lt;/p&gt;</content:encoded></item><item><title>How to compute average annual receipts for the SBA size standard, with a $45 million general contractor example</title><link>https://constructionmetrics.com/2026/10/30/compute-average-annual-receipts-sba-size-standard/</link><pubDate>Fri, 30 Oct 2026 11:34:03 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/30/compute-average-annual-receipts-sba-size-standard/</guid><category>Data</category><description>SBA averages five years of receipts, subcontractor costs included, to decide if a contractor is small. This example tracks a GC near the $45 million line.</description><content:encoded>&lt;p&gt;Before a contractor bids a federal small business set-aside, someone in the office certifies that the company is small. That person is usually the CFO or controller, and the test is a single figure called average annual receipts, compared against a dollar limit the Small Business Administration (SBA) sets for each industry code.&lt;/p&gt;
&lt;p&gt;The rules are in Title 13 of the Code of Federal Regulations, which the eCFR shows as current through October 28, 2026. Section 121.104 defines receipts and the averaging period. Section 121.201 lists the limits, and section 121.404 sets the date the test applies. This post walks through each and then runs the numbers for a growing general contractor.&lt;/p&gt;
&lt;h2 id="the-limits-for-construction"&gt;The limits for construction&lt;/h2&gt;
&lt;p&gt;SBA assigns a size standard to every six-digit NAICS code, the federal industry classification. For construction it is a ceiling on average annual receipts. The general contracting and heavy civil codes share one figure, and most specialty trades share a lower one.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Selected SBA size standards for NAICS Sector 23, Construction, as listed in 13 CFR 121.201.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;NAICS code&lt;/th&gt;&lt;th&gt;Industry&lt;/th&gt;&lt;th class="num"&gt;Size standard ($ millions)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;236115 to 236118&lt;/td&gt;&lt;td&gt;New housing construction and residential remodelers&lt;/td&gt;&lt;td class="num"&gt;45.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;236210&lt;/td&gt;&lt;td&gt;Industrial Building Construction&lt;/td&gt;&lt;td class="num"&gt;45.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;236220&lt;/td&gt;&lt;td&gt;Commercial and Institutional Building Construction&lt;/td&gt;&lt;td class="num"&gt;45.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;237110&lt;/td&gt;&lt;td&gt;Water and Sewer Line and Related Structures Construction&lt;/td&gt;&lt;td class="num"&gt;45.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;237130&lt;/td&gt;&lt;td&gt;Power and Communication Line and Related Structures Construction&lt;/td&gt;&lt;td class="num"&gt;45.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;237310&lt;/td&gt;&lt;td&gt;Highway, Street, and Bridge Construction&lt;/td&gt;&lt;td class="num"&gt;45.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;237990&lt;/td&gt;&lt;td&gt;Other Heavy and Civil Engineering Construction&lt;/td&gt;&lt;td class="num"&gt;45.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;237210&lt;/td&gt;&lt;td&gt;Land Subdivision&lt;/td&gt;&lt;td class="num"&gt;34.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;238210&lt;/td&gt;&lt;td&gt;Electrical Contractors and Other Wiring Installation Contractors&lt;/td&gt;&lt;td class="num"&gt;19.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;238220&lt;/td&gt;&lt;td&gt;Plumbing, Heating, and Air-Conditioning Contractors&lt;/td&gt;&lt;td class="num"&gt;19.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;238290&lt;/td&gt;&lt;td&gt;Other Building Equipment Contractors&lt;/td&gt;&lt;td class="num"&gt;22.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;238910&lt;/td&gt;&lt;td&gt;Site Preparation Contractors&lt;/td&gt;&lt;td class="num"&gt;19.0&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.ecfr.gov/current/title-13/section-121.201" rel="noopener"&gt;ecfr.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The code that counts is the one the contracting officer puts on the solicitation. Section 121.404 says the company, with its affiliates, must qualify under the NAICS code assigned to the contract. For example, an electrical contractor that averages $30 million is over the $19.0 million limit for 238210, and it is still under the $45.0 million limit when a solicitation carries 236220.&lt;/p&gt;
&lt;h2 id="what-counts-as-receipts"&gt;What counts as receipts&lt;/h2&gt;
&lt;p&gt;Section 121.104 defines receipts as all revenue from any source, less returns and allowances. SBA generally reads them from the federal income tax return as &amp;ldquo;total income&amp;rdquo; plus &amp;ldquo;cost of goods sold,&amp;rdquo; and it relies on the return and any amendments filed by the date of self-certification.&lt;/p&gt;
&lt;p&gt;The rule names a short list of exclusions: net capital gains or losses, sales taxes collected and remitted, transactions with affiliates, and pass-through amounts for a few agent industries. It then names items that stay in, and subcontractor costs are first on that list, along with reimbursed purchases, investment income and payroll taxes.&lt;/p&gt;
&lt;p&gt;That matters most to a general contractor. For example, a GC that bills $57 million in a year and pays $38 million of it to subs reports $57 million of receipts for this test.&lt;/p&gt;
&lt;h2 id="the-averaging-period"&gt;The averaging period&lt;/h2&gt;
&lt;p&gt;For federal contracting, a company with five or more completed fiscal years divides its total receipts over the most recent five by five. Section 121.104 sets out three other cases:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;A company with fewer than five completed fiscal years divides its total receipts by the number of weeks in business and multiplies by 52. A firm with $60 million of receipts over 156 weeks averages $20.0 million.&lt;/li&gt;
&lt;li&gt;A company with a short year inside the five-year window adds the short year to the four full years, divides by the total weeks and multiplies by 52.&lt;/li&gt;
&lt;li&gt;For SBA&amp;rsquo;s Business Loan, Disaster Loan, Surety Bond Guarantee and SBIC programs, a company with three or more completed years may choose a three-year or a five-year average.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;If the company has affiliates, section 121.104(d) adds each affiliate&amp;rsquo;s average annual receipts to its own. A company that acquires an affiliate during the window counts the acquired company&amp;rsquo;s receipts for the whole window.&lt;/p&gt;
&lt;h2 id="when-the-test-applies"&gt;When the test applies&lt;/h2&gt;
&lt;p&gt;Section 121.404 fixes the date. The company must qualify as of the day it submits its written self-certification with its initial offer that includes price. Once it wins a contract as a small business, the regulation says it is generally considered small for the life of that contract.&lt;/p&gt;
&lt;p&gt;So the five-year window moves when a fiscal year closes. For a company on a calendar fiscal year, an offer priced in December 2026 uses 2021 through 2025. An offer priced in January 2027 uses 2022 through 2026. If the 2026 tax return is not filed yet, section 121.104 has SBA use the company&amp;rsquo;s books, audited statements or an affidavit for that year.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The figures below are an example. A commercial general contractor on a calendar fiscal year bids federal work under NAICS 236220, where the limit is $45.0 million. It has no affiliates, and its receipts have grown each year.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Average annual receipts for an example general contractor under NAICS 236220. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Fiscal year&lt;/th&gt;&lt;th class="num"&gt;Receipts ($ millions)&lt;/th&gt;&lt;th&gt;Offer priced in 2026&lt;/th&gt;&lt;th&gt;Offer priced in 2027&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;2021&lt;/td&gt;&lt;td class="num"&gt;30.0&lt;/td&gt;&lt;td&gt;Counted&lt;/td&gt;&lt;td&gt;Dropped&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;2022&lt;/td&gt;&lt;td class="num"&gt;36.0&lt;/td&gt;&lt;td&gt;Counted&lt;/td&gt;&lt;td&gt;Counted&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;2023&lt;/td&gt;&lt;td class="num"&gt;42.0&lt;/td&gt;&lt;td&gt;Counted&lt;/td&gt;&lt;td&gt;Counted&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;2024&lt;/td&gt;&lt;td class="num"&gt;50.0&lt;/td&gt;&lt;td&gt;Counted&lt;/td&gt;&lt;td&gt;Counted&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;2025&lt;/td&gt;&lt;td class="num"&gt;57.0&lt;/td&gt;&lt;td&gt;Counted&lt;/td&gt;&lt;td&gt;Counted&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;2026&lt;/td&gt;&lt;td class="num"&gt;64.0&lt;/td&gt;&lt;td&gt;Not yet complete&lt;/td&gt;&lt;td&gt;Counted&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total of the five counted years&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td&gt;215.0&lt;/td&gt;&lt;td&gt;249.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Average annual receipts&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td&gt;43.0&lt;/td&gt;&lt;td&gt;49.8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Size standard for 236220&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td&gt;45.0&lt;/td&gt;&lt;td&gt;45.0&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.ecfr.gov/current/title-13/section-121.104" rel="noopener"&gt;ecfr.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Through 2026, the window runs from 2021 to 2025. Those five years total $215 million, the average is $43.0 million, and the company is small for 236220 by $2.0 million.&lt;/p&gt;
&lt;p&gt;When 2026 closes, the $30 million from 2021 drops out and the $64 million from 2026 comes in. The five-year total rises to $249 million and the average to $49.8 million, which is over the limit for any offer priced after December 31, 2026.&lt;/p&gt;
&lt;p&gt;For the 2022 to 2026 average to stay at $45.0 million, the five-year total could be no more than $225 million. The four years from 2022 to 2025 already hold $185 million, so 2026 receipts would have had to stay at $40 million or less, which is $17 million below 2025.&lt;/p&gt;
&lt;p&gt;An affiliate changes the result as well. If the same company had a sister firm averaging $4.0 million, its average for offers priced in 2026 would be $47.0 million, over the limit a year earlier.&lt;/p&gt;
&lt;h2 id="subcontracting-limits-after-award"&gt;Subcontracting limits after award&lt;/h2&gt;
&lt;p&gt;A small business that wins a set-aside above the simplified acquisition threshold also agrees to limits on how much of the work it passes to firms that are not similarly situated. Under 13 CFR 125.6, a general construction prime may pay those firms no more than 85% of the amount the government pays it. A special trade prime may pay them no more than 75%. Cost of materials is excluded in both cases and does not count as subcontracted.&lt;/p&gt;
&lt;h2 id="how-to-track-this-in-your-books"&gt;How to track this in your books&lt;/h2&gt;
&lt;p&gt;Keep a five-year receipts schedule with one row per fiscal year, taken from the tax return, and a row for each affiliate. Add the current year&amp;rsquo;s receipts to date from the general ledger, so the controller can see the next window before the year closes. The &lt;a href="https://constructionmetrics.com/2026/09/28/compute-backlog-in-months-abc-indicator/"&gt;backlog in months post&lt;/a&gt; and the &lt;a href="https://constructionmetrics.com/2026/09/26/build-work-in-progress-schedule-job-cost/"&gt;work-in-progress schedule&lt;/a&gt; already hold the revenue forecast that feeds that row.&lt;/p&gt;
&lt;p&gt;Then list the federal bids expected in the next six months with the NAICS code on each solicitation and the date pricing is due. Flag any bid due after fiscal year end whose code&amp;rsquo;s limit is within reach of the projected average. The &lt;a href="https://constructionmetrics.com/2026/10/03/track-bid-hit-ratio-client-type-job-size/"&gt;bid-hit ratio post&lt;/a&gt; covers how to tag bids by client type, and a federal set-aside flag fits in the same log. As a first step, pull the last five tax returns and compute this year&amp;rsquo;s average against the code you bid most often.&lt;/p&gt;</content:encoded></item><item><title>Bobyard adds AI submittals that build product data packages from a trade contractor's takeoff</title><link>https://constructionmetrics.com/2026/10/30/bobyard-ai-submittals-takeoff-product-data/</link><pubDate>Fri, 30 Oct 2026 07:35:30 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/30/bobyard-ai-submittals-takeoff-product-data/</guid><category>AI</category><description>Bobyard's new submittals tool matches takeoff materials to catalog cut sheets and exports a GC-ready product data package as one PDF.</description><content:encoded>&lt;p&gt;Bobyard, a San Francisco company that sells AI takeoff and estimating software to trade contractors, announced AI-prepared submittals on October 29, 2026. The tool matches the materials in a contractor&amp;rsquo;s takeoff to manufacturer cut sheets and assembles a product data submittal package for the general contractor. The same release ties Bobyard&amp;rsquo;s takeoff, cost database, estimate table and proposal generator into one workflow, and adds drywall, insulation, doors and windows to the trades it covers.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;On a subcontractor&amp;rsquo;s side, the product data submittal usually falls to the estimator or project manager who won the bid. They take the material list, find each product&amp;rsquo;s cut sheet on a vendor site or in a catalog PDF, mark up the right model on each page, and format a cover sheet by hand. Bobyard&amp;rsquo;s blog post describes that work as hours of screenshots and cross-referencing.&lt;/p&gt;
&lt;p&gt;The tool follows the order of that work. A team uploads its manufacturer catalogs once, and Bobyard splits each catalog into individual products tagged with manufacturer, model and size. The library is shared across the company, so a catalog one estimator uploads is there for every later job.&lt;/p&gt;
&lt;p&gt;For each job, the user uploads the spec or the submittal requirements. Bobyard&amp;rsquo;s product page says the AI then lists the required packages, such as product data, warranties and test reports, with spec references. Materials come in from the Bobyard takeoff with descriptions filled from the legend. Teams that did their takeoff elsewhere can paste in a list instead.&lt;/p&gt;
&lt;p&gt;Bobyard&amp;rsquo;s AI assistant, Bob GPT, then searches the library and the web for each item. It returns candidate cut sheets ranked by a confidence score, which is the model&amp;rsquo;s own estimate of how likely a match is correct. It also highlights the model number on the page. The user confirms every product and every page before it goes into the package. Bobyard&amp;rsquo;s FAQ says the AI does not choose the product.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;How Bobyard describes the submittal workflow, step by step&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Step&lt;/th&gt;&lt;th&gt;What goes in&lt;/th&gt;&lt;th&gt;What Bobyard does&lt;/th&gt;&lt;th&gt;Who checks it&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Build the product library&lt;/td&gt;&lt;td&gt;Manufacturer catalogs uploaded once&lt;/td&gt;&lt;td&gt;Splits each catalog into products and tags manufacturer and model and size&lt;/td&gt;&lt;td&gt;Anyone on the team who uploads&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Set up the packages&lt;/td&gt;&lt;td&gt;The spec or the submittal requirements&lt;/td&gt;&lt;td&gt;Lists the required packages such as product data and warranties and test reports with spec references&lt;/td&gt;&lt;td&gt;Project manager or estimator&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Load the items&lt;/td&gt;&lt;td&gt;Materials from a Bobyard takeoff or a pasted list&lt;/td&gt;&lt;td&gt;Creates submittal items and fills descriptions from the takeoff legend&lt;/td&gt;&lt;td&gt;Estimator&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Match product data&lt;/td&gt;&lt;td&gt;Each submittal item&lt;/td&gt;&lt;td&gt;Searches the library and the web and ranks candidate cut sheets with confidence scores&lt;/td&gt;&lt;td&gt;The user confirms every product and page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Package and send&lt;/td&gt;&lt;td&gt;Confirmed cut sheets&lt;/td&gt;&lt;td&gt;Builds a branded cover page and table of contents and exports one PDF&lt;/td&gt;&lt;td&gt;Project manager before sending to the GC&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Resubmit&lt;/td&gt;&lt;td&gt;GC review marks per item&lt;/td&gt;&lt;td&gt;Builds a resubmittal with only the items marked Resubmission Required&lt;/td&gt;&lt;td&gt;Project manager&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bobyard.com/solutions/submittals" rel="noopener"&gt;bobyard.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The output is one PDF with a branded cover page, a table of contents and the marked-up spec sheets. Each item can then be marked Approved, Approved as Noted, or Resubmission Required. A resubmittal package includes only the flagged items. For plants and other organic materials, which have no manufacturer cut sheet, the tool generates a product data page with an image and cited sources for the user to check.&lt;/p&gt;
&lt;p&gt;Bobyard describes the tool for product data packages, and its pages do not cover shop drawings or samples.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence so far is Bobyard&amp;rsquo;s announcement, its product pages, and comments from unnamed participants in its beta program. Bobyard identifies the quoted participants as landscaping contractors.&lt;/p&gt;
&lt;p&gt;These claims come from Bobyard:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;In a survey of beta participants, most said a single submittal took 2 to 5 hours to prepare, and some put it at 10 hours or more.&lt;/li&gt;
&lt;li&gt;The tool cuts submittal prep time in half.&lt;/li&gt;
&lt;li&gt;Customers cut takeoff time by an average of 65% and submit three to five times more bids per estimator, according to the release.&lt;/li&gt;
&lt;li&gt;Building the submittals feature took one engineer about two months, according to founder and CEO Michael Ding.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;One landscaping contractor in the beta said the tool was about twice as fast as the old method for irrigation and soil submittals. Another wrote, &amp;ldquo;Search accuracy on our irrigation catalogs was flawless, and setting up the package and items was straightforward.&amp;rdquo; Both comments come from irrigation and soil work, where the catalogs are narrow. Match rates on drywall, doors or MEP equipment, and the size of the beta survey, are not yet public.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track prep hours per product data package. Start the clock when someone opens the material list for the package and stop it when the PDF goes to the GC. Log rework hours on a resubmittal separately.&lt;/p&gt;
&lt;p&gt;Capture the baseline before the pilot:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Pick three to five recent product data packages from one trade, with a similar item count.&lt;/li&gt;
&lt;li&gt;Ask the person who built each one for the hours it took, and count the line items in each.&lt;/li&gt;
&lt;li&gt;Record whether each package came back Approved, Approved as Noted, or Resubmission Required.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;On the pilot job, log the same three figures for each package built in Bobyard. Count the line items where the top-ranked match was wrong and the user had to pick another or search again. That count tells you how much of the saved time goes to checking. The first package will also include catalog uploads, so log those hours as setup.&lt;/p&gt;
&lt;p&gt;A first step you can take on one job is to pull the last approved product data package and its resubmittal from the project file and count the line items the GC sent back.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;Bobyard&amp;rsquo;s blog post on the feature is dated October 1, 2026, and tells existing customers to ask their customer success manager to add submittals to their plan. New customers book a demo, and Bobyard prices through that demo request. Teams can use submittals without Bobyard&amp;rsquo;s takeoff. The company&amp;rsquo;s earlier releases on Business Wire include a $35 million Series A led by 8VC.&lt;/p&gt;
&lt;p&gt;Related reading: &lt;a href="https://constructionmetrics.com/2026/09/30/buildertrend-ai-submittals-log-from-spec-book/"&gt;Buildertrend&amp;rsquo;s AI Submittals drafts the submittal log from an uploaded spec book&lt;/a&gt;.&lt;/p&gt;</content:encoded></item><item><title>Construction employment rose in 180 of 360 metro areas in the year to September 2026, with Baton Rouge up 27%</title><link>https://constructionmetrics.com/2026/10/29/construction-jobs-metro-areas-september/</link><pubDate>Thu, 29 Oct 2026 11:33:46 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/29/construction-jobs-metro-areas-september/</guid><category>Data</category><description>AGC's ranking of BLS metro data shows construction jobs up in 180 of 360 areas and down in 118 from September 2025 to September 2026.</description><content:encoded>&lt;p&gt;Construction employment rose in 180 of 360 metro areas and metro divisions between September 2025 and September 2026, fell in 118 and held flat in 62, according to a ranking the Associated General Contractors of America (AGC) built from the Bureau of Labor Statistics metro release of October 28. The metro figures are preliminary and not seasonally adjusted, which is why AGC compares September with September. Nationally, BLS counts 8,364,000 construction jobs in September 2026, seasonally adjusted and preliminary. That is 11,000 more than August and 109,000 more than September 2025, a gain of 1.3%. It is the highest count in the 25 months charted below and about 54,000 above the 12-month average of roughly 8,310,000.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;National construction employment reached its highest count in 25 months&lt;/p&gt;&lt;p class="chart-subtitle"&gt;All employees, construction, thousands, seasonally adjusted&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;National construction employment reached its highest count in 25 months&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: value. Values range from 8,239 to 8,364.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="234.0" y2="234.0"/&gt;&lt;line x1="72" x2="616" y1="162.0" y2="162.0"/&gt;&lt;line x1="72" x2="616" y1="90.0" y2="90.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;8,200&lt;/text&gt;&lt;text x="64" y="237.5" text-anchor="end"&gt;8,250&lt;/text&gt;&lt;text x="64" y="165.5" text-anchor="end"&gt;8,300&lt;/text&gt;&lt;text x="64" y="93.5" text-anchor="end"&gt;8,350&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;8,400&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;2025-02&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;2025-07&lt;/text&gt;&lt;text x="412.0" y="324" text-anchor="middle"&gt;2025-12&lt;/text&gt;&lt;text x="525.3" y="324" text-anchor="middle"&gt;2026-05&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="72" x2="616" y1="147.5" y2="147.5"/&gt;
&lt;text x="76" y="143.5"&gt;12-period average 8,310&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,228.2 L94.7,216.7 L117.3,209.5 L140.0,196.6 L162.7,213.8 L185.3,209.5 L208.0,200.9 L230.7,203.8 L253.3,206.6 L276.0,209.5 L298.7,218.2 L321.3,249.8 L344.0,226.8 L366.7,244.1 L389.3,192.2 L412.0,202.3 L434.7,137.5 L457.3,167.8 L480.0,146.2 L502.7,141.8 L525.3,139.0 L548.0,134.6 L570.7,108.7 L593.3,85.7 L616.0,69.8 L616.0,306.0 L72.0,306.0 Z"/&gt;
&lt;path class="line" d="M72.0,228.2 L94.7,216.7 L117.3,209.5 L140.0,196.6 L162.7,213.8 L185.3,209.5 L208.0,200.9 L230.7,203.8 L253.3,206.6 L276.0,209.5 L298.7,218.2 L321.3,249.8 L344.0,226.8 L366.7,244.1 L389.3,192.2 L412.0,202.3 L434.7,137.5 L457.3,167.8 L480.0,146.2 L502.7,141.8 L525.3,139.0 L548.0,134.6 L570.7,108.7 L593.3,85.7 L616.0,69.8"/&gt;
&lt;circle class="end" cx="616.0" cy="69.8" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="228.2" r="9"&gt;&lt;title&gt;September 2024: 8,254&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="216.7" r="9"&gt;&lt;title&gt;October 2024: 8,262&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="209.5" r="9"&gt;&lt;title&gt;November 2024: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="196.6" r="9"&gt;&lt;title&gt;December 2024: 8,276&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="213.8" r="9"&gt;&lt;title&gt;January 2025: 8,264&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="209.5" r="9"&gt;&lt;title&gt;February 2025: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="200.9" r="9"&gt;&lt;title&gt;March 2025: 8,273&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="203.8" r="9"&gt;&lt;title&gt;April 2025: 8,271&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="206.6" r="9"&gt;&lt;title&gt;May 2025: 8,269&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="209.5" r="9"&gt;&lt;title&gt;June 2025: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="218.2" r="9"&gt;&lt;title&gt;July 2025: 8,261&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="249.8" r="9"&gt;&lt;title&gt;August 2025: 8,239&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="226.8" r="9"&gt;&lt;title&gt;September 2025: 8,255&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="244.1" r="9"&gt;&lt;title&gt;October 2025: 8,243&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="192.2" r="9"&gt;&lt;title&gt;November 2025: 8,279&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="202.3" r="9"&gt;&lt;title&gt;December 2025: 8,272&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="137.5" r="9"&gt;&lt;title&gt;January 2026: 8,317&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="167.8" r="9"&gt;&lt;title&gt;February 2026: 8,296&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="146.2" r="9"&gt;&lt;title&gt;March 2026: 8,311&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="141.8" r="9"&gt;&lt;title&gt;April 2026: 8,314&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="139.0" r="9"&gt;&lt;title&gt;May 2026: 8,316&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="134.6" r="9"&gt;&lt;title&gt;June 2026: 8,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="108.7" r="9"&gt;&lt;title&gt;July 2026: 8,337&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="85.7" r="9"&gt;&lt;title&gt;August 2026: 8,353&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="69.8" r="9"&gt;&lt;title&gt;September 2026: 8,364&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="73.8"&gt;8,364&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="62.8" y2="49.8"/&gt;
&lt;circle cx="616.0" cy="69.8" r="3.5"/&gt;&lt;text x="616.0" y="45.8" text-anchor="end"&gt;September 2026, 8,364&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;National construction employment reached its highest count in 25 months&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: value. Values range from 8,239 to 8,364.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="168.5" y2="168.5"/&gt;&lt;line x1="50" x2="276" y1="117.0" y2="117.0"/&gt;&lt;line x1="50" x2="276" y1="65.5" y2="65.5"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;8,200&lt;/text&gt;&lt;text x="42" y="172.0" text-anchor="end"&gt;8,250&lt;/text&gt;&lt;text x="42" y="120.5" text-anchor="end"&gt;8,300&lt;/text&gt;&lt;text x="42" y="69.0" text-anchor="end"&gt;8,350&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;8,400&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2025-09&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="50" x2="276" y1="106.6" y2="106.6"/&gt;
&lt;text x="54" y="102.6"&gt;12-period average 8,310&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,164.4 L59.4,156.1 L68.8,151.0 L78.2,141.7 L87.7,154.1 L97.1,151.0 L106.5,144.8 L115.9,146.9 L125.3,148.9 L134.8,151.0 L144.2,157.2 L153.6,179.8 L163.0,163.3 L172.4,175.7 L181.8,138.6 L191.2,145.8 L200.7,99.5 L210.1,121.1 L219.5,105.7 L228.9,102.6 L238.3,100.5 L247.8,97.4 L257.2,78.9 L266.6,62.4 L276.0,51.1 L276.0,220.0 L50.0,220.0 Z"/&gt;
&lt;path class="line" d="M50.0,164.4 L59.4,156.1 L68.8,151.0 L78.2,141.7 L87.7,154.1 L97.1,151.0 L106.5,144.8 L115.9,146.9 L125.3,148.9 L134.8,151.0 L144.2,157.2 L153.6,179.8 L163.0,163.3 L172.4,175.7 L181.8,138.6 L191.2,145.8 L200.7,99.5 L210.1,121.1 L219.5,105.7 L228.9,102.6 L238.3,100.5 L247.8,97.4 L257.2,78.9 L266.6,62.4 L276.0,51.1"/&gt;
&lt;circle class="end" cx="276.0" cy="51.1" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="164.4" r="9"&gt;&lt;title&gt;September 2024: 8,254&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="156.1" r="9"&gt;&lt;title&gt;October 2024: 8,262&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="151.0" r="9"&gt;&lt;title&gt;November 2024: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="141.7" r="9"&gt;&lt;title&gt;December 2024: 8,276&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="154.1" r="9"&gt;&lt;title&gt;January 2025: 8,264&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="151.0" r="9"&gt;&lt;title&gt;February 2025: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="144.8" r="9"&gt;&lt;title&gt;March 2025: 8,273&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="146.9" r="9"&gt;&lt;title&gt;April 2025: 8,271&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="148.9" r="9"&gt;&lt;title&gt;May 2025: 8,269&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="151.0" r="9"&gt;&lt;title&gt;June 2025: 8,267&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="157.2" r="9"&gt;&lt;title&gt;July 2025: 8,261&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="179.8" r="9"&gt;&lt;title&gt;August 2025: 8,239&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="163.3" r="9"&gt;&lt;title&gt;September 2025: 8,255&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="175.7" r="9"&gt;&lt;title&gt;October 2025: 8,243&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="138.6" r="9"&gt;&lt;title&gt;November 2025: 8,279&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="145.8" r="9"&gt;&lt;title&gt;December 2025: 8,272&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="99.5" r="9"&gt;&lt;title&gt;January 2026: 8,317&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="121.1" r="9"&gt;&lt;title&gt;February 2026: 8,296&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="105.7" r="9"&gt;&lt;title&gt;March 2026: 8,311&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="102.6" r="9"&gt;&lt;title&gt;April 2026: 8,314&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="100.5" r="9"&gt;&lt;title&gt;May 2026: 8,316&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="97.4" r="9"&gt;&lt;title&gt;June 2026: 8,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="78.9" r="9"&gt;&lt;title&gt;July 2026: 8,337&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="62.4" r="9"&gt;&lt;title&gt;August 2026: 8,353&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="51.1" r="9"&gt;&lt;title&gt;September 2026: 8,364&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="55.1"&gt;8,364&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="58.1" y2="70.1"/&gt;
&lt;circle cx="276.0" cy="51.1" r="3.5"/&gt;&lt;text x="276.0" y="81.1" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;September 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;8,364&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;September 2026 is preliminary.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/USCONS" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;U.S. construction employment, last 13 months&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Employment (000s)&lt;/th&gt;&lt;th class="num"&gt;MoM change (000s)&lt;/th&gt;&lt;th class="num"&gt;YoY&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Sep 2025&lt;/td&gt;&lt;td class="num"&gt;8,255&lt;/td&gt;&lt;td class="num"&gt;16&lt;/td&gt;&lt;td class="num"&gt;0.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oct 2025&lt;/td&gt;&lt;td class="num"&gt;8,243&lt;/td&gt;&lt;td class="num"&gt;-12&lt;/td&gt;&lt;td class="num"&gt;-0.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nov 2025&lt;/td&gt;&lt;td class="num"&gt;8,279&lt;/td&gt;&lt;td class="num"&gt;36&lt;/td&gt;&lt;td class="num"&gt;0.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec 2025&lt;/td&gt;&lt;td class="num"&gt;8,272&lt;/td&gt;&lt;td class="num"&gt;-7&lt;/td&gt;&lt;td class="num"&gt;-0.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jan 2026&lt;/td&gt;&lt;td class="num"&gt;8,317&lt;/td&gt;&lt;td class="num"&gt;45&lt;/td&gt;&lt;td class="num"&gt;0.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb 2026&lt;/td&gt;&lt;td class="num"&gt;8,296&lt;/td&gt;&lt;td class="num"&gt;-21&lt;/td&gt;&lt;td class="num"&gt;0.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mar 2026&lt;/td&gt;&lt;td class="num"&gt;8,311&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;&lt;td class="num"&gt;0.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Apr 2026&lt;/td&gt;&lt;td class="num"&gt;8,314&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;0.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;8,316&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;0.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jun 2026&lt;/td&gt;&lt;td class="num"&gt;8,319&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;0.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jul 2026&lt;/td&gt;&lt;td class="num"&gt;8,337&lt;/td&gt;&lt;td class="num"&gt;18&lt;/td&gt;&lt;td class="num"&gt;0.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aug 2026&lt;/td&gt;&lt;td class="num"&gt;8,353&lt;/td&gt;&lt;td class="num"&gt;16&lt;/td&gt;&lt;td class="num"&gt;1.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Sep 2026&lt;/td&gt;&lt;td class="num"&gt;8,364&lt;/td&gt;&lt;td class="num"&gt;11&lt;/td&gt;&lt;td class="num"&gt;1.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/USCONS" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="what-moved"&gt;What moved&lt;/h2&gt;
&lt;p&gt;The same four metros led the count for a second month. Houston-Pasadena-The Woodlands added 13,800 construction jobs over the year, a 5% increase to 269,300. Baton Rouge added 12,300 and again had the largest percentage gain, 27%, taking it from 46,400 to 58,700 jobs. St. Louis and Columbus, Ohio each added 10,700, for gains of 13% and 17%. Minneapolis-St. Paul (7,600) and Phoenix (5,900) came next.&lt;/p&gt;
&lt;p&gt;Louisiana shows up more often in the percentage list than any other state. Lafayette (15%), Shreveport-Bossier City (14%), Houma-Bayou Cane-Thibodaux (11%) and New Orleans-Metairie (10%) all sit in AGC&amp;rsquo;s top group alongside Baton Rouge.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Largest over-the-year changes in construction employment, September 2025 to September 2026, not seasonally adjusted&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Metro area or division&lt;/th&gt;&lt;th&gt;BLS series&lt;/th&gt;&lt;th class="num"&gt;Sep 2025&lt;/th&gt;&lt;th class="num"&gt;Sep 2026&lt;/th&gt;&lt;th class="num"&gt;Change&lt;/th&gt;&lt;th class="num"&gt;Change (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Houston-Pasadena-The Woodlands TX&lt;/td&gt;&lt;td&gt;Construction&lt;/td&gt;&lt;td class="num"&gt;255,500&lt;/td&gt;&lt;td class="num"&gt;269,300&lt;/td&gt;&lt;td class="num"&gt;13,800&lt;/td&gt;&lt;td class="num"&gt;5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Baton Rouge LA&lt;/td&gt;&lt;td&gt;Construction&lt;/td&gt;&lt;td class="num"&gt;46,400&lt;/td&gt;&lt;td class="num"&gt;58,700&lt;/td&gt;&lt;td class="num"&gt;12,300&lt;/td&gt;&lt;td class="num"&gt;27%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;St. Louis MO-IL&lt;/td&gt;&lt;td&gt;Mining, logging and construction&lt;/td&gt;&lt;td class="num"&gt;80,300&lt;/td&gt;&lt;td class="num"&gt;91,000&lt;/td&gt;&lt;td class="num"&gt;10,700&lt;/td&gt;&lt;td class="num"&gt;13%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Columbus OH&lt;/td&gt;&lt;td&gt;Mining, logging and construction&lt;/td&gt;&lt;td class="num"&gt;62,400&lt;/td&gt;&lt;td class="num"&gt;73,100&lt;/td&gt;&lt;td class="num"&gt;10,700&lt;/td&gt;&lt;td class="num"&gt;17%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Minneapolis-St. Paul-Bloomington MN-WI&lt;/td&gt;&lt;td&gt;Mining, logging and construction&lt;/td&gt;&lt;td class="num"&gt;99,700&lt;/td&gt;&lt;td class="num"&gt;107,300&lt;/td&gt;&lt;td class="num"&gt;7,600&lt;/td&gt;&lt;td class="num"&gt;8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Phoenix-Mesa-Chandler AZ&lt;/td&gt;&lt;td&gt;Construction&lt;/td&gt;&lt;td class="num"&gt;178,000&lt;/td&gt;&lt;td class="num"&gt;183,900&lt;/td&gt;&lt;td class="num"&gt;5,900&lt;/td&gt;&lt;td class="num"&gt;3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Pittsburgh PA&lt;/td&gt;&lt;td&gt;Construction&lt;/td&gt;&lt;td class="num"&gt;61,400&lt;/td&gt;&lt;td class="num"&gt;58,000&lt;/td&gt;&lt;td class="num"&gt;-3,400&lt;/td&gt;&lt;td class="num"&gt;-6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Lakewood-New Brunswick NJ (div.)&lt;/td&gt;&lt;td&gt;Mining, logging and construction&lt;/td&gt;&lt;td class="num"&gt;55,500&lt;/td&gt;&lt;td class="num"&gt;51,900&lt;/td&gt;&lt;td class="num"&gt;-3,600&lt;/td&gt;&lt;td class="num"&gt;-6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Riverside-San Bernardino-Ontario CA&lt;/td&gt;&lt;td&gt;Construction&lt;/td&gt;&lt;td class="num"&gt;109,600&lt;/td&gt;&lt;td class="num"&gt;105,700&lt;/td&gt;&lt;td class="num"&gt;-3,900&lt;/td&gt;&lt;td class="num"&gt;-4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oakland-Fremont-Berkeley CA (div.)&lt;/td&gt;&lt;td&gt;Construction&lt;/td&gt;&lt;td class="num"&gt;72,000&lt;/td&gt;&lt;td class="num"&gt;67,600&lt;/td&gt;&lt;td class="num"&gt;-4,400&lt;/td&gt;&lt;td class="num"&gt;-6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jersey City-White Plains NY-NJ&lt;/td&gt;&lt;td&gt;Mining, logging and construction&lt;/td&gt;&lt;td class="num"&gt;71,200&lt;/td&gt;&lt;td class="num"&gt;66,700&lt;/td&gt;&lt;td class="num"&gt;-4,500&lt;/td&gt;&lt;td class="num"&gt;-6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Atlanta-Sandy Springs-Roswell GA (div.)&lt;/td&gt;&lt;td&gt;Construction&lt;/td&gt;&lt;td class="num"&gt;109,800&lt;/td&gt;&lt;td class="num"&gt;104,700&lt;/td&gt;&lt;td class="num"&gt;-5,100&lt;/td&gt;&lt;td class="num"&gt;-5%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.agc.org/sites/default/files/Files/Communications/Metro_Empl_2026_September_top10.pdf" rel="noopener"&gt;agc.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;On the loss side, the Atlanta-Sandy Springs-Roswell metro division dropped 5,100 jobs, or 5%. Jersey City-White Plains lost 4,500, the Oakland-Fremont-Berkeley division lost 4,400 and Riverside-San Bernardino-Ontario lost 3,900. Anchorage had the steepest percentage loss at 10%, a drop of 1,400 jobs to 12,000.&lt;/p&gt;
&lt;p&gt;So the count improved slightly from a month ago. AGC&amp;rsquo;s August ranking counted 177 metros with gains and 126 with losses, which makes September&amp;rsquo;s count three higher on gains and eight lower on losses. The leaders&amp;rsquo; annual gains narrowed a little: Houston went from 14,100 to 13,800 and Baton Rouge from 29% to 27%.&lt;/p&gt;
&lt;p&gt;AGC reads the split by project type. Chief economist Ken Simonson said there is often &amp;ldquo;a correlation between where data centers or large power and manufacturing facilities are getting built and which metro areas are adding new construction jobs.&amp;rdquo; AGC attributes the weakness elsewhere to materials prices and interest rates. The release does not tie any single metro&amp;rsquo;s gain to a named project, so that link is AGC&amp;rsquo;s general reading of the map.&lt;/p&gt;
&lt;p&gt;The BLS release shows Washington-Arlington-Alexandria losing 61,000 nonfarm jobs over the year, the largest decline of any metro, while construction in its Arlington-Alexandria-Reston division fell 2,100, or 2%.&lt;/p&gt;
&lt;h2 id="how-to-use-this-number"&gt;How to use this number&lt;/h2&gt;
&lt;p&gt;Metro construction employment is the nearest public count of the labor pool your crews and subcontractors draw from. Both uses below rely on the year-over-year change, because the metro figures are not seasonally adjusted.&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Compare the change in your own field headcount from September 2025 to September 2026 with your metro&amp;rsquo;s change. If your metro grew 13% and your self-performed headcount is flat, you are recruiting against local competitors who added crews over the year, and your wage assumptions should account for that. If your metro lost jobs and you held headcount, you now employ a larger share of a smaller local workforce.&lt;/li&gt;
&lt;li&gt;Before you bid labor-heavy work in an unfamiliar metro, look it up in AGC&amp;rsquo;s alphabetical list. A 27% gain like Baton Rouge&amp;rsquo;s means the local workforce grew by more than a quarter in a year. Build that into your wage assumptions and into the number of subs you expect to bid.&lt;/li&gt;
&lt;/ol&gt;
&lt;h2 id="revisions-and-caveats"&gt;Revisions and caveats&lt;/h2&gt;
&lt;p&gt;The September metro figures are preliminary. The BLS technical note says employment estimates are benchmarked once a year to a full count of jobs from unemployment insurance tax records, and that benchmark can move a metro&amp;rsquo;s level for past months.&lt;/p&gt;
&lt;p&gt;The national figure was revised too. BLS first reported August construction employment at 8,359,000. The September release lowered August to 8,353,000, so the August monthly gain is now 16,000.&lt;/p&gt;
&lt;p&gt;Three details in AGC&amp;rsquo;s method matter when you read the ranking:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;In most metros BLS publishes construction only inside a combined mining, logging and construction series, because samples are small. AGC counts all of it as construction. St. Louis, Columbus and Minneapolis-St. Paul are in that group, so part of their totals may be mining or logging jobs.&lt;/li&gt;
&lt;li&gt;BLS rounds metro employment to the nearest 100. AGC ranks percentage changes to the nearest whole percent, so many metros tie. Hanford-Corcoran, Calif. ranks third for percentage loss at 8%, a change of 100 jobs.&lt;/li&gt;
&lt;li&gt;The ranking counts metro divisions separately and leaves out the parent metro totals to avoid double counting. The Atlanta figure covers only the Atlanta-Sandy Springs-Roswell division.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;BLS cites metro job changes only when they are statistically significant at the 90% confidence level, meaning large enough that sampling chance is an unlikely explanation. It publishes sampling error for detailed series such as construction only on request (it lists 373 of 387 metros as essentially unchanged in total nonfarm jobs), so a swing of a few hundred construction jobs in a small metro could be survey noise. The national series in the chart is seasonally adjusted and comes from a different estimate, so compare it with the metro figures only year over year.&lt;/p&gt;</content:encoded></item><item><title>Bluebeam Max puts AI drawing checks and a Claude connection inside Revu for $590 per user a year</title><link>https://constructionmetrics.com/2026/10/29/bluebeam-max-ai-drawing-review-revu/</link><pubDate>Thu, 29 Oct 2026 07:34:57 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/29/bluebeam-max-ai-drawing-review-revu/</guid><category>AI</category><description>Bluebeam Max adds AI sheet checks, AI revision comparison and a Claude connection to Revu, at an introductory $590 per user per year.</description><content:encoded>&lt;p&gt;On October 29, 2026, the Nemetschek Group grouped its AI products for architecture, engineering and construction under one name, Max. The construction member is Bluebeam Max, a premium plan for Bluebeam Revu that has been on sale worldwide since May 19. It adds AI checks of drawing sets, AI comparison of revisions, and a connection that lets an AI assistant such as Anthropic&amp;rsquo;s Claude carry out markup and reporting tasks in Revu. The work it touches is drawing review, revision comparison and takeoff markup. Bluebeam says more than 4 million professionals use its software.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;The three Max products Nemetschek announced on October 29, 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Product&lt;/th&gt;&lt;th&gt;Discipline&lt;/th&gt;&lt;th&gt;Status on October 29 2026&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Bluebeam Max&lt;/td&gt;&lt;td&gt;Construction&lt;/td&gt;&lt;td&gt;Available globally since May 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Allplan Max 2027&lt;/td&gt;&lt;td&gt;Engineering&lt;/td&gt;&lt;td&gt;Available globally, launched the week of October 26&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Archicad Max&lt;/td&gt;&lt;td&gt;Architecture&lt;/td&gt;&lt;td&gt;Available with Archicad 30, rolling out by region&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.nemetschek.com/en/news-media/nemetschek-group-brings-ai-design-engineering-and-construction-newly-released-max" rel="noopener"&gt;nemetschek.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;Start with the preconstruction manager who gets a reissued drawing set before bid day. Today that person overlays the old and new sheets, scans for clouds that were missed, and checks that tags and gridlines still line up before pricing the changes. Bluebeam Max puts AI into three steps of that review.&lt;/p&gt;
&lt;p&gt;Smart Review scans a set for problems that Bluebeam lists by name: missing sheets, missing door tags, missing plumbing fixture tags and gridline inconsistencies. It uses computer vision, software that recognizes shapes and symbols in an image, and returns its findings as markups on the sheets, a dashboard and trackable issues. Bluebeam says Smart Review is in preview and is optimized for US vertical commercial construction.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;What Bluebeam says Smart Review looks for&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Item Smart Review checks&lt;/th&gt;&lt;th&gt;Where Bluebeam lists it&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Missing sheets&lt;/td&gt;&lt;td&gt;Bluebeam Max page and pricing page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Missing door tags&lt;/td&gt;&lt;td&gt;Bluebeam Max page and pricing page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Missing plumbing fixture tags&lt;/td&gt;&lt;td&gt;Bluebeam Max page and pricing page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Gridline inconsistencies&lt;/td&gt;&lt;td&gt;Bluebeam Max page and pricing page&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Design discrepancies, scope gaps and missing information&lt;/td&gt;&lt;td&gt;May 19 launch release and October 29 Nemetschek release&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/bluebeam-max/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Smart Overlay compares sheet sets across disciplines and drawing scales and reports what changed. It produces visual overlays, reports and trackable comparisons. It is also in preview.&lt;/p&gt;
&lt;p&gt;The third piece connects Revu to an outside AI assistant through the Model Context Protocol (MCP), an open standard that lets an assistant call another program&amp;rsquo;s functions. A user with the Claude desktop app can type a request, and Claude reads the open PDF&amp;rsquo;s text and markup data and then creates or edits markups, creates custom columns or builds a report. The Bluebeam University course on the feature walks through four examples:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Changing the subject on a group of markups.&lt;/li&gt;
&lt;li&gt;Building an Excel summary of markups, filtered by page label and author.&lt;/li&gt;
&lt;li&gt;Writing a narrative of changes from an existing drawing overlay.&lt;/li&gt;
&lt;li&gt;Checking title block information against the ISO 7200 standard with a saved Claude project.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Nemetschek&amp;rsquo;s release says Bluebeam Max also works with GitHub Copilot CLI and AnythingLLM. Bluebeam&amp;rsquo;s own FAQ says the plan connects to Claude first and is built to connect to other assistants as they add MCP support to their desktop apps.&lt;/p&gt;
&lt;p&gt;The other Max features handle sheet layout and markup work. Stitching, which Bluebeam also labels as AI, joins sheets from different parts of a project into one continuous view, and Bluebeam pitches it for large and linear infrastructure projects. Magic Markups duplicates a markup as another type, converts a shape into a measurement, or offsets a markup a set distance. Connected Studio Sessions link a Bluebeam markup to the matching spot in a Revit sheet or 3D view.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Bluebeam Max features, where their data goes, and whether an admin can turn them off&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Feature&lt;/th&gt;&lt;th&gt;What it does&lt;/th&gt;&lt;th&gt;Where the data is processed&lt;/th&gt;&lt;th&gt;Admin can turn it off&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Smart Review&lt;/td&gt;&lt;td&gt;Checks pages, gridlines, doors and similar items and builds a dashboard of marked issues&lt;/td&gt;&lt;td&gt;Uploaded PDFs processed on AWS servers in the UK&lt;/td&gt;&lt;td&gt;Yes&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Smart Overlay&lt;/td&gt;&lt;td&gt;Finds design changes and discrepancies across drawing sets and disciplines&lt;/td&gt;&lt;td&gt;Uploaded PDFs processed on AWS servers in the UK&lt;/td&gt;&lt;td&gt;Yes&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;AI connection through MCP&lt;/td&gt;&lt;td&gt;Lets an AI assistant such as Claude run Revu tasks from typed prompts&lt;/td&gt;&lt;td&gt;With user permission, prompts, PDF text, markup data and Studio file metadata go to the AI client&lt;/td&gt;&lt;td&gt;Yes&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Stitching&lt;/td&gt;&lt;td&gt;Combines multiple drawing sheets into one navigable view&lt;/td&gt;&lt;td&gt;On the user&amp;#39;s machine&lt;/td&gt;&lt;td&gt;No&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Magic Markups&lt;/td&gt;&lt;td&gt;Duplicates, converts or offsets existing markups&lt;/td&gt;&lt;td&gt;Not listed on the AI transparency page&lt;/td&gt;&lt;td&gt;Not listed&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/company/ai-transparency/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;aside class="note"&gt;In plain terms, Smart Review and Smart Overlay upload your PDFs and process them on AWS servers in the UK. The Claude connection sends the text and markup data of the file you are working in to the assistant you connected. An admin can turn off all three in Org Admin Pro.&lt;/aside&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Bluebeam&amp;rsquo;s May launch release, Nemetschek&amp;rsquo;s October 29 release, and comments from two beta customers. Both releases come from the company selling the product.&lt;/p&gt;
&lt;p&gt;These claims come from Bluebeam and Nemetschek:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;More than 2,000 people took part in the Bluebeam Max beta, and Nemetschek says those early adopters reported significant productivity gains in preconstruction, design coordination and construction management.&lt;/li&gt;
&lt;li&gt;Martin-Harris Construction, a Las Vegas construction manager, uses Smart Overlay and Smart Review to compare revisions for pricing and impact analysis during design and construction. James Miranda, its director of preconstruction, said, &amp;ldquo;Features like Smart Overlay help us instantly see what&amp;rsquo;s changed and where to focus, which is critical when you&amp;rsquo;re managing complex projects at scale.&amp;rdquo;&lt;/li&gt;
&lt;li&gt;At KPFF&amp;rsquo;s Los Angeles civil office, an associate said the offset tool cuts down on trips back to CAD for parallel utilities and curved geometry.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Nemetschek&amp;rsquo;s October release gives one percentage, and it covers a different product. The company says early beta users of Allplan Max, its engineering offering, finished selected tasks up to 36 percent faster. Detection rates for Smart Review and Smart Overlay, and measured time savings for Bluebeam Max, are not yet public.&lt;/p&gt;
&lt;p&gt;Bluebeam&amp;rsquo;s training material sets limits on the Claude connection. The course says results depend on the document text and markup data that MCP exposes, that users should review generated reports rather than treat them as a guarantee of accuracy or compliance, and that AI provider usage limits and company network controls can affect the workflow.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track reissue review hours: the staff hours from receipt of a revised drawing set to the point where the changes are logged and priced. Pair it with a count of drawing discrepancies found at review, so faster reviews cannot hide misses.&lt;/p&gt;
&lt;p&gt;Capture the baseline before turning on Smart Review or Smart Overlay:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Pull the last three reissued sets on a comparable job and record the review hours your preconstruction or project team logged for each.&lt;/li&gt;
&lt;li&gt;Count the discrepancies your reviewers flagged on each set, such as missing tags, mismatched gridlines and unclouded changes.&lt;/li&gt;
&lt;li&gt;Count RFIs from the following 60 days that trace back to a drawing problem in those sets, since each one marks something the review missed.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;During the pilot, have the reviewer mark each AI flag as a real problem, a false flag or something already found. The share of flags that turn out to be real problems is the tool&amp;rsquo;s precision. The share of your reviewer&amp;rsquo;s own findings that the tool also flagged is its recall. A first step on one job is to run Smart Review on a set your team has already reviewed and compare the two lists, using a trial seat.&lt;/p&gt;
&lt;p&gt;Earlier posts covered &lt;a href="https://constructionmetrics.com/2026/10/26/document-crunch-drawings-review-contracts-specs/"&gt;Document Crunch&amp;rsquo;s drawing review against contracts and specs&lt;/a&gt;, &lt;a href="https://constructionmetrics.com/2026/10/07/buildcheck-raises-12-million-ai-drawing-review/"&gt;BuildCheck&amp;rsquo;s funding for AI drawing review&lt;/a&gt; and &lt;a href="https://constructionmetrics.com/2026/10/21/earthcam-jobsite-camera-ai-chatgpt-claude/"&gt;EarthCam&amp;rsquo;s connectors to ChatGPT and Claude&lt;/a&gt;.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;Bluebeam Max is available globally and sold per user on annual billing. The introductory price is $590 per user per year, $150 more than the Complete plan. Buyers at that price keep it through their 2027 renewal, and Bluebeam will announce the standard list price for later renewals. Existing users can start a trial through Org Admin, and since September 2026 the plan is free for eligible students and educators.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Bluebeam plan prices per user per year, October 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Plan&lt;/th&gt;&lt;th class="num"&gt;Price per user per year (USD)&lt;/th&gt;&lt;th&gt;What the plan adds&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Basics&lt;/td&gt;&lt;td class="num"&gt;$260&lt;/td&gt;&lt;td&gt;PDF markups, length and area measurement, joining Studio sessions&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Core&lt;/td&gt;&lt;td class="num"&gt;$330&lt;/td&gt;&lt;td&gt;Perimeter, count, angle and volume measurement; overlay and compare; hosting Studio sessions&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Complete&lt;/td&gt;&lt;td class="num"&gt;$440&lt;/td&gt;&lt;td&gt;Dynamic Fill, Quantity Link to Excel, markup reporting, batch hyperlinks and slip sheets, scripting&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Max (introductory)&lt;/td&gt;&lt;td class="num"&gt;$590&lt;/td&gt;&lt;td&gt;AI drawing review and comparison, AI connection through MCP, Stitching, Magic Markups, Connected Studio Sessions with Revit&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.bluebeam.com/pricing/" rel="noopener"&gt;bluebeam.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Plans can be mixed, so a firm can put Max on its estimators and preconstruction staff and leave field users on a lower plan. Revu runs on Windows. Revu 20 reached end of support on July 31, 2026, and reaches end of life on December 31, 2026, so firms still on that version will pick a subscription plan before year-end.&lt;/p&gt;</content:encoded></item><item><title>How to compute unabsorbed home office overhead with the Eichleay formula, with a 60-day suspension example</title><link>https://constructionmetrics.com/2026/10/28/eichleay-formula-unabsorbed-home-office-overhead/</link><pubDate>Wed, 28 Oct 2026 11:33:51 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/28/eichleay-formula-unabsorbed-home-office-overhead/</guid><category>Data</category><description>The Eichleay formula prices home office overhead lost during a federal suspension. This example turns a 60-day suspension into a $2,000 daily rate.</description><content:encoded>&lt;p&gt;When a federal contracting officer stops work on a job for an open-ended period, the home office keeps paying its salaries and rent. The suspended job stops carrying its share of those costs, because it is billing little or nothing. Contractors call the stranded share unabsorbed home office overhead.&lt;/p&gt;
&lt;p&gt;On federal construction, the courts price it with the Eichleay formula, a three-step allocation by billings. The Defense Contract Audit Agency (DCAA) lays the formula out in Chapter 12 of its Contract Audit Manual, the guide its auditors use on delay claims, in a revision dated September 18, 2026. The &lt;a href="https://constructionmetrics.com/2026/10/25/liquidated-damages-daily-rate-delay-cost/"&gt;liquidated damages post&lt;/a&gt; priced the field cost of a late finish. This post covers who can recover the home office cost and then works the formula on an example job.&lt;/p&gt;
&lt;h2 id="where-the-formula-comes-from"&gt;Where the formula comes from&lt;/h2&gt;
&lt;p&gt;DCAA says the formula comes from a 1960 decision of the Armed Services Board of Contract Appeals and that the Court of Appeals for the Federal Circuit has widely relied on it as the legal standard for unabsorbed overhead on construction contracts.&lt;/p&gt;
&lt;p&gt;The usual route to recovery on a fixed-price federal job is FAR 52.242-14, the Suspension of Work clause. If the contracting officer&amp;rsquo;s act, or failure to act, suspends or delays the work for an unreasonable period, the clause calls for an adjustment for the added cost of performance, excluding profit. Two deadlines apply. Costs incurred more than 20 days before the contractor gives written notice are not allowed, though that limit does not apply to a claim from a written suspension order. The claim itself must be in writing, with an amount, no later than final payment.&lt;/p&gt;
&lt;h2 id="who-qualifies"&gt;Who qualifies&lt;/h2&gt;
&lt;p&gt;The Federal Circuit set out the tests in &lt;em&gt;P.J. Dick Inc. v. Principi&lt;/em&gt;, decided April 7, 2003, and DCAA&amp;rsquo;s manual follows them. The tests run in this order:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;The government caused the delay, and no other delay ran concurrently with it.&lt;/li&gt;
&lt;li&gt;The delay extended the contract&amp;rsquo;s time of performance. A contractor that finished on time can still qualify if it planned from the start to finish early, had the capacity to, and would have finished early without the government&amp;rsquo;s actions.&lt;/li&gt;
&lt;li&gt;The contractor was on standby. A written order that suspends all the work for an uncertain duration and requires the contractor to stay ready to resume settles this. Without one, the contractor must show the delay had no set end, that it had to be ready to return immediately at full speed, and that it could not bill substantial work on the contract during the delay.&lt;/li&gt;
&lt;li&gt;Once those are proven, the government has to show it was practical for the contractor to take on replacement work. If it does, the contractor must prove it could not find enough.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The court wrote, &amp;ldquo;Only where the above exacting requirements can be satisfied will a contractor be entitled to Eichleay damages.&amp;rdquo; P.J. Dick lost on standby. Its billings during one suspension period were 47% of prior months, and the court agreed with the board that it kept performing substantial work on the contract. It still recovered home office overhead, because the parties had stipulated daily rates for field and home office overhead on any day that qualified under the Suspension of Work clause.&lt;/p&gt;
&lt;h2 id="the-three-steps"&gt;The three steps&lt;/h2&gt;
&lt;p&gt;The formula assigns fixed home office cost to the job by its share of company revenue, then turns that amount into a daily rate:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Overhead allocable to the contract equals the contract&amp;rsquo;s billings divided by total company billings for the same period, multiplied by total fixed overhead for that period. The billings fraction is called the allocation ratio.&lt;/li&gt;
&lt;li&gt;The daily contract overhead rate equals the allocable overhead divided by the days of performance.&lt;/li&gt;
&lt;li&gt;Unabsorbed overhead equals the daily rate multiplied by the delay days.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;DCAA adds rules for each input. Every figure covers the same interval, the contract&amp;rsquo;s actual performance period from start to completion, extension included. &amp;ldquo;Billings&amp;rdquo; means recognized revenue, cost plus profit, under one consistent method, percentage-of-completion or completed-contract. If the claim goes in before the job finishes, prospective figures are allowed when they can be reasonably estimated, and every input then runs to expected substantial completion. Any unabsorbed overhead already estimated comes out of contract billings, since leaving it in counts it twice.&lt;/p&gt;
&lt;p&gt;The overhead pool holds only fixed home office costs that benefit all jobs. Job site overhead charged directly to the contract stays out. DCAA&amp;rsquo;s examples of variable costs to exclude include small tools and shop supplies, and it splits semi-variable costs, so electricity&amp;rsquo;s line charge stays in and its usage charge comes out.&lt;/p&gt;
&lt;h2 id="counting-delay-days"&gt;Counting delay days&lt;/h2&gt;
&lt;p&gt;Delay days are the days the government delay added past the original or revised completion date. The DCAA manual gives these cases:&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Delay days under the Eichleay formula, from examples in DCAA Contract Audit Manual section 12-609.4.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Case in the DCAA manual&lt;/th&gt;&lt;th class="num"&gt;Delay days counted&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;70-day contract, a 20-day government delay after day 50, work finished on day 85&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Finished 20 days late, 15 days from a government delay and 5 from contractor inefficiency&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Finished within the original or revised performance period&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.dcaa.mil/Portals/88/Documents/Guidance/CAM/CAM_Chapter_12_20260918.pdf?ver=0n5-uFJ1kNOXsAHyMORrrA%3D%3D" rel="noopener"&gt;dcaa.mil&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The zero case has the same early-completion exception as the second test above.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The figures below are an example. A general contractor holds a 300-day federal contract for a clinic. On day 120 the contracting officer issues a written order suspending all work for an uncertain period and requiring the crew to be ready to return on short notice. The order is lifted 60 days later, and the job finishes on day 360. Under P.J. Dick, the written order settles standby.&lt;/p&gt;
&lt;p&gt;Start with the home office ledger for those 360 days and sort each cost as fixed or variable.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Home office costs for the 360-day performance period. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Home office cost&lt;/th&gt;&lt;th class="num"&gt;Cost over the 360 days ($)&lt;/th&gt;&lt;th&gt;In the Eichleay pool&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Executive and officer salaries&lt;/td&gt;&lt;td class="num"&gt;$1,500,000&lt;/td&gt;&lt;td&gt;Yes (fixed)&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Accounting and IT staff salaries&lt;/td&gt;&lt;td class="num"&gt;$1,000,000&lt;/td&gt;&lt;td&gt;Yes (fixed)&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Office rent and the fixed line charge for utilities&lt;/td&gt;&lt;td class="num"&gt;$600,000&lt;/td&gt;&lt;td&gt;Yes (fixed)&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Business insurance and property taxes&lt;/td&gt;&lt;td class="num"&gt;$300,000&lt;/td&gt;&lt;td&gt;Yes (fixed)&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Depreciation on office equipment&lt;/td&gt;&lt;td class="num"&gt;$200,000&lt;/td&gt;&lt;td&gt;Yes (fixed)&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Small tools and shop supplies that track field labor&lt;/td&gt;&lt;td class="num"&gt;$250,000&lt;/td&gt;&lt;td&gt;No (variable)&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Usage portion of the yard&amp;#39;s electricity bill&lt;/td&gt;&lt;td class="num"&gt;$50,000&lt;/td&gt;&lt;td&gt;No (variable)&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Fixed home office overhead used in the formula&lt;/td&gt;&lt;td class="num"&gt;$3,600,000&lt;/td&gt;&lt;td&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;Then run the three steps with revenue recognized over the same 360 days.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Eichleay calculation for the example clinic contract. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Line&lt;/th&gt;&lt;th class="num"&gt;Value&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Revenue recognized on the clinic contract during the 360 days&lt;/td&gt;&lt;td class="num"&gt;$9,000,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Revenue recognized on all company contracts during the same 360 days&lt;/td&gt;&lt;td class="num"&gt;$45,000,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Allocation ratio&lt;/td&gt;&lt;td class="num"&gt;20%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Fixed home office overhead during the 360 days&lt;/td&gt;&lt;td class="num"&gt;$3,600,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Step 1: overhead allocable to the clinic contract&lt;/td&gt;&lt;td class="num"&gt;$720,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Days of performance&lt;/td&gt;&lt;td class="num"&gt;360&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Step 2: daily contract overhead rate&lt;/td&gt;&lt;td class="num"&gt;$2,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Delay days&lt;/td&gt;&lt;td class="num"&gt;60&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Step 3: unabsorbed home office overhead&lt;/td&gt;&lt;td class="num"&gt;$120,000&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;The clinic carried 20% of company revenue during its performance period, so 20% of the $3.6 million pool, or $720,000, belongs to it. Spread over 360 days, that is $2,000 a day, and the 60 delay days come to $120,000. With the same pool and $60 million of company revenue, the allocation ratio drops to 15%, the daily rate to $1,500, and the claim to $90,000.&lt;/p&gt;
&lt;p&gt;The superintendent and the field office for those 60 days are a separate line, because DCAA keeps job site overhead out of this pool. The field cost table in the &lt;a href="https://constructionmetrics.com/2026/10/25/liquidated-damages-daily-rate-delay-cost/"&gt;liquidated damages post&lt;/a&gt; shows how to price them per calendar day. Profit stays out of both, under FAR 52.242-14.&lt;/p&gt;
&lt;h2 id="private-contracts"&gt;Private contracts&lt;/h2&gt;
&lt;p&gt;On private work, the contract language governs recovery. In the AIA A201-2017 general conditions, section 15.1.7 is a mutual waiver of consequential damages, and its list of the contractor&amp;rsquo;s waived damages includes principal office expenses and the pay of personnel stationed there. Check that section before building a home office overhead claim on an A201 job.&lt;/p&gt;
&lt;h2 id="how-to-start-on-your-jobs"&gt;How to start on your jobs&lt;/h2&gt;
&lt;p&gt;Once a year, sort the general and administrative ledger with the controller into fixed and variable costs, using DCAA&amp;rsquo;s tests above. Keep the split next to the &lt;a href="https://constructionmetrics.com/2026/09/26/build-work-in-progress-schedule-job-cost/"&gt;work-in-progress schedule&lt;/a&gt;, which already holds revenue recognized by job.&lt;/p&gt;
&lt;p&gt;On the next federal job, log every suspension the day it starts. Record whether a written order covers all the work, whether the crew had to stay ready, what the job billed that month against the month before, and the date of written notice, so that no cost falls outside the 20-day limit in FAR 52.242-14. The &lt;a href="https://constructionmetrics.com/2026/10/12/track-total-float-across-schedule-updates/"&gt;total float post&lt;/a&gt; shows how to track whether the suspension moved the completion date.&lt;/p&gt;</content:encoded></item><item><title>Bedrock Robotics raises $600 million after its retrofitted excavators began paid, operator-free earthwork in August</title><link>https://constructionmetrics.com/2026/10/28/bedrock-robotics-600-million-autonomous-excavators/</link><pubDate>Wed, 28 Oct 2026 07:35:03 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/28/bedrock-robotics-600-million-autonomous-excavators/</guid><category>AI</category><description>Bedrock Robotics retrofits existing excavators to dig on their own once a site manager sets the plan, and says contractors now pay for that work.</description><content:encoded>&lt;p&gt;Bedrock Robotics announced on October 26, 2026, that it has raised a $600 million Series C at a $4.1 billion post-money valuation, co-led by CapitalG and Emergence Capital. The San Francisco company sells a retrofit kit that lets an existing excavator dig with nobody in the cab. Bedrock says those machines have done paid work on live commercial sites since mid-August, and the new money goes toward putting more of them on earthwork and sitework jobs.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;The product is called the Bedrock Operator. According to Bedrock&amp;rsquo;s August announcement, a crew installs a sensor and compute package on an excavator the contractor already owns, in one day and with no permanent changes to the machine. A site manager sets the initial plan. From there, a single machine learning model perceives the surroundings, plans its motion, and carries out the digging. Bedrock says the model was trained across tens of thousands of field hours.&lt;/p&gt;
&lt;p&gt;On safety, Bedrock says its excavators work next to other equipment in normal site conditions without barriers. If a person or an unauthorized object comes too close, the machine stops until the area is clear.&lt;/p&gt;
&lt;p&gt;So on a contractor&amp;rsquo;s job, the superintendent and the grade foreman would work with it most, since they set the dig plan and run the trucks and support equipment around it. The equipment manager decides which machines get the kit. Bedrock picked excavators first because, it says, they often make up 25% of a contractor&amp;rsquo;s fleet and take five years or more to learn to run well. Dump trucks, dozers and loaders are on its list for later.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Bedrock&amp;rsquo;s two press releases, comments from customers and investors in them, and a reading of the news by the construction technology newsletter Bricks &amp;amp; Bytes. Here is what Bedrock reports:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Operator-free excavators began paid work on commercial sites in mid-August 2026, after a year of testing under human supervision.&lt;/li&gt;
&lt;li&gt;It has more than doubled its total customer volume since 2025. The release gives this as a ratio, without a customer count.&lt;/li&gt;
&lt;li&gt;In August, it counted 15 general contractor partners operating across 23 states.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The named jobs and new contracts are below.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Contractors Bedrock names in its August and October announcements&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Contractor&lt;/th&gt;&lt;th&gt;Where&lt;/th&gt;&lt;th&gt;Work Bedrock describes&lt;/th&gt;&lt;th&gt;Announced&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Sundt Construction&lt;/td&gt;&lt;td&gt;Nevada&lt;/td&gt;&lt;td&gt;Excavation at a water treatment facility&lt;/td&gt;&lt;td&gt;August 17, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Champion Site Prep&lt;/td&gt;&lt;td&gt;Texas&lt;/td&gt;&lt;td&gt;Multi-million-cubic-yard earthwork site&lt;/td&gt;&lt;td&gt;August 17, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Zachry Construction&lt;/td&gt;&lt;td&gt;Not stated&lt;/td&gt;&lt;td&gt;Civil sitework project of 1.2 million cubic yards&lt;/td&gt;&lt;td&gt;August 17, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Haydon&lt;/td&gt;&lt;td&gt;Texas (remote site)&lt;/td&gt;&lt;td&gt;Autonomous earthwork, with trench work and larger machines to be tested&lt;/td&gt;&lt;td&gt;October 26, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Wagner Construction&lt;/td&gt;&lt;td&gt;Minnesota&lt;/td&gt;&lt;td&gt;New customer contract&lt;/td&gt;&lt;td&gt;October 26, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Smith Trucking Company&lt;/td&gt;&lt;td&gt;Florida&lt;/td&gt;&lt;td&gt;New customer contract&lt;/td&gt;&lt;td&gt;October 26, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;B&amp;amp;S Site Development&lt;/td&gt;&lt;td&gt;Virginia&lt;/td&gt;&lt;td&gt;New customer contract&lt;/td&gt;&lt;td&gt;October 26, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Native Excavating&lt;/td&gt;&lt;td&gt;Colorado&lt;/td&gt;&lt;td&gt;New customer contract&lt;/td&gt;&lt;td&gt;October 26, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Clarkson Construction&lt;/td&gt;&lt;td&gt;Missouri&lt;/td&gt;&lt;td&gt;New customer contract&lt;/td&gt;&lt;td&gt;October 26, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;C.W. Matthews&lt;/td&gt;&lt;td&gt;Georgia&lt;/td&gt;&lt;td&gt;New customer contract&lt;/td&gt;&lt;td&gt;October 26, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;ArchKey Solutions&lt;/td&gt;&lt;td&gt;Arkansas&lt;/td&gt;&lt;td&gt;Selected projects&lt;/td&gt;&lt;td&gt;October 26, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.globenewswire.com/news-release/2026/10/26/3388197/0/en/bedrock-robotics-raises-600-million-series-c-to-scale-autonomous-construction-equipment-across-u-s-sites.html" rel="noopener"&gt;globenewswire.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Read the yardage carefully. Bricks &amp;amp; Bytes points out that 1.2 million cubic yards is the size of Zachry&amp;rsquo;s sitework project. The volume the autonomous machine dug on that job is a separate figure. The newsletter&amp;rsquo;s editors list the questions that come next: uptime, cost per cubic yard, hours between human interventions, and whether customers order more machines. Production rates, intervention rates and pricing for the Bedrock Operator are not yet public.&lt;/p&gt;
&lt;p&gt;Katie Haydon is CEO and chair of Haydon, an employee-owned general contractor in Tempe, Arizona. Katie Haydon said in the October release: &amp;ldquo;For us, the biggest win is a safer, more predictable job site.&amp;rdquo; Haydon is deploying the system on a remote Texas site and plans to test trench work and larger machines later.&lt;/p&gt;
&lt;p&gt;US Innovative Technology Fund, Bessemer Venture Partners and Temasek joined the round as new investors, alongside existing backers such as NVIDIA and 8VC. Total funding is now close to $1 billion (in August, Bedrock put the figure at $350 million). Bedrock also hired Amy Jones Satrom, formerly of Amazon, Nuro and Uber, as VP of operations, and Lando Juarez, who led legal for Uber&amp;rsquo;s autonomous mobility and delivery business, as general counsel. Bedrock says the hires support its growing footprint on customer sites.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track cost per bank cubic yard (earth measured in place, before it swells) for each excavator on a mass excavation scope. Add the machine&amp;rsquo;s hourly owning and operating cost to the operator&amp;rsquo;s burdened hourly wage, multiply by hours worked, and divide by bank cubic yards moved. Our post on &lt;a href="https://constructionmetrics.com/2026/10/17/compute-equipment-hourly-rate-corps-method/"&gt;computing an equipment hourly rate with the Corps of Engineers method&lt;/a&gt; covers the first term.&lt;/p&gt;
&lt;p&gt;If you get a pilot, capture the baseline first on a crewed machine in similar material:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Engine hours and idle hours per shift from telematics.&lt;/li&gt;
&lt;li&gt;Bank cubic yards per shift, taken from survey or grade-check quantities rather than truck counts.&lt;/li&gt;
&lt;li&gt;Operator hours and the burdened wage rate.&lt;/li&gt;
&lt;li&gt;Trucks loaded per hour, since a slow loading cycle holds up the haul fleet too.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;During the pilot, log the same four items for the autonomous machine. Add every automatic stop and every time someone took control, with the minutes lost. Count the hours of the person setting dig plans and watching the machine in its cost column. Leaving that time out makes the robot look cheaper than it is. The &lt;a href="https://constructionmetrics.com/2026/10/06/measure-labor-productivity-daily-logs-timecards/"&gt;labor productivity method from daily logs and timecards&lt;/a&gt; works for the crew side of the comparison.&lt;/p&gt;
&lt;p&gt;A first step on one job: have the grade foreman record bank cubic yards and engine hours for one excavator every shift for two weeks.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;Bedrock describes its model as co-developing autonomy with general contractors on their own machines. The new contracts in the October release take the machines beyond the West and Central South into the Midwest and South Atlantic. Pricing is not public, and the release lists &lt;a href="mailto:press@bedrockrobotics.com"&gt;press@bedrockrobotics.com&lt;/a&gt; as its contact. For another robot that works next to a crew, see our post on &lt;a href="https://constructionmetrics.com/2026/10/19/origin-og-1-drywall-finishing-robot/"&gt;Origin&amp;rsquo;s OG-1 drywall finishing robot&lt;/a&gt;.&lt;/p&gt;</content:encoded></item><item><title>How to set monthly weather delay days from NOAA climate normals, with a Chicago O'Hare example</title><link>https://constructionmetrics.com/2026/10/27/weather-delay-days-noaa-climate-normals/</link><pubDate>Tue, 27 Oct 2026 11:40:19 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/27/weather-delay-days-noaa-climate-normals/</guid><category>Data</category><description>NOAA climate normals count rain days by month at more than 15,000 stations. This example turns Chicago O'Hare's counts into a work-day weather allowance.</description><content:encoded>&lt;p&gt;A scheduler building the baseline for a job that starts in spring has to decide how many days the crew will lose to weather each month. Three authors at PMA Consultants write that US contracts commonly leave normal adverse weather with the contractor and grant time only for weather worse than normal. That makes the scheduler&amp;rsquo;s monthly number the baseline both parties measure against later.&lt;/p&gt;
&lt;p&gt;The U.S. Army Corps of Engineers writes that baseline into its contracts as a table of anticipated weather delay days for each month, built from National Oceanic and Atmospheric Administration (NOAA) or similar data. NOAA&amp;rsquo;s National Centers for Environmental Information (NCEI) publishes the counts that make the table quick to build. Its 1991-2020 U.S. Climate Normals, which are 30-year averages first released in May 2021, give the average number of days per month with 0.10 inch or more of precipitation at more than 15,000 stations.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;May averages the most rain days at Chicago O&amp;#39;Hare&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Average days per month with 0.10 inch or more of precipitation, 1991-2020 normals&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;May averages the most rain days at Chicago O&amp;#39;Hare&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Bar chart with 12 points from Jan to Dec. Series: Days with 0.10 in. or more precipitation. Values range from 0 to 8.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="162.0" y2="162.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;0&lt;/text&gt;&lt;text x="64" y="165.5" text-anchor="end"&gt;5&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;10&lt;/text&gt;&lt;text x="94.7" y="324" text-anchor="start"&gt;Jan&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;Mar&lt;/text&gt;&lt;text x="276.0" y="324" text-anchor="middle"&gt;May&lt;/text&gt;&lt;text x="366.7" y="324" text-anchor="middle"&gt;Jul&lt;/text&gt;&lt;text x="457.3" y="324" text-anchor="middle"&gt;Sep&lt;/text&gt;&lt;text x="593.3" y="324" text-anchor="end"&gt;Dec&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;rect x="77.7" y="156.2" width="34.0" height="149.8"&gt;&lt;title&gt;Jan: 5.2&lt;/title&gt;&lt;/rect&gt;&lt;rect x="123.0" y="170.6" width="34.0" height="135.4"&gt;&lt;title&gt;Feb: 4.7&lt;/title&gt;&lt;/rect&gt;&lt;rect x="168.3" y="147.6" width="34.0" height="158.4"&gt;&lt;title&gt;Mar: 5.5&lt;/title&gt;&lt;/rect&gt;&lt;rect x="213.7" y="101.5" width="34.0" height="204.5"&gt;&lt;title&gt;Apr: 7.1&lt;/title&gt;&lt;/rect&gt;&lt;rect x="259.0" y="72.7" width="34.0" height="233.3"&gt;&lt;title&gt;May: 8.1&lt;/title&gt;&lt;/rect&gt;&lt;rect x="304.3" y="113.0" width="34.0" height="193.0"&gt;&lt;title&gt;Jun: 6.7&lt;/title&gt;&lt;/rect&gt;&lt;rect x="349.7" y="139.0" width="34.0" height="167.0"&gt;&lt;title&gt;Jul: 5.8&lt;/title&gt;&lt;/rect&gt;&lt;rect x="395.0" y="118.8" width="34.0" height="187.2"&gt;&lt;title&gt;Aug: 6.5&lt;/title&gt;&lt;/rect&gt;&lt;rect x="440.3" y="144.7" width="34.0" height="161.3"&gt;&lt;title&gt;Sep: 5.6&lt;/title&gt;&lt;/rect&gt;&lt;rect x="485.7" y="124.6" width="34.0" height="181.4"&gt;&lt;title&gt;Oct: 6.3&lt;/title&gt;&lt;/rect&gt;&lt;rect x="531.0" y="153.4" width="34.0" height="152.6"&gt;&lt;title&gt;Nov: 5.3&lt;/title&gt;&lt;/rect&gt;&lt;rect x="576.3" y="167.8" width="34.0" height="138.2"&gt;&lt;title&gt;Dec: 4.8&lt;/title&gt;&lt;/rect&gt;
&lt;text class="label" x="593.3" y="162.8" text-anchor="middle"&gt;4.8&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="65.7" y2="52.7"/&gt;
&lt;circle cx="276.0" cy="72.7" r="3.5"/&gt;&lt;text x="276.0" y="48.7" text-anchor="middle"&gt;May, 8.1&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;May averages the most rain days at Chicago O&amp;#39;Hare&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Bar chart with 12 points from Jan to Dec. Series: Days with 0.10 in. or more precipitation. Values range from 0 to 8.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="117.0" y2="117.0"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;0&lt;/text&gt;&lt;text x="42" y="120.5" text-anchor="end"&gt;5&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;10&lt;/text&gt;&lt;text x="59.4" y="237" text-anchor="start"&gt;Jan&lt;/text&gt;&lt;text x="172.4" y="237" text-anchor="middle"&gt;Jul&lt;/text&gt;&lt;text x="266.6" y="237" text-anchor="end"&gt;Dec&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;rect x="52.4" y="112.9" width="14.1" height="107.1"&gt;&lt;title&gt;Jan: 5.2&lt;/title&gt;&lt;/rect&gt;&lt;rect x="71.2" y="123.2" width="14.1" height="96.8"&gt;&lt;title&gt;Feb: 4.7&lt;/title&gt;&lt;/rect&gt;&lt;rect x="90.0" y="106.7" width="14.1" height="113.3"&gt;&lt;title&gt;Mar: 5.5&lt;/title&gt;&lt;/rect&gt;&lt;rect x="108.9" y="73.7" width="14.1" height="146.3"&gt;&lt;title&gt;Apr: 7.1&lt;/title&gt;&lt;/rect&gt;&lt;rect x="127.7" y="53.1" width="14.1" height="166.9"&gt;&lt;title&gt;May: 8.1&lt;/title&gt;&lt;/rect&gt;&lt;rect x="146.5" y="82.0" width="14.1" height="138.0"&gt;&lt;title&gt;Jun: 6.7&lt;/title&gt;&lt;/rect&gt;&lt;rect x="165.4" y="100.5" width="14.1" height="119.5"&gt;&lt;title&gt;Jul: 5.8&lt;/title&gt;&lt;/rect&gt;&lt;rect x="184.2" y="86.1" width="14.1" height="133.9"&gt;&lt;title&gt;Aug: 6.5&lt;/title&gt;&lt;/rect&gt;&lt;rect x="203.0" y="104.6" width="14.1" height="115.4"&gt;&lt;title&gt;Sep: 5.6&lt;/title&gt;&lt;/rect&gt;&lt;rect x="221.9" y="90.2" width="14.1" height="129.8"&gt;&lt;title&gt;Oct: 6.3&lt;/title&gt;&lt;/rect&gt;&lt;rect x="240.7" y="110.8" width="14.1" height="109.2"&gt;&lt;title&gt;Nov: 5.3&lt;/title&gt;&lt;/rect&gt;&lt;rect x="259.5" y="121.1" width="14.1" height="98.9"&gt;&lt;title&gt;Dec: 4.8&lt;/title&gt;&lt;/rect&gt;
&lt;text class="label" x="266.6" y="116.1" text-anchor="middle"&gt;4.8&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="134.8" x2="134.8" y1="60.1" y2="72.1"/&gt;
&lt;circle cx="134.8" cy="53.1" r="3.5"/&gt;&lt;text x="134.8" y="83.1" text-anchor="middle"&gt;&lt;tspan x="134.8"&gt;May&lt;/tspan&gt;&lt;tspan x="134.8" dy="12"&gt;8.1&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;Station USW00094846. Precipitation includes the liquid equivalent of snow.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://www.ncei.noaa.gov/data/normals-monthly/1991-2020/access/USW00094846.csv" rel="noopener"&gt;ncei.noaa.gov&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="how-the-corps-clause-works"&gt;How the Corps clause works&lt;/h2&gt;
&lt;p&gt;The Corps sets its method out in Engineer Regulation 415-1-15, Construction Time Extensions for Weather, dated October 31, 1989. It defines adverse weather as conditions at a definite time and place that are unfavorable to construction. Unusually severe weather is weather more severe than the adverse weather anticipated for the season or location.&lt;/p&gt;
&lt;p&gt;The contract clause carries a 12-month table of anticipated adverse weather delay work days, based on a five-day week. The contractor&amp;rsquo;s progress schedule has to carry those days in every weather-dependent activity. During the job, the contractor records adverse weather and its effect on the daily quality control report. A day counts as an actual weather delay day when weather stops work on critical activities for 50 percent or more of the scheduled work day.&lt;/p&gt;
&lt;p&gt;When a month&amp;rsquo;s actual delay days exceed the table, the month had unusually severe weather. The regulation says in capital letters that this finding does not by itself earn a time extension for the difference. The contracting officer first checks the progress schedule to see whether the weather delayed work critical to completion, then converts qualifying delays to calendar days and issues a modification at least quarterly.&lt;/p&gt;
&lt;h2 id="pick-the-threshold"&gt;Pick the threshold&lt;/h2&gt;
&lt;p&gt;Appendix B of the regulation starts from the scope. The scheduler chooses the weather that could stop the work, such as temperature, precipitation or wind, and takes a numerical limit for each from the specifications. When two phases share a parameter, the regulation uses the less severe limit. Its example is roofing that stops below 40 degrees and concrete that stops below 32, where the threshold becomes 40 unless roofing is minor to the schedule.&lt;/p&gt;
&lt;p&gt;For rain, the PMA authors report general agreement among practitioners that 0.1 inch or more during a work day interrupts outdoor work. They add that 1 inch or more is likely to cost the following work day for drying, snow removal or dewatering. They cite the Federal Highway Administration&amp;rsquo;s Eastern Federal Lands specification, which defines a rain day at 0.10 inch and a drying day as the work day after 1.00 inch or more. NOAA&amp;rsquo;s monthly normals report both counts directly, in tenths of a day.&lt;/p&gt;
&lt;p&gt;Freezing temperature behaves differently. At O&amp;rsquo;Hare the low reaches 32°F or below on 28.1 days of an average January, according to NOAA. A limit that is met on nearly every day of a month points to winter protection or a different sequence, and it makes a poor delay allowance. The PMA authors also warn against counting one lost day twice, so a day with both rain and high wind counts once.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The figures below are an example built on NOAA&amp;rsquo;s normals for Chicago O&amp;rsquo;Hare International Airport. A general contractor is scheduling a sitework and foundation package near Chicago on a five-day week. The scheduler defines a lost day as one with 0.10 inch or more of precipitation and adds a drying day for each day with 1.00 inch or more.&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Download the station&amp;rsquo;s monthly normals file from NCEI and read two columns: MLY-PRCP-AVGNDS-GE010HI, the days with 0.10 inch or more, and MLY-PRCP-AVGNDS-GE100HI, the days with 1.00 inch or more.&lt;/li&gt;
&lt;li&gt;Add them to get calendar days lost.&lt;/li&gt;
&lt;li&gt;Multiply by 5/7 to convert to work days. The PMA authors describe this weekly factor for a five-day schedule.&lt;/li&gt;
&lt;li&gt;Round to whole days, with halves rounded up, because the Corps table uses whole days.&lt;/li&gt;
&lt;/ol&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Anticipated weather delay days at Chicago O&amp;#39;Hare, five-day week. Example method applied to NOAA 1991-2020 monthly normals.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Rain days (0.10 in. or more)&lt;/th&gt;&lt;th class="num"&gt;Drying days (1.00 in. or more)&lt;/th&gt;&lt;th class="num"&gt;Calendar days lost&lt;/th&gt;&lt;th class="num"&gt;Work days lost (x 5/7)&lt;/th&gt;&lt;th class="num"&gt;Work days in the schedule&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Jan&lt;/td&gt;&lt;td class="num"&gt;5.2&lt;/td&gt;&lt;td class="num"&gt;0.1&lt;/td&gt;&lt;td class="num"&gt;5.3&lt;/td&gt;&lt;td class="num"&gt;3.8&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb&lt;/td&gt;&lt;td class="num"&gt;4.7&lt;/td&gt;&lt;td class="num"&gt;0.3&lt;/td&gt;&lt;td class="num"&gt;5.0&lt;/td&gt;&lt;td class="num"&gt;3.6&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mar&lt;/td&gt;&lt;td class="num"&gt;5.5&lt;/td&gt;&lt;td class="num"&gt;0.4&lt;/td&gt;&lt;td class="num"&gt;5.9&lt;/td&gt;&lt;td class="num"&gt;4.2&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Apr&lt;/td&gt;&lt;td class="num"&gt;7.1&lt;/td&gt;&lt;td class="num"&gt;0.8&lt;/td&gt;&lt;td class="num"&gt;7.9&lt;/td&gt;&lt;td class="num"&gt;5.6&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May&lt;/td&gt;&lt;td class="num"&gt;8.1&lt;/td&gt;&lt;td class="num"&gt;1.1&lt;/td&gt;&lt;td class="num"&gt;9.2&lt;/td&gt;&lt;td class="num"&gt;6.6&lt;/td&gt;&lt;td class="num"&gt;7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jun&lt;/td&gt;&lt;td class="num"&gt;6.7&lt;/td&gt;&lt;td class="num"&gt;1.2&lt;/td&gt;&lt;td class="num"&gt;7.9&lt;/td&gt;&lt;td class="num"&gt;5.6&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jul&lt;/td&gt;&lt;td class="num"&gt;5.8&lt;/td&gt;&lt;td class="num"&gt;0.9&lt;/td&gt;&lt;td class="num"&gt;6.7&lt;/td&gt;&lt;td class="num"&gt;4.8&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aug&lt;/td&gt;&lt;td class="num"&gt;6.5&lt;/td&gt;&lt;td class="num"&gt;1.2&lt;/td&gt;&lt;td class="num"&gt;7.7&lt;/td&gt;&lt;td class="num"&gt;5.5&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Sep&lt;/td&gt;&lt;td class="num"&gt;5.6&lt;/td&gt;&lt;td class="num"&gt;0.8&lt;/td&gt;&lt;td class="num"&gt;6.4&lt;/td&gt;&lt;td class="num"&gt;4.6&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oct&lt;/td&gt;&lt;td class="num"&gt;6.3&lt;/td&gt;&lt;td class="num"&gt;0.7&lt;/td&gt;&lt;td class="num"&gt;7.0&lt;/td&gt;&lt;td class="num"&gt;5.0&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nov&lt;/td&gt;&lt;td class="num"&gt;5.3&lt;/td&gt;&lt;td class="num"&gt;0.5&lt;/td&gt;&lt;td class="num"&gt;5.8&lt;/td&gt;&lt;td class="num"&gt;4.1&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec&lt;/td&gt;&lt;td class="num"&gt;4.8&lt;/td&gt;&lt;td class="num"&gt;0.3&lt;/td&gt;&lt;td class="num"&gt;5.1&lt;/td&gt;&lt;td class="num"&gt;3.6&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Year&lt;/td&gt;&lt;td class="num"&gt;71.6&lt;/td&gt;&lt;td class="num"&gt;8.3&lt;/td&gt;&lt;td class="num"&gt;79.9&lt;/td&gt;&lt;td class="num"&gt;57.1&lt;/td&gt;&lt;td class="num"&gt;60&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.ncei.noaa.gov/data/normals-monthly/1991-2020/access/USW00094846.csv" rel="noopener"&gt;ncei.noaa.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;O&amp;rsquo;Hare averages 79.9 calendar days a year that meet this definition. That comes to 57.1 work days before rounding and 60 after, since rounding each month adds a little. May carries the largest allowance at 7 work days. January and February carry 4 each, because O&amp;rsquo;Hare&amp;rsquo;s normal precipitation in those months is under 2 inches, compared with 4.49 inches in May.&lt;/p&gt;
&lt;p&gt;The regulation asks for the last 10 consecutive years of data where possible and an annual review of the baseline. Normals are 30-year averages that end in 2020. NCEI also publishes 15-year normals for 2006-2020, and it reports that the eastern two-thirds of the contiguous U.S. was wetter in 1991-2020 than in 1981-2010. Where a contract names the data period or the station, the contract governs, and the normals serve as a check at bid time.&lt;/p&gt;
&lt;h2 id="track-it-month-by-month"&gt;Track it month by month&lt;/h2&gt;
&lt;p&gt;The second table is also an example. The same package runs from April through July with an allowance of 24 work days. The superintendent&amp;rsquo;s daily logs record 27 lost days.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Monthly comparison of anticipated and actual weather days. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Anticipated work days lost&lt;/th&gt;&lt;th class="num"&gt;Actual work days lost (example)&lt;/th&gt;&lt;th class="num"&gt;Days above the allowance&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Apr&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May&lt;/td&gt;&lt;td class="num"&gt;7&lt;/td&gt;&lt;td class="num"&gt;11&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jun&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jul&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;&lt;td class="num"&gt;7&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total&lt;/td&gt;&lt;td class="num"&gt;24&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.publications.usace.army.mil/Portals/76/Publications/EngineerRegulations/ER_415-1-15.pdf" rel="noopener"&gt;publications.usace.army.mil&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The regulation tests each month on its own, so April and June&amp;rsquo;s unused days do not cover May. The excess is 4 days in May and 2 in July, a total of 6 work days. Those 6 days support a request for time only where the schedule shows the weather held up critical work. The PMA authors note that the usual practice takes no deduction from the contractor when a month&amp;rsquo;s weather comes in better than the allowance.&lt;/p&gt;
&lt;p&gt;Every excused day has a dollar value on a job with liquidated damages, which the &lt;a href="https://constructionmetrics.com/2026/10/25/liquidated-damages-daily-rate-delay-cost/"&gt;liquidated damages post&lt;/a&gt; covers. The &lt;a href="https://constructionmetrics.com/2026/10/12/track-total-float-across-schedule-updates/"&gt;float post&lt;/a&gt; shows how to watch the critical path across updates, which is the test the Corps applies before it grants weather time.&lt;/p&gt;
&lt;h2 id="how-to-start-on-your-jobs"&gt;How to start on your jobs&lt;/h2&gt;
&lt;p&gt;Pick one active job with weather-sensitive work on the critical path. Find the nearest NOAA station whose normals carry the S completeness flag, which NCEI uses for records with 24 or more years of data. Build the 12-month table from its two precipitation columns and compare it with the weather allowance in the contract or the baseline schedule.&lt;/p&gt;
&lt;p&gt;Then add one field to the daily log. Each day the superintendent records whether weather stopped critical work for half the scheduled day or more, so the monthly count matches the definition in the contract.&lt;/p&gt;</content:encoded></item><item><title>NetSuite plans AI agents that turn estimates into job budgets and draft pay applications</title><link>https://constructionmetrics.com/2026/10/27/netsuite-ai-agents-estimates-pay-applications/</link><pubDate>Tue, 27 Oct 2026 07:40:43 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/27/netsuite-ai-agents-estimates-pay-applications/</guid><category>AI</category><description>NetSuite's planned construction product uses AI agents to turn estimates into schedules of values and job budgets, and to draft monthly pay applications.</description><content:encoded>&lt;p&gt;Oracle NetSuite announced on October 26, 2026, at its SuiteWorld conference in Las Vegas, that it plans a construction accounting product called &lt;a href="https://www.netsuite.com/portal/company/newsroom/netsuite-helps-construction-businesses-protect-margins-and-improve-cash-flow.shtml"&gt;NetSuite for Construction Businesses&lt;/a&gt;. The product includes two AI agents. One sets up a new job from the estimate, and the other prepares the monthly payment application. Both work on the handoff between estimating, project management and billing at general contractors, subcontractors and specialty-trade firms, the three groups NetSuite names as users.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;Job setup after award usually falls to a project accountant or a project manager. They take the final estimate, build the schedule of values for the owner contract, and load a budget by cost code into the accounting system. NetSuite says its Estimate Import Agent converts an estimate into the contract, the schedule of values and a cost-coded job budget. Each imported line traces back to the estimate, so a reviewer can check it against the source.&lt;/p&gt;
&lt;p&gt;An AI agent here means software that carries out a sequence of steps, such as reading an estimate and creating the records it implies, and then hands the result to a person for review. NetSuite says users reach both agents through Ask Oracle, its chat assistant, by typing requests in plain language.&lt;/p&gt;
&lt;p&gt;The Payment Application Agent works on the monthly billing cycle. According to the announcement, it prepares a pay app from verified progress, approved change orders and retainage terms. The project manager confirms percent complete, and the billing team reviews and approves the application before it posts.&lt;/p&gt;
&lt;aside class="note"&gt;In plain terms, the agents fill in the job setup and a draft pay app from data already in the system. The project manager still signs off on percent complete, and billing still approves what goes to the owner.&lt;/aside&gt;
&lt;p&gt;The rest of the planned product supports those two agents. NetSuite lists:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;A Construction Workbench showing budget, committed cost, actual cost, billed to date and estimated cost to complete for each job.&lt;/li&gt;
&lt;li&gt;Change orders that carry into the schedule of values and later pay apps.&lt;/li&gt;
&lt;li&gt;AIA-style payment applications built from the schedule of values, including stored materials.&lt;/li&gt;
&lt;li&gt;WIP accounting that compares earned and billed revenue, adjusts for over- and underbilling, and tracks retainage through final collection.&lt;/li&gt;
&lt;li&gt;Construction payroll with certified payroll, wage determinations, multi-rate overtime and garnishments.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;A contractor that keeps its WIP schedule in Excel will recognize those workbench columns from our &lt;a href="https://constructionmetrics.com/2026/09/26/build-work-in-progress-schedule-job-cost/"&gt;work-in-progress schedule walkthrough&lt;/a&gt;.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence so far is NetSuite&amp;rsquo;s press release and its construction product page. These claims come from NetSuite:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;The Estimate Import Agent automates job setup and gives each job a consistent financial baseline.&lt;/li&gt;
&lt;li&gt;The Payment Application Agent cuts manual work and speeds up billing.&lt;/li&gt;
&lt;li&gt;The Construction Workbench helps project managers and controllers spot margin problems earlier.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Evan Goldberg, NetSuite&amp;rsquo;s founder, says in the release that small gaps between project activity and financial records can quickly hurt profit and cash flow. The release describes planned capabilities and carries Oracle&amp;rsquo;s future-product disclaimer, which says features, timing and pricing may change. Customer results for the construction agents, such as the accuracy of the estimate conversion or the time saved per pay app, are not yet public.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track pay application cycle time: the calendar days from the end of the billing period to the day the pay app goes to the owner or the GC. Record it per job, per month. A pay app that goes out later gets paid later, and our &lt;a href="https://constructionmetrics.com/2026/10/11/adjust-dso-retainage-billing-cycles/"&gt;DSO post&lt;/a&gt; shows how that lag feeds days sales outstanding.&lt;/p&gt;
&lt;p&gt;Before a pilot, pull the last six billing cycles for five to ten active jobs. For each pay app, record:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;The billing period end date and the submission date.&lt;/li&gt;
&lt;li&gt;Whether the owner or architect returned it for corrections, and how many days the resubmission took.&lt;/li&gt;
&lt;li&gt;Hours the project manager and billing staff spent on it, if your timesheets break that out.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;During the pilot, log the same items. Also log every line where the agent&amp;rsquo;s draft differed from what the project manager approved. The share of lines changed is the error rate that matters on your jobs. Job setup can be measured the same way, as hours from award to a loaded budget and the count of budget lines corrected in the first month.&lt;/p&gt;
&lt;p&gt;A first step on one job: pick the job with the most change orders this year and write down the submission dates of its last six pay apps.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;NetSuite says the product will start with a limited US rollout, with broader availability expected later. The construction page says NetSuite sells an annual subscription made up of the core platform, optional modules and user count, plus a one-time implementation fee. Launch dates and pricing for the construction product and its agents are not in the release. NetSuite says it has more than 44,000 customers in 220 countries and dependent territories, and its construction page notes that some capabilities described there require partner integrations.&lt;/p&gt;</content:encoded></item><item><title>How to tie a fuel price adjustment to EIA diesel prices, with a 160,000-cubic-yard earthwork example</title><link>https://constructionmetrics.com/2026/10/26/fuel-price-adjustment-clause-eia-diesel/</link><pubDate>Mon, 26 Oct 2026 11:49:44 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/26/fuel-price-adjustment-clause-eia-diesel/</guid><category>Data</category><description>A fuel price adjustment pays for estimated gallons at the change in a diesel index. This example prices 160,000 cubic yards of earthwork.</description><content:encoded>&lt;p&gt;An estimator pricing mass excavation carries diesel inside the equipment rate, so the bid never shows a line for fuel. When the price at the pump moves between bid day and the last load of dirt, the sitework contractor absorbs the whole change. A fuel price adjustment clause moves part of that risk to the owner with a formula: estimated gallons times the change in a published diesel price.&lt;/p&gt;
&lt;p&gt;The Energy Information Administration (EIA) reports that U.S. on-highway diesel averaged $6.291 a gallon in September 2026, up from $3.722 in February. That is the highest monthly average in EIA&amp;rsquo;s series, which begins in 1994 and is not adjusted for inflation. In the week of October 19, EIA&amp;rsquo;s average was $6.276, which is $2.656 above a year earlier.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Diesel averaged $6.29 a gallon in September 2026&lt;/p&gt;&lt;p class="chart-subtitle"&gt;U.S. on-highway No. 2 diesel retail price, monthly average, dollars per gallon, all taxes included&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 376" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;Diesel averaged $6.29 a gallon in September 2026&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: U.S. on-highway diesel ($/gal). Values range from 3 to 6.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="342.0" y2="342.0"/&gt;&lt;line x1="72" x2="616" y1="270.0" y2="270.0"/&gt;&lt;line x1="72" x2="616" y1="198.0" y2="198.0"/&gt;&lt;line x1="72" x2="616" y1="126.0" y2="126.0"/&gt;&lt;line x1="72" x2="616" y1="54.0" y2="54.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="342.0" y2="342.0"/&gt;&lt;text x="64" y="345.5" text-anchor="end"&gt;3&lt;/text&gt;&lt;text x="64" y="273.5" text-anchor="end"&gt;4&lt;/text&gt;&lt;text x="64" y="201.5" text-anchor="end"&gt;5&lt;/text&gt;&lt;text x="64" y="129.5" text-anchor="end"&gt;6&lt;/text&gt;&lt;text x="64" y="57.5" text-anchor="end"&gt;7&lt;/text&gt;&lt;text x="72.0" y="360" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="185.3" y="360" text-anchor="middle"&gt;2025-02&lt;/text&gt;&lt;text x="298.7" y="360" text-anchor="middle"&gt;2025-07&lt;/text&gt;&lt;text x="412.0" y="360" text-anchor="middle"&gt;2025-12&lt;/text&gt;&lt;text x="525.3" y="360" text-anchor="middle"&gt;2026-05&lt;/text&gt;&lt;text x="616.0" y="360" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,301.8 L94.7,299.9 L117.3,304.4 L140.0,306.4 L162.7,296.4 L185.3,293.4 L208.0,299.9 L230.7,301.2 L253.3,306.1 L276.0,298.9 L298.7,285.9 L321.3,288.4 L344.0,288.1 L366.7,293.1 L389.3,282.8 L412.0,297.7 L434.7,304.3 L457.3,290.0 L480.0,203.7 L502.7,161.9 L525.3,154.8 L548.0,196.3 L570.7,201.2 L593.3,164.7 L616.0,105.0 L616.0,342.0 L72.0,342.0 Z"/&gt;
&lt;path class="line" d="M72.0,301.8 L94.7,299.9 L117.3,304.4 L140.0,306.4 L162.7,296.4 L185.3,293.4 L208.0,299.9 L230.7,301.2 L253.3,306.1 L276.0,298.9 L298.7,285.9 L321.3,288.4 L344.0,288.1 L366.7,293.1 L389.3,282.8 L412.0,297.7 L434.7,304.3 L457.3,290.0 L480.0,203.7 L502.7,161.9 L525.3,154.8 L548.0,196.3 L570.7,201.2 L593.3,164.7 L616.0,105.0"/&gt;
&lt;circle class="end" cx="616.0" cy="105.0" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="301.8" r="9"&gt;&lt;title&gt;September 2024: 3.56&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="299.9" r="9"&gt;&lt;title&gt;October 2024: 3.59&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="304.4" r="9"&gt;&lt;title&gt;November 2024: 3.52&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="306.4" r="9"&gt;&lt;title&gt;December 2024: 3.49&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="296.4" r="9"&gt;&lt;title&gt;January 2025: 3.63&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="293.4" r="9"&gt;&lt;title&gt;February 2025: 3.68&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="299.9" r="9"&gt;&lt;title&gt;March 2025: 3.59&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="301.2" r="9"&gt;&lt;title&gt;April 2025: 3.57&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="306.1" r="9"&gt;&lt;title&gt;May 2025: 3.50&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="298.9" r="9"&gt;&lt;title&gt;June 2025: 3.60&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="285.9" r="9"&gt;&lt;title&gt;July 2025: 3.78&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="288.4" r="9"&gt;&lt;title&gt;August 2025: 3.74&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="288.1" r="9"&gt;&lt;title&gt;September 2025: 3.75&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="293.1" r="9"&gt;&lt;title&gt;October 2025: 3.68&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="282.8" r="9"&gt;&lt;title&gt;November 2025: 3.82&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="297.7" r="9"&gt;&lt;title&gt;December 2025: 3.62&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="304.3" r="9"&gt;&lt;title&gt;January 2026: 3.52&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="290.0" r="9"&gt;&lt;title&gt;February 2026: 3.72&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="203.7" r="9"&gt;&lt;title&gt;March 2026: 4.92&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="161.9" r="9"&gt;&lt;title&gt;April 2026: 5.50&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="154.8" r="9"&gt;&lt;title&gt;May 2026: 5.60&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="196.3" r="9"&gt;&lt;title&gt;June 2026: 5.02&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="201.2" r="9"&gt;&lt;title&gt;July 2026: 4.96&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="164.7" r="9"&gt;&lt;title&gt;August 2026: 5.46&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="105.0" r="9"&gt;&lt;title&gt;September 2026: 6.29&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="109.0"&gt;6.29&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="457.3" x2="457.3" y1="283.0" y2="270.0"/&gt;
&lt;circle cx="457.3" cy="290.0" r="3.5"/&gt;&lt;text x="457.3" y="266.0" text-anchor="middle"&gt;Base month in the example&lt;/text&gt;&lt;line x1="616.0" x2="616.0" y1="98.0" y2="85.0"/&gt;
&lt;circle cx="616.0" cy="105.0" r="3.5"/&gt;&lt;text x="616.0" y="81.0" text-anchor="end"&gt;September 2026, 6.29&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 300" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;Diesel averaged $6.29 a gallon in September 2026&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: U.S. on-highway diesel ($/gal). Values range from 3 to 6.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="270.0" y2="270.0"/&gt;&lt;line x1="50" x2="276" y1="218.5" y2="218.5"/&gt;&lt;line x1="50" x2="276" y1="167.0" y2="167.0"/&gt;&lt;line x1="50" x2="276" y1="115.5" y2="115.5"/&gt;&lt;line x1="50" x2="276" y1="64.0" y2="64.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="270.0" y2="270.0"/&gt;&lt;text x="42" y="273.5" text-anchor="end"&gt;3&lt;/text&gt;&lt;text x="42" y="222.0" text-anchor="end"&gt;4&lt;/text&gt;&lt;text x="42" y="170.5" text-anchor="end"&gt;5&lt;/text&gt;&lt;text x="42" y="119.0" text-anchor="end"&gt;6&lt;/text&gt;&lt;text x="42" y="67.5" text-anchor="end"&gt;7&lt;/text&gt;&lt;text x="50.0" y="287" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="163.0" y="287" text-anchor="middle"&gt;2025-09&lt;/text&gt;&lt;text x="276.0" y="287" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,241.3 L59.4,239.9 L68.8,243.1 L78.2,244.6 L87.7,237.3 L97.1,235.2 L106.5,239.9 L115.9,240.8 L125.3,244.3 L134.8,239.2 L144.2,229.9 L153.6,231.7 L163.0,231.5 L172.4,235.0 L181.8,227.7 L191.2,238.3 L200.7,243.1 L210.1,232.8 L219.5,171.1 L228.9,141.2 L238.3,136.1 L247.8,165.8 L257.2,169.3 L266.6,143.2 L276.0,100.5 L276.0,270.0 L50.0,270.0 Z"/&gt;
&lt;path class="line" d="M50.0,241.3 L59.4,239.9 L68.8,243.1 L78.2,244.6 L87.7,237.3 L97.1,235.2 L106.5,239.9 L115.9,240.8 L125.3,244.3 L134.8,239.2 L144.2,229.9 L153.6,231.7 L163.0,231.5 L172.4,235.0 L181.8,227.7 L191.2,238.3 L200.7,243.1 L210.1,232.8 L219.5,171.1 L228.9,141.2 L238.3,136.1 L247.8,165.8 L257.2,169.3 L266.6,143.2 L276.0,100.5"/&gt;
&lt;circle class="end" cx="276.0" cy="100.5" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="241.3" r="9"&gt;&lt;title&gt;September 2024: 3.56&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="239.9" r="9"&gt;&lt;title&gt;October 2024: 3.59&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="243.1" r="9"&gt;&lt;title&gt;November 2024: 3.52&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="244.6" r="9"&gt;&lt;title&gt;December 2024: 3.49&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="237.3" r="9"&gt;&lt;title&gt;January 2025: 3.63&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="235.2" r="9"&gt;&lt;title&gt;February 2025: 3.68&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="239.9" r="9"&gt;&lt;title&gt;March 2025: 3.59&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="240.8" r="9"&gt;&lt;title&gt;April 2025: 3.57&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="244.3" r="9"&gt;&lt;title&gt;May 2025: 3.50&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="239.2" r="9"&gt;&lt;title&gt;June 2025: 3.60&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="229.9" r="9"&gt;&lt;title&gt;July 2025: 3.78&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="231.7" r="9"&gt;&lt;title&gt;August 2025: 3.74&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="231.5" r="9"&gt;&lt;title&gt;September 2025: 3.75&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="235.0" r="9"&gt;&lt;title&gt;October 2025: 3.68&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="227.7" r="9"&gt;&lt;title&gt;November 2025: 3.82&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="238.3" r="9"&gt;&lt;title&gt;December 2025: 3.62&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="243.1" r="9"&gt;&lt;title&gt;January 2026: 3.52&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="232.8" r="9"&gt;&lt;title&gt;February 2026: 3.72&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="171.1" r="9"&gt;&lt;title&gt;March 2026: 4.92&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="141.2" r="9"&gt;&lt;title&gt;April 2026: 5.50&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="136.1" r="9"&gt;&lt;title&gt;May 2026: 5.60&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="165.8" r="9"&gt;&lt;title&gt;June 2026: 5.02&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="169.3" r="9"&gt;&lt;title&gt;July 2026: 4.96&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="143.2" r="9"&gt;&lt;title&gt;August 2026: 5.46&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="100.5" r="9"&gt;&lt;title&gt;September 2026: 6.29&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="104.5"&gt;6.29&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="210.1" x2="210.1" y1="225.8" y2="212.8"/&gt;
&lt;circle cx="210.1" cy="232.8" r="3.5"/&gt;&lt;text x="210.1" y="208.8" text-anchor="end"&gt;Base month in the example&lt;/text&gt;&lt;line x1="276.0" x2="276.0" y1="107.5" y2="119.5"/&gt;
&lt;circle cx="276.0" cy="100.5" r="3.5"/&gt;&lt;text x="276.0" y="130.5" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;September 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;6.29&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;Nominal dollars. EIA release of October 20, 2026.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://www.eia.gov/dnav/pet/hist/LeafHandler.ashx?n=PET&amp;amp;s=EMD_EPD2D_PTE_NUS_DPG&amp;amp;f=M" rel="noopener"&gt;eia.gov&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="how-the-clause-works"&gt;How the clause works&lt;/h2&gt;
&lt;p&gt;The Federal Highway Administration set out how highway agencies can write these clauses in Technical Advisory T 5080.3, dated December 10, 1980. It explains why fuel needs its own method. Fuel is usually incidental to the project and is not paid for directly, so the owner needs an agreed estimate of how much fuel the work burns.&lt;/p&gt;
&lt;p&gt;The advisory describes four ways to get that estimate:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Fuel usage per unit. Each unit of completed work, such as a cubic yard of excavation or a ton of asphalt, carries a fixed number of gallons.&lt;/li&gt;
&lt;li&gt;Specified total fuel. The owner puts its estimate of total gallons in the bid documents and releases it against a schedule tied to percent complete.&lt;/li&gt;
&lt;li&gt;Bid item. The bidder enters a lump sum for fuel, capped by the owner, and it is paid out on the same schedule.&lt;/li&gt;
&lt;li&gt;Percent of cost. Fuel is a set share of the dollar value of work on each progress estimate, such as 13% to 15% for grade and drain work.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;FHWA says these methods are not designed to estimate the fuel a contractor burns. They give both parties a reasonable basis for average conditions. FHWA also advises against paying from contractor fuel invoices, citing the audit work and the room for manipulation.&lt;/p&gt;
&lt;p&gt;The per-unit factors come from a July 1974 survey published by the Highway Research Board, now the Transportation Research Board, and attached to the advisory. These are the diesel figures.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Diesel usage factors for highway work, gallons per unit, from FHWA T 5080.3 Attachment 1&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Item of work&lt;/th&gt;&lt;th&gt;Units&lt;/th&gt;&lt;th class="num"&gt;Diesel low&lt;/th&gt;&lt;th class="num"&gt;Diesel average&lt;/th&gt;&lt;th class="num"&gt;Diesel high&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Earth excavation&lt;/td&gt;&lt;td&gt;gal per cubic yard&lt;/td&gt;&lt;td class="num"&gt;0.27&lt;/td&gt;&lt;td class="num"&gt;0.29&lt;/td&gt;&lt;td class="num"&gt;0.30&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Rock excavation&lt;/td&gt;&lt;td&gt;gal per cubic yard&lt;/td&gt;&lt;td class="num"&gt;0.37&lt;/td&gt;&lt;td class="num"&gt;0.39&lt;/td&gt;&lt;td class="num"&gt;0.42&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Other excavation&lt;/td&gt;&lt;td&gt;gal per cubic yard&lt;/td&gt;&lt;td class="num"&gt;0.33&lt;/td&gt;&lt;td class="num"&gt;0.35&lt;/td&gt;&lt;td class="num"&gt;0.38&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aggregate onsite production&lt;/td&gt;&lt;td&gt;gal per ton&lt;/td&gt;&lt;td class="num"&gt;0.25&lt;/td&gt;&lt;td class="num"&gt;0.28&lt;/td&gt;&lt;td class="num"&gt;0.36&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aggregate base 0-10 mile haul&lt;/td&gt;&lt;td&gt;gal per ton&lt;/td&gt;&lt;td class="num"&gt;0.24&lt;/td&gt;&lt;td class="num"&gt;0.27&lt;/td&gt;&lt;td class="num"&gt;0.33&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aggregate base 10-20 mile haul&lt;/td&gt;&lt;td&gt;gal per ton&lt;/td&gt;&lt;td class="num"&gt;0.35&lt;/td&gt;&lt;td class="num"&gt;0.42&lt;/td&gt;&lt;td class="num"&gt;0.54&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Asphalt concrete production&lt;/td&gt;&lt;td&gt;gal per ton&lt;/td&gt;&lt;td class="num"&gt;1.75&lt;/td&gt;&lt;td class="num"&gt;2.43&lt;/td&gt;&lt;td class="num"&gt;3.50&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Asphalt concrete hauling 0-10 miles&lt;/td&gt;&lt;td&gt;gal per ton&lt;/td&gt;&lt;td class="num"&gt;0.28&lt;/td&gt;&lt;td class="num"&gt;0.33&lt;/td&gt;&lt;td class="num"&gt;0.34&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Asphalt concrete hauling 10-20 miles&lt;/td&gt;&lt;td&gt;gal per ton&lt;/td&gt;&lt;td class="num"&gt;0.30&lt;/td&gt;&lt;td class="num"&gt;0.49&lt;/td&gt;&lt;td class="num"&gt;0.56&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Asphalt concrete placement&lt;/td&gt;&lt;td&gt;gal per ton&lt;/td&gt;&lt;td class="num"&gt;0.06&lt;/td&gt;&lt;td class="num"&gt;0.14&lt;/td&gt;&lt;td class="num"&gt;0.20&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;PCC pavement production&lt;/td&gt;&lt;td&gt;gal per cubic yard&lt;/td&gt;&lt;td class="num"&gt;0.15&lt;/td&gt;&lt;td class="num"&gt;0.28&lt;/td&gt;&lt;td class="num"&gt;0.45&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;PCC pavement hauling&lt;/td&gt;&lt;td&gt;gal per cubic yard&lt;/td&gt;&lt;td class="num"&gt;0.33&lt;/td&gt;&lt;td class="num"&gt;0.48&lt;/td&gt;&lt;td class="num"&gt;0.67&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;PCC pavement placement&lt;/td&gt;&lt;td&gt;gal per cubic yard&lt;/td&gt;&lt;td class="num"&gt;0.13&lt;/td&gt;&lt;td class="num"&gt;0.22&lt;/td&gt;&lt;td class="num"&gt;0.31&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Structures&lt;/td&gt;&lt;td&gt;gal per $1000 of work&lt;/td&gt;&lt;td class="num"&gt;10.00&lt;/td&gt;&lt;td class="num"&gt;19.00&lt;/td&gt;&lt;td class="num"&gt;25.00&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Miscellaneous&lt;/td&gt;&lt;td&gt;gal per $1000 of work&lt;/td&gt;&lt;td class="num"&gt;10.00&lt;/td&gt;&lt;td class="num"&gt;19.00&lt;/td&gt;&lt;td class="num"&gt;30.00&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.fhwa.dot.gov/programadmin/contracts/ta50803.cfm" rel="noopener"&gt;fhwa.dot.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The earth excavation factor covers mobilization, clearing and grubbing, excavating, hauling, compacting and subgrade preparation, for hauls up to about 5,000 feet. FHWA notes that urban jobs that haul by truck may burn more than the table shows. Gasoline has its own factors in FHWA&amp;rsquo;s table.&lt;/p&gt;
&lt;h2 id="pick-the-index"&gt;Pick the index&lt;/h2&gt;
&lt;p&gt;FHWA asks for an index that contractors and suppliers cannot manipulate, either built by the owner or taken from government price data. EIA says many shippers, carriers and truckers use its weekly retail diesel price in their fuel pricing formulas. EIA collects the cash self-serve pump price, including taxes, at 8:00 a.m. local time each Monday from a sample of 590 truck stops and service stations, and publishes it around 10:00 a.m. Eastern on Tuesday. EIA&amp;rsquo;s FAQ says the agency does not calculate fuel surcharges and does not endorse any method.&lt;/p&gt;
&lt;p&gt;The clause should also name the geography, because regions moved by different amounts over the past year.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;EIA on-highway diesel price by region, week of October 19, 2026, and change from a year earlier&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Region&lt;/th&gt;&lt;th class="num"&gt;Price week of Oct. 19 2026 ($/gal)&lt;/th&gt;&lt;th class="num"&gt;Change from year ago ($/gal)&lt;/th&gt;&lt;th class="num"&gt;Change from year ago (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;U.S.&lt;/td&gt;&lt;td class="num"&gt;6.28&lt;/td&gt;&lt;td class="num"&gt;2.66&lt;/td&gt;&lt;td class="num"&gt;73.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;East Coast (PADD 1)&lt;/td&gt;&lt;td class="num"&gt;5.98&lt;/td&gt;&lt;td class="num"&gt;2.31&lt;/td&gt;&lt;td class="num"&gt;62.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;New England (PADD 1A)&lt;/td&gt;&lt;td class="num"&gt;6.47&lt;/td&gt;&lt;td class="num"&gt;2.53&lt;/td&gt;&lt;td class="num"&gt;64.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Central Atlantic (PADD 1B)&lt;/td&gt;&lt;td class="num"&gt;6.51&lt;/td&gt;&lt;td class="num"&gt;2.63&lt;/td&gt;&lt;td class="num"&gt;67.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Lower Atlantic (PADD 1C)&lt;/td&gt;&lt;td class="num"&gt;5.74&lt;/td&gt;&lt;td class="num"&gt;2.16&lt;/td&gt;&lt;td class="num"&gt;60.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Midwest (PADD 2)&lt;/td&gt;&lt;td class="num"&gt;6.35&lt;/td&gt;&lt;td class="num"&gt;2.79&lt;/td&gt;&lt;td class="num"&gt;78.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Gulf Coast (PADD 3)&lt;/td&gt;&lt;td class="num"&gt;5.90&lt;/td&gt;&lt;td class="num"&gt;2.65&lt;/td&gt;&lt;td class="num"&gt;81.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Rocky Mountain (PADD 4)&lt;/td&gt;&lt;td class="num"&gt;6.42&lt;/td&gt;&lt;td class="num"&gt;2.84&lt;/td&gt;&lt;td class="num"&gt;79.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;West Coast (PADD 5)&lt;/td&gt;&lt;td class="num"&gt;7.39&lt;/td&gt;&lt;td class="num"&gt;2.97&lt;/td&gt;&lt;td class="num"&gt;67.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;West Coast less California&lt;/td&gt;&lt;td class="num"&gt;6.66&lt;/td&gt;&lt;td class="num"&gt;2.65&lt;/td&gt;&lt;td class="num"&gt;66.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;California&lt;/td&gt;&lt;td class="num"&gt;8.24&lt;/td&gt;&lt;td class="num"&gt;3.34&lt;/td&gt;&lt;td class="num"&gt;68.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.eia.gov/petroleum/gasdiesel/" rel="noopener"&gt;eia.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The Gulf Coast price rose 81.3% from a year earlier and the Lower Atlantic price rose 60.4%. With a base one year back, a clause tied to the Gulf Coast index would pay $2.647 a gallon, and one tied to the Lower Atlantic index would pay $2.162 on the same gallons.&lt;/p&gt;
&lt;p&gt;Some state DOTs build their own index. New York State DOT posts an average price for fuel each month, on or about the 25th, for its Fuel Price Adjustment item. Its September 2026 price was $3.85, which is 86.0% above its February price of $2.07. EIA&amp;rsquo;s national retail average rose 69.0% over the same months. The two series measure different prices, and NYSDOT&amp;rsquo;s page refers readers to its standard specifications for how the payment is calculated. On a state contract the specification names the index. On a private subcontract, name the EIA series and the region in writing.&lt;/p&gt;
&lt;h2 id="set-the-trigger-the-cap-and-the-dates"&gt;Set the trigger, the cap and the dates&lt;/h2&gt;
&lt;p&gt;FHWA recommends the following:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;A trigger between 3% and 10%, so small moves pay nothing. AASHTO suggested 5% in a 1974 guide.&lt;/li&gt;
&lt;li&gt;A ceiling on upward adjustment, written as a percentage, in the range of 25% to 100%, and a floor on downward adjustment.&lt;/li&gt;
&lt;li&gt;Adjustment in both directions, so the owner takes a credit when prices fall.&lt;/li&gt;
&lt;li&gt;Monthly computation, paid automatically on the progress estimate, so the contractor has no option to accept or reject it.&lt;/li&gt;
&lt;li&gt;During an unapproved time overrun, either hold upward adjustment at the last index within the contract time plus extensions or stop adjusting.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Take February 2025 as a base month. EIA&amp;rsquo;s monthly average then stayed between 4.8% below and 4.0% above that base through February 2026, so a 5% trigger would have paid nothing for a year. In March 2026 the price was 33.9% above the base.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The figures below are an example. A sitework subcontractor bids 160,000 cubic yards of earth excavation in February 2026 and works it from March through September. The subcontract uses the per-unit method with FHWA&amp;rsquo;s average diesel factor of 0.29 gallons per cubic yard, EIA&amp;rsquo;s U.S. monthly average, a February 2026 base of $3.722, a 5% trigger and a 50% cap.&lt;/p&gt;
&lt;p&gt;Each month the project manager multiplies the cubic yards on the pay application by 0.29 to get gallons. The adjustment per gallon is the month&amp;rsquo;s EIA price minus the base. The 50% cap limits the recognized price to $5.583, which is 1.5 times the base.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Fuel price adjustment on 160,000 cubic yards of earth excavation, base month February 2026. Example quantities with EIA prices.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Earth excavation (cu yd)&lt;/th&gt;&lt;th class="num"&gt;Diesel (gal)&lt;/th&gt;&lt;th class="num"&gt;EIA diesel ($/gal)&lt;/th&gt;&lt;th class="num"&gt;Change from February base (%)&lt;/th&gt;&lt;th class="num"&gt;Adjustment per gallon ($)&lt;/th&gt;&lt;th class="num"&gt;Adjustment ($)&lt;/th&gt;&lt;th class="num"&gt;Adjustment with 50% cap ($)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;March 2026&lt;/td&gt;&lt;td class="num"&gt;20,000&lt;/td&gt;&lt;td class="num"&gt;5,800&lt;/td&gt;&lt;td class="num"&gt;4.92&lt;/td&gt;&lt;td class="num"&gt;32.2%&lt;/td&gt;&lt;td class="num"&gt;1.20&lt;/td&gt;&lt;td class="num"&gt;6,954.20&lt;/td&gt;&lt;td class="num"&gt;6,954.20&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;April 2026&lt;/td&gt;&lt;td class="num"&gt;30,000&lt;/td&gt;&lt;td class="num"&gt;8,700&lt;/td&gt;&lt;td class="num"&gt;5.50&lt;/td&gt;&lt;td class="num"&gt;47.8%&lt;/td&gt;&lt;td class="num"&gt;1.78&lt;/td&gt;&lt;td class="num"&gt;15,477.30&lt;/td&gt;&lt;td class="num"&gt;15,477.30&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;30,000&lt;/td&gt;&lt;td class="num"&gt;8,700&lt;/td&gt;&lt;td class="num"&gt;5.60&lt;/td&gt;&lt;td class="num"&gt;50.5%&lt;/td&gt;&lt;td class="num"&gt;1.88&lt;/td&gt;&lt;td class="num"&gt;16,338.60&lt;/td&gt;&lt;td class="num"&gt;16,190.70&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;June 2026&lt;/td&gt;&lt;td class="num"&gt;30,000&lt;/td&gt;&lt;td class="num"&gt;8,700&lt;/td&gt;&lt;td class="num"&gt;5.02&lt;/td&gt;&lt;td class="num"&gt;35.0%&lt;/td&gt;&lt;td class="num"&gt;1.30&lt;/td&gt;&lt;td class="num"&gt;11,327.40&lt;/td&gt;&lt;td class="num"&gt;11,327.40&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;July 2026&lt;/td&gt;&lt;td class="num"&gt;20,000&lt;/td&gt;&lt;td class="num"&gt;5,800&lt;/td&gt;&lt;td class="num"&gt;4.96&lt;/td&gt;&lt;td class="num"&gt;33.1%&lt;/td&gt;&lt;td class="num"&gt;1.23&lt;/td&gt;&lt;td class="num"&gt;7,151.40&lt;/td&gt;&lt;td class="num"&gt;7,151.40&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;August 2026&lt;/td&gt;&lt;td class="num"&gt;20,000&lt;/td&gt;&lt;td class="num"&gt;5,800&lt;/td&gt;&lt;td class="num"&gt;5.46&lt;/td&gt;&lt;td class="num"&gt;46.7%&lt;/td&gt;&lt;td class="num"&gt;1.74&lt;/td&gt;&lt;td class="num"&gt;10,092.00&lt;/td&gt;&lt;td class="num"&gt;10,092.00&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;September 2026&lt;/td&gt;&lt;td class="num"&gt;10,000&lt;/td&gt;&lt;td class="num"&gt;2,900&lt;/td&gt;&lt;td class="num"&gt;6.29&lt;/td&gt;&lt;td class="num"&gt;69.0%&lt;/td&gt;&lt;td class="num"&gt;2.57&lt;/td&gt;&lt;td class="num"&gt;7,450.10&lt;/td&gt;&lt;td class="num"&gt;5,396.90&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total&lt;/td&gt;&lt;td class="num"&gt;160,000&lt;/td&gt;&lt;td class="num"&gt;46,400&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;74,791.00&lt;/td&gt;&lt;td class="num"&gt;72,589.90&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.eia.gov/dnav/pet/hist/LeafHandler.ashx?n=PET&amp;amp;s=EMD_EPD2D_PTE_NUS_DPG&amp;amp;f=M" rel="noopener"&gt;eia.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The job burns an estimated 46,400 gallons, which cost $172,701 at the February price. Every month cleared the 5% trigger. Without a cap, the clause pays $74,791. The cap binds in May and September and brings the total to $72,590.&lt;/p&gt;
&lt;p&gt;The fuel factor sets the gallons the clause covers. A crew that burns 0.35 gallons a yard on a long or wet haul still gets paid for 0.29, and the job&amp;rsquo;s equipment fuel logs show the difference. The &lt;a href="https://constructionmetrics.com/2026/10/17/compute-equipment-hourly-rate-corps-method/"&gt;equipment rate post&lt;/a&gt; shows where fuel sits inside an hourly rate. The &lt;a href="https://constructionmetrics.com/2026/10/14/steel-escalation-clause-bls-producer-price-index/"&gt;steel escalation post&lt;/a&gt; applies a trigger and a cap to a BLS index. The &lt;a href="https://constructionmetrics.com/2026/10/15/construction-input-prices-september-diesel/"&gt;September input price post&lt;/a&gt; covers BLS&amp;rsquo;s producer price index for diesel.&lt;/p&gt;
&lt;h2 id="how-to-start-on-your-jobs"&gt;How to start on your jobs&lt;/h2&gt;
&lt;p&gt;List every open job with earthwork, paving or hauling still to place, and check each contract for a fuel adjustment clause. Where one exists, write down the index, the region, the base month, the trigger and the cap, and check that the monthly adjustment shows up on the pay estimate.&lt;/p&gt;
&lt;p&gt;For bids going out now, pull fuel gallons per unit from your own equipment logs for the last three closed jobs of the same type. Compare them with the FHWA factor before you propose a clause or accept the owner&amp;rsquo;s.&lt;/p&gt;</content:encoded></item><item><title>Document Crunch, now part of Trimble, adds drawing sets to its AI review of contracts and specs</title><link>https://constructionmetrics.com/2026/10/26/document-crunch-drawings-review-contracts-specs/</link><pubDate>Mon, 26 Oct 2026 07:43:17 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/26/document-crunch-drawings-review-contracts-specs/</guid><category>AI</category><description>Document Crunch's CrunchAI now indexes drawing sheet text so preconstruction teams can query drawings, contracts and specs together for scope gaps.</description><content:encoded>&lt;p&gt;Document Crunch, the contract review software Trimble agreed to buy in April, announced on October 21, 2026, that its AI can now read construction drawing sets alongside contracts and specifications. The &lt;a href="https://www.tidewaternews.com/news/trimble-expands-risk-intelligence-capabilities-to-include-construction-drawings/"&gt;announcement&lt;/a&gt; says the feature is available to all Document Crunch users. It affects the preconstruction document review, the stage where an estimator or project manager reads the bid set for scope gaps and conflicting requirements before the price goes in.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;Today that review means someone reads the contract, then the spec book, then pages through the drawings and tries to connect a general note on one sheet to a requirement in the specs. Josh Levy, a Document Crunch co-founder who is now Trimble&amp;rsquo;s vice president of risk and compliance solutions, says in the announcement that teams work across hundreds of drawing sheets on a project.&lt;/p&gt;
&lt;p&gt;The new feature starts with the drawing set. Document Crunch says its CrunchAI engine extracts and indexes the text on each sheet, including notes, allowances and the language that defines scope. Indexing here means the software builds a searchable record of every word and where it sits, the way a spec book&amp;rsquo;s table of contents points to a section. The announcement describes text extraction only.&lt;/p&gt;
&lt;p&gt;Once the set is indexed, a user asks questions in a chat window across drawings, contracts and specs together. Each answer links back to the source page so a reviewer can open the sheet and check it. Document Crunch lists these checks:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;Verify the sheet index and flag missing sheets or spec sections.&lt;/li&gt;
&lt;li&gt;Flag discrepancies between disciplines.&lt;/li&gt;
&lt;li&gt;Find requirements that conflict between drawings, contracts and specs, along with scope gaps and unclear responsibilities.&lt;/li&gt;
&lt;li&gt;Run the same company checklist on every drawing set.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Findings can be turned into review items, assigned to a person and tracked inside the project. The users are the preconstruction group, the estimators pricing a package and the project manager who inherits the job after award.&lt;/p&gt;
&lt;aside class="note"&gt;In plain terms, the tool reads the words on the drawings, so a general note that adds work can be matched against the contract scope and the spec section that covers it. The person reviewing still decides what to price or clarify.&lt;/aside&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Document Crunch&amp;rsquo;s announcement and one customer comment inside it. These claims come from Document Crunch:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;General-purpose AI models have trouble with large, text-dense drawing sheets and lack the project context to connect requirements across documents.&lt;/li&gt;
&lt;li&gt;The drawing review finds conflicts and scope gaps early enough for a team to clarify, price or resolve them before they turn into rework or disputes.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Kristen Ortiz, vice president of project controls at Hill &amp;amp; Wilkinson, describes a renovation where the team had to redo plumbing and the drawings did not show the concrete cutting and backfill that work would require. &amp;ldquo;Document Crunch caught those additional requirements, helping our team identify work that might otherwise have been overlooked,&amp;rdquo; she said in the announcement.&lt;/p&gt;
&lt;p&gt;Earlier figures cover the contract side of the product. In its June platform release, Document Crunch said it had been deployed on more than 10,000 customer projects that served more than $350 billion in annual construction volume. In the same release, a Ben Hur Construction vice president estimated that contract and scope review time fell 80%. That figure predates the drawing feature. Accuracy figures for the drawing review, such as the share of real scope conflicts it flags, are not yet public.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track scope-gap change orders as a percent of original contract value. Count only the change orders your team coded to a scope gap or a conflict between documents, the items a pre-bid review is meant to catch. Our &lt;a href="https://constructionmetrics.com/2026/10/04/measure-change-order-rate-by-cause/"&gt;change order rate post&lt;/a&gt; walks through coding a log by cause.&lt;/p&gt;
&lt;p&gt;Capture two baselines before the pilot:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;From five to ten closed jobs of similar type, total the scope-gap and document-conflict change orders and divide by the original contract value.&lt;/li&gt;
&lt;li&gt;On your next two or three bids, have the estimator log hours spent on document review and the number of clarifications or exclusions written from it.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;During the pilot, run the tool on new bid sets and log every item it flags. Mark each one as a real issue, a duplicate of something your team already caught or a false alarm. The share marked real is the tool&amp;rsquo;s precision on your documents, the fraction of its flags worth an estimator&amp;rsquo;s time. The change order percentage will take months to show up, so review hours and the flag log are the early read.&lt;/p&gt;
&lt;p&gt;A first step on one job: pick a recently awarded project, run its bid set through the tool and compare the flags with the change orders that job has already logged.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;The announcement says drawing review is available now to all Document Crunch users, inside their existing workflows. The June release said the project-level platform is available in the United States and Canada. Trimble announced its agreement to acquire Document Crunch on April 2, 2026, and Document Crunch now calls itself a Trimble company. The April release said Trimble plans to bring Document Crunch&amp;rsquo;s contract rules into Trimble Construction One project management and ERP workflows. Pricing is not listed in the announcements.&lt;/p&gt;</content:encoded></item><item><title>How to price delay cost from the liquidated damages daily rate and your own field overhead</title><link>https://constructionmetrics.com/2026/10/25/liquidated-damages-daily-rate-delay-cost/</link><pubDate>Sun, 25 Oct 2026 11:35:06 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/25/liquidated-damages-daily-rate-delay-cost/</guid><category>Data</category><description>FAR and FHWA rules set liquidated damages from the owner's daily costs. This example adds a contractor's field overhead and tests Saturday shifts.</description><content:encoded>&lt;p&gt;A project manager who sees the completion date slipping on the schedule update has to put a dollar figure on the slip. The contract supplies part of that figure as a liquidated damages rate, a fixed amount per day that the owner deducts from payment for each day the work runs past the contract time. The contractor&amp;rsquo;s own cost of staying on site longer is the other part, and it never appears in the contract.&lt;/p&gt;
&lt;p&gt;This post covers how public owners set the rate under federal rules, then prices a late job with example figures and tests a plan to recover the schedule.&lt;/p&gt;
&lt;h2 id="how-owners-set-the-rate"&gt;How owners set the rate&lt;/h2&gt;
&lt;p&gt;On federal construction, the clause is FAR 52.211-12. It says the contractor pays the amount the contracting officer inserts &amp;ldquo;for each calendar day of delay until the work is completed or accepted.&amp;rdquo; If the government terminates the contractor&amp;rsquo;s right to proceed, the clause says the damages keep accruing until the work is done, on top of the excess cost of finishing the job.&lt;/p&gt;
&lt;p&gt;FAR 11.501 says liquidated damages are not punitive. They compensate the government for probable damages, so the rate must be a reasonable forecast of the harm from late performance on that contract. The same section says to use them only when timely performance matters enough that the government expects to suffer damage and that damage would be hard to estimate or prove.&lt;/p&gt;
&lt;p&gt;FAR 11.502 says what goes into the number. A construction rate should include the government&amp;rsquo;s estimated daily cost of inspection and superintendence, plus other expected costs of late completion such as renting substitute property or paying extra allowances for living quarters. When a contract has separate completion dates for stages of the work, FAR 11.503 calls for a separate rate for each stage.&lt;/p&gt;
&lt;p&gt;Highway work funded by FHWA follows 23 CFR 635.127. Each state DOT must set its own rates, either per project or as a table by project cost and type. At a minimum the rates cover the estimated average daily construction engineering cost for that type of work. With FHWA concurrence a state can add other delay costs, and the regulation names road user delay costs, detours kept in place longer and winter shutdowns among them. The state must review its rates at least every two years, and any incentive or disincentive for early completion has to be shown separately from liquidated damages.&lt;/p&gt;
&lt;h2 id="calendar-days-and-working-days"&gt;Calendar days and working days&lt;/h2&gt;
&lt;p&gt;The federal clause counts calendar days, so a Saturday and a Sunday past the completion date each carry the full rate.&lt;/p&gt;
&lt;p&gt;Iowa DOT&amp;rsquo;s standard specifications show the other common form. Section 1108.08 assesses the rate per calendar day on completion date contracts and per working day on working day contracts. When several portions of an Iowa job each carry their own working days and rate, the daily charge is the total of the rates for every portion still open. Iowa also withholds final payment until the parties agree on the amount of liquidated damages.&lt;/p&gt;
&lt;h2 id="which-days-get-excused"&gt;Which days get excused&lt;/h2&gt;
&lt;p&gt;The rate applies only to days the contractor is responsible for. FAR 52.249-10 says the government cannot charge damages under that clause for delay from unforeseeable causes beyond the contractor&amp;rsquo;s control and without its fault or negligence. Its examples include fires, floods, strikes, freight embargoes, unusually severe weather, acts of the government and delays of subcontractors or suppliers that meet the same test.&lt;/p&gt;
&lt;p&gt;The clause has a notice requirement. The contractor must notify the contracting officer in writing of the causes within 10 days from the beginning of the delay, unless the contracting officer extends that period. The contracting officer then finds the facts and extends the time when they warrant it. The clause addresses time, so the extra field cost for an excused day is a separate question under the rest of the contract.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The figures below are an example. A general contractor is building an $18 million federal office building with a liquidated damages rate of $2,000 per calendar day. The latest schedule update forecasts completion 20 calendar days late.&lt;/p&gt;
&lt;p&gt;The first step is the contractor&amp;rsquo;s own daily cost of staying on site. Take the time-related lines from the general conditions estimate, the ones that run by the week, and convert them to a calendar day by dividing by seven.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Time-related field cost for the example job. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Time-related cost&lt;/th&gt;&lt;th class="num"&gt;Per week ($)&lt;/th&gt;&lt;th class="num"&gt;Per calendar day ($)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Superintendent with burden&lt;/td&gt;&lt;td class="num"&gt;$3,500&lt;/td&gt;&lt;td class="num"&gt;$500&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Project manager at half time&lt;/td&gt;&lt;td class="num"&gt;$1,750&lt;/td&gt;&lt;td class="num"&gt;$250&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Project engineer&lt;/td&gt;&lt;td class="num"&gt;$2,100&lt;/td&gt;&lt;td class="num"&gt;$300&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Field office with utilities and toilets&lt;/td&gt;&lt;td class="num"&gt;$700&lt;/td&gt;&lt;td class="num"&gt;$100&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Telehandler on rent&lt;/td&gt;&lt;td class="num"&gt;$1,400&lt;/td&gt;&lt;td class="num"&gt;$200&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Fencing and site security&lt;/td&gt;&lt;td class="num"&gt;$350&lt;/td&gt;&lt;td class="num"&gt;$50&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total&lt;/td&gt;&lt;td class="num"&gt;$9,800&lt;/td&gt;&lt;td class="num"&gt;$1,400&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;The job costs the contractor $9,800 a week, or $1,400 per calendar day, before any work gets installed. On a working day contract, divide by the number of working days in the week instead.&lt;/p&gt;
&lt;p&gt;Next, sort the 20 days. The project engineer logged eight days of unusually severe weather and sent written notice within 10 days of each event, so assume the contracting officer extends the time by eight days. Twelve days remain at the liquidated damages rate. The field cost runs for all 20.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Cost of finishing the example job 20 calendar days late. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Item&lt;/th&gt;&lt;th class="num"&gt;Calendar days&lt;/th&gt;&lt;th class="num"&gt;Per day ($)&lt;/th&gt;&lt;th class="num"&gt;Amount ($)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Liquidated damages after an 8-day weather extension&lt;/td&gt;&lt;td class="num"&gt;12&lt;/td&gt;&lt;td class="num"&gt;$2,000&lt;/td&gt;&lt;td class="num"&gt;$24,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Extended field cost for the full overrun&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;&lt;td class="num"&gt;$1,400&lt;/td&gt;&lt;td class="num"&gt;$28,000&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Total cost of finishing 20 days late&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;&lt;td class="num"&gt;$52,000&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;The late finish costs $52,000. For each of the 12 unexcused days, the contractor loses $2,000 in liquidated damages and $1,400 in field cost, $3,400 in all.&lt;/p&gt;
&lt;p&gt;That $3,400 is the most it makes sense to spend to recover one of those days. Say the schedule shows that nine Saturday shifts for a 20-person crew would pull the finish back 12 days. In this example each worker earns $40 an hour and $60 for Saturday hours after a 40-hour week, a premium of $20 an hour. The &lt;a href="https://constructionmetrics.com/2026/10/19/compute-overtime-premium-extended-workweek/"&gt;overtime premium post&lt;/a&gt; covers how that premium is calculated.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Three ways to price the 12 unexcused days. Wages only, before payroll taxes and insurance. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Option for the 12 unexcused days&lt;/th&gt;&lt;th class="num"&gt;Cost ($)&lt;/th&gt;&lt;th class="num"&gt;Cost per day of the 12 ($)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Finish late and pay liquidated damages plus field cost&lt;/td&gt;&lt;td class="num"&gt;$40,800&lt;/td&gt;&lt;td class="num"&gt;$3,400&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Work 9 Saturdays and pay the overtime premium&lt;/td&gt;&lt;td class="num"&gt;$28,800&lt;/td&gt;&lt;td class="num"&gt;$2,400&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Work 9 Saturdays at the full overtime wage&lt;/td&gt;&lt;td class="num"&gt;$86,400&lt;/td&gt;&lt;td class="num"&gt;$7,200&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;Count only the premium as new cost. The crew would work those hours at straight time later anyway, because the installed quantities stay the same. At $20 an hour, nine shifts add $28,800, or $2,400 per day recovered, which is less than the $3,400 that finishing late costs. A comparison that charges the full $60 Saturday wage gets $86,400 and rejects the plan. Salaried supervision adds no wage cost in this example. The labor taxes and insurance on the premium hours would raise the $28,800, and the &lt;a href="https://constructionmetrics.com/2026/10/16/compute-labor-burden-per-hour-worked/"&gt;labor burden post&lt;/a&gt; shows how to add them.&lt;/p&gt;
&lt;h2 id="how-to-start-on-your-jobs"&gt;How to start on your jobs&lt;/h2&gt;
&lt;p&gt;Pull the contract for every job with less than 60 days of total float on its last update. Write down the liquidated damages rate, whether it counts calendar days or working days, and the notice period for delays. The &lt;a href="https://constructionmetrics.com/2026/10/12/track-total-float-across-schedule-updates/"&gt;total float post&lt;/a&gt; shows how to track that float from one update to the next.&lt;/p&gt;
&lt;p&gt;Then compute the time-related field cost per day for one of those jobs from its general conditions budget and add it to the rate. Report the combined figure with each monthly schedule update, next to the days of float remaining. When a delay is excusable, log the event and the date of written notice on the day it happens, since the federal default clause gives 10 days from the start of the delay. Where an owner directs work that adds time, the &lt;a href="https://constructionmetrics.com/2026/10/04/measure-change-order-rate-by-cause/"&gt;change order rate post&lt;/a&gt; shows how to code the cause.&lt;/p&gt;</content:encoded></item><item><title>BRG survey finds 68% of North American construction executives spent $250,000 or more on AI and 15% call it fully integrated</title><link>https://constructionmetrics.com/2026/10/25/brg-survey-construction-ai-spending-integration/</link><pubDate>Sun, 25 Oct 2026 07:35:40 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/25/brg-survey-construction-ai-spending-integration/</guid><category>AI</category><description>BRG surveyed 109 builder and owner executives on where they use AI, what they spent, the savings they report and how they measure the return.</description><content:encoded>&lt;p&gt;The consulting firm BRG published AI in Construction: Measurable Results, Unclear Benchmarks on October 9, 2026, the fourth report in its AI Industry Spotlight Series. In July 2026 BRG surveyed 109 executives who work on their organizations&amp;rsquo; AI efforts, and the report&amp;rsquo;s figures describe the 65 North American respondents unless it says otherwise. Of that group, 68% spent at least $250,000 on AI over the previous 24 months, and 15% say AI is fully integrated across their projects and operations. The questions run through estimating, bidding and contract formation, procurement, scheduling, field operations and warranty work, and they end with how firms measure the return.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;The survey tests no product. BRG split respondents into builders, who deliver projects (58 respondents across all regions), and owners, who develop and commission them (51). Construction Dive reports that the builders were mainly small and midsize general contractors and construction managers, and the owners mostly larger developers and REITs. For each function, a respondent said whether AI is implemented, planned, wanted with no current plan, or not being explored.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;AI implementation status by function, North American respondents, July 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Function&lt;/th&gt;&lt;th class="num"&gt;Implemented (%)&lt;/th&gt;&lt;th class="num"&gt;Planning to implement (%)&lt;/th&gt;&lt;th class="num"&gt;Aspire with no current plans (%)&lt;/th&gt;&lt;th class="num"&gt;Not exploring (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Planning and feasibility&lt;/td&gt;&lt;td class="num"&gt;58&lt;/td&gt;&lt;td class="num"&gt;32&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Project management and scheduling&lt;/td&gt;&lt;td class="num"&gt;52&lt;/td&gt;&lt;td class="num"&gt;32&lt;/td&gt;&lt;td class="num"&gt;14&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Warranty and post-completion services (builders only)&lt;/td&gt;&lt;td class="num"&gt;52&lt;/td&gt;&lt;td class="num"&gt;36&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Corporate and administrative functions&lt;/td&gt;&lt;td class="num"&gt;48&lt;/td&gt;&lt;td class="num"&gt;35&lt;/td&gt;&lt;td class="num"&gt;12&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Procurement and supply chain&lt;/td&gt;&lt;td class="num"&gt;46&lt;/td&gt;&lt;td class="num"&gt;37&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Field operations and site execution&lt;/td&gt;&lt;td class="num"&gt;46&lt;/td&gt;&lt;td class="num"&gt;31&lt;/td&gt;&lt;td class="num"&gt;18&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Bidding and contract formation&lt;/td&gt;&lt;td class="num"&gt;40&lt;/td&gt;&lt;td class="num"&gt;38&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Design and engineering&lt;/td&gt;&lt;td class="num"&gt;38&lt;/td&gt;&lt;td class="num"&gt;45&lt;/td&gt;&lt;td class="num"&gt;12&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Risk, claims and dispute management&lt;/td&gt;&lt;td class="num"&gt;37&lt;/td&gt;&lt;td class="num"&gt;37&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://media.thinkbrg.com/wp-content/uploads/2026/10/09105705/AI-in-Construction-Report-2026.pdf" rel="noopener"&gt;media.thinkbrg.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Planning and feasibility leads at 58%, and BRG says the share reaches 80% among builders. On the builder side, the report lists cost estimating, schedule modeling, feasibility analysis and permitting support as that function&amp;rsquo;s uses. Design and engineering sits at 38% implemented, with the largest share in the table planning to implement, at 45%.&lt;/p&gt;
&lt;p&gt;Of the North American respondents, 37% spent $1 million or more over 24 months, and 6% made no dedicated AI investment. On integration, 29% expect to get there within twelve months of July 2026 and 31% within one to two years, while 5% do not expect AI ever to be fully integrated.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is one survey of self-reported answers, run by a firm whose services include economics, disputes and investigations work. Every respondent is involved in AI at their organization, so the adoption rates describe firms already doing AI work. Builders and owners are pooled in most figures. A margin of error is not stated, and with 65 North American respondents, one answer moves a percentage by about 1.5 points.&lt;/p&gt;
&lt;p&gt;Respondents reported savings by project phase, and BRG counts the share reporting savings above 10%.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;AI-delivered cost savings by phase, share of respondents. The last column is BRG&amp;#39;s published figure.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Phase&lt;/th&gt;&lt;th class="num"&gt;Less than 5% (%)&lt;/th&gt;&lt;th class="num"&gt;5 to 10% (%)&lt;/th&gt;&lt;th class="num"&gt;11 to 20% (%)&lt;/th&gt;&lt;th class="num"&gt;21 to 30% (%)&lt;/th&gt;&lt;th class="num"&gt;More than 30% (%)&lt;/th&gt;&lt;th class="num"&gt;Too early to quantify (%)&lt;/th&gt;&lt;th class="num"&gt;Above 10% (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Pre-construction&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;&lt;td class="num"&gt;36&lt;/td&gt;&lt;td class="num"&gt;31&lt;/td&gt;&lt;td class="num"&gt;18&lt;/td&gt;&lt;td class="num"&gt;9&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;58&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Construction&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;&lt;td class="num"&gt;38&lt;/td&gt;&lt;td class="num"&gt;25&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;67&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Business operations&lt;/td&gt;&lt;td class="num"&gt;9&lt;/td&gt;&lt;td class="num"&gt;27&lt;/td&gt;&lt;td class="num"&gt;31&lt;/td&gt;&lt;td class="num"&gt;22&lt;/td&gt;&lt;td class="num"&gt;9&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;62&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://media.thinkbrg.com/wp-content/uploads/2026/10/09105705/AI-in-Construction-Report-2026.pdf" rel="noopener"&gt;media.thinkbrg.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Read the savings figures with these limits:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;The report does not say what the savings percentages are measured against, such as the cost of the task, the phase budget or the project.&lt;/li&gt;
&lt;li&gt;For post-construction, the text gives 58% above 10%, while the bars in BRG&amp;rsquo;s chart add to 49%. This table leaves that phase out until the figure is settled.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Anyway, the workforce answers lean toward reorganizing teams. In BRG&amp;rsquo;s results, 18% added headcount in some areas because of AI and 11% reduced it, 38% reskilled existing staff, and 51% changed how much they rely on outside vendors, consultants or contractors.&lt;/p&gt;
&lt;p&gt;The risk questions matter most for anyone drafting an AI policy. Liability for errors in AI-generated work is the concern most often cited as restricting use, at 43%, and 40% point to unclear treatment of AI in contracts. Policies covering human oversight and accountability exist at 42% of firms, and 34% have policies on accuracy and reliability. Construction Dive notes that construction had the lowest policy coverage of the four industries BRG has surveyed. (The other three were retail, energy and financial institutions.)&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;So, on measurement, respondents split across methods. The largest group, 37%, relies mainly on financial metrics. Another 23% track usage, which shows whether a tool is in use and leaves the job&amp;rsquo;s outcome unmeasured.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;How respondents primarily evaluate ROI from AI&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Primary way ROI from AI is evaluated&lt;/th&gt;&lt;th class="num"&gt;Share of respondents (%)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Financial metrics (cost savings, margin improvement, reduced change orders)&lt;/td&gt;&lt;td class="num"&gt;37&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Operational metrics (schedule performance, labor productivity, rework or error reduction)&lt;/td&gt;&lt;td class="num"&gt;29&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Usage or adoption metrics (active users, tools deployed across projects)&lt;/td&gt;&lt;td class="num"&gt;23&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Qualitative assessment (team feedback, post-project reviews)&lt;/td&gt;&lt;td class="num"&gt;5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Not currently evaluating ROI&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://media.thinkbrg.com/wp-content/uploads/2026/10/09105705/AI-in-Construction-Report-2026.pdf" rel="noopener"&gt;media.thinkbrg.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;&amp;ldquo;Contingency is a useful construction-specific measure,&amp;rdquo; says Ben Nolan, a BRG managing director, who suggests reading AI&amp;rsquo;s return in uncommitted contingency at stages of the project. A contractor can turn that into one number. The uncommitted contingency ratio is the contingency not yet committed to a change or a buyout overrun, divided by the original contingency, read at 25%, 50% and 75% complete.&lt;/p&gt;
&lt;p&gt;Build the baseline from closed jobs before the pilot starts:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Pick five to ten closed jobs of similar type and size.&lt;/li&gt;
&lt;li&gt;From the monthly cost reports, record the original contingency and the uncommitted balance at each of the three milestones.&lt;/li&gt;
&lt;li&gt;Average the ratio at each milestone.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Then track the same ratio on jobs where AI handles a defined task, such as drawing conflict review or estimate checks, and compare at each milestone. Pair it with &lt;a href="https://constructionmetrics.com/2026/10/04/measure-change-order-rate-by-cause/"&gt;change order rate by cause&lt;/a&gt;, since a higher ratio is only useful if the commitments it avoided would have become changes. Start by pulling the contingency history for one closed job this week.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;The report is a free PDF on BRG&amp;rsquo;s site with no registration form. It also compares regions: 18% of Asia-Pacific respondents and 9% of European respondents say AI is fully integrated, against 15% in North America.&lt;/p&gt;</content:encoded></item><item><title>How to price crew vehicle mileage with the IRS rate, which rose to 76 cents a mile in July</title><link>https://constructionmetrics.com/2026/10/24/price-crew-mileage-irs-standard-rate/</link><pubDate>Sat, 24 Oct 2026 11:34:49 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/24/price-crew-mileage-irs-standard-rate/</guid><category>Data</category><description>The IRS business mileage rate is 76 cents for July through December 2026. This example prices a diesel crew truck's miles against $6.29 fuel.</description><content:encoded>&lt;p&gt;A superintendent who drives a personal pickup between three jobsites turns in a mileage log at the end of the month, and payroll pays it at a set amount per mile. Many contractors take that amount from the IRS business standard mileage rate. Estimators often use the same rate to price vehicle travel on a job far from the yard.&lt;/p&gt;
&lt;p&gt;The IRS changed the rate partway through 2026. The business rate was 72.5 cents a mile from January 1 through June 30 and is 76 cents from July 1 through December 31, according to the IRS standard mileage rates page. The IRS tied the July increase to fuel prices, and this post prices a month of crew truck miles at both rates.&lt;/p&gt;
&lt;h2 id="what-the-rate-covers"&gt;What the rate covers&lt;/h2&gt;
&lt;p&gt;The standard rate replaces the itemized costs of running a vehicle. IRS Topic 510 lists those costs under the actual expense method as gas, oil, repairs, tires, insurance, registration fees, licenses, and depreciation or lease payments. Parking fees and tolls for business trips are deductible separately under either method.&lt;/p&gt;
&lt;p&gt;Notice 2026-10 says an independent contractor studies the fixed and variable costs of operating an automobile for the IRS each year, and the rate comes from that study. The notice also says 35 cents of each 2026 business mile counts as depreciation. Subtract that from the July rate and 41 cents a mile is left for fuel, maintenance, insurance and the rest, up from 37.5 cents in the first half.&lt;/p&gt;
&lt;p&gt;Topic 510 limits who can use the rate. The taxpayer must own or lease the vehicle and must not operate five or more cars at the same time, as in a fleet operation. An owned vehicle has to go on the standard rate in its first year of business use. A vehicle that has taken MACRS depreciation, a Section 179 deduction or the special depreciation allowance can&amp;rsquo;t use it.&lt;/p&gt;
&lt;p&gt;For reimbursements, Announcement 2026-11 says the rate also sets how much of an employee&amp;rsquo;s mileage allowance counts as substantiated. The 76-cent rate applies to allowances paid on or after July 1 for miles driven on or after July 1. Earlier miles stay at 72.5 cents. The &lt;a href="https://constructionmetrics.com/2026/10/23/per-diem-traveling-crew-gsa-rates/"&gt;per diem post&lt;/a&gt; covers the accountable plan rules that decide whether an allowance is treated as wages.&lt;/p&gt;
&lt;h2 id="what-changed-in-july"&gt;What changed in July&lt;/h2&gt;
&lt;p&gt;The IRS set the 2026 rate in a news release on December 29, 2025, at 2.5 cents above 2025. It raised the rate again in Announcement 2026-11, which gives a single reason: &amp;ldquo;This modification results from recent increases in the price of fuel.&amp;rdquo;&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Diesel reached $6.29 a gallon in September, its highest in 25 months&lt;/p&gt;&lt;p class="chart-subtitle"&gt;U.S. average retail price, dollars per gallon, monthly average of EIA&amp;#39;s weekly survey, September 2024 to September 2026&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 376" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;Diesel reached $6.29 a gallon in September, its highest in 25 months&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: Diesel, Regular gasoline. Values range from 3 to 6.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="342.0" y2="342.0"/&gt;&lt;line x1="72" x2="616" y1="284.4" y2="284.4"/&gt;&lt;line x1="72" x2="616" y1="226.8" y2="226.8"/&gt;&lt;line x1="72" x2="616" y1="169.2" y2="169.2"/&gt;&lt;line x1="72" x2="616" y1="111.6" y2="111.6"/&gt;&lt;line x1="72" x2="616" y1="54.0" y2="54.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="342.0" y2="342.0"/&gt;&lt;text x="64" y="345.5" text-anchor="end"&gt;2&lt;/text&gt;&lt;text x="64" y="287.9" text-anchor="end"&gt;3&lt;/text&gt;&lt;text x="64" y="230.3" text-anchor="end"&gt;4&lt;/text&gt;&lt;text x="64" y="172.7" text-anchor="end"&gt;5&lt;/text&gt;&lt;text x="64" y="115.1" text-anchor="end"&gt;6&lt;/text&gt;&lt;text x="64" y="57.5" text-anchor="end"&gt;7&lt;/text&gt;&lt;text x="72.0" y="360" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="185.3" y="360" text-anchor="middle"&gt;2025-02&lt;/text&gt;&lt;text x="298.7" y="360" text-anchor="middle"&gt;2025-07&lt;/text&gt;&lt;text x="412.0" y="360" text-anchor="middle"&gt;2025-12&lt;/text&gt;&lt;text x="525.3" y="360" text-anchor="middle"&gt;2026-05&lt;/text&gt;&lt;text x="616.0" y="360" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-emph"&gt;
&lt;path class="line" d="M72.0,252.3 L94.7,250.7 L117.3,254.3 L140.0,255.9 L162.7,247.9 L185.3,245.5 L208.0,250.7 L230.7,251.7 L253.3,255.7 L276.0,249.9 L298.7,239.5 L321.3,241.5 L344.0,241.3 L366.7,245.3 L389.3,237.1 L412.0,249.0 L434.7,254.3 L457.3,242.8 L480.0,173.8 L502.7,140.3 L525.3,134.6 L548.0,167.8 L570.7,171.8 L593.3,142.6 L616.0,94.8"/&gt;
&lt;circle class="end" cx="616.0" cy="94.8" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="252.3" r="9"&gt;&lt;title&gt;September 2024: 3.56&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="250.7" r="9"&gt;&lt;title&gt;October 2024: 3.59&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="254.3" r="9"&gt;&lt;title&gt;November 2024: 3.52&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="255.9" r="9"&gt;&lt;title&gt;December 2024: 3.49&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="247.9" r="9"&gt;&lt;title&gt;January 2025: 3.63&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="245.5" r="9"&gt;&lt;title&gt;February 2025: 3.68&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="250.7" r="9"&gt;&lt;title&gt;March 2025: 3.59&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="251.7" r="9"&gt;&lt;title&gt;April 2025: 3.57&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="255.7" r="9"&gt;&lt;title&gt;May 2025: 3.50&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="249.9" r="9"&gt;&lt;title&gt;June 2025: 3.60&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="239.5" r="9"&gt;&lt;title&gt;July 2025: 3.78&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="241.5" r="9"&gt;&lt;title&gt;August 2025: 3.74&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="241.3" r="9"&gt;&lt;title&gt;September 2025: 3.75&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="245.3" r="9"&gt;&lt;title&gt;October 2025: 3.68&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="237.1" r="9"&gt;&lt;title&gt;November 2025: 3.82&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="249.0" r="9"&gt;&lt;title&gt;December 2025: 3.62&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="254.3" r="9"&gt;&lt;title&gt;January 2026: 3.52&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="242.8" r="9"&gt;&lt;title&gt;February 2026: 3.72&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="173.8" r="9"&gt;&lt;title&gt;March 2026: 4.92&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="140.3" r="9"&gt;&lt;title&gt;April 2026: 5.50&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="134.6" r="9"&gt;&lt;title&gt;May 2026: 5.60&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="167.8" r="9"&gt;&lt;title&gt;June 2026: 5.02&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="171.8" r="9"&gt;&lt;title&gt;July 2026: 4.96&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="142.6" r="9"&gt;&lt;title&gt;August 2026: 5.46&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="94.8" r="9"&gt;&lt;title&gt;September 2026: 6.29&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="98.8"&gt;6.29&lt;/text&gt;
&lt;text class="label label-name" x="624.0" y="111.8"&gt;Diesel&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-ctx"&gt;
&lt;path class="line" d="M72.0,272.1 L94.7,276.5 L117.3,281.3 L140.0,283.4 L162.7,280.0 L185.3,277.4 L208.0,278.9 L230.7,274.6 L253.3,275.8 L276.0,275.8 L298.7,277.2 L321.3,276.7 L344.0,274.8 L366.7,280.9 L389.3,281.5 L412.0,290.5 L434.7,295.4 L457.3,289.7 L480.0,247.7 L502.7,220.9 L525.3,199.2 L548.0,223.9 L570.7,230.7 L593.3,223.5 L616.0,206.4"/&gt;
&lt;circle class="end" cx="616.0" cy="206.4" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="272.1" r="9"&gt;&lt;title&gt;September 2024: 3.21&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="276.5" r="9"&gt;&lt;title&gt;October 2024: 3.14&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="281.3" r="9"&gt;&lt;title&gt;November 2024: 3.05&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="283.4" r="9"&gt;&lt;title&gt;December 2024: 3.02&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="280.0" r="9"&gt;&lt;title&gt;January 2025: 3.08&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="277.4" r="9"&gt;&lt;title&gt;February 2025: 3.12&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="278.9" r="9"&gt;&lt;title&gt;March 2025: 3.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="274.6" r="9"&gt;&lt;title&gt;April 2025: 3.17&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="275.8" r="9"&gt;&lt;title&gt;May 2025: 3.15&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="275.8" r="9"&gt;&lt;title&gt;June 2025: 3.15&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="277.2" r="9"&gt;&lt;title&gt;July 2025: 3.13&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="276.7" r="9"&gt;&lt;title&gt;August 2025: 3.13&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="274.8" r="9"&gt;&lt;title&gt;September 2025: 3.17&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="280.9" r="9"&gt;&lt;title&gt;October 2025: 3.06&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="281.5" r="9"&gt;&lt;title&gt;November 2025: 3.05&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="290.5" r="9"&gt;&lt;title&gt;December 2025: 2.89&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="295.4" r="9"&gt;&lt;title&gt;January 2026: 2.81&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="289.7" r="9"&gt;&lt;title&gt;February 2026: 2.91&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="247.7" r="9"&gt;&lt;title&gt;March 2026: 3.64&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="220.9" r="9"&gt;&lt;title&gt;April 2026: 4.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="199.2" r="9"&gt;&lt;title&gt;May 2026: 4.48&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="223.9" r="9"&gt;&lt;title&gt;June 2026: 4.05&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="230.7" r="9"&gt;&lt;title&gt;July 2026: 3.93&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="223.5" r="9"&gt;&lt;title&gt;August 2026: 4.06&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="206.4" r="9"&gt;&lt;title&gt;September 2026: 4.36&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label label-ctx" x="624.0" y="210.4"&gt;Regular gasoline&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="570.7" x2="570.7" y1="164.8" y2="151.8"/&gt;
&lt;circle cx="570.7" cy="171.8" r="3.5"/&gt;&lt;text x="570.7" y="147.8" text-anchor="end"&gt;IRS rate rises to 76 cents&lt;/text&gt;&lt;line x1="616.0" x2="616.0" y1="101.8" y2="113.8"/&gt;
&lt;circle cx="616.0" cy="94.8" r="3.5"/&gt;&lt;text x="616.0" y="124.8" text-anchor="end"&gt;September 2026, 6.29&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 300" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;Diesel reached $6.29 a gallon in September, its highest in 25 months&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: Diesel, Regular gasoline. Values range from 3 to 6.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="270.0" y2="270.0"/&gt;&lt;line x1="50" x2="276" y1="201.3" y2="201.3"/&gt;&lt;line x1="50" x2="276" y1="132.7" y2="132.7"/&gt;&lt;line x1="50" x2="276" y1="64.0" y2="64.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="270.0" y2="270.0"/&gt;&lt;text x="42" y="273.5" text-anchor="end"&gt;2&lt;/text&gt;&lt;text x="42" y="204.8" text-anchor="end"&gt;4&lt;/text&gt;&lt;text x="42" y="136.2" text-anchor="end"&gt;6&lt;/text&gt;&lt;text x="42" y="67.5" text-anchor="end"&gt;8&lt;/text&gt;&lt;text x="50.0" y="287" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="163.0" y="287" text-anchor="middle"&gt;2025-09&lt;/text&gt;&lt;text x="276.0" y="287" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-emph"&gt;
&lt;path class="line" d="M50.0,216.5 L59.4,215.6 L68.8,217.7 L78.2,218.7 L87.7,213.9 L97.1,212.5 L106.5,215.6 L115.9,216.2 L125.3,218.5 L134.8,215.1 L144.2,208.9 L153.6,210.1 L163.0,210.0 L172.4,212.4 L181.8,207.4 L191.2,214.6 L200.7,217.7 L210.1,210.9 L219.5,169.7 L228.9,149.8 L238.3,146.4 L247.8,166.2 L257.2,168.5 L266.6,151.1 L276.0,122.7"/&gt;
&lt;circle class="end" cx="276.0" cy="122.7" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="216.5" r="9"&gt;&lt;title&gt;September 2024: 3.56&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="215.6" r="9"&gt;&lt;title&gt;October 2024: 3.59&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="217.7" r="9"&gt;&lt;title&gt;November 2024: 3.52&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="218.7" r="9"&gt;&lt;title&gt;December 2024: 3.49&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="213.9" r="9"&gt;&lt;title&gt;January 2025: 3.63&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="212.5" r="9"&gt;&lt;title&gt;February 2025: 3.68&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="215.6" r="9"&gt;&lt;title&gt;March 2025: 3.59&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="216.2" r="9"&gt;&lt;title&gt;April 2025: 3.57&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="218.5" r="9"&gt;&lt;title&gt;May 2025: 3.50&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="215.1" r="9"&gt;&lt;title&gt;June 2025: 3.60&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="208.9" r="9"&gt;&lt;title&gt;July 2025: 3.78&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="210.1" r="9"&gt;&lt;title&gt;August 2025: 3.74&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="210.0" r="9"&gt;&lt;title&gt;September 2025: 3.75&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="212.4" r="9"&gt;&lt;title&gt;October 2025: 3.68&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="207.4" r="9"&gt;&lt;title&gt;November 2025: 3.82&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="214.6" r="9"&gt;&lt;title&gt;December 2025: 3.62&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="217.7" r="9"&gt;&lt;title&gt;January 2026: 3.52&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="210.9" r="9"&gt;&lt;title&gt;February 2026: 3.72&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="169.7" r="9"&gt;&lt;title&gt;March 2026: 4.92&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="149.8" r="9"&gt;&lt;title&gt;April 2026: 5.50&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="146.4" r="9"&gt;&lt;title&gt;May 2026: 5.60&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="166.2" r="9"&gt;&lt;title&gt;June 2026: 5.02&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="168.5" r="9"&gt;&lt;title&gt;July 2026: 4.96&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="151.1" r="9"&gt;&lt;title&gt;August 2026: 5.46&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="122.7" r="9"&gt;&lt;title&gt;September 2026: 6.29&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="126.7"&gt;6.29&lt;/text&gt;
&lt;text class="label label-name" x="284.0" y="139.7"&gt;Diesel&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-ctx"&gt;
&lt;path class="line" d="M50.0,228.3 L59.4,231.0 L68.8,233.8 L78.2,235.0 L87.7,233.1 L97.1,231.5 L106.5,232.4 L115.9,229.8 L125.3,230.5 L134.8,230.5 L144.2,231.4 L153.6,231.1 L163.0,230.0 L172.4,233.6 L181.8,234.0 L191.2,239.3 L200.7,242.2 L210.1,238.8 L219.5,213.8 L228.9,197.8 L238.3,184.9 L247.8,199.6 L257.2,203.7 L266.6,199.3 L276.0,189.1"/&gt;
&lt;circle class="end" cx="276.0" cy="189.1" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="228.3" r="9"&gt;&lt;title&gt;September 2024: 3.21&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="231.0" r="9"&gt;&lt;title&gt;October 2024: 3.14&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="233.8" r="9"&gt;&lt;title&gt;November 2024: 3.05&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="235.0" r="9"&gt;&lt;title&gt;December 2024: 3.02&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="233.1" r="9"&gt;&lt;title&gt;January 2025: 3.08&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="231.5" r="9"&gt;&lt;title&gt;February 2025: 3.12&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="232.4" r="9"&gt;&lt;title&gt;March 2025: 3.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="229.8" r="9"&gt;&lt;title&gt;April 2025: 3.17&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="230.5" r="9"&gt;&lt;title&gt;May 2025: 3.15&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="230.5" r="9"&gt;&lt;title&gt;June 2025: 3.15&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="231.4" r="9"&gt;&lt;title&gt;July 2025: 3.13&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="231.1" r="9"&gt;&lt;title&gt;August 2025: 3.13&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="230.0" r="9"&gt;&lt;title&gt;September 2025: 3.17&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="233.6" r="9"&gt;&lt;title&gt;October 2025: 3.06&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="234.0" r="9"&gt;&lt;title&gt;November 2025: 3.05&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="239.3" r="9"&gt;&lt;title&gt;December 2025: 2.89&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="242.2" r="9"&gt;&lt;title&gt;January 2026: 2.81&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="238.8" r="9"&gt;&lt;title&gt;February 2026: 2.91&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="213.8" r="9"&gt;&lt;title&gt;March 2026: 3.64&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="197.8" r="9"&gt;&lt;title&gt;April 2026: 4.10&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="184.9" r="9"&gt;&lt;title&gt;May 2026: 4.48&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="199.6" r="9"&gt;&lt;title&gt;June 2026: 4.05&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="203.7" r="9"&gt;&lt;title&gt;July 2026: 3.93&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="199.3" r="9"&gt;&lt;title&gt;August 2026: 4.06&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="189.1" r="9"&gt;&lt;title&gt;September 2026: 4.36&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label label-ctx" x="284.0" y="193.1"&gt;Regular gasoline&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="257.2" x2="257.2" y1="161.5" y2="148.5"/&gt;
&lt;circle cx="257.2" cy="168.5" r="3.5"/&gt;&lt;text x="257.2" y="144.5" text-anchor="end"&gt;IRS rate rises to 76 cents&lt;/text&gt;&lt;line x1="276.0" x2="276.0" y1="115.7" y2="102.7"/&gt;
&lt;circle cx="276.0" cy="122.7" r="3.5"/&gt;&lt;text x="276.0" y="86.7" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;September 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;6.29&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;EIA data published on FRED (GASDESM, GASREGM). EIA computes monthly averages as simple averages of its weekly prices.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://www.eia.gov/dnav/pet/pet_pri_gnd_dcus_nus_m.htm" rel="noopener"&gt;eia.gov&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;EIA&amp;rsquo;s average diesel price was $3.615 a gallon in December 2025 and $5.024 in June 2026, a 39% increase over the period when the 72.5-cent rate was in force. Regular gasoline rose 40% over the same months, from $2.894 to $4.050. The mileage rate rose 3.5 cents, or 4.8%, in July.&lt;/p&gt;
&lt;p&gt;Fuel kept rising after the change. Diesel averaged $6.291 in September, 68% above September 2025, and regular gasoline averaged $4.355, up 38%. EIA&amp;rsquo;s weekly survey for October 19 put diesel at $6.276, $2.656 above the same week a year earlier.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;IRS business standard mileage rate since 2022. The IRS split 2022 and 2026 into two periods.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Period&lt;/th&gt;&lt;th class="num"&gt;Business rate (cents per mile)&lt;/th&gt;&lt;th&gt;IRS source&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;2022 (Jan. 1 to June 30)&lt;/td&gt;&lt;td class="num"&gt;58.5&lt;/td&gt;&lt;td&gt;IR-2021-251&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;2022 (July 1 to Dec. 31)&lt;/td&gt;&lt;td class="num"&gt;62.5&lt;/td&gt;&lt;td&gt;IR-2022-124&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;2023&lt;/td&gt;&lt;td class="num"&gt;65.5&lt;/td&gt;&lt;td&gt;IR-2022-234&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;2024&lt;/td&gt;&lt;td class="num"&gt;67.0&lt;/td&gt;&lt;td&gt;IR-2023-239&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;2025&lt;/td&gt;&lt;td class="num"&gt;70.0&lt;/td&gt;&lt;td&gt;IR-2024-312&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;2026 (Jan. 1 to June 30)&lt;/td&gt;&lt;td class="num"&gt;72.5&lt;/td&gt;&lt;td&gt;IR-2025-128&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;2026 (July 1 to Dec. 31)&lt;/td&gt;&lt;td class="num"&gt;76.0&lt;/td&gt;&lt;td&gt;Announcement 2026-11&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.irs.gov/tax-professionals/standard-mileage-rates" rel="noopener"&gt;irs.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;The IRS made a similar mid-year change in 2022, raising the rate from 58.5 to 62.5 cents for July through December.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The figures below are an example. A three-quarter-ton diesel crew truck gets 15 miles per gallon and runs 2,000 miles a month, about one round trip a workday between the yard and a job 45 miles away. The table prices those miles at both 2026 IRS rates and prices the truck&amp;rsquo;s fuel alone at EIA&amp;rsquo;s September averages for 2025 and 2026.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Monthly cost of 2,000 miles at IRS rates and at diesel fuel cost for a 15 mpg truck. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Cost line&lt;/th&gt;&lt;th class="num"&gt;Per mile ($)&lt;/th&gt;&lt;th class="num"&gt;Cost per month ($)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;IRS business rate Jan. to June 2026&lt;/td&gt;&lt;td class="num"&gt;0.73&lt;/td&gt;&lt;td class="num"&gt;$1,450&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;IRS business rate July to Dec. 2026&lt;/td&gt;&lt;td class="num"&gt;0.76&lt;/td&gt;&lt;td class="num"&gt;$1,520&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Diesel at 15 mpg, September 2025 ($3.748 a gallon)&lt;/td&gt;&lt;td class="num"&gt;0.25&lt;/td&gt;&lt;td class="num"&gt;$500&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Diesel at 15 mpg, September 2026 ($6.291 a gallon)&lt;/td&gt;&lt;td class="num"&gt;0.42&lt;/td&gt;&lt;td class="num"&gt;$839&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;At the July rate, 2,000 miles reimburse $1,520 a month. Diesel for the same miles costs $839 at September 2026 prices, up $339 from $500 a year earlier. Over that year the IRS rate went from 70 cents to 76 cents, which adds $120 a month for the same miles.&lt;/p&gt;
&lt;p&gt;Fuel&amp;rsquo;s share of the rate changed with it. In September 2025, fuel for this truck took 25 cents of a 70-cent rate, or 36%, and left 45 cents a mile for everything else. In September 2026 it takes 41.9 cents of 76, or 55%, and leaves 34 cents. A truck that gets 10 miles per gallon burns 62.9 cents of diesel a mile at the September price, 83% of the rate.&lt;/p&gt;
&lt;p&gt;Because of the five-vehicle limit in Topic 510, a contractor with a truck fleet prices those trucks from its own costs, as in the &lt;a href="https://constructionmetrics.com/2026/10/17/compute-equipment-hourly-rate-corps-method/"&gt;equipment hourly rate post&lt;/a&gt;. The fuel line in that rate should use the current diesel price, and the &lt;a href="https://constructionmetrics.com/2026/10/15/construction-input-prices-september-diesel/"&gt;construction input prices post&lt;/a&gt; shows how far fuel has moved in the producer price data. For a long job, the &lt;a href="https://constructionmetrics.com/2026/10/14/steel-escalation-clause-bls-producer-price-index/"&gt;escalation clause post&lt;/a&gt; sets out how to tie a price adjustment to a published index.&lt;/p&gt;
&lt;h2 id="how-to-start-on-your-jobs"&gt;How to start on your jobs&lt;/h2&gt;
&lt;p&gt;Pull your mileage reimbursements for July, August and September and confirm that payroll paid miles driven after July 1 at 76 cents. Miles from June paid in July stay at 72.5 cents under Announcement 2026-11.&lt;/p&gt;
&lt;p&gt;Then take one company truck. Divide last month&amp;rsquo;s fuel card spending by the miles on its odometer or telematics log to get fuel cost per mile, and set it next to the 76-cent rate. On the next bid with long drives, price vehicle miles from that figure plus your maintenance, insurance and ownership costs, and update the fuel portion from the regional diesel prices in EIA&amp;rsquo;s weekly survey.&lt;/p&gt;</content:encoded></item><item><title>Procore says its Magpie 3.0 engine completed 78% of 200-plus construction tasks, 18 points above the closest general AI model</title><link>https://constructionmetrics.com/2026/10/24/procore-magpie-benchmark-78-percent-construction-tasks/</link><pubDate>Sat, 24 Oct 2026 07:36:21 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/24/procore-magpie-benchmark-78-percent-construction-tasks/</guid><category>AI</category><description>Procore's Magpie 3.0 reasons across RFIs, submittals, drawings and schedules, and Procore says it passed 78% of a 200-plus task construction test.</description><content:encoded>&lt;p&gt;Procore shared a preview of its own construction AI benchmark at Groundbreak 2026, its annual customer conference, and posted the results on its blog on October 22, 2026. A benchmark is a fixed set of tasks scored the same way for every system, and this one has more than 200 tasks drawn from RFI, submittal, drawing, schedule and change work. Procore says Magpie 3.0, the new reasoning engine behind Procore AI, completed 78% of them. That is 18 percentage points above the closest general-purpose frontier model, meaning the large commercial models from OpenAI, Anthropic and Google. On October 21, at the same conference, Procore put Procore AI Go, a voice app for field crews, into open beta.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;Start with the project engineer reviewing an emergency generator submittal. That person reads the package against the mechanical spec section and the drawings, then writes a response. A requirement sitting in another division, such as an electrical section that names the transfer switch manufacturer, gets caught only if the reviewer thinks to look there.&lt;/p&gt;
&lt;p&gt;Procore describes three layers in Procore AI that do that cross-referencing:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;A multimodal index, meaning one that reads images as well as text, opens drawings, site photos and meeting minutes. On a drawing it picks out gridlines, fixture symbols, dimension strings and revision clouds.&lt;/li&gt;
&lt;li&gt;A construction ontology, a map of how project records relate to each other, links RFIs, submittals, observations, daily logs, meetings, drawings, photos and change events to the same trade, assembly and location.&lt;/li&gt;
&lt;li&gt;Magpie 3.0 works through a question in steps across those linked records. It chooses a tool for each step, such as an image analyzer or a document parser, and cites the governing drawing detail or spec section in its answer.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;For submittals, two Procore tools described in a September 18 product post sit on top of this. Submittal Builder reads the spec book and drafts the submittal log, including closeout, warranty and O&amp;amp;M items. The Submittal Reviewer agent checks returned packages against the specs and the contract, flags deviations and unapproved substitutions, and drafts a response. The project engineer or PM reviews the draft and makes the call.&lt;/p&gt;
&lt;p&gt;Procore AI Go takes the question-and-answer part to the field. A foreman presses to talk, asks about drawings, specs, RFIs, submittals, daily logs, observations or inspections, and hears a spoken answer drawn from the project&amp;rsquo;s Procore data. Procore says later releases will let crews create daily logs and observations and draft RFIs by voice, and will add its Daily Log Agent and Site Safety Agent to the app.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;What Procore announced around Groundbreak 2026 and where each piece stands&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Capability&lt;/th&gt;&lt;th&gt;What it does&lt;/th&gt;&lt;th&gt;Status in October 2026&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Multimodal index&lt;/td&gt;&lt;td&gt;Reads drawings, site photos and meeting minutes as content, such as gridlines, symbols and revision clouds&lt;/td&gt;&lt;td&gt;Generally available in all Procore AI packages&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Magpie 3.0&lt;/td&gt;&lt;td&gt;Reasons across linked project records and cites the governing drawing, spec section or record&lt;/td&gt;&lt;td&gt;Open beta for Procore AI customers through Procore Explore&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Construction ontology&lt;/td&gt;&lt;td&gt;Links RFIs, submittals, observations, daily logs, meetings, drawings, photos and change events&lt;/td&gt;&lt;td&gt;Built in; drawing-photo linking and rework pattern detection roll out over the coming year&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Procore AI Go&lt;/td&gt;&lt;td&gt;Voice questions and spoken answers on drawings, specs, RFIs, submittals, daily logs, observations and inspections&lt;/td&gt;&lt;td&gt;Open beta in North America on Digital Coworker Starter, Pro and Enterprise&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;AI Go on Meta AI glasses&lt;/td&gt;&lt;td&gt;Hands-free questions and first-person photos&lt;/td&gt;&lt;td&gt;Closed beta&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Daily log and observation creation in AI Go&lt;/td&gt;&lt;td&gt;Create daily logs and observations and draft RFIs by voice and images&lt;/td&gt;&lt;td&gt;Announced as coming&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.procore.com/blog/ai-that-understands-the-job-not-just-the-document" rel="noopener"&gt;procore.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence is Procore&amp;rsquo;s benchmark preview, one customer example in the same post, a customer comment in the AI Go release, and one customer figure from a July release. Procore built the tasks and ran the test. Procore says Thomas Kommer of the California Center for Construction Education at Cal Poly San Luis Obispo reviewed the task scenarios, scoring rubrics and correct answers.&lt;/p&gt;
&lt;p&gt;These claims come from Procore:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;Superintendents, project managers and project executives contributed the questions behind the tasks. The tasks fall into five workflow families and four difficulty tiers, from Easy to Expert.&lt;/li&gt;
&lt;li&gt;A task passed only if the answer was correct and supported by the project record. Speed and cost were measured separately.&lt;/li&gt;
&lt;li&gt;The general models got the same project data and tasks through Procore&amp;rsquo;s public API, the route a customer would use to connect them today.&lt;/li&gt;
&lt;li&gt;Magpie 3.0 passed 78% of tasks. The closest frontier model scored 18 points lower, which works out to about 60%.&lt;/li&gt;
&lt;/ul&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Task success rate on Procore&amp;#39;s construction benchmark, early preview, October 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;System&lt;/th&gt;&lt;th class="num"&gt;Task success rate (%)&lt;/th&gt;&lt;th&gt;Basis&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Procore AI with Magpie 3.0&lt;/td&gt;&lt;td class="num"&gt;78%&lt;/td&gt;&lt;td&gt;Reported by Procore&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Closest general-purpose frontier model&lt;/td&gt;&lt;td class="num"&gt;60%&lt;/td&gt;&lt;td&gt;Computed here as 78 minus the 18-point margin Procore reports&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.procore.com/blog/ai-that-understands-the-job-not-just-the-document" rel="noopener"&gt;procore.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;The five workflow families in Procore&amp;#39;s benchmark&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Workflow family&lt;/th&gt;&lt;th&gt;Example tasks Procore lists&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;RFI management&lt;/td&gt;&lt;td&gt;Investigating root causes, identifying linked drawing callouts, catching duplicates, evaluating schedule impacts&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Submittal management&lt;/td&gt;&lt;td&gt;Cross-checking submittals against spec divisions, identifying non-approved substitutions, flagging lead-time risks&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Drawings and specifications&lt;/td&gt;&lt;td&gt;Resolving revision-sensitive details, tracing section cuts across sheets, detecting constructability clashes&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Schedule and delay&lt;/td&gt;&lt;td&gt;Evaluating float, identifying critical-path impacts from field observations, analyzing trade sequencing&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Cost and change&lt;/td&gt;&lt;td&gt;Identifying unapproved scope changes, calculating budget exposure across cost codes, validating potential change orders&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.procore.com/blog/ai-that-understands-the-job-not-just-the-document" rel="noopener"&gt;procore.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;aside class="note"&gt;In plain terms, on a test built from questions that field and office staff ask, Procore&amp;rsquo;s system got about four tasks in five fully right and the best general model about three in five. Procore says its internal experts judged that some of the hard and expert tasks would take a seasoned professional hours to answer.&lt;/aside&gt;
&lt;p&gt;Procore calls these results an early preview and says it will publish the full set. Scores by model, by difficulty tier and by workflow family are not yet public, and neither are the speed and cost measurements. The post names the three model families tested and gives one score for the closest of them.&lt;/p&gt;
&lt;p&gt;The field example comes from Bernards, a California builder. Procore says project manager Joseph Kim ran a generator submittal through Procore AI, which found that the package met the mechanical spec but missed an electrical spec requirement that the automatic transfer switch come from the generator&amp;rsquo;s manufacturer. Kim&amp;rsquo;s comment: &amp;ldquo;It caught something from a different spec.&amp;rdquo;&lt;/p&gt;
&lt;p&gt;Procore&amp;rsquo;s July 23 release says Haskell cut submittal reviews from seven days to 10 minutes with Procore AI. The number of submittals and the scope of the reviews behind the figure are not yet public.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Submittal review time at Haskell, as Procore reports it&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Customer&lt;/th&gt;&lt;th&gt;Task&lt;/th&gt;&lt;th&gt;Before Procore AI&lt;/th&gt;&lt;th&gt;With Procore AI&lt;/th&gt;&lt;th&gt;Reported by&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Haskell&lt;/td&gt;&lt;td&gt;Submittal review&lt;/td&gt;&lt;td&gt;7 days&lt;/td&gt;&lt;td&gt;10 minutes&lt;/td&gt;&lt;td&gt;Procore press release, July 23, 2026&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.procore.com/press/procore-introduces-digital-coworker-packages-expands-ai-agent-library-and-previews-skills-to-help-construction-teams-put-ai-to-work" rel="noopener"&gt;procore.com&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;For AI Go, the evidence is a comment from Andrew Baker, CIO of Sequoyah Electric, who says his foremen ask questions while looking at the problem and get an answer on the spot. Procore says it is part of a study with Moss Construction, designed by SBK Technologies, of how agents, AI Go and AI wearables affect administrative time. The study&amp;rsquo;s results are not yet out.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track submittal review cycle time: calendar days from the date your team receives a submittal package to the date the response goes back to the subcontractor. Next to it, count spec conflicts caught at review, so a shorter cycle cannot hide missed requirements.&lt;/p&gt;
&lt;p&gt;Capture the baseline before you turn on the agent:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Pull the last 30 to 50 closed submittals on a comparable job and record the received and returned dates for each.&lt;/li&gt;
&lt;li&gt;Count the revise-and-resubmit responses, and mark the ones whose reason came from a spec section outside the package&amp;rsquo;s own division.&lt;/li&gt;
&lt;li&gt;Count change events or field issues from the last six months that trace back to an approved submittal with a missed requirement.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;During the pilot, have the reviewer log each agent flag as a real problem, a false flag or something already caught. The share of flags that were real problems is the tool&amp;rsquo;s precision. A first step on one job is to run the agent on 10 submittals your team has already approved and compare its flags with what your reviewer found.&lt;/p&gt;
&lt;p&gt;Earlier posts covered &lt;a href="https://constructionmetrics.com/2026/09/25/autodesk-forma-submittals-evaluation-agent-beta/"&gt;Autodesk&amp;rsquo;s Submittals Evaluation Agent&lt;/a&gt;, &lt;a href="https://constructionmetrics.com/2026/09/30/buildertrend-ai-submittals-log-from-spec-book/"&gt;Buildertrend&amp;rsquo;s AI Submittals&lt;/a&gt; and &lt;a href="https://constructionmetrics.com/2026/10/20/measure-rfi-turnaround-before-ai-pilot/"&gt;how to measure RFI turnaround before an AI pilot&lt;/a&gt;.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;Procore says the multimodal index is generally available across all Procore AI packages, and Magpie 3.0 is in open beta for Procore AI customers through Procore Explore. Ontology features shown at Groundbreak, including linking drawings and photos and automated rework pattern detection, roll out over the coming year.&lt;/p&gt;
&lt;p&gt;AI Go is in open beta for North American customers on the Digital Coworker Starter, Pro and Enterprise packages. The Meta AI glasses version is in closed beta. Each Digital Coworker package includes Control Tower, which shows AI usage and credit consumption by agent, project and team member. Package prices are not listed in the releases.&lt;/p&gt;</content:encoded></item><item><title>How to price per diem for a traveling crew with the FY 2027 GSA rates, $181 a day in most of the US</title><link>https://constructionmetrics.com/2026/10/23/per-diem-traveling-crew-gsa-rates/</link><pubDate>Fri, 23 Oct 2026 11:40:05 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/23/per-diem-traveling-crew-gsa-rates/</guid><category>Data</category><description>GSA's FY 2027 standard per diem is $113 for lodging and $68 for meals. This example prices a four-person crew on a three-week out-of-town job.</description><content:encoded>&lt;p&gt;Per diem is a fixed daily allowance an employer pays a worker for lodging, meals and incidental expenses while the worker is away from home on a job. An estimator pricing work three states away needs that cost as its own line, and payroll needs to know how much of the allowance it can pay without treating it as wages. Both figures start from the federal per diem rates.&lt;/p&gt;
&lt;p&gt;The General Services Administration (GSA) sets those rates for federal employees, and the IRS uses them as the ceiling for tax-free allowances. GSA&amp;rsquo;s new rates for fiscal year 2027 took effect on October 1, 2026. This post prices a crew&amp;rsquo;s travel from them.&lt;/p&gt;
&lt;h2 id="what-the-federal-rates-are"&gt;What the federal rates are&lt;/h2&gt;
&lt;p&gt;GSA publishes a lodging rate and a meals and incidental expenses rate, called M&amp;amp;IE, for each location in the continental United States. A standard rate covers most of the country. GSA&amp;rsquo;s per diem page says about 300 non-standard areas have their own rates, and most of those are a key city plus its surrounding county.&lt;/p&gt;
&lt;p&gt;For FY 2027, the standard rate is $113 a night for lodging and $68 a day for M&amp;amp;IE, according to GSA&amp;rsquo;s per diem data. Lodging rose $3 from $110 in FY 2026, and M&amp;amp;IE stayed at $68.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;GSA per diem rates for three locations, FY 2026 and FY 2027. The federal fiscal year starts October 1.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Location&lt;/th&gt;&lt;th class="num"&gt;FY 2026 lodging ($)&lt;/th&gt;&lt;th class="num"&gt;FY 2027 lodging ($)&lt;/th&gt;&lt;th class="num"&gt;M&amp;amp;IE both years ($)&lt;/th&gt;&lt;th class="num"&gt;FY 2027 first and last day M&amp;amp;IE ($)&lt;/th&gt;&lt;th class="num"&gt;FY 2027 full-day total ($)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Standard CONUS rate&lt;/td&gt;&lt;td class="num"&gt;$110&lt;/td&gt;&lt;td class="num"&gt;$113&lt;/td&gt;&lt;td class="num"&gt;$68&lt;/td&gt;&lt;td class="num"&gt;$51.0&lt;/td&gt;&lt;td class="num"&gt;$181&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Houston (Harris, Fort Bend, Montgomery counties)&lt;/td&gt;&lt;td class="num"&gt;$128&lt;/td&gt;&lt;td class="num"&gt;$133&lt;/td&gt;&lt;td class="num"&gt;$80&lt;/td&gt;&lt;td class="num"&gt;$60.0&lt;/td&gt;&lt;td class="num"&gt;$213&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Denver/Aurora, April to October&lt;/td&gt;&lt;td class="num"&gt;$215&lt;/td&gt;&lt;td class="num"&gt;$227&lt;/td&gt;&lt;td class="num"&gt;$92&lt;/td&gt;&lt;td class="num"&gt;$69.0&lt;/td&gt;&lt;td class="num"&gt;$319&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Denver/Aurora, November to March&lt;/td&gt;&lt;td class="num"&gt;$165&lt;/td&gt;&lt;td class="num"&gt;$170&lt;/td&gt;&lt;td class="num"&gt;$92&lt;/td&gt;&lt;td class="num"&gt;$69.0&lt;/td&gt;&lt;td class="num"&gt;$262&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.gsa.gov/travel/plan-a-trip/per-diem-rates" rel="noopener"&gt;gsa.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Some areas change rates by season. Denver/Aurora lodging is $227 a night from April through October and $170 from November through March in FY 2027. A job that runs through the spring crosses from one rate to the other, so the estimate should split the nights by month.&lt;/p&gt;
&lt;p&gt;GSA&amp;rsquo;s M&amp;amp;IE table also lists a first and last day amount for each tier, which works out to 75% of the full-day rate. For the $68 tier that is $51.&lt;/p&gt;
&lt;h2 id="what-the-irs-rules-decide"&gt;What the IRS rules decide&lt;/h2&gt;
&lt;p&gt;IRS Publication 463 covers how an employer treats these allowances. Under an accountable plan, reimbursements aren&amp;rsquo;t reported as pay. An accountable plan is a reimbursement arrangement that meets the IRS rules, and for a per diem that means the allowance is no more than the federal rate and each worker documents the dates, place and business purpose of the travel.&lt;/p&gt;
&lt;p&gt;Publication 463 sets out the points that matter for a traveling crew:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;The federal rate can be the regular GSA rate, the standard meal allowance, or the high-low rate. The high-low method uses two flat rates, one for designated high-cost locations and one for everywhere else, and the IRS updates it in a notice each year.&lt;/li&gt;
&lt;li&gt;The rate comes from the place where the worker stops for sleep or rest. A crew that works in one county and sleeps in a cheaper one uses the rate where they sleep.&lt;/li&gt;
&lt;li&gt;Travel days are partial days. One method gives three-fourths of the M&amp;amp;IE rate for the day of departure and the day of return. The other allows any proration method the employer applies consistently and that follows reasonable business practice.&lt;/li&gt;
&lt;li&gt;When the employer pays the hotel directly or furnishes lodging, the worker&amp;rsquo;s allowance covers M&amp;amp;IE only.&lt;/li&gt;
&lt;li&gt;An allowance above the federal rate splits in two. The amount up to the federal rate goes under code L in box 12 of the W-2 and isn&amp;rsquo;t taxable, and the excess goes in box 1 as wages.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Publication 463 also ties the tax treatment to how long the assignment is expected to last. It calls an assignment in a single location temporary when it is realistically expected to last, and does in fact last, one year or less. An assignment expected to last more than a year is indefinite from the start, the job site becomes the worker&amp;rsquo;s tax home, and the living allowances become income. A series of short assignments to the same location can add up to an indefinite one. On a long project, set the travel policy with your tax adviser before the first crew mobilizes.&lt;/p&gt;
&lt;p&gt;Allowances under an accountable plan aren&amp;rsquo;t reported as pay, so the items in the &lt;a href="https://constructionmetrics.com/2026/10/16/compute-labor-burden-per-hour-worked/"&gt;labor burden post&lt;/a&gt; that are calculated on wages may not apply to them. Confirm each burden line with your payroll provider before pricing.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The figures below are an example. A four-person crew travels out on a Sunday, works three 50-hour weeks, and returns home on the Sunday three weeks later. That is 21 nights of lodging and 22 days of M&amp;amp;IE, with full M&amp;amp;IE on 20 days and the three-fourths rate on the two travel days. Each worker logs 150 hours.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Per diem for a four-person crew, 21 nights and 22 days of M&amp;amp;IE, at FY 2027 GSA rates. Example figures.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Location and month&lt;/th&gt;&lt;th class="num"&gt;Lodging per worker ($)&lt;/th&gt;&lt;th class="num"&gt;M&amp;amp;IE per worker ($)&lt;/th&gt;&lt;th class="num"&gt;Per diem per worker ($)&lt;/th&gt;&lt;th class="num"&gt;Crew of four ($)&lt;/th&gt;&lt;th class="num"&gt;Per diem per hour worked ($)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Standard rate area&lt;/td&gt;&lt;td class="num"&gt;$2,373&lt;/td&gt;&lt;td class="num"&gt;$1,462&lt;/td&gt;&lt;td class="num"&gt;$3,835&lt;/td&gt;&lt;td class="num"&gt;$15,340&lt;/td&gt;&lt;td class="num"&gt;25.57&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Houston, any month&lt;/td&gt;&lt;td class="num"&gt;$2,793&lt;/td&gt;&lt;td class="num"&gt;$1,720&lt;/td&gt;&lt;td class="num"&gt;$4,513&lt;/td&gt;&lt;td class="num"&gt;$18,052&lt;/td&gt;&lt;td class="num"&gt;30.09&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Denver, January 2027&lt;/td&gt;&lt;td class="num"&gt;$3,570&lt;/td&gt;&lt;td class="num"&gt;$1,978&lt;/td&gt;&lt;td class="num"&gt;$5,548&lt;/td&gt;&lt;td class="num"&gt;$22,192&lt;/td&gt;&lt;td class="num"&gt;36.99&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Denver, May 2027&lt;/td&gt;&lt;td class="num"&gt;$4,767&lt;/td&gt;&lt;td class="num"&gt;$1,978&lt;/td&gt;&lt;td class="num"&gt;$6,745&lt;/td&gt;&lt;td class="num"&gt;$26,980&lt;/td&gt;&lt;td class="num"&gt;44.97&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;In a standard-rate area, each worker&amp;rsquo;s per diem comes to $3,835. Lodging is 21 nights at $113, or $2,373. M&amp;amp;IE is 20 days at $68 plus 2 days at $51, or $1,462. The crew of four costs $15,340, which spread over 150 hours per worker adds $25.57 to every hour worked.&lt;/p&gt;
&lt;p&gt;The same job in Denver in May costs $26,980 for the crew, or $44.97 per hour worked. Moved to January, the lower lodging rate brings it to $22,192, with the same hours and the same M&amp;amp;IE.&lt;/p&gt;
&lt;p&gt;A crew that stays on site through Saturday and Sunday draws lodging and M&amp;amp;IE on days with no hours to charge. Shorter workweeks spread the same per diem over fewer hours, which raises the cost per hour worked. The 50-hour weeks in this example tie to the &lt;a href="https://constructionmetrics.com/2026/10/19/compute-overtime-premium-extended-workweek/"&gt;overtime premium post&lt;/a&gt;, which prices the extra hours themselves.&lt;/p&gt;
&lt;h2 id="how-to-start-on-your-jobs"&gt;How to start on your jobs&lt;/h2&gt;
&lt;p&gt;Pull the travel costs from your last out-of-town job and split them into lodging, meals and incidentals by worker and by night. Look up the GSA rate for the ZIP code where the crew slept, for the months they were there, and compare what you paid against the federal rate line by line. Under Publication 463, the amount paid above the rate is wages, so check how payroll reported it.&lt;/p&gt;
&lt;p&gt;On the next bid outside your home market, price per diem from the GSA rate for the job&amp;rsquo;s location and season, then divide it by the crew hours in your schedule. Carry that per-hour figure next to the labor rate in the estimate, so a schedule change that adds weekends or shortens weeks shows up in the travel line as well.&lt;/p&gt;</content:encoded></item><item><title>How to compute Prompt Payment Act interest on a late federal pay application, with a $6,740 example</title><link>https://constructionmetrics.com/2026/10/22/compute-prompt-payment-interest-federal-pay-apps/</link><pubDate>Thu, 22 Oct 2026 11:38:55 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/22/compute-prompt-payment-interest-federal-pay-apps/</guid><category>Data</category><description>Federal agencies owe interest on late construction payments. This example computes it for two pay apps and a retainage release at the 4.75% rate.</description><content:encoded>&lt;p&gt;When a federal agency pays a construction invoice late, it owes the contractor interest. The Prompt Payment Act of 1982 requires it, according to the Bureau of the Fiscal Service, the Treasury office that publishes the rate. The agency calculates it and pays it without a request, and the project accountant who posts the receipt can check the math.&lt;/p&gt;
&lt;p&gt;The rules sit in FAR 52.232-27, the prompt payment clause in federal construction contracts, and in the regulation it points to at 5 CFR part 1315.&lt;/p&gt;
&lt;h2 id="when-a-payment-is-late"&gt;When a payment is late&lt;/h2&gt;
&lt;p&gt;FAR 52.232-27 sets the due dates, and each one starts from a different event:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;A progress payment is due 14 days after the designated billing office receives a proper payment request.&lt;/li&gt;
&lt;li&gt;Retainage held under FAR 52.232-5 is due on the date the contract sets. When the contract is silent, it is due 30 days after the contracting officer approves its release.&lt;/li&gt;
&lt;li&gt;A final payment is due on the later of two dates, the 30th day after the billing office receives a proper invoice and the 30th day after the government accepts the work.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The clock starts only with a proper invoice, which the clause defines in eleven items. A billing office that finds a defect has 7 days to return the invoice with its reasons, and the government takes a late return into account when it computes interest.&lt;/p&gt;
&lt;p&gt;Interest is automatic once the agency has processed a receiving report or similar document and there is no disagreement over quantity, quality, compliance or the amount requested. When a due date falls on a Saturday, Sunday or legal holiday, the agency may pay on the next working day with no penalty.&lt;/p&gt;
&lt;h2 id="how-the-interest-is-calculated"&gt;How the interest is calculated&lt;/h2&gt;
&lt;p&gt;5 CFR 1315.10 sets the method. In order:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Count days late from the day after the due date through the payment date. The FAR clause treats the date on the check, or the date of the electronic funds transfer, as the payment date.&lt;/li&gt;
&lt;li&gt;Use the rate in effect on the day after the due date. Treasury publishes the rate by period, and for July 1 through December 31, 2026 it is 4.75%. That rate stays with the invoice even when the payment arrives after a new rate takes effect.&lt;/li&gt;
&lt;li&gt;Use a 360-day year.&lt;/li&gt;
&lt;li&gt;At the end of each 30-day period, add unpaid interest to the principal so later interest accrues on it. This compounding runs for up to one year.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;The Fiscal Service publishes the formula behind its online calculator. Multiply the principal by (1 + r/12) raised to the number of full months, then by (1 + r/360 × the remaining days), and subtract the principal. Here r is the annual rate. For a payment 30 days late or less, no compounding period has closed, so the result is simple interest.&lt;/p&gt;
&lt;p&gt;Interest stops accruing after one year, or once the contractor files a Contract Disputes Act claim for it. The regulation excludes penalties under $1, delays caused by a dispute over the amount or contract compliance, and amounts withheld temporarily under the contract. Retainage falls in that last group until its release is approved, and the &lt;a href="https://constructionmetrics.com/2026/10/10/track-retainage-aging-by-job-owner/"&gt;retainage aging post&lt;/a&gt; covers how to track it by owner.&lt;/p&gt;
&lt;h2 id="a-worked-example"&gt;A worked example&lt;/h2&gt;
&lt;p&gt;The figures below are an example with round numbers. A general contractor on a federal fixed-price job has three payments in the second half of 2026:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;The August progress payment of $1,000,000. The billing office logged the request on September 1, so it was due September 15, and the agency paid on November 5.&lt;/li&gt;
&lt;li&gt;The September progress payment of $800,000, received October 1, due October 15 and paid October 29.&lt;/li&gt;
&lt;li&gt;A $500,000 retainage release the contracting officer approved on September 30. The contract sets no date, so it was due 30 days later on October 30. The agency paid on December 29.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;All three due dates fall in the July to December 2026 period, so each one uses 4.75%.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Prompt Payment interest on three late payments at 4.75% (example figures)&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Payment&lt;/th&gt;&lt;th class="num"&gt;Amount ($)&lt;/th&gt;&lt;th&gt;Due date&lt;/th&gt;&lt;th&gt;Paid&lt;/th&gt;&lt;th class="num"&gt;Days late&lt;/th&gt;&lt;th class="num"&gt;Full 30-day periods&lt;/th&gt;&lt;th class="num"&gt;Remaining days&lt;/th&gt;&lt;th class="num"&gt;Interest owed ($)&lt;/th&gt;&lt;th class="num"&gt;Simple interest ($)&lt;/th&gt;&lt;th class="num"&gt;Additional penalty if interest goes unpaid ($)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;August progress payment&lt;/td&gt;&lt;td class="num"&gt;$1,000,000&lt;/td&gt;&lt;td&gt;Sep 15&lt;/td&gt;&lt;td&gt;Nov 5&lt;/td&gt;&lt;td class="num"&gt;51&lt;/td&gt;&lt;td class="num"&gt;1&lt;/td&gt;&lt;td class="num"&gt;21&lt;/td&gt;&lt;td class="num"&gt;6,740.13&lt;/td&gt;&lt;td class="num"&gt;6,729.17&lt;/td&gt;&lt;td class="num"&gt;5,000.00&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;September progress payment&lt;/td&gt;&lt;td class="num"&gt;$800,000&lt;/td&gt;&lt;td&gt;Oct 15&lt;/td&gt;&lt;td&gt;Oct 29&lt;/td&gt;&lt;td class="num"&gt;14&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;14&lt;/td&gt;&lt;td class="num"&gt;1,477.78&lt;/td&gt;&lt;td class="num"&gt;1,477.78&lt;/td&gt;&lt;td class="num"&gt;1,477.78&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Retainage release&lt;/td&gt;&lt;td class="num"&gt;$500,000&lt;/td&gt;&lt;td&gt;Oct 30&lt;/td&gt;&lt;td&gt;Dec 29&lt;/td&gt;&lt;td class="num"&gt;60&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;0&lt;/td&gt;&lt;td class="num"&gt;3,966.17&lt;/td&gt;&lt;td class="num"&gt;3,958.33&lt;/td&gt;&lt;td class="num"&gt;3,966.17&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;The August payment ran 51 days late, one full 30-day period plus 21 days. The formula gives $1,000,000 × (1 + 0.0475/12) × (1 + 0.0475/360 × 21) minus $1,000,000, or $6,740.13. Simple interest over the same 51 days would be $6,729.17, so compounding adds about $11 here.&lt;/p&gt;
&lt;p&gt;The September payment was 14 days late, which keeps it inside the first period: $800,000 × 0.0475 × 14 / 360 = $1,477.78. The retainage was 60 days late, exactly two periods, for $3,966.17.&lt;/p&gt;
&lt;h2 id="when-the-agency-leaves-out-the-interest"&gt;When the agency leaves out the interest&lt;/h2&gt;
&lt;p&gt;The regulation requires a notice with each interest payment stating the amount, the number of days late and the rate. Compare those three figures to your own calculation, invoice by invoice.&lt;/p&gt;
&lt;p&gt;When the agency pays the principal late without the interest and still has not paid the interest 10 days later, the contractor can request an additional penalty in writing. Under 5 CFR 1315.11, the request must be postmarked or received by the 40th day after the payment. It must name the invoice, attach a copy, and state the date the principal arrived. The additional penalty equals the interest owed, with a $25 minimum and a $5,000 maximum, figured separately for each invoice.&lt;/p&gt;
&lt;p&gt;In the example, the cap holds the August payment&amp;rsquo;s additional penalty to $5,000. For a payment dated November 5, the 40th day is December 15.&lt;/p&gt;
&lt;h2 id="the-subcontractor-side"&gt;The subcontractor side&lt;/h2&gt;
&lt;p&gt;FAR 52.232-27 flows down to subcontracts. The prime has to pay each subcontractor within 7 days of receiving the government&amp;rsquo;s payment, and owes the subcontractor interest from the day after that date until it pays. The rate is the one Treasury sets for interest under 41 U.S.C. 7109, the Contract Disputes Act provision, in effect when the obligation arises. The clause does not specify compounding, so read the subcontract&amp;rsquo;s interest clause.&lt;/p&gt;
&lt;p&gt;Say the drywall subcontractor&amp;rsquo;s share of the August payment is $400,000. The government paid on November 5, so the prime owes the subcontractor by November 12. A prime that pays on November 25 is 13 days late, and at 4.75% simple interest on a 360-day year, which this example assumes, it owes $686.11. Paragraph (k) of the clause says that interest is the prime&amp;rsquo;s obligation alone, and a cost-reimbursement claim may not include it.&lt;/p&gt;
&lt;h2 id="how-to-track-this-on-your-jobs"&gt;How to track this on your jobs&lt;/h2&gt;
&lt;p&gt;Add five columns to the A/R subledger for federal jobs: the date the billing office received the request, the due date, the payment date, the interest you computed and the interest received. Use the receipt date the billing office annotates, or the timestamp from the submission portal. The &lt;a href="https://constructionmetrics.com/2026/10/11/adjust-dso-retainage-billing-cycles/"&gt;DSO post&lt;/a&gt; already sorts federal receivables by due date, so that column may exist. The same 4.75% rate is the cost-of-money input in the &lt;a href="https://constructionmetrics.com/2026/10/17/compute-equipment-hourly-rate-corps-method/"&gt;Corps of Engineers equipment rate method&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;Start with one federal job. Pull every payment received since July 1, 2026, find the ones dated after their due date, and compute the interest each should have carried. Then compare each result to the agency&amp;rsquo;s interest notice, and mark the 40th day after payment on any invoice where the interest is missing.&lt;/p&gt;</content:encoded></item><item><title>Architecture billings index fell to 44.7 in September, the lowest reading since May</title><link>https://constructionmetrics.com/2026/10/21/architecture-billings-september-lowest-since-may/</link><pubDate>Wed, 21 Oct 2026 11:39:46 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/21/architecture-billings-september-lowest-since-may/</guid><category>Data</category><description>The AIA/Deltek Architecture Billings Index fell to 44.7 in September from 47.2 in August, as design contracts dropped and inquiries rose.</description><content:encoded>&lt;p&gt;The AIA/Deltek Architecture Billings Index (ABI) fell to 44.7 for September 2026, down 2.5 points from 47.2 in August and up 1.4 points from 43.3 in September 2025. The American Institute of Architects published the figure on October 21. The ABI is a diffusion index, a score built from the share of firms reporting higher billings against the share reporting lower billings, so 50 means no change and a score below 50 means more firms billed less than the month before. AIA says September had the largest share of firms reporting declines since May. The score sits below the 12-month average of 46.9 and ranks fourth lowest of the 13 months shown, above only September 2025, January 2026 and May 2026. (That makes the year-over-year gain a comparison against the lowest month in the table.)&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Billings fell further below 50 in September&lt;/p&gt;&lt;p class="chart-subtitle"&gt;AIA/Deltek Architecture Billings Index, national score as first reported (50 = no change)&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;Billings fell further below 50 in September&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 13 points from September 2025 to September 2026. Series: value. Values range from 43 to 50.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="234.0" y2="234.0"/&gt;&lt;line x1="72" x2="616" y1="162.0" y2="162.0"/&gt;&lt;line x1="72" x2="616" y1="90.0" y2="90.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;42&lt;/text&gt;&lt;text x="64" y="237.5" text-anchor="end"&gt;44&lt;/text&gt;&lt;text x="64" y="165.5" text-anchor="end"&gt;46&lt;/text&gt;&lt;text x="64" y="93.5" text-anchor="end"&gt;48&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;50&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2025-09&lt;/text&gt;&lt;text x="208.0" y="324" text-anchor="middle"&gt;2025-12&lt;/text&gt;&lt;text x="344.0" y="324" text-anchor="middle"&gt;2026-03&lt;/text&gt;&lt;text x="480.0" y="324" text-anchor="middle"&gt;2026-06&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,259.2 L117.3,104.4 L162.7,187.2 L208.0,72.0 L253.3,241.2 L298.7,39.6 L344.0,25.2 L389.3,79.2 L434.7,216.0 L480.0,115.2 L525.3,140.4 L570.7,118.8 L616.0,208.8 L616.0,306.0 L72.0,306.0 Z"/&gt;
&lt;path class="line" d="M72.0,259.2 L117.3,104.4 L162.7,187.2 L208.0,72.0 L253.3,241.2 L298.7,39.6 L344.0,25.2 L389.3,79.2 L434.7,216.0 L480.0,115.2 L525.3,140.4 L570.7,118.8 L616.0,208.8"/&gt;
&lt;circle class="end" cx="616.0" cy="208.8" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="259.2" r="9"&gt;&lt;title&gt;September 2025: 43.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="104.4" r="9"&gt;&lt;title&gt;October 2025: 47.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="187.2" r="9"&gt;&lt;title&gt;November 2025: 45.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="72.0" r="9"&gt;&lt;title&gt;December 2025: 48.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="241.2" r="9"&gt;&lt;title&gt;January 2026: 43.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="39.6" r="9"&gt;&lt;title&gt;February 2026: 49.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="25.2" r="9"&gt;&lt;title&gt;March 2026: 49.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="79.2" r="9"&gt;&lt;title&gt;April 2026: 48.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="216.0" r="9"&gt;&lt;title&gt;May 2026: 44.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="115.2" r="9"&gt;&lt;title&gt;June 2026: 47.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="140.4" r="9"&gt;&lt;title&gt;July 2026: 46.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="118.8" r="9"&gt;&lt;title&gt;August 2026: 47.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="208.8" r="9"&gt;&lt;title&gt;September 2026: 44.7&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="212.8"&gt;44.7&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="201.8" y2="188.8"/&gt;
&lt;circle cx="616.0" cy="208.8" r="3.5"/&gt;&lt;text x="616.0" y="184.8" text-anchor="end"&gt;September 2026, 44.7&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;Billings fell further below 50 in September&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 13 points from September 2025 to September 2026. Series: value. Values range from 43 to 50.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="117.0" y2="117.0"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;40&lt;/text&gt;&lt;text x="42" y="120.5" text-anchor="end"&gt;45&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;50&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2025-09&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2026-03&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,152.0 L68.8,63.4 L87.7,110.8 L106.5,44.9 L125.3,141.7 L144.2,26.4 L163.0,18.1 L181.8,49.0 L200.7,127.3 L219.5,69.6 L238.3,84.0 L257.2,71.7 L276.0,123.2 L276.0,220.0 L50.0,220.0 Z"/&gt;
&lt;path class="line" d="M50.0,152.0 L68.8,63.4 L87.7,110.8 L106.5,44.9 L125.3,141.7 L144.2,26.4 L163.0,18.1 L181.8,49.0 L200.7,127.3 L219.5,69.6 L238.3,84.0 L257.2,71.7 L276.0,123.2"/&gt;
&lt;circle class="end" cx="276.0" cy="123.2" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="152.0" r="9"&gt;&lt;title&gt;September 2025: 43.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="63.4" r="9"&gt;&lt;title&gt;October 2025: 47.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="110.8" r="9"&gt;&lt;title&gt;November 2025: 45.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="44.9" r="9"&gt;&lt;title&gt;December 2025: 48.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="141.7" r="9"&gt;&lt;title&gt;January 2026: 43.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="26.4" r="9"&gt;&lt;title&gt;February 2026: 49.4&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="18.1" r="9"&gt;&lt;title&gt;March 2026: 49.8&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="49.0" r="9"&gt;&lt;title&gt;April 2026: 48.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="127.3" r="9"&gt;&lt;title&gt;May 2026: 44.5&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="69.6" r="9"&gt;&lt;title&gt;June 2026: 47.3&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="84.0" r="9"&gt;&lt;title&gt;July 2026: 46.6&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="71.7" r="9"&gt;&lt;title&gt;August 2026: 47.2&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="123.2" r="9"&gt;&lt;title&gt;September 2026: 44.7&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="127.2"&gt;44.7&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="116.2" y2="103.2"/&gt;
&lt;circle cx="276.0" cy="123.2" r="3.5"/&gt;&lt;text x="276.0" y="87.2" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;September 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;44.7&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;Each month as AIA first published it. AIA later revised December 2025 to 47.1.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://www.aia.org/about-aia/press/architecture-billings-decline-further-amid-weak-market-conditions" rel="noopener"&gt;aia.org&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;ABI national score, last 13 months, as first reported&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;ABI score&lt;/th&gt;&lt;th class="num"&gt;Change from prior month (points)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Sep 2025&lt;/td&gt;&lt;td class="num"&gt;43.3&lt;/td&gt;&lt;td class="num"&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Oct 2025&lt;/td&gt;&lt;td class="num"&gt;47.6&lt;/td&gt;&lt;td class="num"&gt;4.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Nov 2025&lt;/td&gt;&lt;td class="num"&gt;45.3&lt;/td&gt;&lt;td class="num"&gt;-2.3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Dec 2025&lt;/td&gt;&lt;td class="num"&gt;48.5&lt;/td&gt;&lt;td class="num"&gt;3.2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jan 2026&lt;/td&gt;&lt;td class="num"&gt;43.8&lt;/td&gt;&lt;td class="num"&gt;-4.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Feb 2026&lt;/td&gt;&lt;td class="num"&gt;49.4&lt;/td&gt;&lt;td class="num"&gt;5.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mar 2026&lt;/td&gt;&lt;td class="num"&gt;49.8&lt;/td&gt;&lt;td class="num"&gt;0.4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Apr 2026&lt;/td&gt;&lt;td class="num"&gt;48.3&lt;/td&gt;&lt;td class="num"&gt;-1.5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;44.5&lt;/td&gt;&lt;td class="num"&gt;-3.8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jun 2026&lt;/td&gt;&lt;td class="num"&gt;47.3&lt;/td&gt;&lt;td class="num"&gt;2.8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Jul 2026&lt;/td&gt;&lt;td class="num"&gt;46.6&lt;/td&gt;&lt;td class="num"&gt;-0.7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Aug 2026&lt;/td&gt;&lt;td class="num"&gt;47.2&lt;/td&gt;&lt;td class="num"&gt;0.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Sep 2026&lt;/td&gt;&lt;td class="num"&gt;44.7&lt;/td&gt;&lt;td class="num"&gt;-2.5&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.aia.org/about-aia/press/architecture-billings-decline-further-amid-weak-market-conditions" rel="noopener"&gt;aia.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="what-moved"&gt;What moved&lt;/h2&gt;
&lt;p&gt;The two forward-looking indexes moved apart. Project inquiries rose to 53.2 from 50.8, so more firms saw new project inquiries than saw fewer. The design contracts index, which tracks the value of newly signed design contracts, dropped to 43.7 from 48.3. In August the two indexes were 2.5 points apart, and in September the gap was 9.5 points.&lt;/p&gt;
&lt;p&gt;By region, the Northeast fell to 39.1 from 40.7 and stayed the weakest. The South had the largest regional drop, to 43.1 from 46.1. The West came in at 50.7 and the Midwest at 50.6, which AIA describes as stable conditions.&lt;/p&gt;
&lt;p&gt;By firm specialization, multifamily residential fell 4.9 points to 42.9, the largest move in the detail. Commercial/industrial firms rose to 50.9, which AIA counts as modest growth for a second consecutive month. Institutional firms came in at 47.6 and mixed-practice firms at 41.5, both still in decline.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;ABI detail, August and September 2026&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Measure&lt;/th&gt;&lt;th class="num"&gt;August 2026&lt;/th&gt;&lt;th class="num"&gt;September 2026&lt;/th&gt;&lt;th class="num"&gt;Change (points)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;National ABI&lt;/td&gt;&lt;td class="num"&gt;47.2&lt;/td&gt;&lt;td class="num"&gt;44.7&lt;/td&gt;&lt;td class="num"&gt;-2.5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;West&lt;/td&gt;&lt;td class="num"&gt;49.8&lt;/td&gt;&lt;td class="num"&gt;50.7&lt;/td&gt;&lt;td class="num"&gt;0.9&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Midwest&lt;/td&gt;&lt;td class="num"&gt;50.7&lt;/td&gt;&lt;td class="num"&gt;50.6&lt;/td&gt;&lt;td class="num"&gt;-0.1&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;South&lt;/td&gt;&lt;td class="num"&gt;46.1&lt;/td&gt;&lt;td class="num"&gt;43.1&lt;/td&gt;&lt;td class="num"&gt;-3.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Northeast&lt;/td&gt;&lt;td class="num"&gt;40.7&lt;/td&gt;&lt;td class="num"&gt;39.1&lt;/td&gt;&lt;td class="num"&gt;-1.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Commercial/industrial&lt;/td&gt;&lt;td class="num"&gt;50.4&lt;/td&gt;&lt;td class="num"&gt;50.9&lt;/td&gt;&lt;td class="num"&gt;0.5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Institutional&lt;/td&gt;&lt;td class="num"&gt;47.0&lt;/td&gt;&lt;td class="num"&gt;47.6&lt;/td&gt;&lt;td class="num"&gt;0.6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Multifamily residential&lt;/td&gt;&lt;td class="num"&gt;47.8&lt;/td&gt;&lt;td class="num"&gt;42.9&lt;/td&gt;&lt;td class="num"&gt;-4.9&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mixed practice&lt;/td&gt;&lt;td class="num"&gt;42.5&lt;/td&gt;&lt;td class="num"&gt;41.5&lt;/td&gt;&lt;td class="num"&gt;-1.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Project inquiries&lt;/td&gt;&lt;td class="num"&gt;50.8&lt;/td&gt;&lt;td class="num"&gt;53.2&lt;/td&gt;&lt;td class="num"&gt;2.4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Design contracts&lt;/td&gt;&lt;td class="num"&gt;48.3&lt;/td&gt;&lt;td class="num"&gt;43.7&lt;/td&gt;&lt;td class="num"&gt;-4.6&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.aia.org/about-aia/press/architecture-billings-decline-further-amid-weak-market-conditions" rel="noopener"&gt;aia.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;AIA also reported backlogs at architecture firms for the end of the third quarter. The average was 6.2 months, down from 6.6 months at the end of the first quarter. Large firms with annual billings of $5 million or more held at 8.1 months, and firms with an institutional specialization held at 8.0. Small firms with billings under $250,000 went from 3.1 months to 3.8. Multifamily firms had the sharpest drop, from 6.2 months in March to 4.8 months in September.&lt;/p&gt;
&lt;p&gt;AIA Chief Economist Richard Branch pointed to a soft economy, harder project financing and more cautious clients. &amp;ldquo;With fewer projects moving forward, there is little reason to expect a meaningful improvement in business conditions in the near term,&amp;rdquo; he said.&lt;/p&gt;
&lt;h2 id="how-to-use-this-number"&gt;How to use this number&lt;/h2&gt;
&lt;p&gt;AIA says the ABI predicts nonresidential construction activity 9 to 12 months ahead. So September&amp;rsquo;s design billings relate to work that could start from roughly mid-2027 into the third quarter of that year. That timing is a reading of the data, and AIA&amp;rsquo;s release gives no regional or sector forecast.&lt;/p&gt;
&lt;p&gt;Two uses for a contractor:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;If you build multifamily, put the sector score and the backlog figure next to your own count of multifamily bid invitations for the last six months. A sector score of 42.9 and design backlogs down to 4.8 months both point to fewer projects coming out of design. If your invitation count is holding steady while those two fall, the drop may not have reached your market yet, or you are winning a larger share of a smaller pool. Your win rate by month separates the two.&lt;/li&gt;
&lt;li&gt;Track the design contracts index against your own preconstruction pipeline. Inquiries count interest, and design contracts count owners who signed with an architect. A simple match on your side is the number of pursuits where the owner already has a design contract in place. If that count falls in step with the index over the next quarter, the national figure is a usable early read for your region. If it does not, use the regional score for your area in its place.&lt;/li&gt;
&lt;/ol&gt;
&lt;h2 id="revisions-and-caveats"&gt;Revisions and caveats&lt;/h2&gt;
&lt;p&gt;AIA does not label the monthly score as preliminary. The September release puts August at 47.2, the same as first reported. AIA does revise past months. December 2025 was first published at 48.5, and AIA&amp;rsquo;s January 2026 release put it at 47.1. The pages opened for this post do not explain that revision, so the chart and table use each month as first reported, and the month-over-month changes carry the same caveat.&lt;/p&gt;
&lt;p&gt;The regional and sector scores are three-month moving averages, and AIA notes they may not average out to the national score. The September multifamily reading of 42.9 therefore includes July and August survey responses. The national score counts the direction of each firm&amp;rsquo;s billings and ignores the size of the change, so 44.7 says more firms billed less without saying by how much.&lt;/p&gt;
&lt;p&gt;The index comes from AIA&amp;rsquo;s Work-on-the-Boards survey of architecture firm leaders, which AIA says has run for over 20 years. The pages opened for this post do not give the number of responding firms or a margin of error, so a one-month move is best read alongside the 13-month trend.&lt;/p&gt;</content:encoded></item><item><title>EarthCam connects its jobsite camera AI to ChatGPT and Claude and adds seven detection models</title><link>https://constructionmetrics.com/2026/10/21/earthcam-jobsite-camera-ai-chatgpt-claude/</link><pubDate>Wed, 21 Oct 2026 07:40:24 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/21/earthcam-jobsite-camera-ai-chatgpt-claude/</guid><category>AI</category><description>EarthCam's new connectors let ChatGPT, Claude and other AI assistants answer jobsite questions from detections its cameras have already made.</description><content:encoded>&lt;p&gt;EarthCam, the New Jersey company that rents and installs construction cameras, announced on October 20, 2026, a set of connectors that pass its jobsite detections to general AI assistants. A project team can ask ChatGPT or Claude about deliveries, safety conditions or site activity on a job, and the assistant answers from analysis EarthCam&amp;rsquo;s own software has already run on the camera imagery. The release also adds seven new detection models, several of them aimed at the safety review and delivery log.&lt;/p&gt;
&lt;h2 id="what-it-does"&gt;What it does&lt;/h2&gt;
&lt;p&gt;On many jobs, camera footage gets reviewed after something happens. A superintendent or safety manager scrubs through footage when an incident, a disputed delivery or an owner question comes up, and the answer depends on someone finding the right hour of video.&lt;/p&gt;
&lt;p&gt;EarthCam&amp;rsquo;s software analyzes the imagery as it comes in. According to the release, its computer vision (software that recognizes objects and events in images) runs on EarthCam&amp;rsquo;s servers and in some cases on the camera itself. The detections land in Control Center 9, EarthCam&amp;rsquo;s existing project platform.&lt;/p&gt;
&lt;p&gt;The connectors are the new piece. They are built on the Model Context Protocol, an open standard that lets an AI assistant request data from outside software. EarthCam says the connector is available as an app in ChatGPT and as a connector in Claude, and that it can be added to other assistants that support the protocol, naming Gemini, Copilot and Perplexity. The assistant reads EarthCam&amp;rsquo;s finished detections, with links back to the high-resolution images, timestamps and metadata behind each answer.&lt;/p&gt;
&lt;p&gt;EarthCam says teams can combine that camera data with weather and IoT sensor readings, plus schedules, budgets and specs from other connected systems. Where the assistant supports scheduled tasks, a team can set it to produce safety reviews, delivery summaries and executive updates on a recurring basis. The people most likely to use it are the superintendent, the safety manager and the project executive who writes the owner update.&lt;/p&gt;
&lt;p&gt;The new models, as EarthCam describes them:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;AI Trench Safety Analytics records workers and equipment entering and leaving defined excavation areas.&lt;/li&gt;
&lt;li&gt;AI Housekeeping Hazard Detection flags visible debris, clutter and trip hazards.&lt;/li&gt;
&lt;li&gt;Thermal AI Analytics pairs thermal imaging with object recognition to spot people and activity in darkness.&lt;/li&gt;
&lt;li&gt;AI Delivery Verification recognizes boxes and pallets as they arrive and keeps time-stamped evidence.&lt;/li&gt;
&lt;li&gt;AI Dump Truck Analysis counts truck movements and reads load status.&lt;/li&gt;
&lt;li&gt;Visual Occupancy Analysis and Retail Signage Detection are the other two.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;The release also mentions expanded schedule automation that compares planned milestones with observed site conditions.&lt;/p&gt;
&lt;h2 id="evidence-so-far"&gt;Evidence so far&lt;/h2&gt;
&lt;p&gt;The evidence so far is EarthCam&amp;rsquo;s October 20 announcement, its product pages and one customer comment. These claims come from EarthCam:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;Its AI analyzes jobsite imagery ten times faster than a customer&amp;rsquo;s own AI agent can interpret the raw images.&lt;/li&gt;
&lt;li&gt;Agents working from EarthCam&amp;rsquo;s results use fewer AI usage credits than agents processing the images themselves.&lt;/li&gt;
&lt;li&gt;In EarthCam&amp;rsquo;s benchmark testing, its models identified construction assets and objects more accurately than leading general-purpose models on the same images, with no hallucinations, the AI term for output a model makes up, such as a reported pallet that was never delivered.&lt;/li&gt;
&lt;li&gt;Its models were trained on billions of construction images from its own cameras over three decades.&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;The image set, the scoring method and the accuracy rates from that benchmark are not yet public.&lt;/p&gt;
&lt;p&gt;The customer comment comes from Scott Travis, director of northern operations at GBR Roofing. His crew used EarthCam&amp;rsquo;s detection to set exclusion zones around fall-through hazards while replacing rusted roof panels, and got an alert when someone crossed into one so they could check that fall protection was in place. &amp;ldquo;AI will alert you immediately when someone approaches a fall hazard,&amp;rdquo; Travis said in the release. His example describes the exclusion-zone alerts inside EarthCam&amp;rsquo;s platform.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Start by testing whether the detections are correct, since every answer the assistant gives depends on them. Track the confirmed alert rate: the share of EarthCam alerts or detections that a person, checking the linked image, agrees are correct. Run it per model, because trench entry and delivery recognition can perform differently on the same job.&lt;/p&gt;
&lt;p&gt;For a time measure, track the hours a project executive or superintendent spends preparing the weekly owner or safety update. Capture the baseline before turning on scheduled summaries:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;For four weeks, log the start and end time of each weekly update, including time spent pulling photos and footage.&lt;/li&gt;
&lt;li&gt;Count the camera-related questions from the owner or the safety manager that week, and how long each took to answer.&lt;/li&gt;
&lt;li&gt;For delivery verification, pull the delivery tickets for two of those weeks so you can later check each one against a camera detection.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;During the pilot, log every summary the assistant drafts and every correction made before it goes out. Earlier posts covered &lt;a href="https://constructionmetrics.com/2026/09/28/viact-alliad-ai-cameras-ppe-violations/"&gt;viAct&amp;rsquo;s PPE detection on Alliad&amp;rsquo;s site cameras&lt;/a&gt; and &lt;a href="https://constructionmetrics.com/2026/10/04/miter-raises-40-million-ai-safety-reports/"&gt;Miter&amp;rsquo;s safety reports built from crew photos&lt;/a&gt;, and the confirmed alert rate works for comparing camera tools side by side.&lt;/p&gt;
&lt;p&gt;A first step is to pick one camera on one job, pull a week of its detections and check twenty of them against the images.&lt;/p&gt;
&lt;h2 id="availability-and-cost"&gt;Availability and cost&lt;/h2&gt;
&lt;p&gt;EarthCam says the connectors are available now to its customers through ChatGPT and Claude. Pricing is not listed on EarthCam&amp;rsquo;s product pages, which direct buyers to schedule a demonstration. Custom detection models are available on request from its data science team.&lt;/p&gt;</content:encoded></item><item><title>Housing starts fell 5.2% in September to 1,221,000, the second-lowest rate in 25 months</title><link>https://constructionmetrics.com/2026/10/20/housing-starts-september-second-lowest-25-months/</link><pubDate>Tue, 20 Oct 2026 11:38:27 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/20/housing-starts-september-second-lowest-25-months/</guid><category>Data</category><description>Census says September housing starts fell 5.2% to a 1,221,000 annual rate, with starts in five-plus-unit buildings down 25.9% from a year earlier.</description><content:encoded>&lt;p&gt;Privately owned housing starts fell to a seasonally adjusted annual rate (SAAR) of 1,221,000 units in September 2026, the Census Bureau reported on October 20. The preliminary figure is 5.2% below the revised August rate of 1,288,000 and 7.4% below September 2025&amp;rsquo;s 1,319,000. Only May 2026, at 1,182,000, came in lower in the past 25 months, and September sits about 9% under the 12-month average of 1,345,000. Building permits, the earlier signal in the same release, held nearly flat at 1,400,000.&lt;/p&gt;
&lt;figure class="chart" id="chart-0"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;September starts were the second-lowest of the past 25 months&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Privately owned housing starts, thousands of units, SAAR, September 2024 to September 2026&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-0-w-title chart-0-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-w-title"&gt;September starts were the second-lowest of the past 25 months&lt;/title&gt;
&lt;desc id="chart-0-w-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: value. Values range from 1,182 to 1,522.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="248.4" y2="248.4"/&gt;&lt;line x1="72" x2="616" y1="190.8" y2="190.8"/&gt;&lt;line x1="72" x2="616" y1="133.2" y2="133.2"/&gt;&lt;line x1="72" x2="616" y1="75.6" y2="75.6"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;1,100&lt;/text&gt;&lt;text x="64" y="251.9" text-anchor="end"&gt;1,200&lt;/text&gt;&lt;text x="64" y="194.3" text-anchor="end"&gt;1,300&lt;/text&gt;&lt;text x="64" y="136.7" text-anchor="end"&gt;1,400&lt;/text&gt;&lt;text x="64" y="79.1" text-anchor="end"&gt;1,500&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;1,600&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;2025-02&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;2025-07&lt;/text&gt;&lt;text x="412.0" y="324" text-anchor="middle"&gt;2025-12&lt;/text&gt;&lt;text x="525.3" y="324" text-anchor="middle"&gt;2026-05&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="72" x2="616" y1="165.1" y2="165.1"/&gt;
&lt;text x="76" y="161.1"&gt;12-period average 1,345&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M72.0,158.0 L94.7,150.5 L117.3,190.8 L140.0,79.1 L162.7,160.3 L185.3,80.8 L208.0,164.3 L230.7,133.2 L253.3,197.1 L276.0,145.3 L298.7,114.8 L321.3,196.0 L344.0,179.9 L366.7,206.4 L389.3,179.9 L412.0,145.9 L434.7,141.8 L457.3,164.3 L480.0,62.9 L502.7,125.1 L525.3,258.8 L548.0,110.7 L570.7,151.1 L593.3,197.7 L616.0,236.3 L616.0,306.0 L72.0,306.0 Z"/&gt;
&lt;path class="line" d="M72.0,158.0 L94.7,150.5 L117.3,190.8 L140.0,79.1 L162.7,160.3 L185.3,80.8 L208.0,164.3 L230.7,133.2 L253.3,197.1 L276.0,145.3 L298.7,114.8 L321.3,196.0 L344.0,179.9 L366.7,206.4 L389.3,179.9 L412.0,145.9 L434.7,141.8 L457.3,164.3 L480.0,62.9 L502.7,125.1 L525.3,258.8 L548.0,110.7 L570.7,151.1 L593.3,197.7 L616.0,236.3"/&gt;
&lt;circle class="end" cx="616.0" cy="236.3" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="158.0" r="9"&gt;&lt;title&gt;September 2024: 1,357&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="150.5" r="9"&gt;&lt;title&gt;October 2024: 1,370&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="190.8" r="9"&gt;&lt;title&gt;November 2024: 1,300&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="79.1" r="9"&gt;&lt;title&gt;December 2024: 1,494&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="160.3" r="9"&gt;&lt;title&gt;January 2025: 1,353&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="80.8" r="9"&gt;&lt;title&gt;February 2025: 1,491&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="164.3" r="9"&gt;&lt;title&gt;March 2025: 1,346&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="133.2" r="9"&gt;&lt;title&gt;April 2025: 1,400&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="197.1" r="9"&gt;&lt;title&gt;May 2025: 1,289&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="145.3" r="9"&gt;&lt;title&gt;June 2025: 1,379&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="114.8" r="9"&gt;&lt;title&gt;July 2025: 1,432&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="196.0" r="9"&gt;&lt;title&gt;August 2025: 1,291&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="179.9" r="9"&gt;&lt;title&gt;September 2025: 1,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="206.4" r="9"&gt;&lt;title&gt;October 2025: 1,273&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="179.9" r="9"&gt;&lt;title&gt;November 2025: 1,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="145.9" r="9"&gt;&lt;title&gt;December 2025: 1,378&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="141.8" r="9"&gt;&lt;title&gt;January 2026: 1,385&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="164.3" r="9"&gt;&lt;title&gt;February 2026: 1,346&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="62.9" r="9"&gt;&lt;title&gt;March 2026: 1,522&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="125.1" r="9"&gt;&lt;title&gt;April 2026: 1,414&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="258.8" r="9"&gt;&lt;title&gt;May 2026: 1,182&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="110.7" r="9"&gt;&lt;title&gt;June 2026: 1,439&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="151.1" r="9"&gt;&lt;title&gt;July 2026: 1,369&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="197.7" r="9"&gt;&lt;title&gt;August 2026: 1,288&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="236.3" r="9"&gt;&lt;title&gt;September 2026: 1,221&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="240.3"&gt;1,221&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="229.3" y2="216.3"/&gt;
&lt;circle cx="616.0" cy="236.3" r="3.5"/&gt;&lt;text x="616.0" y="212.3" text-anchor="end"&gt;September 2026, 1,221&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-0-n-title chart-0-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-0-n-title"&gt;September starts were the second-lowest of the past 25 months&lt;/title&gt;
&lt;desc id="chart-0-n-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: value. Values range from 1,182 to 1,522.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="151.3" y2="151.3"/&gt;&lt;line x1="50" x2="276" y1="82.7" y2="82.7"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;1,000&lt;/text&gt;&lt;text x="42" y="154.8" text-anchor="end"&gt;1,200&lt;/text&gt;&lt;text x="42" y="86.2" text-anchor="end"&gt;1,400&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;1,600&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2025-09&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="reference"&gt;
&lt;line x1="50" x2="276" y1="101.7" y2="101.7"/&gt;
&lt;text x="54" y="97.7"&gt;12-period average 1,345&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;path class="area" d="M50.0,97.4 L59.4,93.0 L68.8,117.0 L78.2,50.4 L87.7,98.8 L97.1,51.4 L106.5,101.2 L115.9,82.7 L125.3,120.8 L134.8,89.9 L144.2,71.7 L153.6,120.1 L163.0,110.5 L172.4,126.3 L181.8,110.5 L191.2,90.2 L200.7,87.8 L210.1,101.2 L219.5,40.8 L228.9,77.9 L238.3,157.5 L247.8,69.3 L257.2,93.3 L266.6,121.1 L276.0,144.1 L276.0,220.0 L50.0,220.0 Z"/&gt;
&lt;path class="line" d="M50.0,97.4 L59.4,93.0 L68.8,117.0 L78.2,50.4 L87.7,98.8 L97.1,51.4 L106.5,101.2 L115.9,82.7 L125.3,120.8 L134.8,89.9 L144.2,71.7 L153.6,120.1 L163.0,110.5 L172.4,126.3 L181.8,110.5 L191.2,90.2 L200.7,87.8 L210.1,101.2 L219.5,40.8 L228.9,77.9 L238.3,157.5 L247.8,69.3 L257.2,93.3 L266.6,121.1 L276.0,144.1"/&gt;
&lt;circle class="end" cx="276.0" cy="144.1" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="97.4" r="9"&gt;&lt;title&gt;September 2024: 1,357&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="93.0" r="9"&gt;&lt;title&gt;October 2024: 1,370&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="117.0" r="9"&gt;&lt;title&gt;November 2024: 1,300&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="50.4" r="9"&gt;&lt;title&gt;December 2024: 1,494&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="98.8" r="9"&gt;&lt;title&gt;January 2025: 1,353&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="51.4" r="9"&gt;&lt;title&gt;February 2025: 1,491&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="101.2" r="9"&gt;&lt;title&gt;March 2025: 1,346&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="82.7" r="9"&gt;&lt;title&gt;April 2025: 1,400&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="120.8" r="9"&gt;&lt;title&gt;May 2025: 1,289&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="89.9" r="9"&gt;&lt;title&gt;June 2025: 1,379&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="71.7" r="9"&gt;&lt;title&gt;July 2025: 1,432&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="120.1" r="9"&gt;&lt;title&gt;August 2025: 1,291&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="110.5" r="9"&gt;&lt;title&gt;September 2025: 1,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="126.3" r="9"&gt;&lt;title&gt;October 2025: 1,273&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="110.5" r="9"&gt;&lt;title&gt;November 2025: 1,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="90.2" r="9"&gt;&lt;title&gt;December 2025: 1,378&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="87.8" r="9"&gt;&lt;title&gt;January 2026: 1,385&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="101.2" r="9"&gt;&lt;title&gt;February 2026: 1,346&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="40.8" r="9"&gt;&lt;title&gt;March 2026: 1,522&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="77.9" r="9"&gt;&lt;title&gt;April 2026: 1,414&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="157.5" r="9"&gt;&lt;title&gt;May 2026: 1,182&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="69.3" r="9"&gt;&lt;title&gt;June 2026: 1,439&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="93.3" r="9"&gt;&lt;title&gt;July 2026: 1,369&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="121.1" r="9"&gt;&lt;title&gt;August 2026: 1,288&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="144.1" r="9"&gt;&lt;title&gt;September 2026: 1,221&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="148.1"&gt;1,221&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="137.1" y2="124.1"/&gt;
&lt;circle cx="276.0" cy="144.1" r="3.5"/&gt;&lt;text x="276.0" y="108.1" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;September 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;1,221&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;September 2026 is preliminary. Census revised July and August with this release.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/HOUST" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Housing starts, last 13 months&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Starts (000s SAAR)&lt;/th&gt;&lt;th class="num"&gt;Change from prior month&lt;/th&gt;&lt;th class="num"&gt;Change from a year earlier&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;September 2025&lt;/td&gt;&lt;td class="num"&gt;1,319&lt;/td&gt;&lt;td class="num"&gt;2.2%&lt;/td&gt;&lt;td class="num"&gt;-2.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;October 2025&lt;/td&gt;&lt;td class="num"&gt;1,273&lt;/td&gt;&lt;td class="num"&gt;-3.5%&lt;/td&gt;&lt;td class="num"&gt;-7.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;November 2025&lt;/td&gt;&lt;td class="num"&gt;1,319&lt;/td&gt;&lt;td class="num"&gt;3.6%&lt;/td&gt;&lt;td class="num"&gt;1.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;December 2025&lt;/td&gt;&lt;td class="num"&gt;1,378&lt;/td&gt;&lt;td class="num"&gt;4.5%&lt;/td&gt;&lt;td class="num"&gt;-7.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;January 2026&lt;/td&gt;&lt;td class="num"&gt;1,385&lt;/td&gt;&lt;td class="num"&gt;0.5%&lt;/td&gt;&lt;td class="num"&gt;2.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;February 2026&lt;/td&gt;&lt;td class="num"&gt;1,346&lt;/td&gt;&lt;td class="num"&gt;-2.8%&lt;/td&gt;&lt;td class="num"&gt;-9.7%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;March 2026&lt;/td&gt;&lt;td class="num"&gt;1,522&lt;/td&gt;&lt;td class="num"&gt;13.1%&lt;/td&gt;&lt;td class="num"&gt;13.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;April 2026&lt;/td&gt;&lt;td class="num"&gt;1,414&lt;/td&gt;&lt;td class="num"&gt;-7.1%&lt;/td&gt;&lt;td class="num"&gt;1.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;May 2026&lt;/td&gt;&lt;td class="num"&gt;1,182&lt;/td&gt;&lt;td class="num"&gt;-16.4%&lt;/td&gt;&lt;td class="num"&gt;-8.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;June 2026&lt;/td&gt;&lt;td class="num"&gt;1,439&lt;/td&gt;&lt;td class="num"&gt;21.7%&lt;/td&gt;&lt;td class="num"&gt;4.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;July 2026&lt;/td&gt;&lt;td class="num"&gt;1,369&lt;/td&gt;&lt;td class="num"&gt;-4.9%&lt;/td&gt;&lt;td class="num"&gt;-4.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;August 2026&lt;/td&gt;&lt;td class="num"&gt;1,288&lt;/td&gt;&lt;td class="num"&gt;-5.9%&lt;/td&gt;&lt;td class="num"&gt;-0.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;September 2026&lt;/td&gt;&lt;td class="num"&gt;1,221&lt;/td&gt;&lt;td class="num"&gt;-5.2%&lt;/td&gt;&lt;td class="num"&gt;-7.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/series/HOUST" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Starts have now declined for three straight months, and the September rate is 15.1% below June&amp;rsquo;s 1,439,000. (June followed May&amp;rsquo;s low with a 21.7% jump, the largest monthly move in the table.)&lt;/p&gt;
&lt;h2 id="what-moved"&gt;What moved&lt;/h2&gt;
&lt;p&gt;The South was the only region where starts rose. Its rate climbed 6.1% to 714,000 and is 11.0% above a year ago, which leaves 58.5% of national starts in that one region. The West fell 23.2% to 235,000 and the Midwest fell 19.0% to 158,000. Northeast starts held at 114,000, which is 30.9% below September 2025.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Housing starts by Census region, thousands of units, SAAR&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Region&lt;/th&gt;&lt;th class="num"&gt;August 2026 (000s SAAR)&lt;/th&gt;&lt;th class="num"&gt;September 2026 (000s SAAR)&lt;/th&gt;&lt;th class="num"&gt;Change from prior month&lt;/th&gt;&lt;th class="num"&gt;September 2025 (000s SAAR)&lt;/th&gt;&lt;th class="num"&gt;Change from a year earlier&lt;/th&gt;&lt;th class="num"&gt;Share of September starts&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Northeast&lt;/td&gt;&lt;td class="num"&gt;114&lt;/td&gt;&lt;td class="num"&gt;114&lt;/td&gt;&lt;td class="num"&gt;0.0%&lt;/td&gt;&lt;td class="num"&gt;165&lt;/td&gt;&lt;td class="num"&gt;-30.9%&lt;/td&gt;&lt;td class="num"&gt;9.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Midwest&lt;/td&gt;&lt;td class="num"&gt;195&lt;/td&gt;&lt;td class="num"&gt;158&lt;/td&gt;&lt;td class="num"&gt;-19.0%&lt;/td&gt;&lt;td class="num"&gt;196&lt;/td&gt;&lt;td class="num"&gt;-19.4%&lt;/td&gt;&lt;td class="num"&gt;12.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;South&lt;/td&gt;&lt;td class="num"&gt;673&lt;/td&gt;&lt;td class="num"&gt;714&lt;/td&gt;&lt;td class="num"&gt;6.1%&lt;/td&gt;&lt;td class="num"&gt;643&lt;/td&gt;&lt;td class="num"&gt;11.0%&lt;/td&gt;&lt;td class="num"&gt;58.5%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;West&lt;/td&gt;&lt;td class="num"&gt;306&lt;/td&gt;&lt;td class="num"&gt;235&lt;/td&gt;&lt;td class="num"&gt;-23.2%&lt;/td&gt;&lt;td class="num"&gt;315&lt;/td&gt;&lt;td class="num"&gt;-25.4%&lt;/td&gt;&lt;td class="num"&gt;19.2%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;United States&lt;/td&gt;&lt;td class="num"&gt;1,288&lt;/td&gt;&lt;td class="num"&gt;1,221&lt;/td&gt;&lt;td class="num"&gt;-5.2%&lt;/td&gt;&lt;td class="num"&gt;1,319&lt;/td&gt;&lt;td class="num"&gt;-7.4%&lt;/td&gt;&lt;td class="num"&gt;100.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/graph/fredgraph.csv?id=HOUST,PERMIT,HOUST1F,HOUST5F,HOUSTNE,HOUSTMW,HOUSTS,HOUSTW,COMPUTSA,UNDCONTSA&amp;amp;cosd=2024-08-01" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;By structure type, single-family starts fell 4.6% to 859,000 and are still 2.6% above September 2025. The annual decline sits in apartments. Starts in buildings with five or more units fell 7.2% from August to 349,000, and they are 25.9% below a year ago. That is 122,000 fewer units at an annual rate, more than the 98,000-unit drop in total starts over the same 12 months.&lt;/p&gt;
&lt;p&gt;Permits for those buildings went the other way. Census counted 503,000 five-plus-unit authorizations in September, up 5.9% from August&amp;rsquo;s 475,000 and 1.0% above a year earlier. Single-family permits fell 4.0% to 845,000. So the release shows multifamily authorizations near last year&amp;rsquo;s level while multifamily groundbreakings sit about a quarter lower. If that spread holds through the fall, the count of permitted apartment projects waiting to start will keep growing. One month of permits does not show whether those projects are delayed or simply early in the queue.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Starts, permits, completions and units under construction by structure type, thousands of units, SAAR&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Measure&lt;/th&gt;&lt;th&gt;Structure type&lt;/th&gt;&lt;th class="num"&gt;August 2026 (000s SAAR)&lt;/th&gt;&lt;th class="num"&gt;September 2026 (000s SAAR)&lt;/th&gt;&lt;th class="num"&gt;Change from prior month&lt;/th&gt;&lt;th class="num"&gt;September 2025 (000s SAAR)&lt;/th&gt;&lt;th class="num"&gt;Change from a year earlier&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Starts&lt;/td&gt;&lt;td&gt;All units&lt;/td&gt;&lt;td class="num"&gt;1,288&lt;/td&gt;&lt;td class="num"&gt;1,221&lt;/td&gt;&lt;td class="num"&gt;-5.2%&lt;/td&gt;&lt;td class="num"&gt;1,319&lt;/td&gt;&lt;td class="num"&gt;-7.4%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Starts&lt;/td&gt;&lt;td&gt;Single-family&lt;/td&gt;&lt;td class="num"&gt;900&lt;/td&gt;&lt;td class="num"&gt;859&lt;/td&gt;&lt;td class="num"&gt;-4.6%&lt;/td&gt;&lt;td class="num"&gt;837&lt;/td&gt;&lt;td class="num"&gt;2.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Starts&lt;/td&gt;&lt;td&gt;5 or more units&lt;/td&gt;&lt;td class="num"&gt;376&lt;/td&gt;&lt;td class="num"&gt;349&lt;/td&gt;&lt;td class="num"&gt;-7.2%&lt;/td&gt;&lt;td class="num"&gt;471&lt;/td&gt;&lt;td class="num"&gt;-25.9%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Permits&lt;/td&gt;&lt;td&gt;All units&lt;/td&gt;&lt;td class="num"&gt;1,403&lt;/td&gt;&lt;td class="num"&gt;1,400&lt;/td&gt;&lt;td class="num"&gt;-0.2%&lt;/td&gt;&lt;td class="num"&gt;1,444&lt;/td&gt;&lt;td class="num"&gt;-3.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Permits&lt;/td&gt;&lt;td&gt;Single-family&lt;/td&gt;&lt;td class="num"&gt;880&lt;/td&gt;&lt;td class="num"&gt;845&lt;/td&gt;&lt;td class="num"&gt;-4.0%&lt;/td&gt;&lt;td class="num"&gt;888&lt;/td&gt;&lt;td class="num"&gt;-4.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Permits&lt;/td&gt;&lt;td&gt;5 or more units&lt;/td&gt;&lt;td class="num"&gt;475&lt;/td&gt;&lt;td class="num"&gt;503&lt;/td&gt;&lt;td class="num"&gt;5.9%&lt;/td&gt;&lt;td class="num"&gt;498&lt;/td&gt;&lt;td class="num"&gt;1.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Completions&lt;/td&gt;&lt;td&gt;All units&lt;/td&gt;&lt;td class="num"&gt;1,166&lt;/td&gt;&lt;td class="num"&gt;1,192&lt;/td&gt;&lt;td class="num"&gt;2.2%&lt;/td&gt;&lt;td class="num"&gt;1,386&lt;/td&gt;&lt;td class="num"&gt;-14.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Under construction&lt;/td&gt;&lt;td&gt;All units&lt;/td&gt;&lt;td class="num"&gt;1,280&lt;/td&gt;&lt;td class="num"&gt;1,280&lt;/td&gt;&lt;td class="num"&gt;0.0%&lt;/td&gt;&lt;td class="num"&gt;1,323&lt;/td&gt;&lt;td class="num"&gt;-3.3%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Under construction&lt;/td&gt;&lt;td&gt;Single-family&lt;/td&gt;&lt;td class="num"&gt;587&lt;/td&gt;&lt;td class="num"&gt;587&lt;/td&gt;&lt;td class="num"&gt;0.0%&lt;/td&gt;&lt;td class="num"&gt;604&lt;/td&gt;&lt;td class="num"&gt;-2.8%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Under construction&lt;/td&gt;&lt;td&gt;5 or more units&lt;/td&gt;&lt;td class="num"&gt;677&lt;/td&gt;&lt;td class="num"&gt;677&lt;/td&gt;&lt;td class="num"&gt;0.0%&lt;/td&gt;&lt;td class="num"&gt;699&lt;/td&gt;&lt;td class="num"&gt;-3.1%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.census.gov/construction/nrc/current/index.html" rel="noopener"&gt;census.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Further down the pipeline, completions rose 2.2% to 1,192,000 but are 14.0% below a year ago. Units under construction held at 1,280,000 for a second month, 3.3% below September 2025.&lt;/p&gt;
&lt;figure class="chart" id="chart-4"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;Permits held near 1.4 million while completions fell&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Privately owned housing units, thousands, SAAR, September 2024 to September 2026&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-4-w-title chart-4-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-4-w-title"&gt;Permits held near 1.4 million while completions fell&lt;/title&gt;
&lt;desc id="chart-4-w-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: Permits, Starts, Completions. Values range from 1,166 to 1,695.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="234.0" y2="234.0"/&gt;&lt;line x1="72" x2="616" y1="162.0" y2="162.0"/&gt;&lt;line x1="72" x2="616" y1="90.0" y2="90.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;1,000&lt;/text&gt;&lt;text x="64" y="237.5" text-anchor="end"&gt;1,200&lt;/text&gt;&lt;text x="64" y="165.5" text-anchor="end"&gt;1,400&lt;/text&gt;&lt;text x="64" y="93.5" text-anchor="end"&gt;1,600&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;1,800&lt;/text&gt;&lt;text x="72.0" y="324" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="185.3" y="324" text-anchor="middle"&gt;2025-02&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;2025-07&lt;/text&gt;&lt;text x="412.0" y="324" text-anchor="middle"&gt;2025-12&lt;/text&gt;&lt;text x="525.3" y="324" text-anchor="middle"&gt;2026-05&lt;/text&gt;&lt;text x="616.0" y="324" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-ctx"&gt;
&lt;path class="line" d="M72.0,154.4 L94.7,149.4 L117.3,121.7 L140.0,137.9 L162.7,139.3 L185.3,145.4 L208.0,128.9 L230.7,145.8 L253.3,156.2 L276.0,162.4 L298.7,162.0 L321.3,181.1 L344.0,146.2 L366.7,155.5 L389.3,157.0 L412.0,132.5 L434.7,164.5 L457.3,111.6 L480.0,175.3 L502.7,153.7 L525.3,158.4 L548.0,171.4 L570.7,150.1 L593.3,160.9 L616.0,162.0"/&gt;
&lt;circle class="end" cx="616.0" cy="162.0" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="154.4" r="9"&gt;&lt;title&gt;September 2024: 1,421&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="149.4" r="9"&gt;&lt;title&gt;October 2024: 1,435&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="121.7" r="9"&gt;&lt;title&gt;November 2024: 1,512&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="137.9" r="9"&gt;&lt;title&gt;December 2024: 1,467&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="139.3" r="9"&gt;&lt;title&gt;January 2025: 1,463&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="145.4" r="9"&gt;&lt;title&gt;February 2025: 1,446&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="128.9" r="9"&gt;&lt;title&gt;March 2025: 1,492&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="145.8" r="9"&gt;&lt;title&gt;April 2025: 1,445&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="156.2" r="9"&gt;&lt;title&gt;May 2025: 1,416&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="162.4" r="9"&gt;&lt;title&gt;June 2025: 1,399&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="162.0" r="9"&gt;&lt;title&gt;July 2025: 1,400&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="181.1" r="9"&gt;&lt;title&gt;August 2025: 1,347&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="146.2" r="9"&gt;&lt;title&gt;September 2025: 1,444&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="155.5" r="9"&gt;&lt;title&gt;October 2025: 1,418&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="157.0" r="9"&gt;&lt;title&gt;November 2025: 1,414&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="132.5" r="9"&gt;&lt;title&gt;December 2025: 1,482&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="164.5" r="9"&gt;&lt;title&gt;January 2026: 1,393&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="111.6" r="9"&gt;&lt;title&gt;February 2026: 1,540&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="175.3" r="9"&gt;&lt;title&gt;March 2026: 1,363&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="153.7" r="9"&gt;&lt;title&gt;April 2026: 1,423&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="158.4" r="9"&gt;&lt;title&gt;May 2026: 1,410&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="171.4" r="9"&gt;&lt;title&gt;June 2026: 1,374&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="150.1" r="9"&gt;&lt;title&gt;July 2026: 1,433&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="160.9" r="9"&gt;&lt;title&gt;August 2026: 1,403&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="162.0" r="9"&gt;&lt;title&gt;September 2026: 1,400&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label label-ctx" x="624.0" y="166.0"&gt;Permits&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-emph"&gt;
&lt;path class="line" d="M72.0,177.5 L94.7,172.8 L117.3,198.0 L140.0,128.2 L162.7,178.9 L185.3,129.2 L208.0,181.4 L230.7,162.0 L253.3,202.0 L276.0,169.6 L298.7,150.5 L321.3,201.2 L344.0,191.2 L366.7,207.7 L389.3,191.2 L412.0,169.9 L434.7,167.4 L457.3,181.4 L480.0,118.1 L502.7,157.0 L525.3,240.5 L548.0,148.0 L570.7,173.2 L593.3,202.3 L616.0,226.4"/&gt;
&lt;circle class="end" cx="616.0" cy="226.4" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="177.5" r="9"&gt;&lt;title&gt;September 2024: 1,357&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="172.8" r="9"&gt;&lt;title&gt;October 2024: 1,370&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="198.0" r="9"&gt;&lt;title&gt;November 2024: 1,300&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="128.2" r="9"&gt;&lt;title&gt;December 2024: 1,494&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="178.9" r="9"&gt;&lt;title&gt;January 2025: 1,353&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="129.2" r="9"&gt;&lt;title&gt;February 2025: 1,491&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="181.4" r="9"&gt;&lt;title&gt;March 2025: 1,346&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="162.0" r="9"&gt;&lt;title&gt;April 2025: 1,400&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="202.0" r="9"&gt;&lt;title&gt;May 2025: 1,289&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="169.6" r="9"&gt;&lt;title&gt;June 2025: 1,379&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="150.5" r="9"&gt;&lt;title&gt;July 2025: 1,432&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="201.2" r="9"&gt;&lt;title&gt;August 2025: 1,291&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="191.2" r="9"&gt;&lt;title&gt;September 2025: 1,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="207.7" r="9"&gt;&lt;title&gt;October 2025: 1,273&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="191.2" r="9"&gt;&lt;title&gt;November 2025: 1,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="169.9" r="9"&gt;&lt;title&gt;December 2025: 1,378&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="167.4" r="9"&gt;&lt;title&gt;January 2026: 1,385&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="181.4" r="9"&gt;&lt;title&gt;February 2026: 1,346&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="118.1" r="9"&gt;&lt;title&gt;March 2026: 1,522&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="157.0" r="9"&gt;&lt;title&gt;April 2026: 1,414&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="240.5" r="9"&gt;&lt;title&gt;May 2026: 1,182&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="148.0" r="9"&gt;&lt;title&gt;June 2026: 1,439&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="173.2" r="9"&gt;&lt;title&gt;July 2026: 1,369&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="202.3" r="9"&gt;&lt;title&gt;August 2026: 1,288&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="226.4" r="9"&gt;&lt;title&gt;September 2026: 1,221&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="624.0" y="230.4"&gt;1,221&lt;/text&gt;
&lt;text class="label label-name" x="624.0" y="243.4"&gt;Starts&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-ctx"&gt;
&lt;path class="line" d="M72.0,55.8 L94.7,70.9 L117.3,89.3 L140.0,116.6 L162.7,72.7 L185.3,102.6 L208.0,95.8 L230.7,133.6 L253.3,115.2 L276.0,172.1 L298.7,141.8 L321.3,108.7 L344.0,167.0 L366.7,155.2 L389.3,146.5 L412.0,139.3 L434.7,148.0 L457.3,189.4 L480.0,171.7 L502.7,142.6 L525.3,187.9 L548.0,181.8 L570.7,204.1 L593.3,246.2 L616.0,236.9"/&gt;
&lt;circle class="end" cx="616.0" cy="236.9" r="4"/&gt;
&lt;circle class="hit" cx="72.0" cy="55.8" r="9"&gt;&lt;title&gt;September 2024: 1,695&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="94.7" cy="70.9" r="9"&gt;&lt;title&gt;October 2024: 1,653&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="117.3" cy="89.3" r="9"&gt;&lt;title&gt;November 2024: 1,602&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="140.0" cy="116.6" r="9"&gt;&lt;title&gt;December 2024: 1,526&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="162.7" cy="72.7" r="9"&gt;&lt;title&gt;January 2025: 1,648&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="185.3" cy="102.6" r="9"&gt;&lt;title&gt;February 2025: 1,565&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="208.0" cy="95.8" r="9"&gt;&lt;title&gt;March 2025: 1,584&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="230.7" cy="133.6" r="9"&gt;&lt;title&gt;April 2025: 1,479&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="253.3" cy="115.2" r="9"&gt;&lt;title&gt;May 2025: 1,530&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="172.1" r="9"&gt;&lt;title&gt;June 2025: 1,372&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="298.7" cy="141.8" r="9"&gt;&lt;title&gt;July 2025: 1,456&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="321.3" cy="108.7" r="9"&gt;&lt;title&gt;August 2025: 1,548&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="344.0" cy="167.0" r="9"&gt;&lt;title&gt;September 2025: 1,386&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="366.7" cy="155.2" r="9"&gt;&lt;title&gt;October 2025: 1,419&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="389.3" cy="146.5" r="9"&gt;&lt;title&gt;November 2025: 1,443&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="412.0" cy="139.3" r="9"&gt;&lt;title&gt;December 2025: 1,463&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="434.7" cy="148.0" r="9"&gt;&lt;title&gt;January 2026: 1,439&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="457.3" cy="189.4" r="9"&gt;&lt;title&gt;February 2026: 1,324&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="480.0" cy="171.7" r="9"&gt;&lt;title&gt;March 2026: 1,373&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="502.7" cy="142.6" r="9"&gt;&lt;title&gt;April 2026: 1,454&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="525.3" cy="187.9" r="9"&gt;&lt;title&gt;May 2026: 1,328&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="548.0" cy="181.8" r="9"&gt;&lt;title&gt;June 2026: 1,345&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="570.7" cy="204.1" r="9"&gt;&lt;title&gt;July 2026: 1,283&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="593.3" cy="246.2" r="9"&gt;&lt;title&gt;August 2026: 1,166&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="616.0" cy="236.9" r="9"&gt;&lt;title&gt;September 2026: 1,192&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label label-ctx" x="624.0" y="240.9"&gt;Completions&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="616.0" x2="616.0" y1="219.4" y2="206.4"/&gt;
&lt;circle cx="616.0" cy="226.4" r="3.5"/&gt;&lt;text x="616.0" y="202.4" text-anchor="end"&gt;September 2026, 1,221&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-4-n-title chart-4-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-4-n-title"&gt;Permits held near 1.4 million while completions fell&lt;/title&gt;
&lt;desc id="chart-4-n-desc"&gt;Line chart with 25 points from September 2024 to September 2026. Series: Permits, Starts, Completions. Values range from 1,166 to 1,695.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="168.5" y2="168.5"/&gt;&lt;line x1="50" x2="276" y1="117.0" y2="117.0"/&gt;&lt;line x1="50" x2="276" y1="65.5" y2="65.5"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;1,000&lt;/text&gt;&lt;text x="42" y="172.0" text-anchor="end"&gt;1,200&lt;/text&gt;&lt;text x="42" y="120.5" text-anchor="end"&gt;1,400&lt;/text&gt;&lt;text x="42" y="69.0" text-anchor="end"&gt;1,600&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;1,800&lt;/text&gt;&lt;text x="50.0" y="237" text-anchor="start"&gt;2024-09&lt;/text&gt;&lt;text x="163.0" y="237" text-anchor="middle"&gt;2025-09&lt;/text&gt;&lt;text x="276.0" y="237" text-anchor="end"&gt;2026-09&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-ctx"&gt;
&lt;path class="line" d="M50.0,111.6 L59.4,108.0 L68.8,88.2 L78.2,99.7 L87.7,100.8 L97.1,105.2 L106.5,93.3 L115.9,105.4 L125.3,112.9 L134.8,117.3 L144.2,117.0 L153.6,130.6 L163.0,105.7 L172.4,112.4 L181.8,113.4 L191.2,95.9 L200.7,118.8 L210.1,81.0 L219.5,126.5 L228.9,111.1 L238.3,114.4 L247.8,123.7 L257.2,108.5 L266.6,116.2 L276.0,117.0"/&gt;
&lt;circle class="end" cx="276.0" cy="117.0" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="111.6" r="9"&gt;&lt;title&gt;September 2024: 1,421&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="108.0" r="9"&gt;&lt;title&gt;October 2024: 1,435&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="88.2" r="9"&gt;&lt;title&gt;November 2024: 1,512&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="99.7" r="9"&gt;&lt;title&gt;December 2024: 1,467&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="100.8" r="9"&gt;&lt;title&gt;January 2025: 1,463&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="105.2" r="9"&gt;&lt;title&gt;February 2025: 1,446&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="93.3" r="9"&gt;&lt;title&gt;March 2025: 1,492&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="105.4" r="9"&gt;&lt;title&gt;April 2025: 1,445&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="112.9" r="9"&gt;&lt;title&gt;May 2025: 1,416&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="117.3" r="9"&gt;&lt;title&gt;June 2025: 1,399&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="117.0" r="9"&gt;&lt;title&gt;July 2025: 1,400&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="130.6" r="9"&gt;&lt;title&gt;August 2025: 1,347&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="105.7" r="9"&gt;&lt;title&gt;September 2025: 1,444&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="112.4" r="9"&gt;&lt;title&gt;October 2025: 1,418&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="113.4" r="9"&gt;&lt;title&gt;November 2025: 1,414&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="95.9" r="9"&gt;&lt;title&gt;December 2025: 1,482&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="118.8" r="9"&gt;&lt;title&gt;January 2026: 1,393&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="81.0" r="9"&gt;&lt;title&gt;February 2026: 1,540&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="126.5" r="9"&gt;&lt;title&gt;March 2026: 1,363&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="111.1" r="9"&gt;&lt;title&gt;April 2026: 1,423&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="114.4" r="9"&gt;&lt;title&gt;May 2026: 1,410&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="123.7" r="9"&gt;&lt;title&gt;June 2026: 1,374&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="108.5" r="9"&gt;&lt;title&gt;July 2026: 1,433&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="116.2" r="9"&gt;&lt;title&gt;August 2026: 1,403&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="117.0" r="9"&gt;&lt;title&gt;September 2026: 1,400&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label label-ctx" x="284.0" y="121.0"&gt;Permits&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-emph"&gt;
&lt;path class="line" d="M50.0,128.1 L59.4,124.7 L68.8,142.8 L78.2,92.8 L87.7,129.1 L97.1,93.6 L106.5,130.9 L115.9,117.0 L125.3,145.6 L134.8,122.4 L144.2,108.8 L153.6,145.1 L163.0,137.9 L172.4,149.7 L181.8,137.9 L191.2,122.7 L200.7,120.9 L210.1,130.9 L219.5,85.6 L228.9,113.4 L238.3,173.1 L247.8,107.0 L257.2,125.0 L266.6,145.8 L276.0,163.1"/&gt;
&lt;circle class="end" cx="276.0" cy="163.1" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="128.1" r="9"&gt;&lt;title&gt;September 2024: 1,357&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="124.7" r="9"&gt;&lt;title&gt;October 2024: 1,370&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="142.8" r="9"&gt;&lt;title&gt;November 2024: 1,300&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="92.8" r="9"&gt;&lt;title&gt;December 2024: 1,494&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="129.1" r="9"&gt;&lt;title&gt;January 2025: 1,353&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="93.6" r="9"&gt;&lt;title&gt;February 2025: 1,491&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="130.9" r="9"&gt;&lt;title&gt;March 2025: 1,346&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="117.0" r="9"&gt;&lt;title&gt;April 2025: 1,400&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="145.6" r="9"&gt;&lt;title&gt;May 2025: 1,289&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="122.4" r="9"&gt;&lt;title&gt;June 2025: 1,379&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="108.8" r="9"&gt;&lt;title&gt;July 2025: 1,432&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="145.1" r="9"&gt;&lt;title&gt;August 2025: 1,291&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="137.9" r="9"&gt;&lt;title&gt;September 2025: 1,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="149.7" r="9"&gt;&lt;title&gt;October 2025: 1,273&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="137.9" r="9"&gt;&lt;title&gt;November 2025: 1,319&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="122.7" r="9"&gt;&lt;title&gt;December 2025: 1,378&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="120.9" r="9"&gt;&lt;title&gt;January 2026: 1,385&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="130.9" r="9"&gt;&lt;title&gt;February 2026: 1,346&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="85.6" r="9"&gt;&lt;title&gt;March 2026: 1,522&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="113.4" r="9"&gt;&lt;title&gt;April 2026: 1,414&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="173.1" r="9"&gt;&lt;title&gt;May 2026: 1,182&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="107.0" r="9"&gt;&lt;title&gt;June 2026: 1,439&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="125.0" r="9"&gt;&lt;title&gt;July 2026: 1,369&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="145.8" r="9"&gt;&lt;title&gt;August 2026: 1,288&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="163.1" r="9"&gt;&lt;title&gt;September 2026: 1,221&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label" x="284.0" y="167.1"&gt;1,221&lt;/text&gt;
&lt;text class="label label-name" x="284.0" y="180.1"&gt;Starts&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s-ctx"&gt;
&lt;path class="line" d="M50.0,41.0 L59.4,51.9 L68.8,65.0 L78.2,84.6 L87.7,53.1 L97.1,74.5 L106.5,69.6 L115.9,96.7 L125.3,83.5 L134.8,124.2 L144.2,102.6 L153.6,78.9 L163.0,120.6 L172.4,112.1 L181.8,105.9 L191.2,100.8 L200.7,107.0 L210.1,136.6 L219.5,124.0 L228.9,103.1 L238.3,135.5 L247.8,131.2 L257.2,147.1 L266.6,177.3 L276.0,170.6"/&gt;
&lt;circle class="end" cx="276.0" cy="170.6" r="4"/&gt;
&lt;circle class="hit" cx="50.0" cy="41.0" r="9"&gt;&lt;title&gt;September 2024: 1,695&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="59.4" cy="51.9" r="9"&gt;&lt;title&gt;October 2024: 1,653&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="68.8" cy="65.0" r="9"&gt;&lt;title&gt;November 2024: 1,602&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="78.2" cy="84.6" r="9"&gt;&lt;title&gt;December 2024: 1,526&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="87.7" cy="53.1" r="9"&gt;&lt;title&gt;January 2025: 1,648&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="97.1" cy="74.5" r="9"&gt;&lt;title&gt;February 2025: 1,565&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="106.5" cy="69.6" r="9"&gt;&lt;title&gt;March 2025: 1,584&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="115.9" cy="96.7" r="9"&gt;&lt;title&gt;April 2025: 1,479&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="125.3" cy="83.5" r="9"&gt;&lt;title&gt;May 2025: 1,530&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="134.8" cy="124.2" r="9"&gt;&lt;title&gt;June 2025: 1,372&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="144.2" cy="102.6" r="9"&gt;&lt;title&gt;July 2025: 1,456&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="153.6" cy="78.9" r="9"&gt;&lt;title&gt;August 2025: 1,548&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="163.0" cy="120.6" r="9"&gt;&lt;title&gt;September 2025: 1,386&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="172.4" cy="112.1" r="9"&gt;&lt;title&gt;October 2025: 1,419&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="181.8" cy="105.9" r="9"&gt;&lt;title&gt;November 2025: 1,443&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="191.2" cy="100.8" r="9"&gt;&lt;title&gt;December 2025: 1,463&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="200.7" cy="107.0" r="9"&gt;&lt;title&gt;January 2026: 1,439&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="210.1" cy="136.6" r="9"&gt;&lt;title&gt;February 2026: 1,324&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="219.5" cy="124.0" r="9"&gt;&lt;title&gt;March 2026: 1,373&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="228.9" cy="103.1" r="9"&gt;&lt;title&gt;April 2026: 1,454&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="238.3" cy="135.5" r="9"&gt;&lt;title&gt;May 2026: 1,328&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="247.8" cy="131.2" r="9"&gt;&lt;title&gt;June 2026: 1,345&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="257.2" cy="147.1" r="9"&gt;&lt;title&gt;July 2026: 1,283&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="266.6" cy="177.3" r="9"&gt;&lt;title&gt;August 2026: 1,166&lt;/title&gt;&lt;/circle&gt;&lt;circle class="hit" cx="276.0" cy="170.6" r="9"&gt;&lt;title&gt;September 2026: 1,192&lt;/title&gt;&lt;/circle&gt;
&lt;text class="label label-ctx" x="284.0" y="174.6"&gt;Completions&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="276.0" x2="276.0" y1="156.1" y2="143.1"/&gt;
&lt;circle cx="276.0" cy="163.1" r="3.5"/&gt;&lt;text x="276.0" y="127.1" text-anchor="end"&gt;&lt;tspan x="276.0"&gt;September 2026&lt;/tspan&gt;&lt;tspan x="276.0" dy="12"&gt;1,221&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;Census data published on FRED (PERMIT, HOUST, COMPUTSA, UNDCONTSA). September 2026 is preliminary.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://fred.stlouisfed.org/graph/fredgraph.csv?id=HOUST,PERMIT,HOUST1F,HOUST5F,HOUSTNE,HOUSTMW,HOUSTS,HOUSTW,COMPUTSA,UNDCONTSA&amp;amp;cosd=2024-08-01" rel="noopener"&gt;fred.stlouisfed.org&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="how-to-use-this-number"&gt;How to use this number&lt;/h2&gt;
&lt;p&gt;Start with the regional line that matches your backlog. A site or framing contractor in the South saw starts rise 6.1% in September even as the national rate fell. In the West and Midwest, the drops of 23.2% and 19.0% were more than three times the national figure. Put your residential bid invitations by month next to your region&amp;rsquo;s starts for the last 13 months. If your invitations fell less than regional starts, you are holding share of a smaller market. A steeper fall in invitations than in starts points to your own pipeline, and that belongs in your &lt;a href="https://constructionmetrics.com/2026/09/28/compute-backlog-in-months-abc-indicator/"&gt;backlog-in-months calculation&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;Anyway, multifamily trades should watch the five-plus permit line as closely as starts. Starts describe work reaching the ground now, while permits describe work that has cleared approval and may still be months from mobilization. A concrete, framing or MEP subcontractor can keep a list of multifamily projects in preconstruction that have permits in hand but no start date. If that list grows while the national five-plus starts stay near 349,000, your experience matches the release. The &lt;a href="https://constructionmetrics.com/2026/09/24/census-revises-august-building-permits/"&gt;August permits post&lt;/a&gt; has the regional permit detail for the month before.&lt;/p&gt;
&lt;h2 id="revisions-and-caveats"&gt;Revisions and caveats&lt;/h2&gt;
&lt;p&gt;September&amp;rsquo;s figures are preliminary, and this release revised the two months before it:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;July starts moved from 1,309,000 to 1,369,000, up 60,000 or 4.6%.&lt;/li&gt;
&lt;li&gt;August starts moved from 1,275,000 to 1,288,000, up 13,000 or 1.0%.&lt;/li&gt;
&lt;li&gt;With the higher July base, August&amp;rsquo;s monthly decline is now 5.9%. The earlier estimates showed a 2.6% decline.&lt;/li&gt;
&lt;/ol&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Revisions to housing starts in the October 20 release&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Month&lt;/th&gt;&lt;th class="num"&gt;Estimate before the October 20 release (000s SAAR)&lt;/th&gt;&lt;th class="num"&gt;Estimate in the October 20 release (000s SAAR)&lt;/th&gt;&lt;th class="num"&gt;Revision (000s)&lt;/th&gt;&lt;th class="num"&gt;Revision (percent)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;July 2026&lt;/td&gt;&lt;td class="num"&gt;1,309&lt;/td&gt;&lt;td class="num"&gt;1,369&lt;/td&gt;&lt;td class="num"&gt;60&lt;/td&gt;&lt;td class="num"&gt;4.6%&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;August 2026&lt;/td&gt;&lt;td class="num"&gt;1,275&lt;/td&gt;&lt;td class="num"&gt;1,288&lt;/td&gt;&lt;td class="num"&gt;13&lt;/td&gt;&lt;td class="num"&gt;1.0%&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://alfred.stlouisfed.org/graph/alfredgraph.csv?id=HOUST&amp;amp;vintage_date=2026-10-19&amp;amp;cosd=2024-08-01" rel="noopener"&gt;alfred.stlouisfed.org&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;Starts come from a sample survey, and Census prints a range beside each change. The 5.2% monthly decline carries a range of plus or minus 11.8%, and the 7.4% annual decline carries plus or minus 11.5%. Both ranges include zero, so this sample cannot tell either change apart from no change at all. The same holds for the 4.6% single-family decline (plus or minus 10.0%). The 14.0% annual drop in completions, at plus or minus 11.1%, is the one change in the release text whose range excludes zero. The permit figures carry no range in the release.&lt;/p&gt;
&lt;p&gt;Regional estimates draw on smaller slices of the same sample. A one-month swing such as the West&amp;rsquo;s 23.2% drop deserves a second month of data before it changes a staffing or bidding decision.&lt;/p&gt;</content:encoded></item><item><title>How to measure RFI turnaround before an AI pilot, with a 10-RFI example</title><link>https://constructionmetrics.com/2026/10/20/measure-rfi-turnaround-before-ai-pilot/</link><pubDate>Tue, 20 Oct 2026 07:38:59 -0400</pubDate><guid isPermaLink="true">https://constructionmetrics.com/2026/10/20/measure-rfi-turnaround-before-ai-pilot/</guid><category>AI</category><description>Logging drafting days and answer days for each RFI gives a baseline to test an AI RFI tool against. This example works through a 10-RFI log.</description><content:encoded>&lt;p&gt;A project engineer gets a question from the drywall foreman about a soffit detail that doesn&amp;rsquo;t match the reflected ceiling plan. The engineer checks the drawings and the specs, writes the RFI, attaches a marked-up sheet and sends it to the architect. Days later the answer comes back and goes out to the field. AI tools for RFIs work on both halves of that sequence, so a contractor who wants to test one needs a record of how long each half takes today.&lt;/p&gt;
&lt;p&gt;This post sets up that record. It uses the definitions and benchmarks in a 2013 research paper from the Navigant Construction Forum, which the Construction Management Association of America hosts, and the settings in Procore&amp;rsquo;s RFI tool.&lt;/p&gt;
&lt;h2 id="the-definitions"&gt;The definitions&lt;/h2&gt;
&lt;p&gt;Navigant defines an RFI as a written request from the contractor asking the owner to interpret or clarify a requirement of the contract documents. Its sample contract clause asks the contractor to state the issue, why and when a response is needed, and the contractor&amp;rsquo;s own reading of the requirement.&lt;/p&gt;
&lt;p&gt;The same clause starts the response clock on the date the owner stamps the RFI received from the contractor and stops it on the date the response is stamped out to the contractor. The sample allows 10 working days. A footnote warns owners to say &amp;ldquo;working days&amp;rdquo; when they mean it, because most contracts count calendar days.&lt;/p&gt;
&lt;p&gt;Procore&amp;rsquo;s RFI tool asks an administrator to set how many calendar days after creation an RFI is due, and it sends overdue email notices to assignees. Procore also tracks which party has the ball in court on each open RFI.&lt;/p&gt;
&lt;h2 id="what-the-published-benchmarks-show"&gt;What the published benchmarks show&lt;/h2&gt;
&lt;p&gt;Navigant&amp;rsquo;s figures come from Aconex, which mined its records for 1,362 projects begun between 2001 and 2012. Each project had at least 100 RFIs, and together they logged 1,083,807 RFIs, an average of 796 per project. About 79% of the projects were in Australia and New Zealand, and 29 were in the Americas, so the averages describe that mix.&lt;/p&gt;
&lt;p&gt;Across the sample, the average first reply took 6.4 days and the median reply took 9.7 days. A median is the middle value once the RFIs are sorted by time, so one RFI that waits two months for a structural engineer moves it far less than it moves the average. Projects of one year or less had a median reply of 7 days. Projects of two years or more ran close to 10.&lt;/p&gt;
&lt;p&gt;On cost, Navigant&amp;rsquo;s estimate came from interviews with three US design and construction management firms. They put the typical RFI at about 8 hours to receive, log, review and answer, and Navigant priced that at an average of $1,080 per RFI.&lt;/p&gt;
&lt;p&gt;The paper&amp;rsquo;s case study shows why the RFI log needs categories. A claim on a wastewater treatment plant laboratory cited about 4,000 RFIs. About 800 turned out to be repeats of questions already answered, and about 300 were answered the day they arrived by pointing to a specification section, drawing or detail.&lt;/p&gt;
&lt;h2 id="where-an-ai-tool-would-show-up"&gt;Where an AI tool would show up&lt;/h2&gt;
&lt;p&gt;Procore&amp;rsquo;s Draft RFI with AI feature, in beta, shows the two places a tool can act. The user types the question and any cost or schedule impact, and the feature suggests a subject, a question, a cost impact and a schedule impact. A second step searches the project documents for information that could answer the question, which Procore says helps the user see whether the question has already been answered.&lt;/p&gt;
&lt;p&gt;Suggested wording saves the project engineer drafting time. The document search can stop some RFIs from reaching the architect. The design team&amp;rsquo;s answer time sits outside both steps, so a pilot of a drafting tool should be measured on the contractor&amp;rsquo;s side of the clock. Tools that review drawings before the RFI stage, such as &lt;a href="https://constructionmetrics.com/2026/10/07/buildcheck-raises-12-million-ai-drawing-review/"&gt;Buildcheck&lt;/a&gt; and &lt;a href="https://constructionmetrics.com/2026/10/13/upcodes-ai-plan-review-180000-issues/"&gt;UpCodes&lt;/a&gt;, would show up in the count of RFIs per million dollars of work.&lt;/p&gt;
&lt;h2 id="how-to-measure-it-on-your-projects"&gt;How to measure it on your projects&lt;/h2&gt;
&lt;p&gt;Track three intervals for every RFI, in calendar days unless your contract counts working days:&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Days to draft: from the date the question reached the project engineer to the date the RFI was submitted.&lt;/li&gt;
&lt;li&gt;Days to answer: from submission to the date the response came back, the interval Navigant&amp;rsquo;s clause measures.&lt;/li&gt;
&lt;li&gt;Total days: from the question to the answer reaching the field.&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Add a category to each RFI. Navigant&amp;rsquo;s list for an RFI coordinator includes &amp;ldquo;answered by reference to specification or drawing&amp;rdquo; and &amp;ldquo;previously asked and responded to.&amp;rdquo; Those two categories count the questions a document search might have answered before submission.&lt;/p&gt;
&lt;h3 id="a-worked-example"&gt;A worked example&lt;/h3&gt;
&lt;p&gt;The figures below are an example with round numbers. A general contractor exports 10 closed RFIs from one job, adds the date each question first came in from the field, and assigns a category. The contract allows 10 calendar days for a response.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Example RFI log, 10 closed RFIs from one job (illustrative figures)&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th class="num"&gt;RFI&lt;/th&gt;&lt;th&gt;Category&lt;/th&gt;&lt;th class="num"&gt;Days to draft&lt;/th&gt;&lt;th class="num"&gt;Days to answer&lt;/th&gt;&lt;th class="num"&gt;Total days&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td class="num"&gt;001&lt;/td&gt;&lt;td&gt;Design clarification&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;6&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;002&lt;/td&gt;&lt;td&gt;Answered by reference to documents&lt;/td&gt;&lt;td class="num"&gt;1&lt;/td&gt;&lt;td class="num"&gt;1&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;003&lt;/td&gt;&lt;td&gt;Incomplete plans or specs&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;12&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;004&lt;/td&gt;&lt;td&gt;Design coordination&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;9&lt;/td&gt;&lt;td class="num"&gt;11&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;005&lt;/td&gt;&lt;td&gt;Answered by reference to documents&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;006&lt;/td&gt;&lt;td&gt;Differing site condition&lt;/td&gt;&lt;td class="num"&gt;1&lt;/td&gt;&lt;td class="num"&gt;14&lt;/td&gt;&lt;td class="num"&gt;15&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;007&lt;/td&gt;&lt;td&gt;Design clarification&lt;/td&gt;&lt;td class="num"&gt;4&lt;/td&gt;&lt;td class="num"&gt;7&lt;/td&gt;&lt;td class="num"&gt;11&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;008&lt;/td&gt;&lt;td&gt;Previously asked and answered&lt;/td&gt;&lt;td class="num"&gt;1&lt;/td&gt;&lt;td class="num"&gt;1&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;009&lt;/td&gt;&lt;td&gt;Constructability&lt;/td&gt;&lt;td class="num"&gt;2&lt;/td&gt;&lt;td class="num"&gt;10&lt;/td&gt;&lt;td class="num"&gt;12&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;010&lt;/td&gt;&lt;td&gt;Design clarification&lt;/td&gt;&lt;td class="num"&gt;3&lt;/td&gt;&lt;td class="num"&gt;8&lt;/td&gt;&lt;td class="num"&gt;11&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Example baseline computed from the log above (illustrative figures)&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Measure&lt;/th&gt;&lt;th class="num"&gt;Example baseline&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Median days to draft&lt;/td&gt;&lt;td class="num"&gt;2.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Median days to answer&lt;/td&gt;&lt;td class="num"&gt;7.5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Mean days to answer&lt;/td&gt;&lt;td class="num"&gt;7.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Median total days&lt;/td&gt;&lt;td class="num"&gt;11.0&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;RFIs answered past the 10-day contract time (%)&lt;/td&gt;&lt;td class="num"&gt;20&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;RFIs answered from existing documents (%)&lt;/td&gt;&lt;td class="num"&gt;30&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;/figure&gt;
&lt;p&gt;Days to answer has a median of 7.5 and a mean of 7.0. Two RFIs, the incomplete-spec question at 12 days and the site condition at 14, ran past the 10-day contract time. Three of the 10, or 30%, were answered from the existing documents, and those three account for 4 of the 21 drafting days and 4 of the 70 answer days.&lt;/p&gt;
&lt;p&gt;If a drafting tool cut the median days to draft from 2 to 1, the typical RFI would reach the architect about a day sooner. If its document search caught the three RFIs answered from the documents before they went out, the architect would receive 7 RFIs. Navigant&amp;rsquo;s estimate of $1,080 per RFI is a 2013 figure from three firms, so price your own review hours before carrying it into a pilot budget.&lt;/p&gt;
&lt;p&gt;Answer days depend on the design team, so a change in the architect&amp;rsquo;s staffing can move them during a pilot. RFI volume follows the job too: Navigant reports that projects of five years or more averaged slightly more than 1,400 RFIs, against 270 for projects of a year or less. Compare months at a similar stage of the work, or use a second job of similar size as a control.&lt;/p&gt;
&lt;aside class="note"&gt;Use the median for days in the summary. A few RFIs that wait weeks for a consultant can raise the mean by several days while most RFIs move at the usual pace.&lt;/aside&gt;
&lt;p&gt;RFIs that are late on activities with little float carry the schedule risk. The &lt;a href="https://constructionmetrics.com/2026/10/12/track-total-float-across-schedule-updates/"&gt;total float log&lt;/a&gt; shows which activities those are, and Navigant&amp;rsquo;s best practices ask contractors to submit RFIs at least 10 days before the response is needed.&lt;/p&gt;
&lt;p&gt;Start with one active job. Export the closed RFIs from the last three months, add the date each question first came in from the field, assign a category, and compute the median of each interval before anyone turns on the new tool.&lt;/p&gt;</content:encoded></item></channel></rss>